Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Similar documents
Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

The Teton Creek Restoration Project Summary:

Prattsville Berm Removal Project. 1.0 Project Location

March Prepared by: Irvine Ranch Water District Sand Canyon Avenue. Irvine, CA Contact: Natalie Likens (949)

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Restoration Planning and Development of a Restoration Bank

Background Information: The Mamquam River Floodplain Restoration Project

Section 4 General Strategies and Tools

URBAN DRAINAGE CRITERIA

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Appendix H Dredging and Stream Channel Restoration

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

1.7.0 Floodplain Modification Criteria

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

AN INITIATIVE TO IMPROVE

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Outlet stabilization structure


Floodplain Connectivity in Restoration Design

Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie

Michigan Wetlands. Department of Environmental Quality

Protecting Floodplain. While Reducing Flood Losses

Restoring and protecting natural floodplains reduces flood losses and benefits the environment. Photo: USDA NRCS.

Sims Bayou Federal Flood Damage Reduction Project

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Proposed General Plan Update Goals, Policies, and Implementation Actions

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Flood Risk Management

Flood Risk Management

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Backyard Buffers that Work for People and Nature by Restoring Ecological Function

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

The Economics of Culvert Replacement: Fish Passage in Eastern Maine

RESTORING streams to reduce flood loss

DECISION DOCUMENT NATIONWIDE PERMIT 27

MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1

CITY UTILITIES DESIGN STANDARDS MANUAL

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Passive Restoration 101: Framework and Techniques Overview. Amy Chadwick, Great West Engineering August 26, 2015 Butte, America

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets

Capitalizing on Flooding as Passive. Hearts and Minds of the Musselshell

Public Law and Non-Structural Alternatives to Levee Repairs

Applying HUD s Floodplain Management and Wetlands Protection Standards U.S. Department of Housing and Urban Development Office of Environment and

4. Environmental Impacts Assessment and Remediation Targets

Flooding Hazards, Prediction & Human Intervention

PUBLIC NOTICE Application for Permit

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

7.0 Stream Restoration

Thank you to all of our 2015 sponsors: Media Partner

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

Post-Flood Assessment

How To Manage Water Resources In The Yakima Basin

Watershed Rehabilitation Program in Texas

Emergency Conservation Program

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Homeowner s Guide to Drainage

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Gold Ray Dam Interagency Technical Team Meeting

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

Oxbow Restoration for Fish Habitat and Water Quality

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

- POLICY - Disaster Recovery Assistance Program

COMMUNITY CERTIFICATIONS

Muddy River Restoration Project Project Description

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

The answers to some of the following questions are separated into two major categories:

Appendix C. Project Opportunities. Middle Twisp River (RM )

FOUR RIVERS RESTORATION PROJECT

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Nipigon Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

The Muddy River: A Century of Change

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters

Transcription:

American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. City of Cranston Pocasset River Riverview Terrace & Blackamore Pond City of Cranston Pocasset River and Pawtuxet River Confluence City of Cranston & Rhodes on-the-pawtuxet Pawtuxet River Oxbow Town of West Warwick Meshanticut River Headwater Floodplain easements restore, protect, maintain, and enhance the functions of the floodplain; conserve natural values including fish and wildlife habitat, water quality, flood water retention, ground water recharge, and open space; reduce long-term federal disaster assistance; and safeguard lives and property from floods, drought, and the products of erosion. NRCS purchases a permanent conservation easement on floodplain lands that meet program criteria and have a history of repeated flooding. All legal and administrative costs are paid 100% by NRCS. The easement provides NRCS with the authority to restore and enhance the floodplain s natural functions to the greatest extent possible. NRCS is paying 100% of the restoration costs. NRCS actively restores the natural features and characteristics of the floodplain through re-creating the topographic diversity, increasing the duration of inundation and saturation, and providing for the re-establishment of native vegetation. Landowners retain several rights to the property including quiet enjoyment, control of public access, and undeveloped recreational use such as hunting and fishing. All restoration construction was substantially complete by December 30, 2010 with the remaining landscape seeding tasks completed by June 15, 2011 The following is a summary of each of the four projects. Page 1 of 12

Meshanticut River Headwater (Janet Drive) Floodplain Restoration West Warwick Description: An existing stream channel that was routed under a road into a poorly functioning culvert often flooded during storm events. The culvert outlet was often submerged, restricting the capacity of the culvert and causing repeated upstream flooding to eight local homeowners along Janet Drive in West Warwick, Rhode Island. Floodplain Easement: Permanent conservation easement has been acquired by NRCS in the amount of $9,000.00 for 2.0 acres with the Town of West Warwick. Works of Improvement: Restoration activities included removal of approximately 400 feet of buried 48-inch concrete pipe that was used to reroute the original stream; creation of new open stream channel using bioengineering techniques to improve habitat and mitigate local flooding; construction of an earthen berm along the eastern and southern perimeter of project area to prevent floodwaters from storms up to a 10 year frequency from entering adjacent properties; and restoration of two acres of floodplain to increase storage. Project Cost: Conservation Easement: $9,000.00 Construction: $238,300.00 Benefits: Economy The project will increase residential property values by flood reduction; reduction in insurance premiums for residential properties; alleviation of repetitive flood damage claims to residential properties (damages as of June 2009 totaled $217,000). Safety, protecting lives, and property The project, as proposed, will result in the abatement of these damages and a decrease in the emergency services provided by the town. Conservation The project restored an impaired floodplain and a buried stream to a geomorphic state consistent with upstream and downstream conditions. This will benefit native wildlife and provide significant aesthetic value to the local community. Greening the environment: This project resulted in the day-lighting of 400 feet of buried stream. Additionally, one acre of filled flood plain will be restored. Page 2 of 12

Janet Drive Photos Project Site Overview March 2010 Flood (pre-construction) Page 3 of 12

Janet Drive Photos New Stream Channel New Earthen Berm Page 4 of 12

Pocasset River Riverview Terrace and Blackamore Pond Floodplain Restoration Cranston Description: This project was identified as part of the Pocasset River Watershed PL 566 Study. An existing stream alignment exiting out of Blackamore Pond was routed into an undersized culvert passing through a residential neighborhood. During larger storm events, this culvert overflowed and caused flooding to 67 residential properties located within the vicinity of the culvert. Floodplain Easement: Permanent conservation easement has been acquired by NRCS in the amount of $109,000.00 for 25.40 acres with the City of Cranston. Works of Improvement: Restoration activities included removing floodplain fill to provide additional flood storage during flood events; relocating/recreating the stream channel from the culvert using bioengineering techniques with direct connection to Pocasset River in order to convey necessary flows without flooding residential properties. Project Cost: Conservation Easement: $109,000.00 Construction: $531,363.00 Benefits: Economy Alleviation of repetitive flood damage claims to 67 residential properties. Average annual damages based on economic analyses conducted as part of the PL566 project are $484,000 to the Riverview Terrace neighborhood. Safety, protecting lives, and property Demand for city emergency services will be reduced during flood events. Homes that now regularly flood will benefit by reducing public health issues associated with mold growth, sewage backups, and power outages. Conservation Aquatic habitat and associated floodplain wildlife habitat will be restored by restoring the historic stream channel. Greening the environment: Structural and bio-engineered stream channel techniques will replace the existing ditched and piped stream system. Page 5 of 12

Blackamore Pond Photos March 2010 Flood (pre-construction) Page 6 of 12

Blackamore Pond Photos Brush mattresses/root wads along new stream bank New Stream Channel Page 7 of 12

Pawtuxet and Pocasset River Confluence Floodplain Restoration Cranston Description: A section of floodplain located at the confluence of two rivers was historically a wetland but had been used as a place to deposit excess fill. Floodplain Easement: Permanent conservation easement has been acquired by NRCS in the amount of $95,000.00 for 25.80 acres with the City of Cranston. Works of Improvement: Restoration activities included removal of dikes and associated floodplain fill to provide additional flood storage during flood events and restore floodplain connectivity to the Pawtuxet and Pocasset Rivers. Other activities included clearing, grubbing, and reestablishment of floodplain vegetation. Project Cost: Conservation Easement: $95,000.00 Construction: $452,253.00 Benefits: Economy Reducing severity and duration of flooding will increase adjacent residential/commercial property values through flood reduction. The project will help reduce sediment delivery to an adjacent navigation channel that was recently dredged. Fishery benefits Restored floodplain connectivity will directly improve spawning/nursery habitat for resident freshwater fisheries and diadromous fisheries including: Federal Listed Fish Species of Concern (Alewife and Blueback Herring), American Shad, and American Eel. Safety, protecting lives, and property - Addressing the downstream Pawtuxet River dam removal and floodplain easement and restoration at Pawtuxet River Oxbows in conjunction with this proposed project will help to reduce duration and severity of upstream flood damages. Conservation Increased floodplain area will result in increased flood storage, sediment trapping, enhanced water quality benefits by increasing dissolved oxygen and nutrient cycling, and enhanced fish and wildlife habitat. Page 8 of 12

Confluence Photos Floodplain fill area Page 9 of 12

Pawtuxet River Oxbows Floodplain Restoration Cranston Description: The Lower Pawtuxet River Oxbows (LPRO) have been subject to extensive physical modification by means of filling and earth moving to accommodate development, and agricultural and recreational uses, thereby altering the natural floodplain storage capacity and impacted the native ecology of the LPRO. Based on historic mapping information, these anthropogenic fill activities have also contributed to decline in flow between the LPRO and the Lower Pawtuxet River (LPR). NRCS proposed to improve the connection between the LPRO and the river and reconnect the westernmost oxbow, which has been isolated from the river. Floodplain Easement: Permanent conservation easement has been acquired by NRCS in the amount of $138,000.00 for 55.30 acres with the City of Cranston. An adjacent permanent conservation easement has been acquired by NRCS in the amount of $9,000.00 for 2.0 acres with Rhodes-on-the-Pawtuxet. Works of Improvement: Restoration activities included the removal of selected dikes and associated fill, restoration of channel geometry using bioengineering techniques, and restoration of floodplain connectivity to the main stem of the Pawtuxet River. Project Cost: Benefits: Conservation Easement Total: $147,000.00 Construction: $308,225.00 Economy Reducing severity and duration of flooding will increase adjacent residential/commercial property values; reduce insurance premiums; and alleviate repetitive flood damage claims to 16 industrial/residential properties. Project will help reduce sediment delivery to an adjacent navigation channel that was recently dredged. Fishery benefits Restored floodplain connectivity will directly improve spawning/nursery habitat for resident freshwater fisheries and diadromous fisheries including: Federal Listed Fish Species of Concern (Alewife and Blueback Herring), American Shad, and American Eel. Safety, protecting lives, and property - Addressing the downstream Pawtuxet River dam removal and floodplain easement and restoration at Pawtuxet and Pocasset River Confluence in conjunction with this proposed project will help to reduce duration and severity of upstream flood damages. Conservation Increased floodplain area will result in increased flood storage, sediment trapping, enhanced water quality benefits by increasing dissolved oxygen and nutrient cycling, and enhanced fish and wildlife habitat. Page 10 of 12

Oxbows Photos Channel at Oxbow #1 pre-construction Bridge and channel at Oxbow #1 post-construction Page 11 of 12

Oxbows Photos Log cribbing at Oxbow #2 Channel at Oxbow #2 with erosion control matting and plantings Re-establishing connection to Pawtuxet River at Oxbow #3 Channel at Oxbow #3 with erosion control matting on banks Page 12 of 12