Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie
|
|
|
- Ambrose Wilkinson
- 9 years ago
- Views:
Transcription
1 September 7, 2011
2 Welcome Catherine Daly Woodbury DCR Coordination Dan Driscoll Project Background Catherine Daly Woodbury Stormwater Wetland Design and Construction Mitigation Duke Bitsko Construction Activities, Schedule and Sequence Tom Ritchie Post Construction Activities and Project Benefits Duke Bitsko Questions
3 Department of Conservation and Recreation Dan Driscoll Cambridge DPW Catherine Daly Woodbury Engineering Kleinfelder/S E A and MWH: Vin Spada, Tom Ritchie Bioengineering Group: Duke Bitsko, Phil Rury Construction P. Gioioso & Sons: Joe Gioioso
4 Project is part of the MWRA Long-Term CSO Control Plan for Alewife Brook LTCP will reduce CSO volume to Alewife Brook by 85% Designed to meet the goals and objectives of DCR s Master Plan for Alewife Reservation
5 CambridgePark Drive Area Drainage Improvement and Stormwater Wetland Project Part of the MWRA s Long Term Control Plan (LTCP)for CSO Control Will allow the sewer separation of CAM004 (Huron A, Huron B and Concord Ave) Will result in the closure of the CAM004 CSO regulator LTCP will reduce volume and frequency of CSOs to the Alewife Brook 50mg annually 7.3mg 63 activations per year 7 activations
6 Relocate/lower existing utilities Wetland reflagging Survey of Limit of Work (LOW) area Installation of LOW fence and erosion control Wildlife assessment
7
8
9
10
11 Final polish of stormwater before discharge into Little River: Sedimentation (in forebay) Adsorption to sediments Physical filtration by plants Microbial breakdown & plant uptake Treatment wetlands are effective at removing suspended solids, heavy metals and nutrients from urban stormwater Retains up to 10.3 acre-feet of stormwater to reduce peak flows to Little River during major storm events
12 Habitat Creation Deep, emergent and high marsh Wet meadow, broadleaf floodplain and open water Scrub/shrub and riparian woodland Over 115,000 new wetland plants Over 3,800 new upland plants
13 Site Amenities Multi-use connector path (Mass DOT) Trails and boardwalks (1,600 linear feet) Overlooks (3) Amphitheatre Benches and bike racks DCR Kiosk and interpretive signage
14 Erosion and sedimentation control Wildlife impacts Multi-Use Path detour and signage
15 BMP Devices (temporary) Sediment control basins Flood protection berm Cover crop seed mix and/or matting Compost filter socks Turbidity curtain (Little River)
16 Turbidity Curtain
17 Compost Filter Socks
18 Wildlife Impact/Risk Assessment Conclusions: October start maximizes use of food resource Minimal breeding season/migratory bird risks Avoid Little River disturbance during Alewife run Licensed Wildlife Trappers were consulted: Predicted resident wildlife will leave work area when clearing and grubbing commence Relocate wildlife outside of the work area American Woodcock
19 Preconstruction Wildlife Reconnaissance Search work area for burrows, dens, nest sites Provide gaps in construction fencing Site monitoring to detect any fauna at risk Preconstruction Rare Plant Reconnaissance Botanist will search entire impact area
20
21 Pre Wetland Activities Utilities relocation (ongoing) Species identification Erosion control and impact mitigation Clearing begins October 1 Species relocation Wetland Construction Grubbing Earthwork: soil excavation and berms Cover crop planting Boardwalk and amphitheater construction Wetland soils, plantings and seeding Final path paving
22 Clearing Mower Skidder Earthwork Bulldozer Excavator Dump Trailer
23 Wetland Construction Start October 2011 Fall/Winter Species identification/relocation; erosion control Site clearing Install berms and French drains Excavate and shape Oxbow, Main Outlet and Forebay elements Spring 2012 Install timber overlook, piping and plantings Excavate and install plantings for central area east of access road Fall 2012 Excavate remaining central area; install boardwalk and plantings Install amphitheater Remove outlet barriers after vegetation is established Spring 2013 Any remaining planting Anticipated Completion April 2013
24 Fall/Winter Species identification and relocation Erosion control and site clearing Install berms and French drains Excavate Oxbow, Main Outlet and Forebay areas MAIN OUTLET OXBOW FOREBAY
25 Spring 2012 Install timber overlook Planting of Forebay, Oxbow and Main Outlet areas Excavate central wetland and begin planting CENTRAL UPLANDS/WETLANDS OVERLOOK
26 Fall 2012 Construct amphitheater Install boardwalks Complete planting of central wetland and upland area Complete Multi Use Path Spring 2013 Complete plantings BOARDWALKS AMPHITHEATER
27 Observe plant growth Replace vegetation as needed Identify invasive species for removal Exclusion Fencing
28 Alewife Reservation Project Benefits Fully integrated with DCR Alewife Reservation and Greenway Master Plan: Water Quality Improvements: 3.4 acre treatment wetland, and future closure of the CAM004 regulator Ecological enhancements of fish and wildlife habitat quality Mitigation of invasive plant species Improved site amenities Educational and recreational opportunities
29 Contact Information Primary Contact: Catherine Daly Woodbury Hour Emergency Reporting Cambridge DPW at DCR Primary Contact: Dan Driscoll Web site Information under CambridgePark Drive Area Drainage Improvements and Stormwater Wetland Project
30 Questions?
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
Green Spaces to Improve Waterways and Communities
Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015
Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects
City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
Massachusetts Water Resources Authority. Combined Sewer Overflow Control Plan
Alewife Wetland, Cambridge March 2014 MWRA Board of Directors Richard K. Sullivan, Jr., Chairman John J. Carroll, Vice-Chairman Joseph C. Foti, Secretary Joel A. Barrera Kevin L. Cotter Paul E. Flanagan
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
SECTION 5. Sediment Control Measures
SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished
The Muddy River: A Century of Change
The Muddy River: A Century of Change Tom Brady, Brookline Conservation Administrator, Tree Warden, Town Arborist 617-730-2088 or [email protected] Muddy River Flood Damage Reduction and Environmental
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
Muddy River Restoration Project Project Description
Muddy River Restoration Project Project Description Since the fall of 1996, the Muddy River has flooded three times, causing damage to residents, businesses institutions and the public transit system in
Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding
New York State Water Resources Institute Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation
Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation 702 E. Johnson Street, Madison, Wisconsin 53703 (608) 441-2677 Fax (608) 441-2676 [email protected]
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets
SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation
CITY OF UKIAH TREE MANAGEMENT GUIDELINES TREE MANAGEMENT POLICIES FOR THE PROTECTION, OPERATION AND MAINTENANCE OF CITY PROPERTY
CITY OF UKIAH TREE MANAGEMENT GUIDELINES TREE MANAGEMENT POLICIES FOR THE PROTECTION, OPERATION AND MAINTENANCE OF CITY PROPERTY FINAL DRAFT November 2010 1.0 PURPOSE STATEMENT The purpose of this document
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
ANGORA FIRE RESTORATION PROJECT
ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist 3 PHASES OF FIRE REHAB Phase I Rehab:
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
CASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management
40 slide sample of Presentation Please contact [email protected] if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated
Waterway Technote Drains
Waterway Technote Drains Contents Benefits of good drain practice 1 Are your drains healthy? 2 The Sustainable Dairying Water Accord 3 Planning drain maintenance 3 Fencing and clearing 3 Bank shaping (battering)
13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT
13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT A. Existing Conditions Ramsey is fortunate to have an ample amount of natural resources and open space areas and a community attitude that is increasingly
4.2 Buena Vista Creek Watershed
Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: [email protected]
Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL
Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL Thomas Nelson Community College 99 Thomas Nelson Drive Hampton, VA 23666 4601 Opportunity Way Williamsburg, VA 23188 TABLE
Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT
UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the
Floodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
BROWNFIELD REDEVELOPMENT AND ECOLOGICAL RESTORATION AT INDIAN RIDGE MARSH, CHICAGO, ILLINOIS
BROWNFIELD REDEVELOPMENT AND ECOLOGICAL RESTORATION AT INDIAN RIDGE MARSH, CHICAGO, ILLINOIS Robert Smalley, U.S. Army Corps of Engineers City of Chicago Department of Environment Jack Brunner, Dennis
Appendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
Chesapeake Bay Preservation Area (CBPA) in Virginia Beach, Virginia. The Resource Protection Area (RPA) and Buffers The First 100 Feet
Chesapeake Bay Preservation Area (CBPA) in Virginia Beach, Virginia The Resource Protection Area (RPA) and Buffers The First 100 Feet How Large is the Chesapeake Bay Watershed? The Chesapeake Bay Watershed
Briefing note: Sustainable Stormwater Management prepared by the NTUA
Briefing note: Sustainable Stormwater Management prepared by the NTUA Sustainable drainage systems are cost-effective easy-to-manage solutions, designed to manage runoff flow rates, reduce the impact of
GENESEE COUNTY DRAIN COMMISSIONER S OFFICE
GENESEE COUNTY DRAIN COMMISSIONER S OFFICE DIVISION OF SURFACE WATER MANAGEMENT G-4608 BEECHER ROAD, FLINT, MI 48532 PHONE (810) 732-1590 FAX (810) 732-1474 JEFFREY WRIGHT COMMISSIONER October 1, 2012
Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington
Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline
San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide
What Is Rehabilitation?
Location of Aggregate Operations Ready Mix Plant Locations Aggregate Locations Cement Terminal Locations What Is Rehabilitation? Rehabilitation is the treatment of land from which aggregate has been excavated
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org [email protected] Chagrin River Watershed Partners Formed
Michigan Wetlands. Department of Environmental Quality
Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about
Restoration Planning and Development of a Restoration Bank
Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program
Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015 Outline MMSD Service Area Problem and Challenges Solution
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
Remaining Wetland Acreage 1,500,000 915,960 584,040-39%
NEW JERSEY Original Wetland Acreage Remaining Wetland Acreage Acreage Lost % Lost 1,500,000 915,960 584,040-39% New Jersey Wetlands: Nearly 99 percent of New Jersey s wetlands are palustrine or estuarine.
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
Proposed Action: Morrow Flat Substation Construction and Related Improvements Near Boardman, Oregon
DOE F 1325.8 e Electronic Form Approved by CGIR - 01/20/95 (8-89) United States Government memorandum Department of Energy Bonneville Power Administration DATE: August 8, 2014 REPLY TO ATTN OF: KEC-4 SUBJECT:
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting
Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth
Beseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan
Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how
STATE LEVEL AGREEMENT BETWEEN THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION
STATE LEVEL AGREEMENT BETWEEN THE NATRAL RESORCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION PRPOSE The NRCS, and New Jersey State Historic Preservation Officer (SHPO)
Sustainable Drainage Systems (SUDS) A guide for developers
Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
Sims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA
IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA David Chastant AUTHORS:DeKalb County, 330 West Ponce De Leon Ave, Decatur, Georgia 30030 REFERENCE:Proceedings
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
PNWS-AWWA PRESENTATION May 9, 2013 Spokane, Washington. Water Operations Stormwater Best Management Practices
PNWS-AWWA PRESENTATION May 9, 2013 Spokane, Washington Water Operations Stormwater Best Management Practices Presenters David Owens- Senior Water Pipe Worker; Certified Erosion and Sediment Control Lead
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
Prepared By: Tom Parker Geum Environmental Consulting, Inc.
Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs
LOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION
LOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION LILAC MANUAL LOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION TABLE OF CONTENTS Introduction... 3 General Eligibility... 4 Specific Eligibility Criteria
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold
CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable
Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007
Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal
Beasley Lake Watershed National Sedimentation Laboratory Water Quality & Ecology Research Unit USDA ARS Oxford, Mississippi
Beasley Lake Watershed National Sedimentation Laboratory Water Quality & Ecology Research Unit USDA ARS Oxford, Mississippi M. A. Locke, S. S. Knight, C. M. Cooper, S. Smith, Jr., M. T. Moore, F. D. Shields,
Mosquito Control Guidelines
Appendix G Mosquito Control Guidelines This appendix presents the guidance for designing and maintaining stormwater treatment measures to control mosquitoes from ACCWP s Vector Control Plan. Project sponsors
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
Restoring Ecosystems. Ecosystem Restoration Services
Restoring Ecosystems Ecosystem Restoration Services 2 Ecosystem Restoration Services AECOM s integrated approach sciencebased planning, with innovative design and execution delivers sustainable and cost-effective
OXBOW RESTORATION PROJECT RECONNECTING TO OUR RIVER AND OUR HABITAT
OXBOW RESTORATION PROJECT RECONNECTING TO OUR RIVER AND OUR HABITAT John O Meara, Jane Tesner, Razik Alsaigh Environmental Consulting & Technology, Inc. 1249 Washington Blvd., Suite 3500 Detroit, MI 48226
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately
West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting
West Thornhill Stormwater Flood Remediation Phase 1 Construction Community Information Meeting Thornhill C.C. May 7, 2014 Purpose To advise residents and businesses of 2014 and 2015 construction activities
Section 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,