The better way to build TM. Installation Manual ROOF SIPs

Similar documents
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

Additions and Alterations

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

PANELIZED HOME INSTALLATION GUIDELINE

INSTALLATION OF A BAY WINDOW

Asphalt Shingle Application Requirements

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

CHAPTER 7: Building Systems ROOFING SYSTEMS

AUTHORIZATION TO MARK

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

Window Installation Instructions

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

Mark Cramer Inspection Services, Inc.

How To Repair A Boat Landing Deck With A Boat Bed

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

Chapter 6 ROOF-CEILING SYSTEMS

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Residential Roofing Guide

March 14, Installation of Bay, Bow and Garden Windows

Superform Products Ltd.

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

Retrofitting an Insulated Cold Roof

Detached accessory structures that contain no conditioned floor area are exempt.

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO

SUPER SHED. Indoor shelter for your outdoor tools.

Best Barns USA Assembly Book

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application

application instructions

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHOP APPLIED WOOD COATINGS SECTION: SHEATHING REPORT HOLDER:

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings

RB271 06/07 R807.1 RB272 06/07 R Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

Electrical Wiring Technical Bulletin

INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels

MUNICODE SERVICES LTD.

WINDOW INSTALLATION GUIDE

Post and Beam Construction

G VYCOR DECK PROTECTOR

MASTERFORMAT SPECIFICATION

NRCA s steep-slope manual is thoroughly revised for 2013

STANDARD OPEN PATIO COVER

Sun Windows General Information Sun New Construction Window Installation Instructions

Clad Direct Glaze Window Installation Instructions

Directions For Applying Malarkey Laminate Shingles

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Classic Products, Inc. ClickLock Standing Seam Installation Manual

DEFAULT HEAT LOSS COEFFICIENTS

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

Smooth cap sheet SQ $ Smooth cap sheet SQ $ Smooth cap sheet SQ $ Smooth cap sheet SQ $ 36.

Custom 30 x 20-8 Garage Plan Plan #g233 By SDS-CAD Specialized Design Systems

Tundra Series Windows January 2016

Renovating Your Basement

Screw Patterns Roof & Walls TR-36 MD-36 TSM-32. PBR-Panel

Chapter 36 - STRAW BALE CONSTRUCTION SECTION PURPOSE. SECTION SCOPE. SECTION DEFINITIONS.

TYPICAL PATIO COVERS 111

Building Construction. Lightweight construction. Conventional Construction

providing documentation that validates the year of construction. Acceptable documents include

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

LEGACY REPORT. (800) (562) A Subsidiary of the International Code Council RETAINED ON U.S.

Shingle Installation Guide

THE DOW CHEMICAL COMPANY Issued: August 1, LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN (989)

AMERICAN GOTHIC PLAYHOUSE

SECTION STANDING SEAM METAL ROOFING

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

High Wind & Hail Standards

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

8/18/14. Introduction to. Framing. Terminology and Concepts

Sample Drawing Package for One and Two Family Dwelling Applications

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

SHINGLE APPLICATION GUIDE

B. Related categories: The following categories contain requirements that relate to this section:

GreenGuard Housewrap Installation Guide

HfHMD uses LP SmartSide siding and trim.

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

Installation Manual for STANDING SEAM ROOFING

Titan Old World Spanish Tile

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

POST AND FRAME STRUCTURES (Pole Barns)

Chapter 9: INSTALLING ROOFING

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra Includes:

Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions

Transcription:

The better way to build TM Installation Manual ROOF SIPs

November 2016 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials.............................................. 3 Electrical Wiring......................................... 3 Interior Finish........................................... 4 Exterior Cladding........................................ 4 Materials Estimation...................................... 5 Details Air Barrier Details for Air Barrier Sealants.................. AB-1 Air Barrier Details for Sealing SIP Connections............. AB-2 Vapour Barrier Details for Vapour Sealing SIP Connections.... VB-1 Typical Roof Ridge..................................... R-1 Roof Ridge Details for 12/12 Pitch Roof.................... R-2 Beam Pocket Detail.................................... R-3 Roof Valley & Intermediate Roof Support.................... R-4 Eave Detail and Roof Support at Exterior Wall................ R-5 Typical Sloped Roof Assembly............................ R-6 Sloped Roof Assembly with Ridge Beam.................... R-7 Flat Roof Assembly..................................... R-8 Skylight Opening & Assembly............................ R-9 Typical Roof Connection Sections (Roof to Wall)............. R-10 Roofing Applied to SIPs................................ R-11 Flat Roofing Applied to SIPs............................. R-12 Roof Overhang Eave Details (Timberframe)............... R-TF-1 Roof Overhang & Rake (Timberframe)................... R-TF-2 Roof SIP - Installation Manual 2

November 2016 ROOF SIPs Installation Manual 1. General Requirements 1.1 Scope The basic design and construction requirements for the Thermapan Structural Insulated Panel (SIP) roof system is set forth in this specification. Criteria for materials, environmental control, design loads, and structural design are included. Where requirements are based on internationally recognized standards and specifications, these standards and specifications are referenced without elaboration. Installers shall reference engineering design package for fastening arrangements. 2. Materials 2.1 The Thermapan Roof SIP is composed of an expanded polystyrene (EPS) foam core laminated between two layers of oriented strand board (OSB) with a structural adhesive. 2.2 Framing Lumber shall be DOC PS 20 or NLGA No.2 or better. 2.3 Wire nails, ring nails, spikes and staples shall conform to CSA B111 or ANSI/ASME B11.1. 2.4 Wood screws shall conform to ANSI/ASME B18.6.1.. 2.5 SIP screws shall conform to ICC-AC233. 2.6 Caulking Compounds shall conform to CAN/CGSB 19.13 or ASTM C 920. 2.7 Polyethylene Sheeting shall conform to CAN/CGSB-37.2, CAN/ CGSB-37.16, or ASTM D 4397. 2.8 Low expansion foam seal shall conform to AAMA 812-04. 2.9 Structural adhesive shall conform to CAN/CGSB 71GP26, APA AFG-01 or ASTM D3498. 3. Electrical Wiring 3.1 An optional furring for electrical passage should be fastened to the underside of the roof SIP between the vapour barrier and the interior finish. See details R-1, R-4 and R-5. Roof SIP - Installation Manual 3

November 2016 4. Interior Finish 4.1 The interior of the roof SIP can be finished with any of the common required building code materials. It is recommended that the SIP joints and connections be sealed as per Details AB-1, AB-2 and VB-1. 5. Exterior Roofing 5.1 Consult your local building code and refer to details R-11 and R-12 for roofing applied to SIPs. Roof SIP - Installation Manual 4

November 2016 MATERIALS ESTIMATING Roof (Vaulted Ceiling) Estimation Only Lumber Requirements: Perimeter of roof or fascia length Caulking and Sealant Requirements: Every 1200 sqft (111 m 2 ) of SIP equals 1 case of Expandable Foam Every 2000 sqft (185 m 2 ) of SIP requires 1 case of Sealant Fasteners: Recommend 2 (50mm) Ring nail or 2 (50mm) screws for connection to panel ~ 1.25 times the square footage of SIPs... nailing of spline SIP screws use 40% of Roof square footage Roof SIP - Installation Manual 5

AIR BARRIER RECOMMENDED DETAILS FOR AIR BARRIER SEALANTS All sealants, FOAM (A) or CAULKING (B), should be applied onto the SIP in a continuous rectangular pattern along the outer most edge of the area to be sealed. (A) A low expansion FOAM SEALANT should conform to the AAMA 812-04 standard. Apply a 1/2 inch or a 12.5 mm diameter of a continuous bead of expandable foam sealant onto the SIP: Expandable Foam Sealant Bead EPS (B) A CAULKING SEALANT should conform to ASTM C920-02 and/or CAN/CGSB 19.13-M. Apply a 3/8 inch or a 10 mm diameter continuous bead of caulking onto the lumber spline: CAULKING (CONTINUOUS BEAD) Caulking Bead LUMBER STUD OR SPLINE AIR BARRIER DETAILS FOR AIR BARRIER SEALANTS REVISION DWG. No. NOVEMBER 2010 1 AB-1

AIR BARRIER RECOMMENDED DETAILS FOR SEALING SIP CONNECTIONS (1) Foam to Foam: Use a low expansion foam sealant. 1/4 (6 mm) GAP FOAM SEALANT FOAM SEALANT SIP SPLINE JOINT SEE VAPOUR BARRIER DETAIL (VB-1) BUTT JOINT (2) Foam to Wood: Use a low expansion foam sealant. PLATES SECTION LUMBER SPLINES CAP TOP PLATE FOAM SEALANT CAULKING (SEE WOOD TO WOOD) FOAM SEALANT BOTTOM PLATE LUMBER SPLINE, END STUD OR JOIST (3) Wood to Wood: Use caulking and a low expansion foam sealant. CORNER DETAIL PLAN LUMBER SPLINE FOAM SEALANT SEE VAPOUR BARRIER DETAIL (VB-1) FOAM SEALANT FOAM SEALANT CAULKING (SEE AB-1) CAULKING (SEE AB-1) AIR BARRIER DETAILS FOR SEALING SIP CONNECTIONS MAY 2009 REVISION DWG. No. AB-2

VAPOUR BARRIER RECOMMENDED DETAILS FOR VAPOUR SEALING SIP CONNECTIONS The function of a vapour barrier is to control the entry of water vapour into the building assembly. Vapour barriers should not be confused with an air barrier. All SIP seams and connections must be VAPOUR SEALED from the INTERIOR. These are recommended vapour barrier methods: OSB EXTERIOR INTERIOR CONTINUOUS 6 MIL POLY OVER ENTIRE SIP ASSEMBLY SEE AIR BARRIER DETAIL (AB-2) 6 MIL POLY STRIP CAULKED TO OSB SEE AIR BARRIER DETAIL (AB-2) CONTINUOUS 6 MIL POLY RECOMMENDED 6 MIL POLY STRIPS & CAULKING EXTERIOR INTERIOR CAULKING SEE AIR BARRIER DETAIL (AB-2) OSB SEE AIR BARRIER DETAIL (AB-2) SIP TAPE CAULKING SIP TAPE VAPOUR BARRIER DETAILS FOR VAPOUR SEALING SIP CONNECTIONS NOVEMBER 2010 REVISION DWG. No. 1 VB-1

SIP SCREW ( SEE FASTENING TABLE) FOAM SEALANT VAPOUR SEALED AS PER VB-1 CHAMFER BLOCKING (WEDGE) OPTIONAL FURRING FOR ELECTRICAL PASSAGE INTERIOR FINISH RIDGE SECTION (WITH RIDGE BEAM) STRUCTURAL SUPPORT AS REQUIRED SIP SCREW (SEE FASTENING TABLE) ADJUST FRAMING MEMBER AS REQUIRED FOAM SEALANT VAPOUR SEALED AS PER VB-1 CAULK TO PANEL INTERIOR FINISH OPTIONAL FURRING FOR ELECTRICAL PASSAGE RIDGE SECTION (NO RIDGE BEAM) NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS ROOF RIDGE DETAILS REVISION FEBRUARY 2012 5 DWG. No. R-1

SIP SCREWS CAULK TO PANEL 6 MIL POLY VAPOUR BARRIER RIDGE SECTION (TYPICAL RIDGE BEAM) SIP SCREWS CAULK TO PANEL RAFTER & BEAM BY OTHERS FOR RAFTER & BEAMS (DESIGNED BY OTHERS) 6 MIL POLY NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS SECTIONS - ROOF RIDGE DETAILS FOR 12/12 PITCH ROOF FEBRUARY 2012 REVISION R-2 DWG. No. R-2

CHAMFER BLOCKING FOAM SEALANT SIP SCREW SIP SCREW VAPOUR SEALED AS PER VB-1 CAULK TO PANEL TOP PLATES RIDGE BEAM AS REQUIRED POST (BUILT-UP OR SOLID) PANEL JOINT WALL P ANEL RIDGE BEAM & POST POCKET NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS BEAM POCKET DETAIL REVISION DECEMBER 2010 2 DWG. No. R-3

FOAM SEALANT SIP SCREW CAULK TO PANEL VAPOUR SEALED AS PER VB-1 CHAMFER BLOCKING INTERIOR FINISH OPTIONAL FURRING FOR ELECTRICAL PASSAGE ROOF VALLEY STRUCTURAL SUPPORT AS REQUIRED SIP SCREWS SIP SCREW FOAM CHAMFER BLOCKING OPTIONAL FURRING FOR ELECTRICAL PASSAGE INTERIOR FINISH PANEL JOINT AT ROOF SUPPORT WEDGE OR BEAM CHAMFERED AT TOP INTERIOR FINISH PANEL CONTINUES OVER ROOF SUPPORT STRUCTURAL SUPPORT AS REQUIRED NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS ROOF VALLEY & INTERMEDIATE ROOF SUPPORT REVISION JANUARY 2012 3 DWG. No. R-4

CHAMFER BLOCKING (INSERT AFTER ROOF PANELS ARE IN PLACE) SIP SCREW SEE FASTENING TABLE CAULK TO PANEL FASCIA FOAM SEALANT VAPOUR SEALED AS PER VB-1 INTERIOR FINISH FOAM OPTIONAL FURRING FOR ELECTRICAL PASSAGE CAULK FOAM SEALANT FASCIA CAP & PLATE BLOCKING SOFFIT FRAMING OVERHANG (SEE TABLE R-T-3) WALL PANEL ROOF SUPPORT NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS EAVE DETAIL & ROOF SUPPORT AT EXTERIOR WALL REVISION FEBRUARY 2012 5 DWG. N o. R-5

SECTION A-A SEE FASTENING TABLE AND DETAIL BELOW EPS CORE OSB SKIN VAPOUR SEALED AS PER VB-1 A A SEE SECTION B BELOW SPLINE ROOF ASSEMBLY SECTION B SIP SPLINE BLIND FASCIA (SITE) FASCIA WEDGE FOR PLUMB CUT (SITE) NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS TYPICAL SLOPED ROOF ASSEMBLY REVISION FEBRUARY 2012 6 DWG. No. R-6

SEE DETAIL R-1 OR R-2 A A SEE DETAIL R-4 OR R-5 BLIND FASCIA (SITE) FASCIA WEDGE FOR PLUMB CUT (SITE) ROOF ASSEMBLY SECTION A-A SIP SPLINE SIP SPLINE LUMBER SPLINE FOAM SEALANT OR CAULKING (SEE AB-1) NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS SLOPED ROOF ASSEMBLY WITH RIDGE BEAM REVISION FEBRUARY 2012 2 DWG. No. R-7

A A INSTALL FASCIA BOARD ON SITE SPLINE SEE SECTION B BELOW EPS CORE SECTION A-A SEE FASTENING TABLE SECTION B ISOMETRIC ROOF ASSEMBLY GENERIC DETAIL FOR FLAT ROOF FOAM SEAL 3 FOAM CORE SPLINE OSB SKIN CAULK VAPOUR SEALED AS PER VB-1 VAPOUR SEALED AS PER VB-1 NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS FLAT ROOF ASSEMBLY REVISION FEBRUARY 2012 2 DWG. No. R-8

ROOF JOISTS ATTACHED BY HANGERS OR SIDE NAILING OPTIONAL JOISTS OPTIONAL 1.5 RECESS TYPICAL U.N.O. 1.5 OR 3 RECESS SEE SKYLIGHT MANUFACTURER S DETAIL HANGER OR NAILS DOUBLE SPLINE JOIST SKYLIGHT OPENING & ASSEMBLY FEBRUARY 2012 3 REVISION DWG. No. R-9

FLASHING SECURE END PLATE REMOVE FOAM FROM ROOF PANEL AS TO INSTALL NAILER AND LEDGER BOARD TO MATCH WALL BOARD. LEDGER SECURED TO STUDS OPTION 1 FLASHING EMBEDDED MIN. 1" IN MASONRY SECURE TO NEW STUD WALL WITH SIP SCREWS WATER RESISTANT MEMBRANE NEW STUD WALL SECURED TO EXISTING STRUCTURAL WALL EXISTING WALL OPTION 2 NEW ROOF TO EXISTING WALL TYPICAL ROOF CONNECTION SECTIONS (ROOF TO WALL) REVISION DWG. No. FEBRUARY 2012 3 R-10

S (TWO SHOWN) ASPHALT SHINGLES NON-ADHERING ROOFING UNDERLAYMENT INSTALLED AS PER MANUFACTURER S INSTRUCTIONS DRIP EDGE FASCIA COVER 2X_ FASCIA BOARD DRIP EDGE FASCIA BOARD FASCIA COVER FASCIA WEDGE FOR PLUMB CUT 2X_ BLIND FASCIA STARTER SHINGLE INSTALLED AS PER MANUFACTURER S INSTRUCTIONS METAL ROOFING OR CEDAR SHAKES S (TWO SHOWN) NON-ADHERING ROOFING UNDERLAYMENT INSTALLED AS PER MANUFACTURER S INSTRUCTIONS DRIP EDGE FURRING INSTALLED AS PER MANUFACTURER S INSTRUCTIONS 2X_ FASCIA COVER FASCIA BOARD DRIP EDGE FASCIA BOARD FASCIA COVER FASCIA WEDGE FOR PLUMB CUT 2X_ BLIND FASCIA METAL ROOFING OR SHAKES INSTALLED AS PER MANUFACTURER S INSTRUCTIONS NOTE: VENTILATION OF SIP ROOF NOT REQUIRED. ROOFING APPLIED TO SLOPED SIPS REVISION DWG. No. APRIL 2011 1 R-11

NON-ADHERED MEMBRANE (EPDM, PVC, TPO, ETC.) FASTENERS INTO OSB PROTECTIVE SHEATHING OR MEMBRANE AS REQUIRED OSB EPS ADHERED ROOFING MEMBRANE TORCHED ON OR GLUED ON ROOFING MEMBRANE FASTEN PROTECTIVE SHEATHING LAYER (OSB, PLYWOOD) WITH GLUE, NAILS OR SCREWS OSB EPS NOTES: SIP SURFACE TO BE DRY. INSTALL MEMBRANE ACCORDING TO MEMBRANE MANUFACTURER S DETAILS AND CONFORM TO REQUIREMENTS OF LOCAL BUILDING CODE. FLAT ROOFING APPLIED TO SIPS NOVEMBER 2011 REVISION DWG. No. R-12

UNFINISHED EAVE DETAIL FOR LEVEL SOFFIT RAFTER RECESS FOR INLAY FOAM SEALANT WALL PANEL VAPOUR SEALED AS PER VB-1 2 NAIL INTO TIMBERFRAME POST 1/2 DRYWALL CAULK TO PANEL FINISHED EAVE DETAIL WITH LEVEL SOFFIT RAFTER TAIL AND INLAY INSTALLED ON GROUND - SCREWED FROM TOP AND BOTTOM RAFTER TAILS @ 16" O/C RAFTER 1/2 " DRY WALL CAULK TO PANEL FINISHED FASCIA KICKER VAPOUR SEALED AS PER VB-1 INSULATION SUGGESTED POST FINISHED SOFFIT LEDGER WALL PANEL NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. ROOF OVERHANG EAVE DETAILS (TIMBERFRAME) 8020 REVISION DWG. No. FEBRUARY 2012 3 R-TF-1

HURRICANE STRAP OSB "TIE" CONVENTIONAL LADDER FOAM SEALANT BEAM / RAFTER VAPOUR SEALED AS PER VB-1 BUILT OUT OPTION POPULAR FOR ROOFS WITH COMMON RAFTER SYSTEMS AND PANEL ORIENTED VERTICALLY WALL PANEL NOTE: SCREW AND GLUE LADDER TO WALL PANEL FOAM HELD BACK FOR RAKE BLOCKING 2X_ INLAY RAKE BLOCKING FOAM SEALANT RAFTER / BEAM VAPOUR SEALED AS PER VB-1 RUN-BY OPTION, POPULAR FOR ROOFS WITH PRINCIPAL RAFTERS AND PURLINS AND PANELS ORIENTED HORIZONTALLY WALL PANEL NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. ROOF OVERHANG & RAKE (TIMBERFRAME) 8020 REVISION DWG. No. MAY 2009 2 R-TF-2