WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGES CLAIMS
|
|
|
- Jasper Pope
- 10 years ago
- Views:
Transcription
1 WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGES CLAIMS Expenditure Balance Summary Total R24,500, R24,500, R0.00 Dora R24,500, R24,500, R0.00 Under/Over Expenditure R0.00 Approval of Business Plan dated: 22 December 2004 Projects Hessequa Municipality: 1) Rehab of existing tar, concrete storm channel and drifts in Heidelberg 2) Rehab of sewage treatment works in Heidelberg 3) Rehab of roads, storm water culverts and main water outfall in Riversdale R9,064, R9,064, R0.00 Laingsburg Municipality: 1) Repair of main water supply in Bergsig community Swellendam Municipality: 1) Upgr of existing culvert bridge and pedestrian crossing in Barrydale 2) Repair of bridges crossing over the Koringland river 3) Repair of low water bridge and infrastructure at Swellendam 4) Remedial measures to stabilize bank erosions of the Koringland river 5) Repair of pipelines at Swellendam R32, R32, R0.00 R4,042, R4,042, R0.00 Bitou Municipality: 1) Rehab of roads in Green Valley R650, R650, R0.00 Breede River/Winelands: 1) Repair of civil services in Robertson include rebuilt, repair and reseal of streets sidewalks, rehabilitation of sidewalks channels and repairs to 2 x low water concrete bridges R1,368, R1,368, R0.00 Knysna Municipality: 1) Repair of damage community facilities (halls, creche) 2) Repair of solid waste handling facility 3) Repair of electrical infrastructure 4) Repair of recreation and sport facilities 4) Repair of water infrastructure 5) Repair of damaged facilities in the nature reserve 6) Repair of damaged sewer infrastructure 7) Repair to damaged roads and stormwater structure 8) Repairs to sidewalks R6,900, R6,900, R0.00 Mosselbay Municipality: 1) Repair to electrical systems and flood light at KwaNonqwaba 2) Repair to streets and storm water systems 3) Repair to sewer system R2,122, R2,122, R0.00 George Municipality: 1) Repair of damaged roads R320, R320, R /Reports/ Monthly Flood Damage claims-payments Jan2007/Summary Prepared by ekotze 2008/04/10 17
2 Summary Hessequa Municipality: 1) Rehab of existing tar, concrete storm channel and drifts in Heidelberg 2) Rehab of sewage treatment works in Heidelberg 3) Rehab of roads, storm water culverts and main water outfall in Riversdale R9,064, R9,064, Claims to date R9,064, Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January /Reports/ Monthly Flood Damage claims-payments Jan2007/Hessequa Bladsy 2 van /04/10
3 Hessequa Municipality: 1) Rehab of existing tar, concrete storm channel and drifts in Heidelberg 2) Rehab of sewage treatment works in Heidelberg 3) Rehab of roads, storm water culverts and main water outfall in Riversdale February 2006 R9,064, March Jan Hessequa Flood damages 2006/03/20 R2,275, Jan Hessequa Flood damage 2006/03/20 R3,944, Jan Hessequa Flood damage 2006/03/20 R732, Dec Hessequa Flood damage 2006/12/28 R2,113, TOTAL 4 R9,064, /Reports/ Monthly Flood Damage claims-payments Jan2007/Hessequa Bladsy 3 van /04/10
4 Laingsburg Municipality: 1) Repair of main water supply in Bergsig community R32, Summary R32, Claims to date R32, Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February Feb Laingsburg Repair of main water supply Bergsig dd 12/01/ /02/07 R29, TOTAL 1 R29, /Reports/ Monthly Flood Damage claims-payments Jan2007/Laingsburg Bladsy 4 van /04/10
5 Laingsburg Municipality: 1) Repair of main water supply in Bergsig community R32, March Mar Laingsburg Herstel hoof watertoevoer na Bergsig In /03/20 R3, TOTAL 1 R3, /Reports/ Monthly Flood Damage claims-payments Jan2007/Laingsburg Bladsy 5 van /04/10
6 Swellendam Municipality: 1) Upgr of existing culvert bridge and pedestrian crossing in Barrydale 2) Repair of bridges crossing over the Koringland river 3) Repair of low water bridge and infrastructure at Swellendam 4) Remedial measures to stabilize bank erosions of the Koringland river 5) Repair of pipelines at Swellendam R4,042, Summary R4,042, Claims to date R4,042, Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February /Reports/ Monthly Flood Damage claims-payments Jan2007/Swellendam Bladsy 6 van /04/10
7 Swellendam Municipality: 1) Upgr of existing culvert bridge and pedestrian crossing in Barrydale 2) Repair of bridges crossing over the Koringland river 3) Repair of low water bridge and infrastructure at Swellendam 4) Remedial measures to stabilize bank erosions of the Koringland river 5) Repair of pipelines at Swellendam R4,042, March Mar-06 Swellendam Repair of Infrastructure 2006/03/20 R379, Sep-06 Swellendam Barrydale: Repair Stormwater culverts 2006/09/29 R300, Mar Swellendam Memorandum of agreement 2006/03/20 R808, Sep Swellendam Repair Stormwater Culverts 2006/09/29 R478, Sep Suurbraak Repair Pipelines 2006/09/29 R860, Dec-06 Swellendam Barrydale: Repair Stormwater culverts 2006/12/28 R1,216, TOTAL 6 R4,042, /Reports/ Monthly Flood Damage claims-payments Jan2007/Swellendam Bladsy 7 van /04/10
8 Bitou Municipality: 1) Rehab of roads in Green Valley R650, Summary R650, Claims to date R650, Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February /Reports/ Monthly Flood Damage claims-payments Jan2007/Bitou Bladsy 8 van /04/10
9 Bitou Municipality: 1) Rehab of roads in Green Valley R650, March Mar-06 Bitou Floof damage 2006/03/ TOTAL 1 R650, /Reports/ Monthly Flood Damage claims-payments Jan2007/Bitou Bladsy 9 van /04/10
10 Breede River/Winelands: 1) Repair of civil services in Robertson include rebuilt, repair and reseal of streets sidewalks, rehabilitation of sidewalks channels and repairs to 2 x low water concrete bridges R1,368, Summary R1,368, Claims to date R1,368, Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February Feb-06 Breede River Winelands Robertson rehabilitationof roads and Ref: sidewalks 5/15/2/3/1 dd 20/12/ /02/07 R764, /Reports/ Monthly Flood Damage claims-payments Jan2007/Breede River Winelands Bladsy 10 van /04/10
11 Breede River/Winelands: 1) Repair of civil services in Robertson include rebuilt, repair and reseal of streets sidewalks, rehabilitation of sidewalks channels and repairs to 2 x low water concrete bridges March 2006 WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGE CLAIMS/PAYMENTS R1,368, TOTAL 1 R764, Mar-06 Breede River Winelands Robertson rehabilitationof roads and sidewalks 2006/03/17 R603, TOTAL 1 R603, /Reports/ Monthly Flood Damage claims-payments Jan2007/Breede River Winelands Bladsy 11 van /04/10
12 Knysna Municipality: 1) Repair of damage community facilities (halls, creche) 2) Repair of solid waste handling facility 3) Repair of electrical infrastructure 4) Repair of recreation and sport facilities 4) Repair of water infrastructure 5) Repair of damaged facilities in the nature reserve 6) Repair of damaged sewer infrastructure 7) Repair to damaged roads and stormwater structure 8) Repairs to sidewalks R6,900, Summary R6,900, Claims to date R6,900, Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January /Reports/ Monthly Flood Damage claims-payments Jan2007/Knysna Bladsy 12 van /04/10
13 Knysna Municipality: 1) Repair of damage community facilities (halls, creche) 2) Repair of solid waste handling facility 3) Repair of electrical infrastructure 4) Repair of recreation and sport facilities 4) Repair of water infrastructure 5) Repair of damaged facilities in the nature reserve 6) Repair of damaged sewer infrastructure 7) Repair to damaged roads and stormwater structure 8) Repairs to sidewalks R6,900, February Mar-06 Memorandum of agreement R1,380, TOTAL 0 R1,380, March Mar-06 Knysna Memorandum of understanding 2006/03/20 R500, Mar-06 Knysna Memorandum of agreement 2006/03/20 R250, Mar-06 Knysna Memorandum of Understanding 2006/03/20 R200, Mar-06 Knysna Memorandum of agreement 2006/03/20 R300, Mar-06 Knysna Memorandum of agreement 2006/03/20 R1,380, Mar-06 Knysna Memorandum of agreement 2006/03/20 R101, Mar-06 Knysna Memorandum of agreement 2006/03/20 R342, Mar-06 Knysna Memorandum of agreement 2006/03/20 R518, Dec-06 Knysna Memorandum of agreement 2006/12/28 R1,621, Mar-06 Knysna Memorandum of agreement 2006/03/20 R306, TOTAL 10 R5,520, /Reports/ Monthly Flood Damage claims-payments Jan2007/Knysna Bladsy 13 van /04/10
14 Summary April 2005 WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGE CLAIMS/PAYMENTS Mosselbay Municipality: 1) Repair to electrical systems and flood light at KwaNonqwaba 2) Repair to streets and storm water systems 3) Repair to sewer system Claims to date R2,122, R2,122, R2,122, Total R0.00 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February /Reports/ Monthly Flood Damage claims-payments Jan2007/Mosselbay Bladsy 14 van /04/10
15 Mosselbay Municipality: 1) Repair to electrical systems and flood light at KwaNonqwaba 2) Repair to streets and storm water systems 3) Repair to sewer system March 2006 WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGE CLAIMS/PAYMENTS R2,122, Mar-06 Mosselbay Flood Damages 2006/03/20 R150, Mosselbay Flood Damages 2006/03/20 R1,618, Mar-06 Mosselbay Flood Damages 17/16/3/1 2006/03/23 R173, Mar-06 Mosselbay Flood Damages 2006/03/20 R179, TOTAL 4 R2,122, /Reports/ Monthly Flood Damage claims-payments Jan2007/Mosselbay Bladsy 15 van /04/10
16 George Municipality: 1) Repair of damaged roads R320, R320, Claims to date R320, Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February /Reports/ Monthly Flood Damage claims-payments Jan2007/George Bladsy 16 van /04/10
17 George Municipality: 1) Repair of damaged roads R320, March /03/20 R320, TOTAL 1 R320, /Reports/ Monthly Flood Damage claims-payments Jan2007/George Bladsy 17 van /04/10
NERSA APPROVED TARIFFS
NERSA APPROVED TARIFFS WESTERN CAPE PROVINCE Low High 1. AECI Heartland Somerset West 20.13% Very Small Basic Charge: R280.00 Summer : 65.00 Winter : 85.00 Small Basic Charge: R420.00 Summer : 65.00 Winter
GENERAL OBLIGATION BONDS
DESCRIPTIONS GENERAL OBLIGATION BONDS Appendix C, page 2 GENERAL OBLIGATION BONDS State Transportation Bonds --- 1968 An amount of $640,000,000 was authorized to improve the public transportation system.
Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts
Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed
CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
Bay Park Sewage Treatment Plant Super Storm Sandy Recovery
County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park
Introduction to the Envision Sustainability Rating System
THE ENVISION RATING SYSTEM Introduction to the Envision Sustainability Rating System Russell Moore, PE, ENV SP Richard Gomez, PE, MSEM, ENV SP test APWA Public Works Conference Richmond, CA November 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting
West Thornhill Stormwater Flood Remediation Phase 1 Construction Community Information Meeting Thornhill C.C. May 7, 2014 Purpose To advise residents and businesses of 2014 and 2015 construction activities
Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
Directorate: Local Government Accounting Ms. Lusanda Ngxonono. Reference: T7/2/7 TREASURY CIRCULAR MUN NO 26/2012
Directorate: Local Government Accounting Ms. Lusanda Ngxonono [email protected] T: +27 21 483 6684 F: +27 21 483 4558 Reference: T7/2/7 TREASURY CIRCULAR MUN NO 26/2012 THE MAYOR, CITY OF CAPE
Toronto s Wet Weather Flow Master Plan
Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
STAFF REPORT TO COMMITTEE OF THE WHOLE
STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None
Asset Management Plan
Asset Management Plan Final Report May 2014 EXECUTIVE SUMMARY Adequate municipal infrastructure such as roads, bridges, and underground water and sewage pipes are essential to economic development, citizen
House Research Department General Fund Appropriations in Flood Relief Bills
House Research Department General Fund Appropriations in Flood Relief Bills These tables included state funding from the major disaster bills enacted to respond to a disaster. Appropriations may have been
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco Emilio Cruz AGM, Infrastructure Agenda + San Francisco s Sewer System + San Francisco
Standard Operating Procedures Storm Drain System Maintenance
s Storm Drain System Maintenance SECTIONS 1. Storm Drain System Inspections 2. Storm Drain System Cleaning 3. Storm Drain System Repairs 4. Proper Disposal of Material Storm Sewer System Cleaning Directive
Harris County Flood Control District. Policy, Criteria, and Procedure Manual
Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD
Examples of Eligible Projects. Project Category Description Examples
Examples of Eligible Projects Public Transit Local Roads, Bridges, and Active Transportation Regional and Local Airports which supports a shared passenger transport system which is available for public
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN
Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall
EXPENDITURES SUMMARY 2015 2016 INCREASE BUDGET BUDGET (DECREASE) Over 2015 $ $ $
EXPENDITURES SUMMARY 2015 2016 INCREASE Mayor and Council 900,000 900,000 - Office of Chief Administrative Officer 598,500 598,500 - Clerks 1,635,000 1,659,500 24,500 Legal Services 2,686,000 2,777,000
Bridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
ASSET MANAGEMENT PLAN
ASSET MANAGEMENT PLAN REPORT Prepared for: Township of South Frontenac December 2013 RVA 132914 This report is protected by copyright and was prepared by R.V. Anderson Associates Limited for the account
DAMAGE ASSESSMENT ANNEX E
DAMAGE ASSESSMENT ANNEX E E1. Purpose, Situation, and Assumptions E1.1 Purpose The purpose of this Damage Assessment Functional Annex is to guide and coordinate agencies and organizations in conducting
Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements
Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King
City of Auburn Summary of Capital Outlay by Fund and Department
General Fund ~ MidBiennium Budget Review ~ FY 04 City Council (none) $ Office of the City Manager $ 25,000 Judicial (none) Information Technology Information Technology Division Upgrade for intrusion detection
Disaster Recovery Managing and Leveraging Multiple Funding Sources
Disaster Recovery Managing and Leveraging Multiple Funding Sources Jordan Williams, CFM June 3, 2015 Overview Programs FEMA Public Assistance (PA) and Hazard Mitigation Grant Program HUD s Community Development
Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs
Oakwood Beach Storm Damage Prevention Project NJDEP- Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Branch Dwight Pakan, Project Manager, Philadelphia District The State of New Jersey
How To Help The Environment
Worldwide Partners in Environment and Construction EMR Capabilities Environment Site Characterization and Contamination Assessments Remedial Design and Remedial Action Human Health and Ecological Risk
Request for Proposal Campus Master Planning Consultant
Request for Proposal Campus Master Planning Consultant Institution Institution URL for Additional Information about this Project (Optional) Project Name Type of Services Project Manager : Western Carolina
Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants
Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants I. Introduction and Purpose This document provides
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives
Rivers Group Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers Flooding & Drainage Perspectives Waimakariri River Catchment Waimakariri River Hydrology Catchment area - 3,990
CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR
JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf
Contracts Awarded by Gympie Regional Council worth $200,000.00 or more
RFT 2014/2015 T027 Provision of Recycling Services at Waste Management Facility RFT 2014/2015 T025 Connonngibber Creek Road Bridge Replacement RFT 2014/2015 T020 Snapper Creek Sewer Rising Main and T6
Repair or Replacement - Band-Aids vs. Surgery
Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
Barre City City-wide Policy and Program Options
Barre City (VERI Land Use Regulations Update policies allowing fill in flood hazard areas. RPC, DEC River Management, VLCT, Allowing landowners to elevate buildings using fill may help protect an individual
Glenorchy City Council Asset Management Strategy for Infrastructure Assets
Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control
Carlton Fields Memorandum
Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed
City of Minot CDBG Disaster Recovery Action Plan Amendment #3
City of Minot CDBG Disaster Recovery Action Plan Amendment #3 Table 2: Method of Distribution for Program Activities. Project delivery costs are in green [AMENDMENT #2 ADDED PROJECT DELIVERY TO EACH ACTIVITY]
STORM WATER MANAGEMENT PLAN (SWMP)
ENVIRONMENTAL HEALTH, SAFETY & RISK MANAGEMENT OFFICE STORM WATER MANAGEMENT PLAN (SWMP) DEL MAR COLLEGE CO-PERMITEE (Previously TXS 000601) January 24, 2009 1.0 INTRODUCTION S TORM W ATER M ANAGEMENT
ASSET MANAGEMENT STRATEGY
ASSET MANAGEMENT STRATEGY Version 3 - Final Adopted 19 February 2013 NAMS.PLUS Burnie City Council Asset Strategy Document Control Document Control NAMS.PLUS Asset www.ipwea.org.au/namsplus Document ID:
Green Spaces to Improve Waterways and Communities
Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015
Illinois IKE Disaster Recovery Program Housing Rehabilitation and Reconstruction Program (IKE-HRR) FAQS
Illinois IKE Disaster Recovery Program Housing Rehabilitation and Reconstruction Program (IKE-HRR) FAQS Existing Damage In reference to the requirement for $10,000 in damages to the home, does that mean
City of Pitt Meadows 2015 Utilities Financial Plan December 11, 2014
City of Pitt Meadows 2015 Utilities Financial Plan December 11, 2014 Agenda Purpose of Today s Presentation Drainage 2015 Capital & Operating Budget Sewer 2015 Capital & Operating Budget Water 2015 Capital
Town of Warwick, Village of Florida, Village of Greenwood Lake and Village of Warwick MULTI JURISIDICTIONAL, MULTI HAZARD MITIGATION PLAN DRAFT
Town of Warwick, Village of Florida, Village of Greenwood Lake and Village of Warwick MULTI JURISIDICTIONAL, MULTI HAZARD MITIGATION PLAN DRAFT Appendix B Historical Hazard Documentation Rev #0 May 2013
Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners
Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners In recent years, multiple flood events in the New York City
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
West London Dyke Flood Control Structure Master Plan Appendix A
West London Dyke Flood Control Structure Master Plan Appendix A Introduction The West London Dyke runs along the west bank of the North Branch of the Thames River from Oxford Street to the forks of the
Eastern Connecticut Risk & Vulnerability Assessment Workshop
Coastal Resilience New York and Connecticut A Tool for Coastal Planning in a Changing World Eastern Connecticut Risk & Vulnerability Assessment Workshop January 11, 2012 Waterford Town Hall - Auditorium
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities
The Corporation of the Municipality of Callander. Asset Management Plan
The Corporation of the Municipality of Callander Asset Management Plan April 2014 1 Index A) Executive Summary P. 3 B) Introduction P. 4 C) State of Local Infrastructure P. 7 D) Expected Levels of Service
Paving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
EXPENDITURES SUMMARY 2014 2015 INCREASE BUDGET BUDGET (DECREASE) (Restated) Over 2014
EXPENDITURES SUMMARY 2014 2015 INCREASE (Restated) Over 2014 Mayor and Council 879,500 900,000 20,500 Office of Chief Administrative Officer 577,500 598,500 21,000 Clerks 1,727,500 1,635,000 (92,500) Legal
April 17, 2015 SUMMARY OF SUBJECT MATTER
April 17, 2015 SUMMARY OF SUBJECT MATTER TO: FROM: RE: Members, Subcommittee on Water Resources and Environment Staff, Subcommittee on Water Resources and Environment Hearing on A Review of the President
Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities
Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities Jacob Greenstein Ph.D, PE, EGAT/ I&E EGAT workshop-december 2009 1 Natural disasters-new trends Natural
Town of Huntsville Municipal Asset Management Plan
Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
Mouth of the Columbia River Jetties Major Rehabilitation Study
Mouth of the Columbia River Jetties Major Rehabilitation Study PNWA Port of Vancouver January 29, 2010 US Army Corps of Engineers Project Overview Background Corps Guidance for Major Rehab Project Alternatives
MAJOR FUNDING SOURCES FOR COMMUNITY DEVELOPMENT
MAJOR FUNDING SOURCES FOR COMMUNITY DEVELOPMENT There are hundreds of funding sources available from federal government, state government, private organizations and foundations, for a variety of activities.
Approved Natural Disaster Recovery Round Green Army projects
Approved Natural Disaster Recovery Round Green Army projects Project Title Project Description State Territory Belmont Wetlands East Coast This project will reduce erosion and revegetate and control weeds
Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa
Review Report and Recommendations for the Remediation of Flood Damage at the Berg River Causeway and the Dam Bypass Channel on Portion of Farms 1646 and 1014, Franschhoek Contact person: Colin Whittemore
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
PUBLIC WORKS DEPARTMENT STRATEGIC PLAN 2015 2020
PUBLIC WORKS DEPARTMENT STRATEGIC PLAN 2015 2020 1 Purpose of Strategic Plan This document serves as the road map for the Public Works Department. It identifies where we are going and how we are going
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE
Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of