CAPITAL EXPENDITURES



Similar documents
November 3, 2015 Bond and District Additional Assistance Election Information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, :30 PM School Board Room

PLUMMER ELEMENTARY SCHOOL

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

DRAPER ELEMENTARY SCHOOL

Repair Project for April 7, 2009

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools

HOUSTON ELEMENTARY SCHOOL

Van Vleck ISD Bond Election

BUNKER HILL ELEMENTARY SCHOOL

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

Building Description Project Description Estimated Cost Notes Total Deferred

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW

PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015)

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

School Board Proposed Capital Improvements Program. Fiscal Years

PROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

FY16 School District Budget EXECUTIVE SUMMARY

Financing Options to support Energy Efficiency & Contractors

Town of Medway Capital Improvements Planning Committee

Cedarfield Plantation

WILLIAM LYON HOMES - ARIZONA 3-YEAR WARRANTY & SERVICE PROGRAM

School Facilities Referendum Recommendations

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

Invesco Advisers, Inc. Minimum Vendor / Contractor Insurance Requirements and Risk Category Schedule

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

Capital Expenditure. The common definition of capital expenditure is

The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination policy involves

Items in red were complete Items in green were complete on Lined out items are Life Safety Codes.

MURCH ELEMENTARY SCHOOL

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Newtown and Holland Middle Schools Construction Project Bid Review

SMART Initiative Information

School Construction Authority Architecture & Engineering

Presented by The Facilities Management Group TFMG / TFMG Architecture, PC. in conjunction with EMTEC Engineers, LLC

Five-Year Capital Plan Request FY through FY

Chicago Public Schools

SITE OVERALL CONDITION COMMENTS

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, , 2012

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

MASTER FACILITIES PLAN

Projected Statements of Local Assessments. City of Saco, Maine. For the years ending June 30, 2015, 2016 and 2017

Home Repair Program. Section 1: Homeowner Information. Section 2: Special Needs Homeowner Application

CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PATTERSON ELEMENTARY SCHOOL

Attachment C. Application for Downtown Derry Revitalization Tax Relief Program

Frequently Asked Questions

NSP3 Rehabilitation Standards Certification

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Wantagh s Smart Schools Plan for Technology & Security

EAST LYME HIGH SCHOOL

The work has continued on final Phase 4 and is nearing completion.

Public Building Commission of Chicago. Board Meeting August 20, 2013

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems

Flexible Office Space Up to 66,240 Ft 2

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

The City of Basehor, Kansas

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058)

Accounting Policies Land and Land Improvements Buildings and Building Service Equipment Leasehold Improvements

COMPREHENSIVE PROPERTY INSPECTIONS

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Inspection Item COMMENTS

SCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers

A Quick Guide to Facility Management Services

We ve got you covered.

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

UNIVERSITY OF HAWAI I. E Repair and Maintenance and Capital Improvement Projects

NORTH PENN HIGH SCHOOL RENOVATIONS

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Online Survey Executive Summary

Painting Project (Repairs, Paint & Elements Update) Pool deck drain inoperable (1 of 5)

CITY OF TUKWILA Mayor s Office/Human Services Division Minor Housing Repair Assistance Program 2014 Policies

Building Condition Assessment Report

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal ( )

Converting an existing house in Dallas for two people with MCS

Accounting and Administrative Manual Section 100: Accounting and Finance

PEPPER VINER HOMES WARRANTY GUIDELINES

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

Transcription:

CAPITAL EXPENDITURES 1

CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process. A capital improvement is a tangible asset or project with an estimated useful life of five (5) years or more, and a cost of $5,000 or more. The Regional Capital Planning Committee, comprised of members of the Regional Budget and Finance Subcommittee, the Director of Finance and Operations, and the Director of Facilities and Maintenance, is charged with annually developing a fiveyear capital improvement plan, including the upcoming annual capital improvement budget and a fouryear projection of capital needs and expenditures which details the estimated cost, description, and anticipated funding sources for capital projects. The FY2012 budget development cycle is the first time this policy has been implemented. THE CAPITAL BUDGET On January 11, 2011, The AmherstPelham Regional School District School Committee approved a Capital Improvement Plan for FY2012 totaling $996,000. The Plan calls for the following projects to be funded: 1 Replacement Windows at MS 785,000 2 Repoint Leaking Capstones at MS 50,000 3 Eliminate AC W indow Units at HS 25,000 4 Developmental Study Classroom at HS 10,000 5 Paint Exterior Steel Columns at HS 50,000 Total funded with Bond Anticipation Note 920,000 6 Window Shades for HS Classrooms 30,000 7 Amortization of SEC Renovations 10,000 8 Wireless LAN Infrastructure 36,000 Total funded from Stabilization Fund 76,000 Total Approved Capital Improvements 996,000 1. To replace all windows in the Middle School as part of a green Initiative. 2. To hire a contractor to repoint leaking capstones at Middle School to mitigate water damage and preserve structural integrity. 3. To conduct architectural and engineering studies in anticipation of replacing aging window AC units on top floor of High School with ducted chiller system housed on the roof. 4. To contract for remodeling/reconstructing a classroom at the High School as an Activities of Daily Living class/laboratory for special needs students. 5. To contract for stripping and repainting exterior steel support columns at the High School. 6. To install window shades in High School classrooms for security and energy efficiency. 7. To amortize the cost of interior renovations to accommodate the District s consolidated SEC program. The cost of renovations was born by the Town of Amherst, the owner of the building, with the understanding that the Regional District would amortize the cost over ten (10) years. 2

8. To expand coverage and upgrade the wireless network from consumer to enterprise grade equipment and accommodate the bandwidth demanded by the increasing number of wireless devices. FUNDING CAPITAL EXPENDITURES The plan calls for $920,000 to be funded with Shortterm Borrowing, and $76,000 to be funded from the Stabilization Fund. ShortTerm Borrowing is available to the Regional District though Bond Anticipation Notes (BANS). BANS issued through the Department of Revenue (State House Loan Note Program) have a one year maturity and can be renewed for a total of five years. Payment of interest only is due at the maturity date of the BAN and the principal is renewed for another year. Principal payment is required in third year of borrowing of at least equal to the minimum payment that would have been required if temporary loan had been converted into permanent loan. The Window Replacement project has been approved for a Green Initiatives Grant from the MSBA which will reimburse eligible costs at 59.8%. The reimbursement from MSBA should occur prior to the BAN maturity date in 12 months, reducing the rollover amount to a year 2 BAN. Looking to the future of the Capital Plan, year two (2) projects would be funded with another BAN, and in year three (3) the two BANS would be rolled into a Long Term General Obligation Bond Issue along with the funding for the year three projects. During the first two years of this plan the interest due on the BANS at maturity will be funded from the Stabilization Fund. Once the long term bond is issued, principal and interest payments will be assessed to member towns. Principal and interest on bonds or other obligations authorized by vote of the Regional District School Committee to finance capital costs are apportioned to the Member Towns on the basis of the equalized valuation of each town as determined and reported by The Department of Revenue Division of Local Services in effect on the date such bonds or other obligations are authorized. The proportion of the assessment does not change during the period the bonds or other obligations are outstanding. A look at the current debt obligation (below) illustrates these assessments from prior bond issues. 3

CAPITAL PLAN FORECASTS FOR FIVE (5) YEARS AmherstPelham Regional School District Capital Plan FY12 Plan Adopted by the Regional Capital Planning Committee on 12/7/2010 Revised Plan Adopted by Regional Capital Planning Committee on 1/4/2011 Approved by full School Committee on 1/11/2011 FY12 FY13 FY14 FY15 FY16 TOTAL Buildings 960,000 1,035,000 680,000 529,000 2,065,000 5,269,000 Grounds 25,000 500,000 525,000 Equipment 36,000 98,700 91,500 60,600 60,600 347,400 996,000 1,158,700 771,500 1,089,600 2,125,600 6,141,400 Appropriations Financing 920,000 1,096,500 741,500 2,758,000 Special Revenue Funds 76,000 62,200 10,000 10,000 10,000 168,200 Grants (358,800) (358,800) 637,200 1,158,700 751,500 10,000 10,000 2,567,400 4

AmherstPelham Regional School District Capital Plan Buildings 1/4/2011 Project Name FY12 FY13 FY14 FY15 FY16 TOTAL High School Developmental Study Classroom (173) 10,000 100,000 110,000 Painted Exterior Steel Columns 50,000 50,000 Shades 30,000 30,000 Interior Maintenance (ie. Painting, Flooring) 10,000 10,000 20,000 Locker Room Renovations 15,000 150,000 165,000 Boiler Room Desgn 20,000 20,000 Burner Replacments (old burners 2) 250,000 250,000 Bleacher in Gym 60,000 60,000 Auditorium Curtian 25,000 25,000 Exhaust Fans B,C,D,E Wings 90,000 90,000 Auditorium Seats Refurbish 125,000 125,000 High AC eliminate W indow units 25,000 250,000 275,000 Middle School Repoint leaking Capstones 50,000 50,000 Clauk Windows & Doors Replacement Windows & Doors 785,000 785,000 Security Lock / Crash Bar Upgrade 15,000 15,000 Asbestos Management 10,000 10,000 20,000 Shades 30,000 30,000 Intercom Upgrades for Security 10,000 10,000 Exterior Fire Stairs (redesign & build for new england) 500,000 500,000 Interior Maintenance 10,000 10,000 20,000 Hot Water Upgrades (Showers / Bathrooms) 30,000 30,000 Locker Room Showers Renovations 15,000 15,000 Bleacher in Gym 60,000 60,000 Main Office Carpet 15,000 15,000 Mechanical HVAC Pump Room Renovation 95,000 95,000 Balance Air Flow 150,000 150,000 Exhaust Fans 100,000 100,000 Pool Leaks Repair 50,000 50,000 Pool Heater Upgrade 14,000 14,000 Pool Re Grouting 60,000 60,000 Auditorium Seats Refurbish 125,000 125,000 Electrical Service Upgrade 250,000 250,000 Roofs 75,000 1,500,000 1,575,000 Energy Management 5,000 5,000 10,000 Amortization of SEC renovations (10,000 x 10 yrs) 10,000 10,000 10,000 10,000 10,000 50,000 CO Modulars / Renovation / Disposal 20,000 20,000 TOTAL BUILDINGS CAPITAL 960,000 1,035,000 680,000 529,000 2,065,000 5,269,000 Appropriations Financing 920,000 980,000 650,000 2,550,000 Special Revenue Funds 40,000 55,000 10,000 10,000 10,000 125,000 Grants (358,800) (358,800) 601,200 1,035,000 660,000 10,000 10,000 2,316,200 5

AmherstPelham Regional School District Capital Plan Grounds 12/7/2010 Project Name FY12 FY13 FY14 FY15 FY16 TOTAL High School Additional Parking 100,000 100,000 Track Refinish 35,000 35,000 Court Yard Clean Up (crane) 15,000 15,000 Lawn Sprinlker System Leveling 10,000 10,000 Parking Lot Sealing 50,000 50,000 Pave Gray St Ext. 25,000 25,000 North Field Regrading 75,000 75,000 Middle School Sidewalk Repair 25,000 25,000 Southeast Storm Drain Repair 5,000 5,000 Perimeter Drainage 50,000 50,000 Tennis Court 135,000 135,000 TOTAL GROUNDS CAPITAL 25,000 500,000 525,000 Appropriations Financing 25,000 25,000 Special Revenue Funds Grants 25,000 25,000 6

AmherstPelham Regional School District Capital Plan Equipment 1/11/2011 FACILITIES Project Name FY12 FY13 FY14 FY15 FY16 TOTAL High School Middle School Key Tracking 500 500 1,000 TOTAL FACILITIES 500 500 1,000 TRANSPORTATION TOTAL TRANSPORTATION INFORMATION SYSTEMS High School Projectors 39,000 39,000 6,500 6,500 91,000 Document Cameras 16,500 16,500 2,750 2,750 38,500 Interactive W hite Boards 36,000 36,000 6,000 6,000 84,000 Replacement Network Switch Other 10,000 10,000 20,000 Middle School Document Cameras 8,250 8,250 16,500 Interactive W hite Boards 18,000 18,000 36,000 Replacement Network Switch 8,600 8,600 17,200 Wireless LAN Infrastructure 36,000 7,200 43,200 TOTAL INFORMATION SYTEMS 36,000 98,700 91,500 60,100 60,100 346,400 TOTAL EQUIPMENT CAPITAL 36,000 98,700 91,500 60,600 60,600 347,400 Appropriations Financing 91,500 91,500 183,000 Special Revenue Funds 36,000 7,200 43,200 Grants 36,000 98,700 91,500 226,200 7

AmherstPelham Regional School District Capital Plan 1/4/2011 FY12 Plan Adopted by the Regional Capital Planning Committee on 12/7/2010 Revised Plan Adopted by Regional Capital Planning Committee on 1/4/2011 Approved by full School Committee on 1/11/2011 FY12 FY13 FY14 FY15 FY16 TOTAL Buildings 960,000 1,035,000 680,000 529,000 2,065,000 5,269,000 Grounds 25,000 500,000 525,000 Equipment 36,000 98,700 91,500 60,600 60,600 347,400 996,000 1,158,700 771,500 1,089,600 2,125,600 6,141,400 Appropriations Financing 920,000 1,096,500 741,500 2,758,000 Special Revenue Funds 76,000 62,200 10,000 10,000 10,000 168,200 Grants (358,800) (358,800) 637,200 1,158,700 751,500 10,000 10,000 2,567,400 Financing @ 1.5% @2.0% BAN 1 920,000 BAN 2 561,200 BAN 3 1,096,500 LT Bond 2,399,200 BANs 920,000 MSBA Reimbursement (358,800) Roll to next year 561,200 920,000 1,657,700 2,399,200 Stabilization Fund Beginning Balance 364,000 272,720 177,392 167,392 157,392 Capital Projects (76,000) (62,200) (10,000) (10,000) (10,000) BAN Interest (15,281) (33,128) Assessments Ending Balance 272,720 177,392 167,392 157,392 147,392 8

CURRENT DEBT OBLIGATIONS AmherstPelham Regional School District Debt Payment Schedule Debt Shedule FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 High School Roof Principal (125,000) (125,000) (125,000) (125,000) (125,000) (125,000) (125,000) Interest (32,188) (27,188) (22,188) (17,344) (12,500) (7,500) (2,500) Total (157,188) (152,188) (147,188) (142,344) (137,500) (132,500) (127,500) High School Addition Principal (1,180,000) (1,165,000) (1,145,000) (1,130,000) (1,115,000) (1,100,000) (1,095,000) (1,090,000) (1, Interest (454,619) (417,259) (374,700) (329,200) (284,300) (240,000) (190,625) (136,000) Total (1,634,619) (1,582,259) (1,519,700) (1,459,200) (1,399,300) (1,340,000) (1,285,625) (1,226,000) (1, MS Renovation Project Principal (80,000) (80,000) (80,000) (80,000) (80,000) (80,000) (80,000) (80,000) Interest (26,800) (23,600) (20,400) (17,300) (14,200) (11,000) (7,800) (4,600) Total (106,800) (103,600) (100,400) (97,300) (94,200) (91,000) (87,800) (84,600) Total Debt Expense (1,898,606) (1,838,047) (1,767,288) (1,698,844) (1,631,000) (1,563,500) (1,500,925) (1,310,600) (1, Assessment to Towns Amherst 559,857 515,602 463,460 413,030 363,063 313,441 267,628 125,378 Pelham 46,032 42,365 38,041 33,859 29,716 25,602 21,805 10,443 Leverett 64,434 59,511 53,732 48,142 42,602 37,096 32,004 13,621 Shutesbury 57,638 53,123 47,808 42,668 37,575 32,516 27,843 12,713 Total 727,960 670,601 603,042 537,699 472,955 408,655 349,280 162,155 MSBA Payment 1,063,846 1,063,846 1,063,846 1,063,845 1,063,845 1,063,845 1,063,845 1,063,845 1, MS Project from Stabilization 106,800 103,600 100,400 97,300 94,200 91,000 87,800 84,600 Total Debt Support 1,898,606 1,838,047 1,767,288 1,698,844 1,631,000 1,563,500 1,500,925 1,310,600 1, Consolidated Debt Obligations Beginning Balance 15,568,934 13,670,328 11,832,281 10,064,994 8,366,150 6,735,150 5,171,650 3,670,725 2 Payments Principal (1,385,000) (1,370,000) (1,350,000) (1,335,000) (1,320,000) (1,305,000) (1,300,000) (1,170,000) (1, Interest (513,606) (468,047) (417,288) (363,844) (311,000) (258,500) (200,925) (140,600) Ending Balance 13,670,328 11,832,281 10,064,994 8,366,150 6,735,150 5,171,650 3,670,725 2,360,125 1 9