Executive Summary. Arkari Gol Hydropower Project

Similar documents
Project Layout & Design Features of the Project

Micro-Hydro. Module Introduction. Tokyo Electric Power Co. (TEPCO)

Frequently Asked Questions (FAQs) on Hydropower

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

What are the Benefits?

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

Financing hydropower Introduction to the Specifics of Small Hydro Power Plants

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority

CHAPTER 3 RESEARCH DESIGN

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

HYDROMATRIX Jebel Aulia - Sudan

Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan

Clean Development Mechanism Project Opportunities in Indonesia

INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN

Institut für Energietechnik Department of Energy Systems. Hydroelectric power. Elias Bartos 2/7 2010

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

Assessment of hydropower resources

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada

Overview of Tekeze hydroelectric power plant General

China s Small Hydropower in Rural Energy Development

Búrfell. hydropower station

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

HYDROPOWER POTENTIAL OF NEUQUÉN PROVINCE

Tanzania: Lower Kihansi Hydropower Station / Hydropower plants

A Green Sector Overview

TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station)

Hydroelectric Power Plant - Los Cóndores. Santiago, April 2014

Project Finance Structuring: Case Study - Nam Theun 2

CORUH RIVER DEVELOPMENT PLAN

FACT SHEET 6: HYDRO ELECTRICITY

Amaila Hydropower ESIA Update Section 2. Contents

National Electric Power Regulatory Authority

HydroHelp 1 AN EXCEL PROGRAM DEVELOPED FOR TURBINE-GENERATOR SELECTION FOR HYDROELECTRIC SITES

Feasibility Study Report. India Muerta Small Hydro Power Plant. In Uruguay

Technical Consultant

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

Ways toward Food Security -Lessons Learned from Fish Passages in the Paraná River-

Manage water resources for on site hydro-electricity generation

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon

RECYCLED MICRO HYDROPOWER GENERATION USING HYDRAULIC RAM PUMP (HYDRAM)

Pico Power: A Boon for Rural Electrification

XAYABURI HYDRO POWER PLANT, LAO PDR

Hydro Power Projections Report. Jennifer Palmer

SMALL HYDRO PROJECT ANALYSIS

D 4.4 Report on the feasibility analysis for most technically acceptable locations

MICRO HYDRO POWER GENERATING EQUIPMENT

Cumulative Impact Assessment Baseline Monitoring Report for the Goksu-Seyhan Hydropower Cascade

MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

Pump Storage Technology

HYDROELECTRICITY and DAMS

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

S.1 Introduction to the Case Study on Micro-Hydro Power Plants

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

THE ECONOMIC DATA BASE AN INSTRUMENT SUPPORTING PREPARATION OF THE PROGRAMMES OF MEASURES IN ACCORDANCE TO THE WATER FRAMEWORK DIRECTIVE

BÜYÜKDÜZ HYDROELECTRIC POWER PLANT, TURKEY

GRAND ETHIOPIAN RENAISSANCE DAM

Small-Micro Hydro Facilitation & Innovative Technologies in Japan

Commissioning of 87,000-kW Kaplan Turbine and Generator for Otori Power Station

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž

e7/ppa Workshop on Renewable Energy - TEST ANSWER -

Feasibility Study Mzimvubu Water Project

Exploring the potential of energy recovery using micro hydropower systems in water supply systems

MICRO HYDRO FOR THE FARM AND HOME

Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant

TYPE "A" AND TYPE "B" CONSTANT DOWNSTREAM LEVEL CONTROL GATES TYPE "A" FOR OPEN CHANNEL FLOWS F.P.O. TYPE "B" FOR ORIFICE APPLICATIONS WATERMAN

RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION

Proposed Terms of Reference for EIA studies

HYDROPOWER SYSTEMS BY APPOINTMENT TO H.M. THE QUEEN WATER TURBINE ENGINEERS, GILBERT GILKES & GORDON LTD, KENDAL

Performance of Gangrel Hydroelectric Power Plant A Case Study

Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community.

Environmental and Social Review Summary

Guide on how to refurbish low head small hydro sites

RE Practices in Pakistan Micro Hydro Community-managed micro-hydro projects in Northern Pakistan by Aga Khan Rural Support Programme (AKRSP)

Technical Specifications of Micro Hydropower System Design and its Implementation

DESIGN OF SMALL HYDRO ELECTRIC PROJECT USING TAILRACE EXTENSION SCHEME

Amir Bashirzadeh Tabrizi, Nassir Gifani. TOOSSAB Consulting Engineers Company

Colorado Water Bar December 13, 2012

Integrated Water and Sediment Management of Yellow River

(IV) Proposed Terms of Reference for EIA Studies

Design Criteria & Service Goals

Sustainable. Infrastructure and Asset. Management. Kiyoshi KOBAYASHI

Moving Small Mountains Vesuvius Dam Rehab

Cost base for small-scale hydropower plants (< kw)

Transcription:

Executive Summary Arkari Gol Hydropower Project The optimized maximum power station output is 99 MW corresponding to a maximum design discharge of 36 m 3 /sec at a mean gross head of 335 meters achieved from a horizontal conduit length of 5600 meters. The optimized project will produce 378 GWh/year out of which 139 GWh will be available during 4 hours of daily peaking period. The firm capacity available during these four hours for the duration of the whole year is 79 MW. The total project cost is 179 Million USD or 1800 USD / kw installed. The total construction time is 48 months. The site, after completion of Lowari tunnel will be accessible around the year on existing road system. Before completion of this tunnel access on surface will be only from middle of May until end November. Introduction The project is located in Khyber Pakhtunkhwa (KP) province of Pakistan on Arkari River in Chitral District. The Arkari River is a left tributary of Lutkho River. The project area is accessible by road and is at a distance of 460 km from Islamabad, the capital of Pakistan, and 370 km from Peshawar, the capital of Khyber Pakhtunkhwa province. Comprehensive inventory studies for identification of hydropower potential in the mountainous areas of KP have been carried out by the Government of KP, represented by Pakhtunkhwa Hydel Development Organization (PHYDO) for the Chitral Valley supported by Ministry of Water and Power, Government of Pakistan, both in collaboration with the German Agency for Technical Cooperation (GTZ). Project site for the Arkari Gol Hydropower Project constitutes part of the inventory of hydropower projects identified during the identification studies. This document has been prepared for the Executive Summary of the Feasibility Study of the Arkari Gol Hydropower project. Location of the Arkari Gol Hydropower Project has been presented in the project location map on the following page. CIV-TECH & EPAC, IEGfHPD, DESIGNMEN & FOUR STAR Page - 1

Project Location Map Extensive field reconnaissance including topographical surveys, hydrological and geological investigations and environmental assessments were carried out. Subsequently, the size of the project was optimized and design criteria determined, followed by engineering studies and feasibility design. Project Description General Layout The intake with the dam is located on Arkari River 8 km upstream of its junction into Lutkho River near the village of Uchhatur. From there, the water is transferred through a desander basin, horizontal low pressure tunnel, surge chamber system and vertical pressure shaft with horizontal pressure tunnel to the surface-type powerhouse situated on right bank of CIV-TECH & EPAC, IEGfHPD, DESIGNMEN & FOUR STAR Page - 2

Arkari River near its junction with Lutkho River near the village of Andakht. Project Layout is presented in the figure below. Layout Plan The 20 m high concrete faced rockfill dam creates a reservoir of about 1.06 million cubic meters total capacity out of which 0.489 million cubic meters are used as live-storage for four-hour daily peak operation during dry season. From the intake structure, a concrete lined 290 meter long open canal to a desander basin of 70 m length connected to a 5600 m meter long headrace tunnel with a net diameter of 4.15 m meters will transfer the 36 m 3 /sec design discharge to the surge tank. From there, a 296 m vertical pressure shaft and a 494 m long horizontal pressure tunnel, will lead the water to the powerhouse. The gross head will be 335 m. CIV-TECH & EPAC, IEGfHPD, DESIGNMEN & FOUR STAR Page - 3

The powerhouse is open surface type 46.7 m long, 24.2 m wide and 13.5 m high. It houses three vertical shaft Pelton type turbine-generator sets of 33 MW each. Trail Race and Outlet Structure will discharge the water into Arkari River. The annual production in total will be 378 GWh out of which 139 GWh will be peak energy. The firm capacity is 79 MW. Firm Capacity and peak energy refer to four hours daily at 90% availability. An open 132 kv switchyard is located adjacent to powerhouse and will be connected with the National Grid following the grid system development in the area. Grid interconnection will be arranged to the requirements of NTDC for systematic coordination of evacuation of hydropower production in District to the National Grid. It is proposed to evacuate the entire energy of the District from a Central Grid Station near Chitral Town through a 220 kv, at later stages combined with 500 kv System via Lowari top, through Panjkoora Valley to Mardan. The production of Arkari hydropower project is planned to be transmitted to this Central Grid Station through a 132 kv transmission system, collecting energy production from all hydropower stations along Lutkho River, namely Arkari Gol Powerhouse at Andakht village, Mujigram Shogo and Shogo-Sin. Cost Estimates and Economic Analysis Detailed cost estimates and BOQ are available in Feasibility Report which may be used as a basis for development of tender documents. The total construction cost works out to about US$ 179 million, with a specific capacity cost of 1800 US$/kW. The economic analysis establishes that the project forms part of the least cost generation expansion program of WAPDA and therefore will be economically feasible. The project has also been also demonstrated to be technically feasible and financially viable. The economic analysis has established the project to be attractive with NPV (at 12% discount rate) to be about 260 million US$, the project EIRR works out to be 22%. The CIV-TECH & EPAC, IEGfHPD, DESIGNMEN & FOUR STAR Page - 4

project is therefore economically attractive. PROJECT COST ESTIMATE S.No Description Total Cost in 1000 US$ A Preliminary works 16702.187 B Civil works 89326.25 C Hydraulic steel works 393.257 D Hydro-mechanical & Electrical equipment 39905.683 E Transmission system 309.6 F Engineering and administration 7.44951858 G Other charges (Bank charges insurance, customs duty, income tax etc. 32539.9125 Total project cost price level 2013 (105 Rupees/ US$) 179184.339 Environmental and Social Impact Assessment The demography, the ethnic composition of the people, their socio-economic conditions, health and sanitation, land and water use, agriculture, irrigation, forestry, fisheries, flora and fauna, impact on land, water and air and the socio economic activities have been thoroughly examined. Although the negative impact of the project on the ecology and the inhabitants will be negligible, yet a mitigation plan has been prepared to overcome the problem of perceptible nature. A significant positive effect is that emission of green-house gases is avoided by replacement of fossil-fired plant capacity by environment friendly and renewable hydropower. Field investigations and engineering studies have led to the conclusion that the project is technically feasible, financially sound, economically useful and environmentally safe. Arkari Gol hydropower project ranks as one of the most promising sites and should be undertaken as soon as possible, whether in the public or private sector. Design Features and Project Schedule Principal design features and project schedule have been presented in the pages that follow. CIV-TECH & EPAC, IEGfHPD, DESIGNMEN & FOUR STAR Page - 5

PRINCIPAL DESIGN FEATURES Hydrology (Design Flows) Intake Design Discharge 36 m 3 /s Type Lateral Intake Design Flood at dam site 562 m 3 /s (1000 year flood) No. of Gates 2 Design Flood at powerhouse site 571 m 3 /s (1000 year flood) Gate Size (WxH) 3m x 4m Deck Elevation 2185 m.a.s.l. Reservoir Intake Sill Level 2181 m.a.s.l. Reservoir Length 1.30 km Reservoir Area 0.121 km 2 Connecting Channel Max. Reservoir Operating Level 2190 m.a.s.l. Size(W x H) 6m x 4m Min. Reservoir Operating Level 2186 m.a.s.l. Length 290 m Reservoir Capacity (Live Storage) 0.489 m.c.m. Desander (Surface) Dam Structure No. of Chambers 4 Type of Structure CFRD Size of Chamber 70m x 6m Dam Height (above river bed) 20 m Dam Crest Level 2192 m.a.s.l. Low Pressure Headrace Tunnel Inside shape and dimension Horse Shoe Type of Spillway Dimensions 4.15 m x 2.68 m Spillway with under sluices 4 Length 5600 m No. of Gates (under sluices) 4 Gate Type Roller Gates Surge Tank Gate Size (WXH) 6m x 6m Surge Shaft Discharge Capacity 1436 m 3 /s Diameter (inner) 4.50 m Minimum Net Head 315 m Height 71 m Rated Net head 318 m No. of Surge Chambers 3 Plant Design Discharge 36 m 3 /s Lengths 96m, 96m, 74.5m Installed Plant Capacity 99 Pressure Shaft Turbine Type Diameter 3.10 m No. of Units 3 Length 296 m Turbine Center Line Level 1854.70 m.a.s.l. Generator 3 x 38.82 MVA Pressure Tunnel Design Annual Energy 378 GWh Diameter 3 m Plant Factor 43.60% Length 494 m Powerhouse Type Surface External Size of Powerhouse (LxWxH) 46.71m x 24.20m x 13.46 m Tailrace Channel Power Generation Gross head (HWL-Turbine centre line) 335 m Head Loss 17 m Length of Tailrace Channel 100 m Max. Net head 318 m CIV-TECH & EPAC, IEGfHPD, DESIGNMEN & FOUR STAR Page - 6

0 PROJECT SCHEDULE 1 2 3 4 5 ID 1 ACTIVITY PRELIMINARY WORKS - Land Acquisition - Tenders, Bidding, Contracts Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 2 PREPARATORY WORKS - Camps and Roads 3 4 5 6 DAM STRUCTURE - River Diversion, Excavation - Concreting, Grout Curtain CONDUIT SYSTEM - Tunnels and Shaft - Surge Structures POWERHOUSE CIVIL WORKS - Excavation & Concreting - Internal Works, Tail Race POWERHOUSE EQUIPMENT - Fabrication, delivery & assembly of Turbines, Generators, Transformer 7 SWITCH YARD & TRANSMISSION 8 ADDITIONAL WORKS - Residential Buildings, Stores - Workshops 9 COMMISSIONING & OPERATION CIV-TECH & EPAC, IEGfHPD, DESIGNMEN & FOUR STAR Page - 7