Technical Specifications STEP ELECTRICAL

Similar documents
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS PACKAGE

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

STREETLIGHT SYSTEM GROUNDING AND BONDING

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

A. Shop Drawing submittals shall include, but not be limited to, the following:

IRRIGATION PUMPING Table of Contents - Section 900

Introduction. Safety Guidelines. Part Numbers. Operation and Maintenance Manual. Operation and Maintenance Manual

Electrical Code Regulation

TABLE OF CONTENT

TSn SERIES Surge Protective Device

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION LOW VOLTAGE LIGHTING CONTROLS

MOBILE HOME SERVICE REQUIREMENTS GAS

Please check with your local inspection authority for any additional requirements before installation.

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

ELECTRICAL SAFETY Information Bulletin

CONTROL PANEL INSTALLATION INSTRUCTIONS. Single Phase Simplex Page Phase Simplex Page 8-13

Electrical Grounding. Appendix C

Electrical Service Guidelines

OPL BASIC. Dosing System for Professional Laundry machines. Contents

Electric Service Guide for Commercial Construction

DIVISION 26 - ELECTRICAL SECTION CABLES FOR INSTRUMENTATION

Town House Center Highway North Huntingdon, PA 15642

Generator DoCKInG StatIonS

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23

Multiple Meter Installation Amperes Per Position -Single Phase, Self-contained

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

Requirements for Electrical Installations

DC400 Dispensing Cutoff System

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

SECTION POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

How To Get A Power Line Extension

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

4 Installation Requirements

Electric Service Guide for Residential Construction

Step 1: Application Instructions

SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET

TC Grounding and Bonding for Telecommunications Systems

Unarmored Variable Frequency Drive (VFD) Cable Termination Guide

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp

Use & Care Manual. Electric Tankless Water Heaters. With Installation Instructions for the Installer AP15447 (10/10)

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS

Generator Transfer Switch Model # HTS15-AUTO

Grounding & Bonding Why it is done And How to Install Properly

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

SERVICE ENTRANCE REQUIREMENTS MANUAL

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, December 10, 2015, with amendments and additions noted below.

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

LIEBERT VNSA Installation Sheet

INSTALLATION MANUAL. Installation Instructions

IntelliBrite Controller (For IntelliBrite Pool, Spa and Landscape Lighting Fixtures) Installation and User s Guide

Control Box Wiring For PRSstandard Tool

Sample - No Commercial Use

USA: 866.LAWSON4U ( ) Canada: lawsonproducts.com. Electrical Industrial and Fleet Solutions

Heat Tracing Sales Mt. Airy, Maryland Installation Instructions

Fire Alarm System Plans Review Checklist Property location Date of Review

Electrical Practices for Construction Work

INSTALLATION INSTRUCTION SPEC. SHEET 7/00. City of New York Calendar #40747 ETL LISTED UNDER U.L. STD LOW VOLTAGE TRACK LIGHTING SYSTEM

NEW SERVICE INSTALLATION STEPS. Common Slow Downs. Other Necessary Steps

WIND ALARM. Wind Speed Alarm. Wind Speed. Set Point 2. Set Point 1 NEW BEDFORD, MA USA

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

INSTALLATION INSTRUCTIONS

Chromalox. Installation, Operation. Portable Industrial Unit Blower Air Heater Type DRA RENEWAL PARTS IDENTIFICATION

AMPSEAL* Automotive Plug Connector and Header Assembly

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

CHAPTER 4 UTILITY SYSTEMS ELECTRICAL. Utility Systems Electrical. Main Panel

LEAD FREE FIREX. Interlock Armored Cables TECK90 and MC Industrial Cables. w w w. n e x a n s e n e r g y. c o m

EVANS ELECTRONIC TEMPERATURE CONTROL TROUBLESHOOTING GUIDE for systems equipped with electric coolant valve and external PC board.

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

RayClic Connection System Installation Instructions

800 Communications Circuits

Instruction Manual. Cable Splicing. Models , HDF1, HDF SS1

OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

Customer Substation Manual 08/05/02

INSTALLATION MANUAL ELECTRIC RANGE. Please read these instructions thoroughly before installing and operating the range.

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

COMMERCIAL CONDUIT RULES AND REGULATION

Exclude all sales to foreign countries and all sales or transfers to other divisions or plants of your company. Survey Form 3.3.

PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

City of Riverside Building & Safety Division Phone: (951)

Evaluating Fire- and Heat-Damaged Electrical Equipment

Transcription:

Technical Specifications STEP ELECTRICAL 1.0 General. This section covers Basic Electrical requirements including electrical demolition, metal conduit, nonmetal conduit, fittings and conduit bodies, building wire, control cable, wiring connectors and connections, pull and junction boxes, equipment grounding conductors, bonding, electrical connections to pump equipment and controls, conduit and equipment supports, non-fused knife switch disconnects, anchors and fasteners, nameplates and labels, level control and alarm floats and pump control, alarm panels, and seal offs. All items shall be installed in accordance with the National Electrical Code and state and municipal codes. All items shall be inspected and approved by the Building Division Electrical Inspector for the City of Missoula. All products shall be installed in accordance with manufacturer s instructions and Underwriters Laboratories listed requirements. 2.0 Materials. Materials shall be per applicable sections of the specifications, and as specified herein or shown on the drawings. All materials shall conform to the City of Missoula current standard and shall be listed and classified by Underwriters Laboratories, Inc. A. Metal Conduit. Rigid steel conduit: ANSI C80.1 Fittings and Conduit Bodies: ANSI/NEMA FB 1; all steel fittings. With seal offs. B. Electrical Metallic Tubing. (EMT) ANSI C80.3; galvanized tubing. Fittings and Conduit Bodies: ANSI/NEMA FB1; steel, compression type. C. Nonmetallic Conduit. NEMA TC 2; Schedule 40 PVC. Fittings and Conduit Bodies: NEMA TC 3. With seal offs, type EY for vertical applications, with EYC sealing compound or Chico compound. D. Building Wire. Single conductor insulated wire, copper, rated 600 volts. Insulation, ANSI/NFPA 70, Type THHN/THWN. E. Multiconductor Cable: Seven conductor, 600V power and control cable rated for direct burial, copper. Insulation, conductors: THHN/THWN. Cable: PVC jacket. The following wire color coding shall be used to wire the Orenco control panel: Black, Orange, Red, Blue, Yellow, Brown, Red w/ Black Dash. Neutral and ground conductors shall be identified in field with color tape at all terminations and splices. F. Miscellaneous Junction Boxes: Sheet metal boxes, NEMA Type 3R. (1) Disconnect: Non-fused knife disconnect lockable. G. Wiring Connectors, Grounding Lugs and Tap/Splice Fittings: UL approved for wire size and purpose intended. Butt connectors shall be Partsmaster 20366650 step down crimp and shrink, and 16-20 to 12-14 AWG and 29366655 step down crimp and shrink 14-16 to 10-12 or approved equivalent. H. Meter Main: 125A or 200A continuous duty. Combination meter and main circuit breaker for 120/240V, single phase, three-wire service. Overhead or

underground feed as required. Meet Northwestern Energy current specifications. Size to match existing service. Breakers shall be identified as Sewer and shall have matching locks, installed by electrician, on STEP sewer breakers. I. Miscellaneous Supporting Devices: Provide materials, sizes and type of anchors, fasteners and supports to carry the loads of equipment and conduit. Consider weight of wire in conduit when selecting products. J. Self Adhesive Label: shall be provided by the City of Missoula, upon final approval of the STEP system. K. Underground Warning Tape: 3 wide, black letters with red background. Caution Buried Electrical Line Below. Installed 6 to 8 below finished grade. L. Level Control & Alarm Floats: Float assembly shall meet current City of Missoula approved Orenco float assembly with City of Missoula approved Orenco splice box. Float assembly shall be complete with high water alarm float, on/off float, redundant off and low level float, all cord assemblies and wire markers. Splice box shall be complete with four cord grips (for 3 floats and a pump cord). All connections in tank junction boxes shall be stranded wire only, and connected with Partsmaster step down crimp and shrink preinsulated heat shrinkable butt connectors or approved equivalent. All pump vaults shall have a single PVC float assembly, with floats positioned to provide space for the floats to operate without interference between floats. All floats shall be rated 120V, 13 amps maximum pump running current, 85 amps locked rotor, ½ h.p. They shall meet current City of Missoula specifications. All floats shall be classified for Class I Division II locations. All floats shall be supplied with 17 long cords with no splices. The cords shall not be shortened during installation. M. Pump Control and Alarm Panels: For 1,000 gallon and 1,500 gallon STEP tanks (residential): use the current City of Missoula standard Orenco Simplex Pump control panel. The alarm activates the high liquid level alarm light and buzzer. The buzzer may be silenced by pressing the illuminated Push To Silence button on the front of the control panel. The alarm light will remain on until the high level condition is corrected. On/Off float: energized the motor contactor, which switches on the power to the pump. The float is in the up position when this occurs. De-energizes the motor contactor, which switches off the power to the pump. The float is in the down position when this occurs. Redundant Off and Low Level Alarm: Switches off the power to the pump. This also activates the alarm light and buzzer. The float is in the down position when this occurs.

The control panels shall have a provision for a field installed elapsed time meter and event counter kit, stainless steel latch, internal 120 volt circuit breaker sized and rated for pump served, and control circuit fuse and disconnect sized per manufacturer requirements. Both the pump circuit breaker and control circuit fuse shall be rated for 10,000 AMP interrupt current. Elapsed time meter and even counter kits will not be supplied with the individual control panel. Type EY seal offs shall be installed vertically on conduit runs only, below the control box and 18 above finished grade. A non-fused knife switch disconnect that can be locked into energized and non-energized position shall be installed between the main meter box and the control box. Disconnect shall be within 6 of control panel, and visible from control panel. The lock shall be provided by the City of Missoula and shall be the property of the City of Missoula. The control panels shall be supplied with a padlock and key set. All padlocks on the project shall be keyed alike with a common key, provided by the City of Missoula and shall be the property of the City of Missoula. 3.0 Installation. All items shall be installed in accordance with the National Electrical Code and state and municipal codes. All items shall be inspected and approved by the Building Division Electrical Inspector for the City of Missoula. All products shall be installed in accordance with manufacturer s instructions and Underwriters Laboratories listing requirements. Use stranded conductors or multiconductor cable. Use conductors not smaller than 10 AWG for power circuit with 30 AMP circuit breaker and 12 AWG for control circuits. Pull all conductors into raceway at the same time. Use suitable wire pulling lubricant for cable assemblies. Protect exposed cable from damage. Use suitable cable fittings and connectors. Clean conductor surfaces before installing lugs and connectors. Make splices, taps and terminations to carry full amapcity of conductors with not perceptible temperature rise. Tape uninsulated conductors and connector with electrical tape to 150% of insulation rating of conductor. Inspect wire and cable for physical damage and proper connection. Verify continuity of each circuit conductor. Install electrical boxes as shown in City of Missoula Residential STEP Manual. Provide bonding to meet Regulatory Requirements. Equipment grounding conductor: provide separate, insulated conductor within each circuit. Terminate each end on suitable lug, bus, or bushing. Inspect grounding and bonding system conductors and connections for tightness and proper installation.

Make electrical connections in accordance with equipment manufacturer s instructions. Provide suitable strain-relief clamps and fittings for cord connections at splice box in tank riser. Use correct crimping tool. Splice boxes shall be installed in the STEP tank riser in accordance with the instruction from the supplier or manufacturer. The control panel shall be installed on the permanent structure. The fastening device shall be of sufficient size and length to securely fasten the panel. STEP CHECKLIST (Electrical) Use conductors not smaller than 10AWG for power circuit with single pole 30 AMP circuit breaker and 12 AWG for control circuits. Use stranded conductors or multiconductor cable. 30 AMP breaker shall be identified as Sewer and shall have matching lock, installed by electrician, on STEP sewer breaker. Proper grounding. Non-fused Knife Switch Disconnect that can be locked into non-energized or energized position, installed between the main meter box and the control panel. Disconnect shall be within 6 of control panel, and visible from control panel. Placement of disconnect and control panel Are there obstructions that prevent the boxes from being opened easily? Proper fittings used to connect Control Panel and Disconnect to conduit. Neutral shall not be broken between Control Panel and Breaker. In control panel look for wiring diagram, wire size and placement (see diagram), only 1 wire per lug on bar. Type EY seal offs, with EYC sealing compound or Chico compound, installed vertically on conduit runs only. Conduit or cable at correct trench depth. Conduit 90 degree downsweep directly out of j-box to meet 18 code. 24 trench depth for sewer cable, with red marking tape. Sewer cable application to have approved compression sealed fitting (such as Huston Wire & Cable BICC 424-UNO2 Cable Seal) to prevent vapors, gases, or liquids. Inside riser look at j-box placement, correctly crimped and heated step-down butt connectors, no water in j-box, no extra wires or wirenuts, cord grips secured, No splices in pump or float cords, j-box lid screws.

DIRECT BURY (Sewer Cable) 12 AWG Conductor Cable Color Coding and Labeling Wire Color Terminal Connection in Orenco Panel Black 1 ------ 2 Orange 3 Red 4 Blue 5 Yellow 6 Brown 7 1 Red w/black Dash Ground Lug 2 NOTES 1 Apply white tape at all terminations. 2 Apply green tape at all terminations. CONDUIT 12 AWG Conductor Cable Color Coding and Labeling Wire Color Terminal Connection in Orenco Panel Black 1 ------ 2 Orange 3 Red 4 Blue 5 Yellow 6 Brown 7 Green Ground Lug 1 2 NOTES 1 Apply white tape at all terminations. 2 Apply green tape at all terminations. ***Make sure to secure riser lid***