2013-14 HIGHWAY INFRASTRUCTURE CAPITAL PROJECT LIST



Similar documents
HIV Post-exposure Prophylaxis (PEP) Kit Depot List

How To Build A Stronger Manitoba

Flood Fighting. in Manitoba. A History and Background of Manitoba s Flood Protection Works

Journeyperson Business Start Program Guidelines

MANITOBA FLOOD PROTECTION PROJECTS Project Justification and Benefits. Science Imagination Collaboration

General Obligation Bond Projects FYE

Manitoba Family Services Early Learning and Child Care. Information on the Classification of Early Childhood Educators and Child Care Assistants

ICE CONSULTING INTERNATIONAL HANS R. WUTHRICH Box 1609 Gimli Manitoba Canada R0C 1B0 Fax Cell

Department of Transport and Main Roads. North West

A. Interpretation from one official language to the other for all criminal and civil proceedings*

Personal Care Homes Designation Regulation. Règlement sur la désignation de foyers de soins personnels

Information on the Classification of Early Childhood Educators and Child Care Assistants

18 months in Manitoba emergency management

2014 CONSTRUCTION PLAN

Flood Mitigation Efforts in the Red River Basin. Slobodan P. Simonovic University of Manitoba University of Western Ontario

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

Titles Online User Guide. The Property Registry s

New directions for community safety. Manitoba s Strategy for. Victim-Centred. Justice

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

加 拿 大 留 學 中 心 (Foreign Student Services)

Table of Contents. Different licences for different vehicles 1. Authorized Instruction: Learning to drive other types of vehicles 6

FIRST NATIONS WELLNESS AND ADDICTIONS COUNSELOR CERTIFICATION BOARD

FY 2009 Economic Stimulus List

MORNINGTON SHIRE COUNCIL. Karumba. Burketown. Normanton BURKE SHIRE COUNCIL. Gregory MOUNT ISA CITY COUNCIL. Cloncurry CLONCURRY SHIRE COUNCIL

SCDOT TENTATIVE LETTINGS Rehabilitation & Resurfacing March February 2017 Subject To Change Without Notice

TOWN OF AJAX GEODETIC BENCHMARKS 2007 EDITION

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

Rural Settlement Patterns

11.0 City of Winnipeg Flood Protection Infrastructure

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/ Federal Project: BR-0252(001)D

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

3 Tappan Zee Bridge Rehabilitation Options

Alberta Transportation. Request for Proposals. Short List of Firms and Selection Results

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

2015 Manitoba Association of Fire Chiefs Trade Show

Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL

Introduction to the Envision Sustainability Rating System

Patterns of Job Growth and Decline

Maryland Invests $845 Million in New Highway and Bridge Projects

REGIONAL ROUND TABLE OVERVIEW COMMUNITY COLLABORATION PROJECT: EMPOWERING COMMUNITIES AND BUILDING CAPACITY

London Borough of Merton Local Flood Risk Management Strategy

(

DESIGN ASSISTANCE APPLICATION

SUMMARY OF COMMENTS/RECOMMENDATIONS. Central Manitoba Resource Management Ltd. Swansfleet Farms Irrigation Project

Advancements in GPR for a Sustainable Tomorrow

Highway & Bridge. Municipality: Exempt Code: Widen narw. pave. or recon brdgs (No addtl lanes)

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, TIP Public Review Meeting

CHALLENGES AND INNOVATIVE SOLUTIONS FOR BRIDGE FOUNDATION REPAIRS

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)

All routes and route segments included in this notice are available for selection and approval by the Public Utility Commission of Texas.

CAPITAL IMPROVEMENT PLAN

Job Roles and Responsibilities in Canada. Hairstylists

DOMINION LAND SURVEY. COMPOSED AND PRODUCED BY : Chris Rule. Permission is granted for use by acknowledging the author s name.

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan

CANADIAN CITIZENSHIP STUDY QUESTIONS & ANSWERS for the City of Richmond, 2010

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Draft Transportation Management Plan for Via Verdi Repair Project

Travel Allowance. Eligibility. Allowance. Chapter 3 Travel Allowance

Lawson Outline Plan External Traffic Analysis Working Paper

Chapter 13: Implementation Plan

IDOT Suspends Non-Emergency Road Work for Fourth of July Holiday Weekend

Alberta Transportation. Request for Proposals. Short List of Firms and Selection Results

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT

2015/2016 Apprenticeship Technical Training Registration Guide

Water Security Agency. Plan for saskatchewan.ca

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Elementary Schools 4. Middle Schools 12

Graduated Driver Licensing

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

H: Road Asset Management Plan February 2015

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

Town of Huntsville Municipal Asset Management Plan

Grant Approvals for 2012/2013 Community Places Program

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

Westoba. -ssential. WestProtect and Phillips Insurance Agency Join Forces. Plus

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute

Transcription:

2013-14 HIGHWAY INFRASTRUCTURE CAPITAL PROJECT LIST Trans-Canada Highway (PTH 1) Micro-surface seven kilometres in Headingley from Goal Road to the CPR Crossing Structure rehabilitation at Birch River located 4.8 km east of PR 506, east of Prawda Commence grade widening of 32 km from Brokenhead River to Greater Winnipeg Water District Railway crossing Commence intersection improvements in Headingley Micro-surface 0.9 km from four km east of PTH 26 to 4.9 km, east of PTH 26 Micro-surface 8.5 km from Portage la Prairie to west junction of PTH 1A Micro-surface eight km from PR 248 from 0.5 km, west of PR 332 Continue the culvert replacements from PTH 16 to the Portage Diversion Structure rehabilitation at Assiniboine River located 6.6 km west of PR 430, east of Portage la Prairie Pave 10 km of westbound lanes and shoulders from west of Portage la Prairie to PTH 16 Micro-surface 13.3 km from PTH 21 to west junction of PR 250 Continue paving the new service road in Brandon from Deer Ridge to one km east of east junction PTH 10 Minor structure rehabilitation at Assiniboine River located 0.7 km south of PR 459, west of Brandon Pave 13.1 km on the westbound lanes from PTH 5 to 13.1 km east of PTH 5 including the shoulders. PTH 1A Pave 0.9 km in Portage la Prairie from Eighth Street to 18th Street on Saskatchewan Avenue Pave 1.6 km in Brandon from 34th Street to 18th Street on Victoria Avenue PTH 2 Complete structure replacement at Codner Drain in the vicinity of Starbuck Micro-surface 15.3 km from PR 244 to PR 240 Commence structure rehabilitation at Souris River in the vicinity of Wawanesa as part of flood restoration...2

- 2 - Micro-surface 11.9 km from east junction of PR 256 to 11.9 km east, near the Reston access Micro-surface 21.5 km from PTH 22 to PTH 10 PTH 3 Intersection improvements at PTH 23 Continue grade widening, base and paving of 21.4 km from east junction PR 254 to south junction of PTH 21, west of Deloraine PTH 5 Pave 21.6 km from south junction PR 265 to PR 261 Structure rehabilitation at Shell River located 0.4 km east of PR 583, east of Roblin Micro-surface 10.2 km from PTH 19 to PTH 50 Grade west of PTH 10, southwest of Ashville Replace structure at drain located in the vicinity of Kelwood Replace structure at Turtle River located in the vicinity of Laurier PTH 6 Grade including base a 1.5 km new location in the vicinity of Woodlands Micro-surface 24.7 km from 42.3 km north of PR 513 to 67 km north of PR 513 Micro-surface 25.6 km from Grand Rapids Drive to 25.6 km north of Grand Rapids Micro-surface 29.8 km from PTH 39 to PR 373 Commence grading and culvert replacements of 25 km from Sasagiu Rapids to 25 km north PTH 7 Pavement rehabilitation of 20.6 km from 1.6 km south of PTH 101 to 2.3 km north of PTH 67 PTH 9 Commence paving of 13 km from PTH 4 to three km north of Clandeboye PTH 10 Micro-surface 22.2 km from south junction PTH 23 to south junction of PTH 2...3

- 3 - Culvert jacking from 6.7 km north of PTH 3 to 0.8 km north of south junction PTH 23 Minor structure rehabilitation at Souris River located south of south junction of PTH 2 as part of flood restoration Commence grade widening, base and paving including the passing lanes of 15.6 km from 0.4 km north of PTH 25 to 4.5 km north of PTH 24 Structure rehabilitation at Bowsman River located 0.9 km north of PR 266, north of Bowsman Grade north of Ashville Pave 15 km from Overflowing River to 10 km south of PTH 60 Pave 19.8 km from 19.8 km south to Overflowing River Various culvert replacements located south of The Pas from PTH 60 to PR 289 PTH 11 Commence structure rehabilitation at Powerview Creek, near Pine Falls Micro-surface 14.2 km from 5.8 km west of the south junction of PTH 44 to the north junction of PTH 44 PTH 12 Commence structure replacement at West Pine Creek located 2.7k m east PTH 89, east of Piney Commence structure replacement at East Pine Creek located 3.5 km east PTH 89, east of Piney Commence structure replacement at Sprague Creek located 0.5 km west of PR 308, south of Sprague Commence structure replacement at Mud Creek located 1.1 km west of PR 308, south of Sprague Commence structure replacement at Seine River Diversion located 1.5 km south of PR 210, south of Ste. Anne Micro-surface 40.2 km from PR 308 to PR 210 Replace structure at Rat River Diversion, southwest of Zhoda PTH 13 Continue culvert jacking from Carman to Elm Creek...4

PTH 16-4 - Complete grade widening, base and paving of 18.2 km Binscarth to east of Foxwarren PTH 20A Intersection improvements in Dauphin at Mountain Road PTH 21 Replace structure at Souris River located in the vicinity of Hartney as part of flood restoration PTH 23 Continue the structure rehabilitation at Red River location 1.2 km east of PTH 75, east of Morris PTH 34 Complete structure replacement at Gillespie Drain, south of Gladstone PTH 44 Micro-surface four km from PTH 9 to PTH 59 PTH 59 Micro-surface eight km from two km north of PTH 101 to PR 213 Commence paving 28 km from north of the Brokenhead Ojibway First Nation to PTH 11 PTH 75 Commence intersection improvements at U.S. border PTH 83 Grade reconstruction from 1.1 km north of PR 366 in the vicinity of Inglis Commence grading, base and paving of 1.8 km from PR 366 to 1.8 km north PR 366 in the vicinity of Inglis Complete grading, base and paving of 20.4 km from north of PR 367 to south of PTH 57, north of San Clara Commence grading, base and paving of 8.5 km from PR 264 to north of PR 482...5

- 5 - PTH 100 (South Perimeter Highway) Pavement rehabilitation at PTH 1 west junction, south Perimeter Structure rehabilitation at east interchange of PTH 1, south Perimeter Commence intersection improvements from Brady Road to PR 330, south Perimeter Structure rehabilitation at PTH 75, south Perimeter Continue intersection improvements at various median openings on the south Perimeter PTH 101 Pavement rehabilitation of eight km from 0.9 km south of PTH 59 to 0.7 km north of PTH 15 PTH 110 Complete grading, base and paving of 4.1 km from Assiniboine River to PTH 1 PR 204 Minor structure rehabilitation at the Red River in Selkirk PR 205 Micro-surface 13.1 km from 22 km east of PTH 3 to PTH 75 PR 207 Structure rehabilitation at Cordite Drain located north of PTH 15 PR 211 Structure rehabilitation at Winnipeg River, east of Pinawa PR 213 Micro-surface 8.8 km from PTH 59 to PR 206 PR 221 Continue with the structures at CentrePort Canada Way Continue paving at CentrePort Canada Way PR 222 Replace structure at the Fish Creek drain located 1.7 km south of PR 324, south of Camp Morton...6

- 6 - PR 227 Continue replacing the structure at the Assiniboine River Diversion, north of Portage la Prairie as part of flood restoration PR 243 Grade, base and pave one km in Reinland PR 245 Grade 2.8 km from east junction of PR 242 to 2.8 km east PR 246 Structure rehabilitation at St. Jean Baptiste as part of flood restoration PR 251 Replace structure at Souris River located in the vicinity of Coulter as part of flood restoration PR 253 Commence structure replacement at Pembina River located west of Pilot Mound PR 255 Commence road improvements of various locations between PR 256 to PTH 83 PR 269 Micro-surface 14.6 km from south junction PTH 20 to north junction PR 364 PR 280 Continue grading from PR 391 to 174 km east of PR 391, cost-shared with Manitoba Hydro PR 287 Replace structure at Cormorant Lake Narrows located 38.7 km north of PR 384, at Cormorant PR 304 Continue grading improvements from Manigotagan to east of Wallace Lake...7

- 7 - PR 315 Continue grading improvements from PR 313 to Ontario boundary PR 325 Road improvements of 10 km between 12.9 km east of PTH 6 to 38.7 km east of PTH 6 PR 334 Micro-surface 0.8 km from PTH 3 to PR 247 PR 340 Surface 10.4 km from PR 453 to 10.4 km north of PR 453 PR 348 Minor structure rehabilitation at Little Souris River located southwest of Brandon as part of flood restoration PR 373 Continue surfacing 28.8 km from six km north of Rossville junction to Sea Falls, north of Norway House Continue grading 21.8 km from Minago River to 21.8 km north of Minago River, north of Jenpeg PR 384 Continue grading of the new location in the vicinity of Lobstick Creek PR 391 Grade improvements of various locations from Thompson to Suwannee River PR 392 Continue grading, base and paving of Hudson Bay PR 481 Road improvement from Cayer to Crane River as part of flood restoration PR 483 Surface various locations from PTH 10 to Sapotaweyak Cree Nation...8

- 8 - PR 513 Micro-surface from PTH 6 to 10.1 km east of PTH 6 Road improvements from east of PTH 6 to Dauphin River First Nation PR 610 Intersection improvements in Brandon at 17th Street East (Richmond Avenue) Winter Roads Continue installing the structure at Panko Narrows