DC Cook Plant Process Computer Replacement Project



Similar documents
Cisco Network Switches Juniper Firewall Clusters

Integrated Network Monitoring

FOXBORO. I/A Series SOFTWARE Product Specifications. I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 OVERVIEW

Technical Information POWER PLANT CONTROLLER

Short Form Catalogue. Alarm Systems. Reliable Supervision and Control

TrueAlarm Fire Alarm Systems

Adagio and Terminal Services

Amcrest 960H DVR Quick Start Guide

Complete Managed Services. Proposal for managed services for the City of Tontitown

Combined Cycle Control Overview

Introduction To SCADA and Telemetry

SCADA and Monitoring for Solar Energy Plant

Emerson Smart Firewall

Driver Pant 8 and antenna switcher Ant 8. User manual

AUTOMATIC TRANSFER SWITCH CONTROL UNIT OPERATOR S MANUAL

21 st Century Campus Network Responsibility Matrix 5/26/10

Industrial RS-232/ RS-422/ RS-485 over Ethernet Media Converter

SCD Server. SCD Server Pro

ALL-ZC-2140P-DVI PCoIP Zero Client Overview

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

How To Build A Scada System

Infinity C Reference Guide

ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery

Simplify Data Acquisition with a Built-in LXI Web Server

SCADA. The Heart of an Energy Management System. Presented by: Doug Van Slyke SCADA Specialist

NGSS Data Consolidator (DC)

FLEET MANAGEMENT & CAR SECURITY SYSTEM GPRS/GPS

DCS Data and communication server

SECTION PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL Summary. A. Section Includes:

A Real Time, Object Oriented Fieldbus Management System

McAfee Firewall Enterprise

BROADCAST Trasmettitori / Transmitters DBH3 GAP FILLER

NETWORK ENABLED EQUIPMENT MONITOR

Profibus DP Network with DeltaV/EMERSON Digital Automation System and Ponto Series Remote I/O

Power Efficiency Metrics for the Top500. Shoaib Kamil and John Shalf CRD/NERSC Lawrence Berkeley National Lab

Controller Automation, Model II+

Process Alarm Solutions

Firmware version: 1.10 Issue: 7 AUTODIALER GD30.2. Instruction Manual

Foxboro Evo Process Automation System

GE Measurement & Control. Cyber Security for NEI 08-09

Electronic Health Records Are You Ready?

ABB Technology Days Fall 2013 System 800xA Server and Client Virtualization. ABB Inc 3BSE en. October 29, 2013 Slide 1

Selecting the Right NAS File Server

H ARDWARE C ONSIDERATIONS

Kevin Kochirka, ABB Turbine Automation, June 29, Flexible turbine control retrofits Webinar

5-port / 8-port 10/100BaseTX Industrial Ethernet Switch User Manual

SECTION CONTROL SOFTWARE

Secure Video Surveillance System (SVSS) for Unannounced Safeguards Inspections

Adit 3000 Series Part Guide

WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2014/2015

Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure

Secure Communication Made Easy

Latest Power Plant Control System

Integrated Building Management and Security System. Building Automation & Security.

[FAQ] Troubleshooting Access Control Issues

38. ACCESS CONTROL AND ELECTRONIC SECURITY SYSTEM

PROCESS AUTOMATION FLEXIBLE ASSET MANAGEMENT HART INTERFACE SOLUTIONS

Advanced Diploma In Hardware, Networking & Server Configuration

SCADA and Security Are they Mutually Exclusive? Terry M. Draper, PE, PMP

Recent Technologies in Nuclear Power Plant Supervisory and Control Systems

ABB PSPS Erich Steinmann; Generator control-2013

Terms of Reference Microsoft Exchange and Domain Controller/ AD implementation

Successful Offline Experion PKS R310 Migration. Michael D. Weldon, I&C Engineering Specialist, Luminant Power

EDI Distributor Control Interface Wiring and Setup Instructions

Pleiades USB/LAN. User Manual. & Installation Guide. External Storage Enclosure for 3.5 Hard Drive. v1.1

ALARMS-xx. Remote Alarm Unit Setup Guide RESET ALL

I/A Series HARDWARE Product Specifications

GE Intelligent Platforms. PACSystems High Availability Solutions

Swiss Time Systems. The new multipurpose time server for the LAN and NTP-based Distributed Time System. by MOBATIME DTS 4138.

Daily Operations TRACER SUMMIT

C o v e r. Thin Client Application Options. SIMATIC Thin Client s FAQ h April 2009 e et. Service & Support. Answers for industry.

Telemetry system for cathodic protection equipment of underground metal pipelines

Eaton Remote Monitoring Manual

UniFireNet Facilities Monitoring System MEA GENERAL NETWORK FEATURES

3500/22M Transient Data Interface

TrueAlarm Fire Alarm Systems

Experion PKS. The Next Frontier What is in the next release of Experion PKS? Honeywell Proprietary Honeywell Users Group Asia Pacific

Process Automation Challenges

Substation Automation Products Relion 670/650 series IEC and ANSI Hardware

SAN Conceptual and Design Basics

Activ! Suite CPE Server Preparation Guide. What you need to know to prepare your server.

How To Use The Sunny Central Communication Controller

API Marine. BMS Presentation. Ballast Measurement Systems

PowerLogic ION Enterprise 6.0

Case Study - University at Buffalo State University of New York. Lower Energy Usage Costs with Real Time Monitoring, Campus-wide

ABB RTU560A Series CMU & Modules

CYBER SECURITY: SYSTEM SERVICES FOR THE SAFEGUARD OF DIGITAL SUBSTATION AUTOMATION SYSTEMS. Massimo Petrini (*), Emiliano Casale TERNA S.p.A.

TURBOtech srl. SED-635 Digital Excitation System. Industrial Electronics Sector FEATURES

TX3 Series TELEPHONE/CARD ACCESS SYSTEMS. System Introduction (Sales Training)

Cod. Documento: RT a Title: Fimer Plant Controller Description. Rev. Data Redatto Approvato S.Sidoti A.

How To Install A Power Supply (Uplast) With A Battery Pack

JNIOR. Overview. Get Connected. Get Results. JNIOR Model 310. JNIOR Model 312. JNIOR Model 314. JNIOR Model 410

Smart Cloud Solutions

This webinar brought to you by the Relion product family

Blackboard Collaborate Web Conferencing Hosted Environment Technical Infrastructure and Security

RAD-SYS-NEMA4X-SMS Control Cabinet. Solution guide for SMS-based remote access control and intrusion detection system

Digital Audio and Data Distribution System

Transcription:

DC Cook Plant Process Computer Replacement Project 2013 Scientech User s Symposium Robert Ammon / Scientech Greg Mashak / DC Cook August 2013

Project Organizations DC Cook (Utility) Hurst Technology (Utility Agent and A/E) Scientech (Vendor) Schedule Contract Award Sep 2011 Unit 1 FAT Dec 2012 Unit 1 Simulator Install Sep 2012 Unit 1 PPC Delivered to Site Jan 2013 Unit 1 Plant Install Aug 2013 Unit 2 FAT Jul 2013 Unit 2 Simulator Install Sep 2013 Unit 2 Plant Install Nov 2013

Existing System SAIC PMS Replacement for Westinghouse P250 / P2500 (circa 1991) RTP 7400 I/O with VME HSSP 3 DAS locations VAX 4000 (non redundant) DECnet network 6 control room workstations 4 TSC workstations 2 EOF workstations SAIC RDR (single system for both PPC systems) R*TIME PSS Data feed from PPC Two PSS, one for plant systems and one for simulator systems

Existing System PPC Workstations SAIPMS windows viewer Windows 98 (implemented in VMs) BOP, RO and US control room workstations share keyboard and mouse with LAN workstation

Existing System PPC Computer Room Cabinets Original Westinghouse P250 cabinets I/O equipment Non PPC equipment (backup SSPS) Networking equipment DEC cabinets added for current system PPC VAX and disk storage RDR system and storage

Existing System Aux Building Cabinets Original Westinghouse P2500 I/O equipment Replaced with RTP 7400 I/O equipment Turbine Building Cabinet Original Westinghouse P2500 I/O equipment Replaced with RTP 7400 I/O equipment

Existing System External System Interfaces Control Room Recorders Serial Ethernet Chemistry Recorders Serial Located around the plant MIDAS FTP RMS Ethernet ISFSI (Spent Fuel) Network

Existing System External System Interfaces (cont.) LEFM Serial Digital Display Serial Annunciator Hardware (DOs)

Challenges Project Concurrent project with ANN replacement Resource conflicts in all organizations Existing Implementation did not match Documentation in all cases Other ECs changing the existing PPC configuration while the replacement PPC was being developed Cyber Security ISFSI (Spent Fuel) Cyber Security requirements for the replacement system were not settled until after Unit 1 shipped to DC Cook Changes in other systems during PPC installation Containment Cooling Interface Moved from PSS to PPC

Challenges I/O Equipment RTP 7400 HSWR system RTP does not have a replacement with the same capability RTP Surge Chassis RTP does not have a replacement Space PPC Computer Room cabinets completely full RTP 3000 has a bigger cabinet footprint Original Westinghouse I/O cabinets limit rear access Equipment on the front side, clam shell terminations on the rear side so the rear of the equipment cant be accessed when installed in the cabinets Input impedance issues

Challenges Network Unable to reuse existing fiber cabling Fiber cabling not available to all PPC equipment areas Center control room desk Unable to reuse a significant part of the existing PPC network 10Base2 Serial connections utilize phone system cabling and equipment Desire to get rid of reliance on phone cabling and equipment

Challenges Cyber Security Unable to establish requirements Changes to equipment Cabinet door alarms Rebuild of PPC Computer Room cabinets Doors remove because of interference with existing equipment Change to network organization Existing system is one flat network Replacement network is segregated U1 PPC U2 PPC Common PPC

Challenges Schedule Originally scheduled as outage installation Change to non outage install before the outage due to resource conflicts with Annunciator system install Original U1 installation date postponed Lack of site SAT test procedures Updated installation schedule Aug/Sep 2013 U1 PPC Sep/Oct 2013 U2 ANN Nov 2013 U2 PPC

Challenges Equipment Not Replaced edna Historian used with PSS limited data point name length

Challenges Development System Plant conflicts over who owns PPC Development System and location of system Design Engineering I&C? IT? DC Cook Training Building? Buchanan Office Building (20 miles from the plant)?

Replacement System 9 Workstations 6 Control Room 1 for 1 replacement of existing workstations 1 PPC Computer Room 1 TSC Computer Room 1 TSC per unit EOF and remaining TSC workstations moved to Business LAN workstations on PSS Dell Optiplex 390 All desktop systems BOP and RO monitors mounted on pedestals

Replacement System Redundant PPC Servers HP DL380 Redundant Domain Controllers HP DL360

Replacement System RTP 3000 I/O Equipment Analog Inputs TC RTDs (converted to voltage by bridge modules on the clam shells Voltage (High level) Digital Inputs 48 VDC Analog Outputs Control room trend recorders Digital Outputs 125 VDC (Main Control Room Annunciator)

Replacement System RTP 3000 I/O Equipment (cont.) Redundant Node Processors (RTP 3000D) Redundant Chassis Processors Redundant Chassis Power Supplies 3 DAS nodes PPC Computer Room Aux Building Turbine Building RTP does not provide a 125 VDC Relay Output I/O card Utilize Cyber Research Interposing Relay Panel

Replacement System

Replacement System

Replacement System CyberResearch Surge Chassis Equipment Provides surge ability originally provided by existing RTP surge chassis Each I/O channel signal level can be separately configured Personality module per channel Solves signal level intermixing Each input channel normalized to 0 to 10V output Solves space problem by utilizing 32 channel I/O cards (analog and digital) Four 8 channel AI surge cards are connected to one 32 channel RTP I/O cad Two 16 channel DI surge cards are connected to one 32 channel RTP I/O card Reduces all analog input and digital input I/O cards to a single model Decouple input scanning from input signal impedance

Replacement System

Replacement System

Replacement System Network New Plant Data Network (PDN) fiber backbone PPC system ANN system Push out Ethernet network to remote plant location with Chemistry Recorders Obsolete phone network wiring used for serial connections Benefit of connecting new devices to the PPC Segregated Network U1 PPC Network U2 PPC Network Common PPC Network Chemistry Recorders RMS ISFSI

Replacement System Network Segregated Network (cont.) Firewalls between each network Cyber Security Network Intrusion Detection System Located in the Common Network Connections to U2 DAS Network and U2 HMI Network Event Log Manager Located in the Common Network Receives logs from all devices in U2 Network Project only implementing for U2, DC Cook implementing for U1

Replacement System Applications SPDS & EOP Status Trees Blackout and Time Response Testing Digital Reactivity Control Rod Functions Calorimetric Xenon Follow and Prediction Set-point Supervision Saturation Margin Core Burnup Calcs Flux Mapping Plant Mode Change

Replacement System Applications Delta Flux Tilting Factors Core Exit Thermocouple RCS Leakrate Deviation & Redundant Measures RMS Annunciator

Replacement System Interfaces Digital Display Interface Recorder Interface Rad Monitoring Interface MIDAS Interface LEFM Interface NRC ERDS VPN Interface Simulator Interface PSS Interfaces System Monitoring

Installation Online Installation 30 day window from Flux Map to Flux Map Pre installation of Turbine Bldg. I/O node Temporary Calorimetric System LEFM inputs Manual data input Additional manual entry screen Temporary recorder to collect plant data Eliminate need to downpower during PPC outage

Installation Challenges Existing I/O equipment wired spare channels Westinghouse P250 / P2500 6 or 7 channel analog inputs SAIC wired the channels not connected through the clam shells to new terminations as spare points Need to move 1 or 2 hard wired inputs as part of replacing surge chassis equipment 14 or 16 channel digital inputs SAIC wired the channels not connected through the clam shells to new terminations as spare points Need to move 2 hard wired inputs as part of replacing surge chassis equipment

Installation Challenges Not all interfaces tested in FAT DC Cook unable to provide test units for all Chemistry and Control Room recorders to Scientech for Development / FAT testing Plant systems Flux mapping Rod control No parallel operation testing between existing system and replacement system

Installation Easy Buttons DC Cook has used R*TIME PSS since 2007, users already familiar with the HMI interface Operators already use PSS displays in the control room Schedule delay Allowed for more system run time in the Simulator U2 FAT completed before U1 installed

Questions?