1 Shortlist of projects
2 Client: Provincia di Roma Assignment: Detailed design inside the PRUSST asse Tiburtino Nodo di Ponte Lucano Team members: VIA Ingegneria srl Mission: Preliminary design-build contract including the Study of Environamental assessment General plan Location: Villa Adriana, Tivoli (RM) Year of implementation: Construction cost: Progress: Ongoing contract Design phase completed Section through the viduct on the Aniene river Plauti s mausoleum Villa Adriana Archeologic zone Elevation of the viduct on the Aniene river Ponte Lucano, Villa Adriana Tivoli (RM)
3 3D visual 3D visual Project description: The intervention in implementing the project connecting Maremmana - Tiburtina through the creation of a new bridge on the Aniene 313.0me of a split-level junction, achieving the target of a link with no points of conflict and away from the town. The route embraces three operations described in PRUSST, GT4-11 GT - GT12. A pr the path of the project exceeds the Fosso Scalette, in the section in which these discharging into River Aniene, with a bridge single span of length equal to m. The project involves the simultaneous reprofiling of the bed of the Pit ladders, just upstream of crossing that emerges after a long stretch tombato, and the establishment of appropriate bank protection works with mattresses like "Reno" and their subsequent re-naturation. Ponte Lucano, Villa Adriana Tivoli (RM)
4 Client: ANAS SPA (client) /ING. PAVESI & C SPA (contractor) Assignement: Design and Build of the new road 284 Western-Etnea Team members: Ing. Pavesi & C SPA (main contractor), team: Cogip SPA, Franco Giuseppe SrL, Nuova Costruzione Siciliana COOP. A. R. L. Mission: Detailed design (structural and hydraulic) Location: Bronte (CT), Italy Year of implementation: 2009 Construction cost: Progress: Works in progress Detailed design completed and approved General plan Section through the Madonna della Vena viaduct Section on pillars Viadotto Madonna della Vena Bronte (CT)
5 Environmental impact of the Madonna della Vena viaduct Project description: The viaduct is composed of 6 spans a total length of 270 m, measured on axis supports shoulders. The deck is in steel-concrete composite structures, consisting of two steel beams of variable height between 1.50 m at the centerline and at the supports of the ends of compact board, and 2.40 m to intermediate supports. The beams are arranged at intervals of 8.0 ft above the base solid completion in a total thickness equal to 0.31 m. The lattice of deck beams shall be supplemented by longitudinal and transverse pin positions on the span and at the alignment of support. The static scheme, with reference to vertical loads, is of the continuous beam of more spans. The diagram of constraint of the deck provides at each alignment support the use of elastomeric isolators able to ensure a coefficient of viscous damping at least equal to 15%. These insulators will be characterized by high vertical stiffness at least equal to 800 times the horizontal stiffness. View of the building phase of the Madonna della Vena viaduct Perspective of the Madonna della Vena viaduct Viadotto Madonna della Vena Bronte (CT)
6 Images of the open site of the Madonna della Vena viaduct Viadotto Madonna della Vena Bronte (CT)
7 Project description: The viaduct consists of 3 spans a total length of meters, measured in the lean-back axis. Characteristic of the work are the side spans of light greatly reduced compared to the central span. The set consisting of each span of the edge and the shoulder allows to realize a constraint "snap" to the central span consequently reducing the stresses due to the actions agents. It follows that the two ends of the bridge remain subject to tension for any load condition. The transmission of the relevant traction stresses behind will be through a particular system of anchoring in metal structural work. The deck is a steel-concrete composite structures. General plan Elevation of the details of the deck Details Long section through the viaduct Viadotto Ciapparo Bronte (CT)
8 Images of the open site of the Ciapparo viaduct Viadotto del Ciapparo Bronte (CT)
9 Client: ANAS SPA 3D view of the model Assignement: Design of the new road and viaduct leading to La Spezia Completamento del Lotto 2 Team members: VIA ingegneria SrL Mission: Detailed design (structural and hydraulic) Location: La Spezia (SP), Italy Year of implementation: 2011 Progress: Tender stage ongoing Detailed design completed Contact: COGIP SpA via Trinacria 15 Tremestieri Etneo (CT) Project description: The metal core is made with tubular steel elements in "COR.TEN", to provide intermediate support to the deck structures. It is a three-dimensional structure, with tubes inclined in two directions which tend to converge at the top, connected below the plane of the deck by cross-members, always made with tubular elements, which constitute the intermediate supports of the main beams, and in the direction longitudinal members by two other tubular elements to stabilize the structure in this direction. It follows that the deck, with an overall length axes in support of 60 m, is divided into three bays of light equal to 15 m for spans of 30 m to the edge and center. The deck is provided with a composite steel-concrete section. General plan 3D view of the model Variante all abitato di La Spezia, Lotto 2 La Spezia
10 Client: PENTAPOLI SCARL Assignement: Detailed design of the third roadway on the road between North Rimini and Pedaso Team members: VIA ingegneria SrL Mission: Detailed design (structural and hydraulic) Location: Cesi (MO), Italy Year of implementation: 2010 Progress: Tender stage ongoing Detailed design in progress Cesi viaduct plan Long section through the Cesi viaduct Viadotto di Cesi Rimini (RI)
11 Long section through the back deck Project description: The viaduct is planned as part of expansion work to the third lane of the Catholic - Fano A14 motorway. It consists of 3 spans a total length of 166 m, measured on axis supports shoulders. The deck is in steel-concrete composite structures, consisting of two steel beams of constant height equal to 3.40 m, placed at a center distance of me connected by transverse load-bearing core filled with a distance of 6.0 m (4.0 m in adjacency to the backing stack). A longitudinal beam plug is the main pillar of the slab. The changes have sidelightequalto2.80m. The slab is complete reinforced concrete and has a total thickness equal to 0.29 m and is connected to the beams by means of pegs Nelson. It is provided the use of prefabricated self-supporting slabs (predalles) with bottom metal sheet 5 mm thick woven in the transverse direction. The static scheme, with reference to vertical loads, is of the continuous beam of more spans. Joint details Short sections through the viaduct Viadotto di Cesi Rimini (RI)
12 Client: Comune di Tivoli Assignment: Feasibility study (environmental, technical and economic) of the Monteripoli Tunnel Team members: VIA Ingegneria SrL Mission: Detailed design (structural and hydraulic) Location: Tivoli (RM), Italy Year of implementation: 2008 Progress: Tender stage ongoing Detailed design completed General plan Short section through pillar Viadotto di Monteripoli Tivoli (RM)
13 Project description: Regarding the connections, the segments of the main beams are fully welded, while the links between the transverse beams and the main beam and the unions regarding the type of plug will be bolted. The insole is constituted by the predalle of a thickness of 6cm,dulyarmedinamannerastobeself-supporting during casting, and by the jets of completion in place of a thickness of 25 cm. The static scheme, with reference to vertical loads, is of the continuous beam of more spans. Environmental impact simulation of the Monteripoli viaduct The diagram of constraint involves the use of check valves antiseismic double acting on one of the two shoulders of each viaduct (shoulder fixed, in this case corresponding to the shoulder "A" - side Saragat), acts to limit the extent of the horizontal actions longitudinal transmitted seismic event. In addition, the viaducts have been equipped with insulation system also in the transverse direction through the adoption of the supports in steel-teflon insulators equipped with transverse elastoplastic behavior. Ante operam Post operam Viadotto di Monteripoli Tivoli (RM)
14 S.S. 280 S.S. 106 JONICA Client: ANAS Direzione generale Team members: VIA Ingegneria SrL De.MA.CO SrL, Tecno IN Assignement: S.S. 106 Jonica Categoria B Mission: Preliminary design-build contract including the Study of Environamental assessment Location: Calabria, Italy Year of implementation: 2003 Construction cost: Progress: Works finished Viadotti e Opere Calabria
15 Images of the open site of the DG21 viaduct Viadotti e Opere Calabria
References on tube and transport analysis
References on tube and transport analysis Line C - New tube line in Rome - Section T4 S.Giovanni-Malatesta Client: Metro C S.C.P.A. Team mebers: VIA ingegneria SrL Mission: Detailed design of the new
VIA INGEGNERIA SRL consulting engineers COMPANY PROFILE
VIA INGEGNERIA SRL consulting engineers COMPANY PROFILE OUR HISTORY VIA INGEGNERIA SRL started its activity in Rome in 1988, and the company operates continuously from the beginning in the field of the
Messina Bridge History MULTI-BOX STEEL DECKS AND SUSPENSION SYSTEM FOR VERY LONG SPAN BRIDGES THE STRAIT OF MESSINA CROSSING 1968 International competition of ideas announced by the Italian national roads
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
Aluminium systems profile selection
Aluminium systems profile selection The purpose of this document is to summarise the way that aluminium profile selection should be made, based on the strength requirements for each application. Curtain
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
Via Ex Internati 11/a - 37026 Balconi di Pescantina (VERONA) ITALY. Phone number: +39 045 6704260 Fax +39 045 6704264. www.safital.
Via Ex Internati 11/a - 37026 Balconi di Pescantina (VERONA) ITALY Phone number: +39 045 6704260 Fax +39 045 6704264 www.safital.it GENERAL INFORMATION Company Name SAFITAL s.r.l. Registered office: Via
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
Belt and Roller Conveyor for boxes and containers
logiss srl 38068 Rovereto (TN) Italy Viale del Lavoro, 16/E (ZI) Tel. +39 0464 401121 Fax. +39 0464 423077 Mail [email protected] Web Belt and Roller Conveyor for boxes and containers A wide range of
Company Profile. www.totospa.it
www.totospa.it Table of contents 1 Toto Group Structure 2 Toto S.p.a. Costruzioni Generali: Overview 3 Business Interests 4 5 6 7 8 Toto s Strength: Know How Toto s Technological Assets The Construction
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
Milan M5 metro extension the construction of Lotto station
Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy [email protected] Luca MANCINELLI, Rocksoil S.p.A., Italy, [email protected] Massimiliano
Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width
Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction
How To Write An Analysis System For Bridge Test
Study of Analysis System for Bridge Test Chen Ke, Lu Jian-Ming, Research Institute of Highway, 100088, Beijing, China ([email protected], [email protected]) Summary Analysis System for Bridge Test (Chinese
EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES
EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES Yang-Cheng Wang Associate Professor & Chairman Department of Civil Engineering Chinese Military Academy Feng-Shan 83000,Taiwan Republic
FLOORS REINFORCEMENT Shear Stud Connector for steel- concrete composite structures cold applied by pins
www.tecnaria.com FLOORS REINFORCEMENT Shear Stud Connector for steel concrete composite structures cold applied by pins HIGHPERFORMANCE FLOORS COMPOSITE STEEL AND CONCRETE STRUCTURES: STATIC AND ECONOMIC
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
The minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
Rear Impact Guard TEST METHOD 223. Standards and Regulations Division. Issued: December 2003
Transport Canada Safety and Security Road Safety Transports Canada Sécurité et sûreté Sécurité routière Standards and Regulations Division TEST METHOD 223 Rear Impact Guard Issued: December 2003 Standards
HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long
HYDRAULICS H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long 1. General The series of channels H91.8D has been designed by Didacta Italia to study the hydrodynamic
ETABS. Integrated Building Design Software. Concrete Shear Wall Design Manual. Computers and Structures, Inc. Berkeley, California, USA
ETABS Integrated Building Design Software Concrete Shear Wall Design Manual Computers and Structures, Inc. Berkeley, California, USA Version 8 January 2002 Copyright The computer program ETABS and all
16. Beam-and-Slab Design
ENDP311 Structural Concrete Design 16. Beam-and-Slab Design Beam-and-Slab System How does the slab work? L- beams and T- beams Holding beam and slab together University of Western Australia School of Civil
Storm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
State Route 640 Itinerary Agrigento-Caltanissetta-A19. Description of work
Description of work Sicily Tunnel Caltanissetta Year: 2013 In progress Client: Anas s.p.a. Contractor: Empedocle 2 s.c.p.a. Total length: 28 km Works amount: 175.000.000,00 Activities: Construction design
References on tunnels
Tunneled access to multistorey parking inside the Park of the Castle, Brescia Client: Brescia mobilità S.p.A. Head designer: Via Ingegneria SrL Eng. Matteo Di Girolamo Assignment: Preliminary and detailed
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
FRACASSO SCAFFOLDING PS 720
FRACASSO SCAFFOLDING PS 720 Characteristics Geometry Strengths PS 720 was designed and constructed in keeping with European regulations EN12810 and EN12811. 150 mm pin obtained by tapering the upright
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Macetti Ing. Alessandro Via Marconi 12H 24050 Palosco (BG) Tel: 035-846843 E-mail: [email protected]
Macetti Ing. Alessandro Via Marconi 12H 24050 Palosco (BG) Tel: 035-846843 E-mail: [email protected] INTRODUCTION Studio Macetti Macetti engineering firm provides engineering services in the field of
MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS
MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS May 29, 2013 Revision B Structural Guideline for Design and Installation Holes in Composite Floor Slab Terminal 3, Departure Level
TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...
Starting Guide TABLE OF CONTENTS INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE... 7 ADVANCE CONCRETE USER INTERFACE... 7 Other important
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations
Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
BAGGAGE HANDLING SYSTEMS. Trastecnica S.p.A. Handling Baggage Systems Edition 2002 - Rev. 00-1 -
BAGGAGE HANDLING SYSTEMS Trastecnica S.p.A. Handling Baggage Systems Edition 2002 - Rev. 00-1 - TECHNICAL SPECIFICS INDEX Check-in with one conveyor 4 Scales 6 Belt Conveyors 8 Take away 9 Feeder and Belt
APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS
APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS This appendix summarizes the criteria applied for the design of new hypothetical bridges considered in NCHRP 12-79 s Task 7 parametric
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the
SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 3279 SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP Yuming DING 1, Bruce HAMERSLEY 2 SUMMARY Vancouver
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Delineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
Design rules for bridges in Eurocode 3
Design rules for bridges in Eurocode 3 Gerhard Sedlacek Christian üller Survey of the Eurocodes EN 1991 EN 1990 Eurocode: Basis of Design EN 1992 to EN 1996 Eurocode 1: Actions on Structures Eurocode 2:
METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER
Page 1 of 6 FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER 0 Issued for Review & Comments Rev. Date Description Eng. A.H Prepared by Checked by Approved by Page 2 of 6 REVISION CONTROL SHEET REV. NO. DATE
New Troja Bridge in Prague Concept and Structural Analysis of Steel Parts
Available online at www.sciencedirect.com Procedia Engineering 00 (2012) 000 000 www.elsevier.com/locate/procedia Steel Structures and Bridges 2012 New Troja Bridge in Prague Concept and Structural Analysis
REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.
9.2 One-way Slabs This section covers the following topics. Introduction Analysis and Design 9.2.1 Introduction Slabs are an important structural component where prestressing is applied. With increase
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
INMET Konstrukcje sp z o.o. Leading steel forms for prefabrication manufacturer in Poland
The INMET Konstrukcje company is a leading manufacturer of the steel forms in Poland. On the basis of individualised projects the company manufactures modern and complex steel forms for the prefabrication
Brandangersundet Bridge A slender and light network arch
Brandangersundet Bridge A slender and light network arch Rolf Magne Larssen Dr. ing./ Ph.D. Dr. ing A. Aas-Jakobsen AS Oslo, Norway [email protected] Rolf Magne Larssen, born 1958, received his Ph.D. in structural
Bending, Forming and Flexing Printed Circuits
Bending, Forming and Flexing Printed Circuits John Coonrod Rogers Corporation Introduction: In the printed circuit board industry there are generally two main types of circuit boards; there are rigid printed
SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE
SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: TREY HAMILTON, UNIVERSITY OF FLORIDA NOTE: MOMENT DIAGRAM CONVENTION In PT design,
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
Redundant and Robust Structures by Joint Ductility
COST ACTION TU0601 Robustness of Structures Workshop Zürich 04./05. February 2008 Redundant and Robust Structures by Joint Ductility, Lars Rölle Contents 1 - Objectives of the RFCS-project ROBUSTNESS 2
Design and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)
MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL) NOTE: THIS MANUAL IS INTENDED TO INSTRUCT AND TO ASSIST ALREADY QUALIFIED
UNIVERSAL RAILING, STEEL
RAILINGS Page Universal Railing, steel 108-109 Large Module Railing, steel 110-111 Allround Railing, aluminium 112-113 Module Railing, aluminium 114-115 Standard Type Railing, aluminium 116-117 107 UNIVERSAL
CURRENT PRACTICE SHEET
CURRENT PRACTICE SHEET INTRODUCTION An expansion joint can be defined as a device to support the surfacing, or to provide a running surface, across the expansion gap, ie the area between adjacent spans
4.3.5 - Breakaway Walls
4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free
A transverse strip of the deck is assumed to support the truck axle loads. Shear and fatigue of the reinforcement need not be investigated.
Design Step 4 Design Step 4.1 DECK SLAB DESIGN In addition to designing the deck for dead and live loads at the strength limit state, the AASHTO-LRFD specifications require checking the deck for vehicular
Preliminary steel concrete composite bridge design charts for Eurocodes
Preliminary steel concrete composite bridge 90 Rachel Jones Senior Engineer Highways & Transportation Atkins David A Smith Regional Head of Bridge Engineering Highways & Transportation Atkins Abstract
Stress and deformation of offshore piles under structural and wave loading
Stress and deformation of offshore piles under structural and wave loading J. A. Eicher, H. Guan, and D. S. Jeng # School of Engineering, Griffith University, Gold Coast Campus, PMB 50 Gold Coast Mail
Residential Decks. Planning and Development Services Department
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: [email protected] Planning and Development Services Department Residential Decks
www.pitchmasticpmb.com PmB Expansion Joints World leaders in expansion joint technology
www.pitchmasticpmb.com Expansion Joints World leaders in expansion joint technology High performance expansion joint solutions Pitchmastic offers a comprehensive range of specialist services to the civil
Steel and composite bridges in Germany State of the Art
Steel and composite bridges in Germany State of the Art Univ.-Prof. Dr.-Ing. G. Hanswille Institute for Steel and Composite Structures University of Wuppertal Germany Univ.-Prof. em. Dr.-Ing. Dr. h.c.
Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12)
Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12) Design Criteria AASHTO LRFD Bridge Design Specifications, 6th Edition; Structures Detailing Manual (SDM); Structures Design Guidelines (SDG)
ABSTRACT 1. INTRODUCTION 2. DESCRIPTION OF THE SEGMENTAL BEAM
Ninth LACCEI Latin American and Caribbean Conference (LACCEI 11), Engineering for a Smart Planet, Innovation, Information Technology and Computational Tools for Sustainable Development, August 3-, 11,
1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
Joist. Reinforcement. Draft 12/7/02
Joist Reinforcement Draft 12/7/02 1 JOIST REINFORCING The purpose of this CSD Design Aid is to provide procedures and suggested details for the reinforcement of open web steel joists. There are three basic
How To Understand The World Trade Center'S Structural Design
Emerging Technologies in Structural Engineering Proc. of the 9 th Arab Structural Engineering Conf., Nov. 29 Dec. 1, 2003, Abu Dhabi, UAE WORLD TRADE CENTER COLLAPSE, FIELD INVESTIGATIONS AND ANALYSES
Numerical modelling of shear connection between concrete slab and sheeting deck
7th fib International PhD Symposium in Civil Engineering 2008 September 10-13, Universität Stuttgart, Germany Numerical modelling of shear connection between concrete slab and sheeting deck Noémi Seres
Laying the First Course. 1. Excavate the site and construct the footing.
Use QUIKRETE Mortar Mix or Mason Mix lay up a concrete block wall as shown. QUIKRETE Mortar Mix or Mason Mix Concrete block Mason's line Line blocks 4' level brick trowel Jointer Mason's hammer Stiff brush
REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK
REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE Danijel Tenžera, Krešimir Futivić, Boris Ukrainczyk Summary Bridge structures deteriorate with years of use and exposure to adverse environmental
Requirements for the Attachment of Communication Cable Facilities on PPL Poles
Page 99 of 137 Requirements for the Attachment of Communication Cable Facilities on Replaces: URS-3002 URS-3004 URS-101C-304 A-157649 Page 100 of 137 Reference Notes for Drawings: General 1. The term communication
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
Field Welding Inspection Guide
Field Welding Inspection Guide Assistance in interpretation of any specification or questions concerning field welding issues can be obtained from the Office of Materials Management, Structural Welding
Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
Page & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental
Modular Access Floor for Data Center. From Rack to Row to Room to Building
Modular Access Floor for Data Center From Rack to Row to Room to Building Why using Scneider Electric modular access floor in Data Centers The evolution of modern Data Centers emphasizes specific exigencies
FOOTING DESIGN EXAMPLE
County: Any Design: BRG Date: 10/007 Hwy: Any Ck Dsn: BRG Date: 10/007 FOOTING DESIGN EXAMPLE Design: Based on AASHTO LRFD 007 Specifications, TxDOT LRFD Bridge Design Manual, and TxDOT Project 0-4371
Statics of Structural Supports
Statics of Structural Supports TYPES OF FORCES External Forces actions of other bodies on the structure under consideration. Internal Forces forces and couples exerted on a member or portion of the structure
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
Rehabilitation of a 1985 Steel Moment- Frame Building
Rehabilitation of a 1985 Steel Moment- Frame Building Gregg Haskell, a) M.EERI A 1985 steel moment frame is seismically upgraded using passive energy dissipation, without adding stiffness to the system.
Slab Track Austria. System ÖBB-PORR elastically supported slab
Slab Track Austria System ÖBB-PORR elastically supported slab 5. 2. 3. 4. 7. 6. Five holes for spindles 2. ÖBB-PORR slab 3. elastomeric layer 4. concrete joint sealing compound 5. rail support seat 6.