Contracts Awarded by Gympie Regional Council worth $200,000.00 or more



Similar documents
CIVIL AND MINING CONTRACTORS

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

Application Form - Contracting Firm

Specialist remote area rental solutions.

Prequalification Benefits and Process. Working with TMR

Papich Construction, Inc. Experiences Dramatic Growth Through Vertical Integration And Diversification

Township of Enniskillen. Asset Management Plan

WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGES CLAIMS

Ardessie Hydro Electric Project

MORNINGTON SHIRE COUNCIL. Karumba. Burketown. Normanton BURKE SHIRE COUNCIL. Gregory MOUNT ISA CITY COUNCIL. Cloncurry CLONCURRY SHIRE COUNCIL

CQFMS owns and maintains a fleet of specialised plant and equipment to ensure we are able to provide the best service possible to our clients.

Long Service Leave. Your obligations as an employer of construction industry workers

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

Department of Transport and Main Roads. North West

INNOVATIVE CONSTRUCTION SOLUTIONS RURAL

Capability Statement PROVEN CONTRACT & PROGRAM PERFORMANCE

Pipeline Replacement using Relining

H: Road Asset Management Plan February 2015

ASSET CAPITALISATION AND MATERIALITY THRESHOLD POLICY

ROAD EQUIPMENT MANAGEMENT: A CHALLENGE FOR CAPACITY BUILDING OF LOCAL CONTRACTORS IN TANZANIA

Aquatera 2015/16 Business Plan Highlights

Unit Price Averages Reports

Screening Crushing Mixing Aerating Loading ALLU SM. Screener Crusher

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Mining & Drilling Services Pty Ltd

3. QUALITY ASSURANCE REQUIREMENTS

Bridges & Culverts Condition by Quantity

McCullough Construction Inc.

Road Maintenance Techniques

Advancements in GPR for a Sustainable Tomorrow

SECTION SELECTIVE DEMOLITION

LIGHT FLEET, PLANT & HEAVY VEHICLE REPLACEMENT & MANAGEMENT Light Fleet, Plant & Heavy Vehicle Replacement & Management

ANNEX M TO THE FAIRFIELD COUNTY EMERGENCY OPERATIONS PLAN

ASSET CAPITALISATION AND MATERIALITY THRESHOLDS Financial Management Policy

ASSET MANAGEMENT PLAN

For personal use only

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

TRACTORS SINGAPORE LIMITED (TSL)

15/07/2011 MMD Projects /07/2011 Catherine Construction /08/2011 Monde Consulting Engineers

SKID STEER SPEC GUIDE

AUSTRALIAN PAVING CENTRE

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Let Us Give Utilities the Respect that they Deserve.

Cert Plus Training & Assessment

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

Guidelines for. Permeable Pavement

Guidance on applying for approval of installation of a commercial onsite wastewater system

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015

WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

RESOLUTION R PASSED AT SYCAMORE, ILLINOIS, THIS 16th DAY OF JUNE 2004, A.D. Chairman, DeKalb County Board ATTEST: County Clerk

APPLICATION FOR EMPLOYMENT

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation

10.0 ASSET MANAGEMENT PRACTICES

Traffic Management Issue 1.0 Revision: v2 October 2014

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

Programmes Elegible for CCD Points for Contractor Registration Construction Industry Development Authority (CIDA)

Permeable Pavement Construction Guide

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape

Public Outreach Meeting

Paving Capitalization Work Categories and Treatments

Permeable Pavement Operation & Maintanence Guide

City of Hilshire Village Pine Creek Ln Reconstruction

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

CAPABILITY STATEMENT

age'nin sahip olduðu makina ve ekipman listesi list of machinery and equipment owned by age

Workshop & Lectures on Pavement Engineering, Maintenance and Management

L4. Pipes Materials and Loads

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Presentation Agenda. Introduction. Types of Flooding Identifying Flood Risks Property Improvements Additional Resources.

INFORMATION PACK. Registered Company Address. Contact Names Robert Hatton Chris Jones. Telephone

Contracting Opportunities Vendor Day May 17, 2011

City of Canning. Asset Management Strategy

Settlements Must Be Integrated with Nature

LEAKING SUPPLY PIPE? YOUR GUIDE TO WATER SUPPLY LEAKS. You were out when we visited today.

700 Life-Cycle Cost Analysis

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Transcription:

RFT 2014/2015 T027 Provision of Recycling Services at Waste Management Facility RFT 2014/2015 T025 Connonngibber Creek Road Bridge Replacement RFT 2014/2015 T020 Snapper Creek Sewer Rising Main and T6 Trunk Sewer Main RFT 2014/2015 T018 Elliot & Nelson Rd Bridges RFT 2014/2015 T015 Greenwaste Shredding - Waste Management Facilities RFT 2014/2015 T013 Asphalt Pavement Repairs RFT 2014/2015 T012 Southside Sewerage Infill Stage 5 RFT 2014/2015 T011 Gympie Sewerage Network Rehabilitation Program Stage 1 RFT 2014/2015 T010 Cooloola Coast Sewerage Network Rehab Program Stage 1 Australian Red Cross Society $4,620,000 Recycling Management Services Pentacon $713,130.40 Bridge Reconstruction Offaly Civil Engineering $495,043.39 Sewer Construction PJM Civil Contractors $521,305.88 Bridge Reconstruction TEBROC Unit Trust T/as Corbet s Group $200,000.00 Green Waste Shredding Tropics Asphalts $214,233.80 Asphalt Paving Repairs FBD Constructions and M&K Pipelines $863,961 and $590,267.53 Sewerage Infill Interflow $990,591.42 Sewerage Rehabilitation Interflow $732,363.62 Sewerage Rehabilitation RFT 2014/2015 T009 Slip Restoration Earthtec $831,978.94 Slip Restoration RFT 2014/2015 T008 Flood Restoration Sutton Building Solutions $517,128.70 Flood Restoration RFT 2014/2015 T006 Floodway Remediation Birth Enterprises $667,936.50 Flood Restoration RFT 2014/2015 T005 Slip Restoration GEO Stabilise $1,282,185.41 Slip Restoration RFT 2014/2015 T004 Floodway Restoration RFT 2014/2015 T003 Slip Restoration Various Locations Gatton Earthmovers PTY LTD $251,105.88 Floodway Restoration Earthtec $556,219.53 Slip Restoration Page 1 of 5

RFT 2014/2015 T002 Derrier Road Bridge Replacement RFT 2013/2014 T034 Reinke Road Slip Remediation RFT 2013/2014 T033 Asphalt Pavement Repairs RFT 2013/2014 T030 NDRRA Restoration Birt Enterprises PTY $439,019.35 Bridge Replacement Sunshine Coast Consulting $629,393.07 Slip Remediation Tropic Asphalts $219,890.00 Asphalt Paving Repairs Birt Enterprises $366,131.70 NDRRA Restoration RFT 2013/2014 T029 Asphalt Surfacing Allens Asphalt $357,956.55 Asphalt Paving Repairs RFT 2013/2014 T027 Fishermans Pkt & Mudlo Rd Restoration RFT 2013/2014 T014 NDRRA Remediation Lanson Covil $959,642.20 Restoration Gympie Building Company $218,589.94 NDRRA Remediation RFT 2013/14 T010 AC Overlay Tropic Asphalts $606,951.90 Asphalt Paving Repairs RFT 2013/2014 T004 Construction of Floodway & Associated Floodworks RFT 2013/14 T001 NDRRA Remediation RFT 2012/13 T-020 Southside Sewerage Stage IV Sunshine Coast Consulting $247,857.27 Construction of Floodway & Associated Floodworks Gympie Building Company $482,408.00 NDRRA Remediation M&K Pipelines $1,397,496.55 Southside Sewerage Stage IV RFT 2012/13 T-026 G12 Trunk Sewer M&K Pipelines $1,143,180.77 Construction of G12 Trunk Sewer RFT 2012/13 T-024,025 Provision of Gate Keeping and Recycling Services Res-Q & Recycle $378,886.40 Provision of Gate Keeping and Recycling Services RFQ 2012/13 Q-052 Asphalt Paving Repairs Tropic Asphalts $216,730.80 Asphalt Paving Repairs Emergent /Flooding Barcoo Plant Hire $264,480.85 Crushing & Screening of Quarry Materials Page 2 of 5

RFT 2012/13 T524 Plant Purchases Hastings Deering (Aust) $251,854.95 Cat Wheeled Loader Local Government Legislative Change Previously $100,000.00 or more now $200k or more RFT 2012/13 Q-530 Plant Purchase Action Auto Group $109,048.37 Mitsubishi Pajero Vehicle RFT 2012/13 T520 Plant Purchase Hi-Way 1 Truck & Tractor $246,088.48 Hino 2634 Truck RFT 2012/13 T009 Asphalt Surfacing Downer EDI $184,579.62 Asphalt Surfacing Goomeri RFT 2012/13 T505 Plant Purchase Pacific Hyundai $203,190.35 Six Hyundai ix35 Vehicles RFT 2012/13 T-518 Plant Purchase Hi-Way 1 Truck & Tractor $189,707.49 Hino 2632 Tipper Truck RFT 2012/13 T-516 Plant Purchase Hitachi Construction Machinery $331,690.00 JD 670G Grader RFQ 2012/13 Q519 Plant Purchase Madills Isuzu Truck Service $118,848.00 Four 4x2 Colorado Utilities RFQ 2012/13 Q009 Asphalt Overlay Sunstate Group QLD $107,993.44 Asphalt Overlay Hilton Road Gympie RFT 2012/13 T-502 Plant Purchase Hastings Deering (Aust) $385,100.00 Cat 953D Loader RFT 2012/13 Q-500 Plant Purchase Hi-Way 1 Truck & Tractor $265,912.79 Hino 500 Series Truck RFQ 2012/13 Q502 Plant Purchase ASC Dulevo $109,976.80 Dulevo Footpath Sweeper $113,841.44 2012/13 T002 Geofabrics Australia $136,276.27 Foam Bitumen Stabilizing at Burnett Hwy Goomeri Geosynthetic Clay Liner for Waste Facility Page 3 of 5

2011/12 Q249 Plant Purchase 2011/12 T020 NDRRA Floodway & Culvert 2011/12 Q561 Plant Purchase Allclass Construction Equipment Pty $109,635.67 Pavement Stabilisation $136,075.05 Kubota Excavator $111,218.61 Pavement Stabilisation Gympie Building Company $259,259.16 NDRRA Floodway & Culvert Bundy Star Truck & Machinery Pty $119,000.00 Sterling Truck $110,088.52 Pavement Stabilisation 2011/12 T513 Plant Purchase Action Auto Group $238,524.60 6 x PX Ranger Utilities 2011/12 T509 Plant Purchase 2011/12 T-011 Design & Construct Effluent Irrigation System - Gympie Sewerage Treatment Plant 2011/12 T-007 Design & Construct Shed Gympie Sewerage Treatment Plant 2011/12 T-008 NDRA Floodway & Culvert Dynapac T/A Atlas Copco Construction Equipment Australia Turf Irrigation Services $152,651.00 Timmel T/A Nutrend Construction $156,200.00 Dynapac Drum Roller $159,481.32 Design & Construct Effluent Irrigation System - Gympie Sewerage Treatment Plan Design & Construct Shed Gympie Sewerage Treatment Plant Q Civil Contractors $847,088.00 NDRA Floodway and Culvert 011/12 Q525 Plant Purchase Hi Way 1 Truck & Tractor $143,407.44 Two Hino Trucks 2011/12 Q-011 Asphalt Overlay Tropic Asphalts $137,423.20 Asphalt Pavement Repairs (Various) 2011/12 Q-14 Asphalt Overlay Tropic Asphalts $116,510.54 Asphalt Pavement Repairs (Various) Page 4 of 5

2011/12 T-511 Plant Purchase Madills Isuzu Truck Service $195,188.49 Isuzu Truck 2011/12 T-506 Plant Purchase 2011/12 T-142 Ductile Iron Pipe & Fittings Hitachi Construction Machinery Australia $290,840.00 Hitachi Excavator Tyco Water $579,811.93 Teewah Creek Pipeline Project $463,343.68 Pavement Stabilisation 2010/11 Q-505 Plant Purchase Madills Isuzu Truck Service $141,902.94 Isuzu Truck Local Buy Contact Arrangement Local Buy Contact Arrangement 2011/12 T-002 Goomeri Amenities Block Construction $125,035.50 Pavement Stabilisation $230,135.06 Pavement Stabilisation Suttons Building Solutions $178,351.80 Amenities Block Construction 2011/12 Q-503 Hastings Deering (Aust) $116,250.00 Skidsteer Loader 2011/12 T-142 Ductile Iron Pipe & Fittings 2009/10 T-116 Water Meters & Valves Tyco Water $490,733.07 Teewah Creek Pipeline Project Promains (Qld) $338,215.00 20mm DCV Meters Q-6110001877 Council Minute W41/05/11 Main Roads $298,201.01 Bitumen Reseal Bruce Hwy Page 5 of 5