KMG PROJE ENGINEERING CONSULTING INFORMATION TECHNOLOGIES LTD. CO.
|
|
|
- Bertram Johnston
- 9 years ago
- Views:
Transcription
1 KMG PROJE ENGINEERING CONSULTING INFORMATION TECHNOLOGIES LTD. CO.
2 ABOUT US KMG Proje has been established on 2007 for the consultancy services and project studies of ; highways, railways, high speed railways, metro systems, light rail transit systems and also, tunnels, under and over passes, bridges, viaducts, industrial structures, in accordance with national and international standards. Our company has accomplished numerous studies during his period of activity with high performance. KMG Proje has completed many domestic and international works. Our priority object is to; Hold the customers pleasure at maximum without making any concession about quality Complete the works which are under our scope on time Follow the innovations and technology related to our professions and to improve our quality of works in our projects accordingly. Employ the technical persons who have satisfactory technical background and education Prepare the projects in accordance with national and international standards. Considering professional respect and responsibility; obtain same quality of works from our sub contractors. Professional experiences in the construction sector, together with the young and dynamic technical team; with the light of; engineering ethic, science, and responsibility; our aim is to carry the experience within the construction sector towards the far future. Chairman of the Board Kemalettin GÖÇMEN
3 REFERENCES Preliminary design of 3rd track extension of Gebze Köseköy Railway To increase the number of alignment of the renewed railway between Gebze and Köseköy, alternative alignments will be developed. Within alternative routes, infrastructures will be determined, analysed and reports will be prepared.
4 Re-Design of Tandogan - Keçiören Municipal Subway Line Station Tandogan - Keçiören Municipality Station Metro Line Project, which will be built according to newly constructed method (Top-Down) preparation of static, architectural, electrical and mechanical projects work
5 Railway Track Extension Project Between Akçakale and Nusaybin Stations (226 Km) This project contains the application project of the railway between Akçakale and Nusaybin, and the preparation of the documents that related to construction bid of the project. Vocations through this project are listed below. Determining the alternative corridors and alignments. Map and topographical studies Geological and geotechnical, hydraulic and hydrological studies 226km alignment studies Preparation of the EIA report. The project report of the new railway superstructures. Quantity survey, exploration and preparation of documents for construction bid.
6 Bartin - Amasra - Cide Highway Between Bartin-Çakraz Amasra Junction Road (Including Tunnel ) Within Bartin - Amasra - Cide highway between Bartin-Çakraz Amasra junction road, alignment project, road underpass bridge, tunnel project has been prepared.
7 Renovation of the existing railroad between Sandıklı- Karakuyu-Dazkırı (115 KM) and Dazkırı-Denizli (90 km) Alignment Projects 205 kilometers of railroad alignment projects were prepared for the renovation of the existing railroad between Afyon-Sandıklı and Denizli. Existing railroad alignment was investigated and possible improvements in the alignment were determined. Among those improvements, feasible ones are selected and the projects are prepared accordingly.
8 Ordu-Giresun Airport Project Air transportation which is indsipensable for developing city will maintain safe, fast and efficent transportation opportunity for Giresun and Ordu City. For these reasons, airport project which is the first airport built by fillin sea in Turkey is started.
9 2nd Stage Construction Project of Izmir Light Railway System Within Izmir Light Railway System 2nd Stage Service Construction Completion the tunnel, shaft project of Goztepe, Polygon, and Fahrettin Altay Stations were presented. Polygon and Fahrettin Altay stations are designed according to the method of diaphragm walls and Top-Down. Within the project Project of Railway Station o Excavation-shoring calculations and projects o Project and calculation of static application o Architectural application and detail drawings o Electrical and mechanical project Tunnel Project Shaft Project services are provided.
10 Kars-Tiflis Railway Project Senger Variant Section o Alignment projects o Two Tunnel projects ( L=2900 m, L=1000m) o Viaduct projects
11 L=225 m Viaduct
12 KOSBİ Batıcim Railway Connection Project Engineering Services and Studies o 8 km Alignment projects o Two Tunnel projects ( L=1800 m, L=130m) o Culverts o Underpasses o Hydrological studies and drainage projects.
13 Samsun Light Rail System Project Engineering Services and Studies o Topographical works of 15.6 km alignment o Preliminary and final Alignment projects o Geological, geotechnical studies, laboratory test and drilling works of alignment and structures o Hydrological studies and drillings o Depot area track projects, warehouse projects o 21 overground station projects on the alignment o Energy supply and substation projects o Three viaduct project (L=230m, L=100m, L=100m);cut-cover projects and retaining structure projects o Track superstructure projects (embedded, rail-sleeper, etc.) o Electrical-mechanical projects application projects were prepared
14 Viaduct Warehouse Atgrade Station Structure
15 Alignment Projects and Consultancy of Kadıköy-Kartal System Metro. o 21 Km alignment projects and tunnel plan-profile projects. o Maintenance area alignment and localization projects. o Consultancy services for architectural, statical works and excavation support systems of stations.
16 Eskişehir - Köseköy Railway Project Engineering Services o Detailed designs and construction tender documents for 158 km double track railway with 250 km/h speed were prepared o Bored Tunnels : 39 tunnels, total length of 39 km o Cut-and-cover tunnel : 2, total length of 1.3 km o Viaducts : 20, total length of 11.4 km o Bridges : 17 o Overpasses : 21 o Underpasses : 37 detailed design projects were prepared. GEBZE İSTASYONU KÖSEKÖY İSTASYONU PART-1 KOSEKOY - VEZİRHAN VEZİRHAN İSTASYONU PART-2 VEZİRHAN-İNÖNÜ ÇUKURHİSAR
17 Istanbul Metro System 4.Levent and Taksim, Project Engineering studies o Six underground stations o Eight km tunnel detailed design projects were prepared. Istanbul Metro; Taksim - Yenikapı Section Project Engineering studies o Track structures with total length of 5200 m o Stations : 4 (underground) detailed design project were prepared.
18 Adana Light Rail Transit System - Project Engineering studies o Double track alignment total length of 14000meters o Cut-and-cover tunnel : total length 3520 m o Viaducts : 5330 m o Stations : 13 detailed design project were prepared.
19 Marmaray CR-1 Depot Areas (Gebze, Halkalı and Maltepe) Project and Engineering studies o Geological and geotechnical surveys o Existing Tunnel clearances and structural system analysis o Infrastructure of depot areas and preliminary projects of workshop buildings
20 Ankara-Konya (Polatlı-Konya) Railway (200 km) Project Engineering Services and Studies o Totally 212 km railway line s topographical works and alignment projects for 250 km/hr speed were prepared. o Drilling and laboratory tests were done, geotechnical reports were prepared. o One tunnel and other structures (bridges, under-over passes etc.) final projects were prepared. o Tender documents for construction were prepared.
21 Bodrum Yalıkavak Tourist Settlement Project Engineering Services and Studies o Hotels, villages o Cut-and-cover tunnel, o Infrastructure, o Marine structures detailed design projects were prepared.
22 Turkmenistan, Türkmenbaşı Farab First Category Highway Bridge Viaduct design and Consultancy Services for Construction Tender
23 Çan - Biga State Highway Project Engineering Services and studies o Thirty Five kilometers Application Studies, Levelment and road application project services o Four hundred meters drilling and geotechnical surveys o Biga City Crossing Bridges with spans of meters Application projects were prepared. Hanlı - Bostankaya Two Lane Railway Second Stage Project Works o Culverts: 91 o Underpasses: 11 o Overpasses: 4 o Railway Bridges: 2. projects were prepared.
24 Zonguldak - K.Ereğlisi Railway Project Engineering Services and studies o Culverts : 35 o Underpasses : 3 o Overpasses : 2 o Seven Prestressed railway bridges with total length of 510 m o Four Prestressed railway viaducts with total length of 1000 m o Retaining structures Projects were prepared.
25 CONTACT Official Title: KMG PROJE MÜHENDİSLİK MÜŞAVİRLİK BİLİŞİM TEKNOLOJİLERİ LTD. ŞTİ. Chairman of the Board Kemalettin Göçmen, Head Office: Ankara Phone: Fax : Web Site: [email protected] Office Addresse : İzci Sk. 24/4 G.O.P. ÇANKAYA / ANKARA TURKEY
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
The rail engineering service provider. Consulting, planning, project management
The rail engineering service provider Consulting, planning, project management The rail engineering service provider Rail infrastructure is a complex system in which all the elements must be precisely
BONATTI: COMPANY OVERVIEW
BONATTI: COMPANY OVERVIEW Bonatti is an International General Contractor which provides Engineering, Procurement, Construction and Operation & Maintenance Services to the Oil & Gas and Power Industry.
Member Nation Report 2010 from Denmark.
Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City
ESER was established in 1968 under the name of Tekser Technical Services Inc. Following a change in its name in 1985, it has served its customers under the name of ESER Consulting Engineering Inc. ESER
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009
Airport Rail Link is gathering speed Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009 Integrated Public Transit System for Metropolitan Regions Regional / Long Distance Rail Service
05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246
CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 Summary of Duties: Performs professional civil engineering work in researching,
İŞİMİ INTRODUCTION. at the crossroads between East and West, overlapping Europe and Asia geographically.
TURKISH STATE RAILWAYS ANKARA HST Station 14 October 2008 1 DEMİRYOLLARININ TARİHSEL GELİŞİ İŞİMİ INTRODUCTION www.ubak.gov.tr TURKEY is: at the crossroads between East and West, overlapping Europe and
MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance
MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance SUMMARY: Mr. Chaudhry, a decisive, innovative leader with a demonstrated
Railway Transport Association
Railway Investments in TURKEY İbrahim ÖZ Chairman Railway Transport Association Turkish Railway Transport Association was founded in July 2006, with the aim of promoting railway transportation according
Railway Crossing Information System
Railway Crossing Information System ITS Canada Presentation June 2, 2014 Ian Steele, P.Eng Agenda Click to edit Master title style RBRC Program Project Background Concept of Operations Design Process Design
Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A
Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement
Macetti Ing. Alessandro Via Marconi 12H 24050 Palosco (BG) Tel: 035-846843 E-mail: [email protected]
Macetti Ing. Alessandro Via Marconi 12H 24050 Palosco (BG) Tel: 035-846843 E-mail: [email protected] INTRODUCTION Studio Macetti Macetti engineering firm provides engineering services in the field of
Role in the project (e.g. Prime Engineering Consultant or Contractor), and summary of professional Duties : Name Professional Duties Contract Awarded?
PROPOSAL FORM FOR SINGLE PROJECT PROFESSIONAL INDEMNITY NOTE: THIS IS A PROPOSAL FOR A CLAIMS MADE POLICY Note : Please provide any necessary explanations or additional details by attachment to this Proposal
Monitoring data and existing information Country Presentation from Turkey
Workshop on DEVELOPING REGIONAL COOPERATION FOR SHARED KARST AQUIFER MANAGEMENT IN SEE 27-28 June 2008 Thessaloniki, Greece Monitoring data and existing information Country Presentation from Turkey Plan
YÜKSEL PROJE. Certificates
YÜKSEL PROJE Certificates YÜKSEL PROJE The Preface YÜKSEL PROJE was founded in 1978 and since then, with it has become the largest, fully independent engineering and consulting company in Türkiye with
The Follo Line Project
The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1 2 the follo line project The project The Follo Line Project is currently the
COWI s Role in the Copenhagen Metro Project
COWI s Role in the Copenhagen Metro Project On the occasion of the award by the Copenhagen Cultural Foundation for COWI A/S part in the implementation of Phase 1 of the Copenhagen Metro 2 COWI s Role in
APPENDIX I (See Paragraph -6) FORM I
APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage
Integrated Tunnelling Data Management, Analysis and Visualization New IT Tools for Better Projects
Integrated Tunnelling Data Management, Analysis and Visualization New IT Tools for Better Projects K. Chmelina 1, G. Krusche 1, G. Hesina 2 1 Geodata Ziviltechnikergesellschaft mbh, Leoben, Austria; 2
NATURAL GAS MARKET TARIFFS REGULATION
NATURAL GAS MARKET TARIFFS REGULATION 1 Presentation Outline NATURAL GAS MARKET TARIFFS Tariff Definition Process and Main Principles Type of Tariffs Connection Tariffs Tariffs Regarding Transmission and
EURASIA TUNNEL PROJECT The most advanced transportation infrastructure connecting two continents
Republic of Turkey Ministry of Transport, Maritime Affairs and Communications General Directorate of Infrastructure Investments EURASIA TUNNEL PROJECT The most advanced transportation infrastructure connecting
Project Manager & Key Staff Standards for Technical Proposals Projects using Level A and/or Level B prequalification disciplines
Projects using Level A and/or Level B prequalification disciplines Project Manager PROJECT MANAGER Key Staff/ ROADWAY DESIGN (TP Section 5) (TP Section 6) BACHELORS DEGREE 4 TO 8 YEARS (TP Sections 6 &
COWI TANZANIA LTD WELCOME TO OUR WORLD OF CONSULTANCY WITHIN ENGINEERING, ENVIRONMENT AND ECONOMICS
COWI TANZANIA LTD WELCOME TO OUR WORLD OF CONSULTANCY WITHIN ENGINEERING, ENVIRONMENT AND ECONOMICS COWI TANZANIA CORE SERVICE LINES Development assistance Urban and regional development Environmental
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets
Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets January 2011 Edition All rights reserved. No part of this publication
NEW BLUE LINE CONNECTIONS
Washington Metropolitan Area Transit Authority NEW BLUE LINE CONNECTIONS 3/31/2014 A Major Capital Project of Momentum s Metro 2025 Program In support of its new strategic plan, Metro has considered the
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
TURKEY WHAT S HOT WHAT S NOT
TURKEY WHAT S NOT TURKEY WHAT S NOT There is TURKEY TURKEY WHAT S NOT There is TURKEY and TURKEY WHAT S NOT There is TURKEY and There is İSTANBUL TURKEY Secondary and tertiary cities Limited/focused service,
Professor Dimitrios Tsamboulas National Technical University of Athens, Greece Expert
UNECE Workshop on Good practices and new tools for financing transport infrastructure 2 nd Session Benchmarking of Transport Infrastructure Construction Costs 8 th September 2014, Geneva Professor Dimitrios
Dulles Corridor Metrorail Project
Dulles Corridor Metrorail Project MONTHLY COST AND SCHEDULE UPDATE FOR PHASE 2 AS OF JULY 31, 2015 SEPTEMBER 2015 Phase 2 Cost Summary July Expenditures $ 19.2 Million Total Expenditures $ 508.7 Million
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
General Manager of Geotechnical Department, CEO
PROFESSIONAL CURRICULUM VITAE Dr. TIBOR HORVÁTH KEY CAPABILITIES : - geotechnical site management, investigation - engineering geology aspect of geotechnics - site investigation, geotechnical and hydro
RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4
RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4 APPENDIX G COST ESTIMATES EXHIBIT J RAILROAD BRIDGE QUANTITIES Report for the US Army Corps of Engineers,
Project and site organization of a NATM tunnel project on the example of the Koralm tunnel. Hanns Wagner OBB Austrian Federal Railways
Project and site organization of a NATM tunnel project on the example of the Koralm tunnel Hanns Wagner OBB Austrian Federal Railways Requirements for a successful application of NATM Design, which considers
Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
Coastal Highway Route E39 Project
Coastal Highway Route E39 Project Teknologidagene 22th September 2015 Trondheim Kjartan J Hove/ Jørn Arve Hasselø/ Harald I. Johnsen Norwegian Public Roads Administration Coastal Highway Route E39 E39
Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Callao Basic Metro Network
Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Mrs. Christy García Godos Naveda Head of Project December 2013 Diagnosis of the current situation Urban transport Buses Lack of
Company Profile. www.totospa.it
www.totospa.it Table of contents 1 Toto Group Structure 2 Toto S.p.a. Costruzioni Generali: Overview 3 Business Interests 4 5 6 7 8 Toto s Strength: Know How Toto s Technological Assets The Construction
CRENSHAW/LAX TRANSIT CORRIDOR PROJECT
CRENSHAW/LAX TRANSIT CORRIDOR PROJECT A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies Robert Ball, P.E. and Kimberly Ong, P.E. Los Angeles Metropolitan Transportation
GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT
GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT March 2013 MINISTRY OF STRATEGY AND FINANCE TABLE OF CONTENTS CHAPTER Ⅰ GENERAL PROVISIONS Article 1 (Purpose)... 1 Article 2 (Definition of Total Project Cost)...
REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE
ATTACHMENT 9 REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE Requirements 1 The Professional Engineers Board will register a candidate as a professional
LETBANE PÅ RING 3. Information about the public procurement process
Information about the public procurement process Document ID: L3-X-LB-PRE-0001 Version: 2.0 Issue date: 2015-11-10 Issued by: Ring 3 Letbane I/S Approved by: AGF Anne-Grethe Foss Checked by: PAMA Patrik
Work Type Definition and Submittal Requirements
Work Type: Geotechnical Studies Soils Analysis & Recommendations The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements,
TORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: July 23, 2014 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT AUXILIARY EQUIPMENT ACTION ITEM RECOMMENDATION It is recommended
CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions
CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions Ove Solheim MSc - Norwegian Public Roads Administration ABSTRACT Feasibility studies
rail global vision local knowledge
rail global vision local knowledge rail rail introduction For over 60 years we have successfully delivered numerous physical and social infrastructure solutions, and engineering design projects to our
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
QUICK ISTANBUL GUIDE
QUICK ISTANBUL GUIDE Map and Directions to the Congress Venue Raffles Hotel / Zorlu Center, Istanbul Raffles Hotel/ Zorlu Center Istanbul is 26 km away from Atatürk International Airport on the European
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
We offer experience in the electrical infrastructure works. en.notrelektrik.com
We offer experience in the electrical infrastructure works en.notrelektrik.com Address Ortabayir Mh. Bacadibi Sk. No : 2 / 6 Gultepe / Kagithane Phone (0212) 264 07 78 Fax (0212) 264 07 78 E-mail [email protected]
High Speed Rail in Poland plans & activities
High Speed Rail in Poland plans & activities UN ECE TER Project Workshop Master Plan for the future High Speed Rail network in Central and Eastern Europe Timisoara, 10 14 September 2012 Jerzy Kleniewski
Melbourne Airport Rail Link Study. Study overview and findings
Melbourne Airport Rail Link Study Study overview and findings Melbourne Airport caters for 28 million air passenger trips each year and this figure is expected to double in the next 20 years. Transport
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL
Job Roles and Responsibilities in Canada
Job Roles and Responsibilities in Canada Drafters Drafting Technologists and Technicians Acknowledgments Winnipeg Technical College and the Department of Labour and Immigration of Manitoba wish to express
DR. DONALD ALEXANDER BRUCE. GEOGRAPHIC BASE: Pittsburgh, PA. TYPE OF COMPANY: Sole Proprietor RESUMÉ
P.O. BOX 237, VENETIA, PA 15367 PHONE: 724-942-0570 FAX: 724-942-1911 EMAIL: [email protected] WEBSITE: WWW.GEOSYSTEMSBRUCE.COM DR. DONALD ALEXANDER BRUCE SPECIALTY/SKILLS: Specialty geotechnical
Transit, Rail, Program, Project & Construction Management Experience
Point of Contact Peter M. Cipolla Vice President, Rail & Transit Mobile: 925.219.5235 Email: [email protected] Project Management Oversight Services Introduction & Background Hatch Mott MacDonald
Lecture 4. Tunneling Through Fault Zones and Melanges
Lecture 4 Tunneling Through Fault Zones and Melanges BIMROCKS SHORT COURSE Dr. Edmund Medley Consulting Geological Engineer, Belmont, California, USA [email protected] Geological Engineering Department,
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation
Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES
Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary
Application Form Part A
A1 Proposal TENtec nr. 2014-FI-TM-0142-M (26195427) MAP Call 2014 F01 Priority 1: (F01) Pre-identified projects on the Core Network corridors Railways Inland Waterways and Ports Roads Maritime Ports Priority
DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: July 13, 2015
I. Purpose DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT To provide a standard for a reasonable A/E fee structure on State of Utah Projects II. Background The State Procurement Code requires that
LVT System for. AlpTransit Gotthard AG
LVT System for the longest railway tunnel in the world AlpTransit Gotthard AG The Low Vibration Track (LVT) system for Gotthard Base Tunnel In December 2016, the world s longest railway tunnel will start
Owner Controlled Insurance Program (OCIP) Overview
Owner Controlled Insurance Program (OCIP) Overview Prepared for Caltrans Oakland Touchdown Outreach Presented by: Willis One Bush Street, Suite 900 San Francisco CA 94104 (415) 981-1141 WHAT IS AN OCIP
Geotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
Structural Engineering Civil Engineering Water Resources Marine & Coastal Engineering Environmental (EIA) Project Management Sustainability
Arup Mauritius Structural Engineering Acoustics Fire Engineering Civil Engineering Transport Planning Aviation Water Resources Energy Geotechnical Engineering Facade Engineering Marine & Coastal Engineering
1. RECOMMENDATIONS. It is recommended that:
Clause No. 7 in Report No. 3 of was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on February 20, 2014. (Mayor Hackson declared an interest in this
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016
I. Purpose DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016 To provide a standard for a reasonable A/E fee structure on State of Utah Projects
URBAN INFRASTRUCTURE METRO
URBAN INFRASTRUCTURE METRO WORKSHOP BOGOTA 2012-03-27 CONSULTING DESIGN PROJECT MANAGEMENT SITE SUPERVISION WORKSHOP BOGOTA STRUCTURE 2 Structure 1. Presentation of Mr. Dieter Stephan and of consulting
AFTES POST-GRADUATE SPECIALISED MASTER S DEGREE TUNNELS AND UNDERGROUND STRUCTURES. from design to operation. www.aftes.asso.fr
AFTES www.aftes.asso.fr POST-GRADUATE SPECIALISED MASTER S DEGREE TUNNELS AND UNDERGROUND STRUCTURES from design to operation http://mstunnels.insa-lyon.fr Post-graduate specialised Master degree TUNNELS
The information and materials contained in this disc are provided as is and as available.
The information and materials contained in this disc are provided as is and as available. Whilst every effort is made to ensure that the information and materials provided are correct, the Land Transport
APPENDIX I. (See Paragraph-6) FORM 1
APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity
Capability Statement
Capability Statement Bridges & Flyovers S.N. Bhobe & Associates Pvt. Ltd. Unit No 10, Banking complex No II, Plot No 9&10, Sector 19A, Vashi, Navi Mumbai - 400 705 Tel. No. +91 22 27831070 Fax No. +91
Marketing day Bybanen in Bergen building stage 3
Marketing day Bybanen in Bergen building stage 3 Ole W. Mortensen Acting Director of Construction Hordaland Fylkeskommune Predictability Availability Quality The meeting today.. Is not a tender conference
COMPANY PROFILE. PROKO CONSTRUCTION INDUSTRY LTD. Yenikent Mh. 2477.Sk. No:2/A D:1 T: +90 262 721 44 10 F: +90 262 721 44 11
COMPANY PROFILE PROKO CONSTRUCTION INDUSTRY LTD. Yenikent Mh. 2477.Sk. No:2/A D:1 T: +90 262 721 44 10 41400, Gebze, KOCAELİ F: +90 262 721 44 11 www.prokoyapi.com [email protected] CORPORATE Domestically
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by
TABLE OF CONTENTS. Section / Article Page
TABLE OF CONTENTS Section / Article Page 1. INTRODUCTION 1.1 Purpose................ 6 1.2 Definitions................ 6 1.3 Guidelines and References............ 7 2. AGREEMENTS 2.1 Applicant and Contractor
ATHENS METRO. Past, Present & Future ATHENS METRO LINES. 46 th ECCE Meeting Athens, 19 October 2007. Dr. G. Leoutsakos ATTIKO METRO S.A.
ATHENS METRO Past, Present & Future 46 th ECCE Meeting Athens, 19 October 2007 Dr. G. Leoutsakos ATTIKO METRO S.A. ATHENS METRO LINES HELLENIC MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING AND PUBLIC
APPENDIX C BLACKPOOL BRIDGES PROJECT COST ESTIMATES GROWTH FUND APPLICATION TO LANCASHIRE ENTERPRISE PARTNERSHIP
APPENDIX C BLACKPOOL BRIDGES PROJECT COST ESTIMATES GROWTH FUND APPLICATION TO LANCASHIRE ENTERPRISE PARTNERSHIP COST BASE: Q4 2014/15 (Version A - 02/02/2015) CONTROL SHEET Version Date Status A February
Alternatives Presentation Meeting Middlebury WCRS(23)
Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College
Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide
Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Renew provides multidisciplinary engineering services to maintain and develop UK infrastructure focused in
Technology and System Layout of the Transrapid Maglev Project
Technology and System Layout of the Transrapid Maglev Project Christian Rausch Transrapid International GmbH & Co. KG, Berlin ABSTRACT: At the start of the project planning, the basic requirements for
Consulting Boards for Large Civil Engineering Projects
Consulting Boards for Large Civil Engineering Projects Evert Hoek and Alan S. Imrie Published in Water Power and Dam Construction, Vol. 47, No. 8, pp 33-34, August 1995. Consulting Boards for Large Civil
Major Construction Project Template (with EA) (Version 20130508) MnDOT - Gantt Chart Layout May-10-13 09:58. Final Design Project Baselined
1 Major Construction Project Template (with EA) (Version 833 2 s 833 3 MS_100 Project Initiated 0 4 MS_110 Initial Design Project Baselined 0 5 MS_120 Layout Staff Approved 0 6 MS_130 Construction Limits
