Unarmored Variable Frequency Drive (VFD) Cable Termination Guide



Similar documents
What Are the Benefits of Using VFD Motors?

DIVISION 26 - ELECTRICAL SECTION CABLES FOR INSTRUMENTATION

100% EMI Emission Containment

Understanding Shielded Cable

CIR. Index. Gexol. Standard CIR UL Listed Type TC-ER. Crush and Impact Resistant Without External Armoring. Arctic CIR UL Listed Type TC-ER-HL*

Solving Signal Problems Effective shielding is key to enhancing the reliability and performance of broadcast cables.

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables

KSR-SK-DB In-Line Splice Kit KSR Snow Melting Cable INSTALLATION PROCEDURES

Instrumentation Cable Power Cable Assembly Solutions...32

2012 CATALOG AEROSPACE VVIRE & CABLE INC. aerospacewire.com

I NTERFACE CABLE ADAPTER MODULE

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

Cable Selection for Medium Voltage Capacitor Banks and Harmonic Filter Banks

Instruction Manual. Cable Splicing. Models , HDF1, HDF SS1

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Cat7/Class F New Installation Concept New infrastructure. Handbook

CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute

Belden Marketing Quarterly Newsletter

Solar Power Solutions

Gexol. Gexol. The Global Cable Solutions Company. Designed for safe, reliable performance in the harshest oil and gas operating environments

Specification SFTP CAT6 Network Cable 23AWG CU

Corporate Profile ROYAL. MODERN ROYAL ELECTRIC Ideal Power Solution MRE ELECTRICAL, INSTRUMENTATION & COMMUNICATION SYSTEMS

Analog Multi-Pair Snake Cable High-Flex and NEC Rated Cables

SECTION SIGNAL WIRE AND CABLE

Industrial Cable Solutions for Variable Frequency Drives

Network Standard Advice No. 1420C 9/6/2011

Standards Affecting a Premise T-1 Installation

800 Communications Circuits

Cable Products HONEYWELL SECURITY & CUSTOM ELECTRONICS. Honeywell's Genesis Series provides a full range

SUBJECT: NO MORE 300 VOLTS IN PLTC PRINT LEGEND

Cable Solutions for Servo and Variable Frequency Drives (VFD)

EcoFlex Cable. Smaller. Lighter. Tougher. 100% Recyclable.

6000 Series Buccaneer

Siemens Energy & Automation. structured. WIRING Product Training Series: Advanced Video Session 3

HARAX circular connector

IEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO

Session 14 Cable Support Systems

RoHS DATA, COAXIAL AND ELECTRONIC M.R. D A TA, C O A X I A L, ECOLGICAL Telecom Cables A N D EL E CTRON I C. Cables

Video Camera Installation Guide

Why FOUNDATION Fieldbus?

Cable Installation Notes

LEAD FREE FIREX. Interlock Armored Cables TECK90 and MC Industrial Cables. w w w. n e x a n s e n e r g y. c o m

Microphone and Musical Instrument Cable Overview

RF & Microwave cable assemblies C291

EH-20 20m antenna. By VE3RGW

WIRE, TERMINAL AND CONNECTOR REPAIR CONDUCTORS

Your Only Solution for All Variable Frequency Drive Applications

1394 locking cables. Your locking cables for AVT IEEE 1394 cameras

KNOW YOUR OPTIONS: 230 KV POWER CABLES

AC and DC Drive System Installation Information

Xtra-Guard Performance Cable

SCTK INSTALLATION PROCEDURES. Splice Connection Termination Kit. SCTK-1D for BSX, RSX, VSX SCTK-2D for KSX, HTSX SCTK-3D for HPT, FP

How to Choose the Right Cable Category

Section kv Power Cables

STABILOY BRAND FeeDeR SOLuTIONS

STABILOY BRAND FEEDER SOLUTIONS ASSISTED LIVING FACILITIES

ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION

STABILOY BRAND FeeDeR SOLuTIONS

KNOW YOUR OPTIONS: 69 KV XLPE POWER CABLE

User s Manual. BNC Mini-High Res, 75 Ohm Termination Kit Connector Installation Guide ( )

White paper. SACE Tmax XT Circuit-Breaker Terminals and Connection

Industrial Ethernet The Perfect Cable for an Imperfect Environment

Copper Cabling Infrastructure Offering

Universal Vehicle Power Supply 9007AX01. Installation Instructions

Balanced vs. Unbalanced Audio Interconnections

Data Highway/Data Highway Plus/ Data Highway II/Data Highway 485 Cable Installation Manual

SICK AG WHITEPAPER. Information for cable manufacturers Note-2_03

Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.

RAY-MAX Integrated Solar Power Strip

Specializing in the cable business for over 38 years, PT. SUPREME CABLE

Communication, Signal & Data Cables

MYTHBUSTING Takes on Shielded Cabling

Coaxial Cables for Medium-Frequency Applications

Thermwire. Selection Guide. Freeze Protection Heating Cable. Thermwire -Wrap. Pre-Assembled. Thermwire-Comp. Thermwire-Melt.

Precision Video Cable for Analog and Digital Overview

The Quality Connection. High Performance Cable Solutions for the World of Semiconductors

The Quality Connection. High Performance Cable Solutions for the World of Semiconductors

Shielding Effectiveness Test Method. Harbour s LL, SB, and SS Coaxial Cables. Designs for Improved Shielding Effectiveness

WHITEPAPER. Cable and Connector for Hiperface dsl motor drive applications

Flexible and safe solutions, for decades. Cables for alarmand safety systems

Position Cat5e (EMT) Modular Plug Connectors. Application Specification

HIGH SPEED COMMUNICATIONS PLENUM CABLE CATEGORY 5e CMP FEP JACKETED, PVC-FREE UNSHIELDED TWISTED PAIR (UTP)

Generator DoCKInG StatIonS

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS PACKAGE

Standard Buccaneer - Ethernet

2012 Electrical Code Changes Module 2 Sections 6-16

Products. Technology. Services. Delivered Globally. LOW-VOLTAGE CABLING SOLUTIONS

MarineTuff Offshore and Marine Cable Solutions

A quick product finder for commercial applications JUDD WIRE INC. A member of the Sumitomo Electric Industries group of companies

C 060 CCTV Coaxial Cable

MICRO SFP+ CONNECTOR & CABLE ASSEMBLY

6000 Series Buccaneer. 30 twist locking Tamperproof lock prevents accidental un-mating. Cat 5e shielded coupler Maintains shielding

Top Drive Service Loops. Conventional, Enhanced and Superior Solutions for Drilling Applications

CONFLEX ELECTRIC CABLE

How To Use A Grounded Neutral System

LIFE-LINE Safety Cables Continuous Bending Hi-Flex Electrical Cables to Guarantee Safe Cable & Hose Carrier Systems

W-14 FAQ MACHINERY MONITORING

The Do s and Don ts of Pressure Transducers

Transcription:

Authorized Distributor Unarmored Variable Frequency Drive (VFD) Cable Termination Guide Be Certain with Belden A Step-by-Step Look at the Connection/Termination of Unarmored VFD Cables

Terminating Unarmored Variable Frequency Drive (VFD) Cables Foil-Braid or Copper-Tape Shield Constructions Belden VFD Cables are designed for quick and easy termination. This Belden VFD Cable Termination Guide takes a step-by-step approach to the connection/ termination of unarmored VFD cables with either foil-braid or copper-tape shield constructions. The instructions cover the termination of the cables in external and self-contained enclosures, at the motor junction box or using an alternative method. VFD Cable Installation Location Considerations It is advisable to maintain as much separation as possible between noise-susceptible cables and VFD cables a minimum of one foot for shielded instrumentation cables and three feet for unshielded instrumentation cables. If the two types of cable must lie close to each other, it is best to minimize the amount of parallel runs between them, limiting these stretches to 10 feet or less to reduce the likelihood of radiated noise pickup. Also, if the two types of cables must cross, it is preferable to cross them perpendicularly at a single point. As you use this step-by-step VFD Cable Termination Guide, please note the references to the drive or motor manufacturer s recommendations. You should be familiar with the manufacturer s termination guidelines as well. If you have specific questions on the instructions given within this guide, please contact Belden Technical Support at 1.800.BELDEN.1 (1.800.235.3361). Belden s Variable Frequency Drive (VFD) Cable Offering See VFD Cable Matrix (page 3) for additional information. Design Design Design with Signal Pair One Full-sized Insulated Ground (same AWG as Circuit Conductors) Three Stranded TC Circuit Conductors with XLPE Insulation Three BC Grounds (full size) One 16 AWG Shielded Signal Pair for Brake with Drain Wire Three Stranded TC Circuit Conductors with XLPE Insulation One Full-sized Insulated Ground (same AWG as Circuit Conductors) Three Stranded TC Circuit Conductors with XLPE Insulation Overall Duofoil Shield + 85% TC Braid plus full size TC Drain Wire Two Spiral Copper Tape Shields (100% Coverage) Overall Duofoil Shield + 85% TC Braid plus full size TC Drain Wire 2

Belden VFD Cable Matrix Physicals Ratings Cable Type No. of Tinned Conductor Circuit Copper (TC) AWG Conductors Conductor No./Type of Grounds Shielding Circuit Conductors feature Heavy XLPE Insulation Fullsized Drain Wire PVC Jacket ER Rating 1000V Flexible Motor Supply Rating 600V UL 1277 Type TC 2000V UL 1277 Type TC Underground (burial) MSHA UL- WTTC 3 16-2 Yes with Brake/ Signal Pair for 2kV Applications for 2kV Applications with Haloarrest Low Smoke Zero Halogen Jacket with Haloarrest Low Smoke Halogen Jacket Interlocked Armor Interlocked Armor Basics CU = Copper TC = Tinned Copper 3 1-4/0 Yes 3 16-10 (16 AWG Signal Pair) Yes 3 14-2 Yes 3 1-4/0 Yes 3 16-2 Yes 3 1-4/0 Yes 3 16-2 Yes 3 1-4/0 Yes 3 16-4/0 No 1 - Full-sized Insulated 1 - Full-sized Segmented Into 3 - Bare CU 1 - Full-sized Insulated 1 - Full-sized Insulated 1 - Full-sized Segmented Into 3 - Bare CU 1 - Full-sized Insulated 1 - Full-sized Segmented Into 3 - Bare CU 1 - Full-sized Insulated 1 - Full-sized Segmented Into 3 - Bare CU 3 - Bare CU Overall 100% Duofoil + 85% TC Braid Dual Spiral Overlapping Copper Tape (100% Coverage) Overall 100% Duofoil + 85% TC Braid Overall 100% Duofoil + 85% TC Braid Dual Spiral Overlapping Copper Tape (100% Coverage) Overall 100% Duofoil + 85% TC Braid Dual Spiral Overlapping Copper Tape (100% Coverage) Overall 100% Duofoil + 85% TC Braid Dual Spiral Overlapping Copper Tape (100% Coverage) Dual Spiral Overlapping Copper Tape (100% Coverage) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes LSZH Yes Yes Yes Yes Yes Yes Yes LSZH Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Meets MC Meets MC Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 3

VFD Cable Termination Instructions Foil-Braid Constructions External and Self-Contained Drive Enclosures General Termination Instructions To properly and effectively terminate a VFD cable system, first ensure the following: Ideally, the shield and jacket should be intact all the way back to the drive so they do not introduce any jumping off points for the common mode currents carried on the common mode current containment system. In this case, no special tools, materials or termination kits are required. Shield grounding cable glands should be avoided at the enclosure ingress as they may introduce jumping off points for the common mode currents into the metal work in addition to undesirable and uncontrolled electrical noise. Intermediate termination of the cable elements on terminal blocks should be avoided as the terminations may significantly reduce the ability of the shielding system to conduct and contain harmful high frequency currents. The cable s outer jacket system serves an important role in isolating the common mode current containment system. The outer jacket should not be removed before the cable enters the drive proper as this introduces the potential for uncontrolled ground currents. Care should be taken to minimize contact between exposed cable shield, and any enclosure metal, especially in the close vicinity of sensitive equipment that is likely present near the drive. How to Terminate an External Enclosure (For Self-Contained Drive Enclosure Instructions - Nema 1,4,4x - skip to Step 2). STEP 1 STEP 2 STEP 3 A. Ingress the enclosure using an isolating cable gland with a suitable protection rating for the enclosure and the environment. Allow a sufficient length of cable to easily reach the drive without unnecessary cable strain. Do not remove the outer cable jacket. B. Secure the cable with suitable cable ties, or through cable duct as appropriate. C. If the drive is open style, route the jacketed cable assembly back to the drive vicinity. A. If the drive is in an internal enclosure, ingress the drive through a suitable insulating cable gland. Measure and mark the cable to determine the jacket strip location and cutoff length. B. If possible, remove the measured cable and place the end for preparation on a suitable work surface. A. Neatly remove the outer cable jacket, exposing sufficient conductor to reach the drive terminals, while still leaving some excess conductor length for trimming (after neatly routing to the drive terminals). B. It is desirable to combine the shielding drains and braid for termination intact at the ground terminal of the drive. STEP 4 STEP 5 STEP 6 A. Push the exposed braid back over the cable jacket. A. Remove the exposed shield and cable fillers where exposed. A. Push the remaining braid forward, and use a tool to open the braid. 4

STEP 7 STEP 8 STEP 9 A. Push the primary conductors and ground through an opening in the braid, separating the intact braid system from the conductors. A. Leave the drain wire inside the braid system. A. Apply heat shrink tubing to the drain and braid. STEP 10 STEP 11 STEP 12 A. Apply 3-5 inches of heat shrink tubing over the entire cable assembly, centered at the jacket strip point. Shrink this piece completely. B. Secure the cable jacket to the drive (or enclosure) if it is not secured by a cable gland. A. Route and trim the conductors to the power terminals, leaving sufficient material for phase reversal, if necessary. A. Terminate the motor leads per the drive manufacturer s recommendations. B. Trim the ground wire to sufficient length to reach the drive ground terminal. STEP 13 A. Terminate the ground and drain per manufacturer s recommendations. 5

VFD Cable Termination Instructions Foil-Braid Constructions Motor Junction Box How to Terminate at the Motor Junction Box STEP 1 STEP 2 A. Ingress the motor junction box through an isolating cable gland with a suitable protection rating for the enclosure. Do not remove the outer cable jacket. Measure and mark the cable for length. When possible, it is desirable to remove the cable from the motor junction box for ease of preparation. B. Neatly remove the outer cable jacket, exposing sufficient conductor to reach the motor leads and ground lug, while still leaving some excess conductor length for trimming (after neatly routing to the motor terminals). C. Follow the cable preparation instruction above as specified for the drive end connection. D. Secure the cable jacket to the motor by tightening the isolating cable gland. A. Route and trim the conductors to the motor terminals, leaving sufficient material for phase reversal, if necessary. Use the termination system recommended by the motor manufacturer. B. Terminate the motor leads per the motor manufacturer s recommendations, or trained practices of a qualified electrician. C. Trim the ground wire to sufficient length to reach the motor ground terminal. D. Heat shrink the drain wire covering and trim to length for connection to the drive ground terminal. Strip to expose conductor as necessary. E. Terminate the ground and drain using a standard lug, or on the provided connection point. Authorized Distributor 6

VFD Cable Termination Instructions Foil-Braid Constructions Alternate Method: Conductive Cable Gland How to Terminate in a Conductive Cable Gland Note: It may be more desirable to terminate the braid in a conductive cable gland at the motor connection. If so, suitable conductive cable glands are available through your Belden Distributor. It should be noted, however, that this will be no more effective for common mode current containment than terminating the braid intact, and will involve a more expensive connector. This connection may provide additional mechanical security, depending on the connector selection, and could reduce EMI in very close proximity to the motor junction box. STEP 1 STEP 2 STEP 3 A. Ingress the motor junction conduit box through the conductive cable gland. A. Prepare the cable per the gland manufacturer s recommendations. A. Trim the foil at least back to the prepared edge of the braid. B. Secure the cable to the gland per gland manufacturer s recommendations, and pass the cable into the motor junction box. STEP 4 STEP 5 STEP 6 A. Secure the cable jacket to the motor by tightening the cable gland lock nut. B. Route and trim the conductors to the motor terminals, leaving sufficient material for phase reversal if necessary. Use the connection system as recommended by the motor manufacturer. C. Trim the ground wire to sufficient length to reach the motor ground terminal. D. Heat shrink the drain wire(s) covering and trim to length for connection to the drive ground terminal. Strip to expose conductor as necessary. A. Terminate the ground and drain using a standard lug, or on the provided connection point. A. Terminate the motor leads per the motor manufacturers recommendations, or trained practices of a qualified electrician. 7

VFD Cable Termination Instructions Copper Tape Shield Constructions External and Self-Contained Drive Enclosures How to Terminate a Drive Mounted in an External Enclosure (For Self-Contained Drive Enclosure Instructions - Nema 1,4,4x - skip to Step 4). STEP 1 STEP 2 STEP 3 A. Ingress the enclosure with an isolating cable gland with a suitable protection rating for the enclosure and the environment. Allow a sufficient length of cable to easily reach the drive without unnecessary cable strain. Do not remove the outer cable jacket. B. Secure the cable with suitable cable ties, or through cable duct as appropriate. C. If the drive is open style, route the jacketed cable assembly back to the drive vicinity. A. If the drive is in an internal enclosure, ingress the drive through a suitable insulating cable gland. B. Neatly remove the outer cable jacket, exposing sufficient conductor to reach the drive terminals, while still leaving some excess conductor length for trimming (after neatly routing to the drive terminals). A. Remove the exposed copper tape shield. B. De-cable the exposed conductors and grounds. STEP 4 STEP 5 STEP 6 A. Combine the exposed ground wires by twisting them together. A. Apply heat shrink tubing to the grounds. A. Apply 3-6 inches of heat shrink tubing over the entire cable assembly, centered at the jacket strip point. Shrink this piece completely. B. Secure the cable jacket to the drive (or enclosure) if it is not secured by a cable gland. 8

STEP 7 STEP 8 A. Route and trim the conductors to the power terminals, leaving sufficient material for phase reversal, if necessary. B. Terminate the motor leads per the drive manufacturer s recommendations. Use lugs and ferrules as appropriate. No special pieces are required. A. Trim the ground wire(s) to sufficient length to reach the drive ground terminal. B. Terminate the ground per the drive manufacturer s recommendations. Note that there is no shield termination for copper tape shielded constructions. VFD Cable Termination Instructions Copper Tape Shield Constructions Motor Junction Box How to Terminate at the Motor Junction Box STEP 1 STEP 2 STEP 3 A. Ingress the motor junction box through an isolating cable gland with a suitable protection rating for the enclosure. Do not remove the outer cable jacket. B. Measure and mark the cable for jacket removal inside the motor junction box. C. Neatly remove the outer cable jacket, exposing sufficient conductor to reach the motor leads and ground lug, while still leaving some excess conductor length for trimming after neatly routing to the motor terminals. A. Trim back the copper tape shield, and any fillers in the cable. B. De-cable the exposed conductors and grounds. A. Combine the ground wires by twisting them together. Apply heat shrink tubing to the combined grounds. B. Secure the cable jacket to the motor by tightening the isolating cable gland. C. Route and trim the conductors to the motor terminals, leaving sufficient material for phase reversal, if necessary. Use the connection system as recommended by the motor manufacturer. D. Terminate the motor leads per the motor manufacturer s recommendations, or trained practices of a qualified electrician. E. Trim the ground wire to sufficient length to reach the motor ground terminal. F. Terminate the ground using a standard lug, or on the provided connection point. 9

Belden VFD Cable Termination FAQs Commonly asked questions about Belden VFD cables. Does Belden require a proprietary connector for VFD cables? Belden VFD Cables are 100% compatible with a wide variety of popular, commercially available connectors from most established suppliers. Because the connector needs of each application are specific to the application requirements and codes, your Belden distributor can help select the most appropriate connector options available. Do I terminate the shield at both ends? Drive cable shields should always be terminated at the motor and at the drive. Intermediate termination of the ground or shield is not recommended. The shield acts as a conductor for common mode current containment. Failure to terminate the shields and grounds properly could result in harmful electrical noise or destructive common mode currents flowing in the ground grid. Intermediate grounding of the shield can cause the unintended release of shield currents and resulting electrical noise. My drives are pre-wired to terminal blocks should I connect there? While you can terminate at prewired terminal blocks, the use of unshielded conductors from the terminal block to the drive can create significant electrical noise, which may affect other sensitive components, or networks within the enclosure. Connections on terminal blocks can also reduce the effectiveness of the shielding and should be avoided when possible. Authorized Distributor

Can I use parallel runs for ease of installation? Parallel runs can be used for most VFD installations, and provide easier pulls and terminations for the installer. Care should be taken to ensure balanced loading in the cables, and where multiple motor winding sets are present (for example in a 12 lead motor which has 4 sets of windings) individual cables should carry a dedicated motor winding set. If this cannot be determined, then common phases should be bussed together at the motor junction box. All T1 leads should be bussed together in the motor junction box, all T2 leads bussed together in the motor junction box, and all T3 leads bussed together in the motor junction box. Failure to balance the loads through bussing, or winding alignment will result in additional cable shield currents and potential cable heating. When cables are adequately space in a cable tray, no additional de-rate should be required. Can I run multiple motor cables in a conduit or cable tray without capacitive losses? Belden VFD Cables will eliminate the potentially significant current losses associated with cable charging of nearby conductors. VFD Cables overcome the challenges found in the toughest of environments. Will Belden VFD cables eliminate reflected wave voltages? No, but the lower capacitance conductors will effectively increase the distance before the buildup of reflected waves, in some cases the difference in critical cable length can be as much as 3 times farther with Belden VFD Cables compared to THHN in Conduit. This can lead to significant differences on motor and cable insulation stresses, and may result in longer motor or cable life. The critical distance is different for every drive, cable, and motor combination. Are Belden VFD Cables suitable for applications with moderate flexing? Additional Information If you need information on the type of VFD cable that is appropriate for your specific installation, or if you have questions related to the instructions given within this guide, please contact Belden Technical Support at 1.800.BELDEN.1 (1.800.235.3361). Additional information is also available on Belden s website at www.belden.com. Here, you can view VFD Cable Procurement Documentation, or you can download Belden s VFD Cable Size Selection Guide (Based on Motor HP), VFD Cable Product Bulletin #316, and a Capabilities Overview for 2000V VFD cables. Belden Foil Braid VFD Cables are tested to over 1 million flexes with a bending radius of not more than 10 times the cable diameter. 11