1 USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency for International Development (USAID)
2 USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS Contract No: AID-EPP-I Order No: AID-391-TO USAID Energy Policy Program House 4, Street 88, Sector G-6/3 Ataturk Avenue, Islamabad, Pakistan Tel: +92 (51) , Fax: +92 (51) DISCLAIMER The contents of this document are the sole responsibility of Advanced Engineering Associates International, Inc. (AEAI) and do not necessarily reflect the views of USAID or the United States Government.
3 Status of 4 Run of River Hydropower Projects October 2013 In keeping with directions from USAID, EPP visited 4 run of river hydropower projects to verify their status. This is a brief report on the visit undertaken from 8 to 12 October All the 4 Run of River power projects were under construction in 2010 and all of them suffered substantial damage during the floods that year. Human life was lost at Duber where about 40 locals and 2 Chinese nationals were taken by the flash flood that swept the power house site. The 3 in the Northern Areas were also hit by an Earthquake and suffered from Sectarian Riots. Each event caused physical damage to structures and the project suffered long shutdown owing to disruption of work as either the access route was blocked or labor had to leave and tend to their home and families or the expatriate staff had to be evacuated and then remobilized. Each disruption delayed construction schedule, cost money and was a major setback for the project. The substantially experienced European consultant for the 3 Northern Projects remarked that: I have never seen anything like this before on any project. These projects have survived unusual natural and political disasters - everything that could possibly go wrong went wrong there was an unprecedented devastating earthquake in 2005, unprecedented bloody riots in 2007 and a flood in 2010 that probably has come down the mountains only once before in the past 1,000 years! It is a tribute to WAPDA and the Contractor that we have finally completed them. 3 plants are now operational and 1 is yet to be commissioned. A list of works to be done at each site is attached. 130MW Duber Khwar The weir is located about 12 km upstream in the Duber Valley. The road to the site is in deplorable condition. Basic structures are complete but works remain. Control room is still to be constructed. Work on Spillway Gates is not complete. Site clearing and some finishing works are to be done. Several micro hydropower generation machines, most reconstructed and improved by various NGOs after the 2010 flood, are located downstream of the weir and 1 cumsec water has to be released to keep them operational besides local use of water from the stream. Power House: The power house is located near the township of Pattan. Pressure test has been done and dry tests on equipment have been conducted but actual operational tests on all equipment and both machines are pending connection of Transmission Line. Clearing and finishing works at station sites are still to be completed. A large Contractors Camp is located on the KKH between the sites of the Weir and the Power House and it is proposed to be paid for and taken over by WAPDA after completion of the project. Status of 4 Run of River Hydropower Projects October
4 72MW Khan Khwar The project was commissioned in 2010 and has generated over 550 Gwh. An issue is that with construction of the weir the otherwise invisible debris and garbage flowing down the stream accumulates at the weir and is released downstream as before the weir was built. The garbage scatters over the roughly 6 km of stream bed or flows to the Indus. During our visit we were told that the spillway gates were stuck shut and unable to open. There was also a visible oil leak in the operating hydraulic distribution node of the servomotors. WAPDA was awaiting rectification by Contractor as all equipment was still under warranty of the 3 year Defect Liability Period. As a social service to local population, a water supply pipeline is under construction to take water from an upstream tributary to the township of Besham where the power station is sited. Power House: The station has 2 Francis Turbines connected to 34MW generators and a 4MW Pelton Wheel auxiliary generator. It is operational since 2010 and the operators seemed satisfied with the plant. 121MW Alai Khwar The weir is located downstream the scenic Alai valley which has considerable population and therefore substantial garbage accumulating in the lake. There is still considerable activity at site although the project has started commercial operations. An access tunnel to the weir has to be completed and major demobilization works are pending, especially of the batching plant just upstream of the weir. Downstream the embankments are being strengthened involving major concrete works and dumping of rip rap. Power House: The power station along the left bank of the Indus is operational and seemed to be better constructed and maintained probably because it is the largest of the 3 and has the central Grid Station serving all 3 power stations. The Grid has 2 x 220kV lines going South and 2 x 132kV lines leading to the Khan and Duber hydropower plants up North. 96MW Jinnah The hydropower facility is located on right bank of Indus at Jinnah Barrage and houses 8 Kaplan Turbines, each connected through a gear assembly to 8 generators of 12MW each. 5 of the machines were inundated during floods of 2010 and have since been replaced by the Contractor. All 8 units are now operational. The power transformers at the Switchyard convert power generated at 11kV to 137.5kV, as against rated voltage of 132kV, and are connected to the National Grid. WAPDA has evaluated and determined that feeding this relatively small amount of power at the higher than normal voltage stabilizes their system. A problem faced by operators is the debris flowing down the Indus that partially clogs the intakes and reduced energy output of the turbines. Attached: List of work to be completed Status of 4 Run of River Hydropower Projects October
5 Works to be completed in 4 RoR Hydropower Projects Duber hydro power project Road repair Intake Structure Civil work Stilling Basin Back Filling of Weir area Transmission interconnection with Grid Station at Allai Khwar Wet Test of Units Trial Commercial Operation of Units Defect Liability Repairs of Civil Work Defect Liabilities Repair of E & M equipment Khan Khwar Hydro Power Project Flaps Gate Seal replacement Bottom Outlet Gates Servomotors oil leakage Back Filling and Leveled Weir Site Defect liabilities repairs of Civil Work. Allai Khwar Hydro Power Project Access Tunnel Not complete Stilling Basin Repair of Bottom outlet gates Back filling Defect Liability Period Repairs of Civil Work Defect Liabilities Repairs of E & M works Jinnah Hydro Power Project Various minor finishing works at plant and others not covered under the EPC Contract, like providing accommodation for plant operating staff and enhancing site security measures. Note: WAPDA reports on these projects say that all environmental issues have been adequately addressed, however, USAID may consider helping WAPDA find a solution to removal of accumulated debris an unexpected benefit afforded by the 4 projects as all such debris was earlier flowing down the streams/river but is now collectable and removable. Status of 4 Run of River Hydropower Projects October
HYDROMATRIX Jebel Aulia - Sudan
HYDROMATRIX Jebel Aulia - Sudan www.andritz.com HYDROMATRIX - Concept Jebel Aulia - Sudan HYDROMATRIX is a new concept of hydraulic energy generation, which has been developed by an American engineer in
What are the Benefits?
Micro hydro power system introduction Not everyone is lucky enough to have a source of running water near their homes. But for those with river-side homes or live-on boats, small water generators (micro-hydro
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
Sample Micro Hydro Initial Report
Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is playing a great role in economic development since the last
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon
3D view of intake - looking upstream from the west bank New intake access track forming upstream bund The intake is located at grid ref 204791,888654. The intake screen arrangement is a drop bar type screen
APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan
APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and
Kyrgyzstan: Power Generation & Transmission
Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...
Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT
RECOVERY PLAN FORMAT Below is a suggested Table of Contents for an Internal Emergency Recovery (Response) Plan. This Internal Emergency Recovery Plan (IERP) is designed as a separate document which can
A Green Sector Overview
A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North
XAYABURI HYDRO POWER PLANT, LAO PDR
XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,
An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada
An Introduction to Micro- Hydropower Systems Natural Resources Canada Ressources naturelles Canada Introduction Hydropower technology has been around for more than a century. Hydropower comes from converting
Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority
Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities Yves Muyange Director General Energy Water & Sanitation Authority Rwanda: A Thousand hills between the two Major Drainage Basins
Hydropower: A closer look at Archimedes Screws. Dr Peter Walker APEM Senior Aquatic Scientist
Hydropower: A closer look at Archimedes Screws Dr Peter Walker APEM Senior Aquatic Scientist Why am I here? To talk about Archimedes screw hydropower Topics covered: A brief, general overview of hydropower
Hydroelectric Power Plant - Los Cóndores. Santiago, April 2014
Hydroelectric Power Plant - Los Cóndores Santiago, April 2014 Introduction Los Cóndores, a large hydro project of 150 MW with water flow regulation using the existing water reservoir of the Embalse Laguna
Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
Assessment of hydropower resources
Assessment of hydropower resources Oliver Froend Assessment of hydropower resources Relevance of surveys, data assessment and analyses to the success of the project. Required data and field survey. Key
SCHEDULE 1-2 CONSTRUCTION AGREEMENT. between KEEYASK HYDROPOWER LIMITED PARTNERSHIP, - and - THE MANITOBA HYDRO-ELECTRIC BOARD. DATED, 2009.
SCHEDULE 1-2 CONSTRUCTION AGREEMENT between KEEYASK HYDROPOWER LIMITED PARTNERSHIP, - and - THE MANITOBA HYDRO-ELECTRIC BOARD. DATED, 2009. TABLE OF CONTENTS Page ARTICLE 1 - SCOPE OF WORK AND RELATED
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for
Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)
Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
Pico Power: A Boon for Rural Electrification
Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 7 (2013), pp. 865-872 Research India Publications http://www.ripublication.com/aeee.htm Pico Power: A Boon for Rural Electrification
INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN
INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN by Adib Geadah Senior Hydraulic Engineer and Consultant, P.O.Box 13-6195, Beirut, 1102-2801, Lebanon International Seminar
NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand
Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department
UCCS ENSC/PES 2500: Renewable Energy Spring 2011 Test 3 name:
UCCS ENSC/PES 2500: Renewable Energy Spring 2011 Test 3 name: 1. These waves travel through the body of the Earth and are called S waves. a. Transverse b. Longitudinal c. Amplitude d. Trough 2. These waves
Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan
Mini & Micro Hydro Power Generation EBARA Hatakeyama Memorial Fund Tokyo, Japan Definitions Large Scale hydro power generation : Capacity 100(MW) Most of them involve major construction of dams. Small
CHAPTER 3 RESEARCH DESIGN
CHAPTER 3 RESEARCH DESIGN 3.1 Introduction In general, micro-hydropower systems operate as Run-of-River type which means that neither a large dam or water storage reservoir is built nor is land flooded.
US Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid
Cronfa Amaethyddol Ewrop ar gyfer Datblygu Gwledig: Ewrop yn Buddsoddi mewn Ardaloedd Gwledig The European Agricultural Fund for Rural Development: Europe Investing in Rural Areas Micro-hydro Power Introduction
Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.
Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three
: Promoters Contribution 950.00 : Term Loan 950.00 Total 1900.00 8 Profitability at optimum level. : Optimum Utilization(3 rd Year)
PROJECT SUMMARY 1 The Proposal : To set up a Small Hydroelectric Power Plant 2 Proposed Location of the project : The following factors need to be thoroughly examined before finalizing the location a.
HYDROELECTRICITY and DAMS
Definition Girotte lake, France Hydroelectricity or hydroelectric energy uses the potential energy of water flows (rivers, waterfalls, ocean currents, etc.). The kinetic energy of the water stream is converted
Manage water resources for on site hydro-electricity generation
Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water
Discover. Waitaki. Meridian Energy s hydro dam
Discover Waitaki Meridian Energy s hydro dam Auckland Activity guide Skiing Fishing Canals Wellington Christchurch Waitaki Dunedin Lake Pukaki Tekapo B Tekapo A Lake Tekapo Tekapo Lookout Picnic Water
KEYWORDS Micro hydro turbine, Turbine testing, Cross flow turbine
DEVELOPMENT OF COST EFFECTIVE TURBINE FOR HILLY AREAS [Blank line 11 pt] A. Tamil Chandran, Senior Research Engineer Fluid Control Research Institute, Kanjikode west, Plalakkad, Kerala, India [email protected]
2013 Flood Recovery Framework
PFC2013-0646 ATTACHMENT 2013 Flood Recovery Framework calgary.ca contact 3-1-1 Onward/ Calgary: A great place to make a living; a great place to make a life. Contents Context...4 Weather conditions...5
CLIFTY CREEK PLANT MADISON, INDIANA
2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection
China s Small Hydropower in Rural Energy Development
China s Small Hydropower in Rural Energy Development Li Zhiwu National Research Institute for Rural Electrification, China Hangzhou regional (Asia & Pacific) Center for Small Hydropower 2012.8.1 As one
MICRO-HYDRO POWER. Technical
MICRO-HYDRO POWER Introduction Water power can be harnessed in many ways; tidal flows can be utilised to produce power by building a barrage across an estuary and releasing water in a controlled manner
TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station)
Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 1 TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station) N. M. Abdelsalam 1, M. M. Abdelaziz 2, A. F. Zobaa 3 and M. S. Aziz
Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA
Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 198 Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 300-MW Pump-turbine
TOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina 28075 Phone: 704 455 3574 Fax 704 455 6391 www.harrisburgfd.
FLOOD FACTS AND SAFETY TIPS Floods are one of the most common hazards in the United States. Flood effects can be local, impacting a neighborhood or community, or very large, affecting entire river basins
Standard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
USACE Dam Safety Program Current Approach & Methodology
USACE Dam Safety Program Current Approach & Methodology Siamac Vaghar, PE, MASCE Chief, Geotechnical Engineering Section Dam Safety Program Manager US Army Corps of Engineers New England District Corps
Technical Approach and Methodology
1 Dam Rehabilitation & Improvement Project (DRIP), India Technical Approach and Methodology relative to Section of Design Flood Review of TOR Making an integral part of Egis Eau Tender Technical Proposal
CONTRACT FOR THE SALE AND PURCHASE OF ELECTRICITY GENERATED BY WIND POWER
CONTRACT FOR THE SALE AND PURCHASE OF ELECTRICITY GENERATED BY WIND POWER ASSISTANCE TO ENERGY SECTOR TO STRENGTHEN ENERGY SECURITY AND REGIONAL INTEGRATION CONTRACT NUMBER EPP-I-08-03-00008-00 AUGUST,
Institut für Energietechnik Department of Energy Systems. Hydroelectric power. Elias Bartos 2/7 2010
Institut für Energietechnik Department of Energy Systems Hydroelectric power Elias Bartos 2/7 2010 1 Contents Different types of power plants Potential Economics Conclusion 2 Impoundment A dam is built
SMALL HYDRO PROJECT ANALYSIS
Training Module SPEAKER S NOTES SMALL HYDRO PROJECT ANALYSIS CLEAN ENERGY PROJECT ANALYSIS COURSE This document provides a transcription of the oral presentation (Voice & Slides) for this training module
FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM
FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM Dr. Murat Ali HATİPOĞLU Fatih KESKİN Kemal SEYREK State Hydraulics Works (DSI), Investigation and Planning Department
Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant
Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant Description A micro-hydro project at SCWD s Graham Hill Water Treatment Plant (WTP) would replace an exisiting non-operational
FACT SHEET 6: HYDRO ELECTRICITY
FACT SHEET 6: HYDRO ELECTRICITY Hydro comes from the Greek word hydra, meaning water. Hydro electricity is electricity produced from the energy contained in the downhill flow of water from rivers and lakes.
VIDEO INSPECTION AND LASER PROFILING IN FLORIDA. AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013
VIDEO INSPECTION AND LASER PROFILING IN FLORIDA AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013 PIPE INSPECTION Over the last 5 years, the Department has spent approximately 175 million dollars
Performance of Gangrel Hydroelectric Power Plant A Case Study
Performance of Gangrel Hydroelectric Power Plant A Case Study Bhoumika Sahu 1, Sanjiv Kumar 2, Dhananjay Kumar Sahu 3,Brijesh patel 4,Kalpit P. Kaurase 5 1 M.Tech scholar (TurboMachinary) & Mats University,
COWENS RISK SOLUTIONS WATER DAMAGE PREVENTION
COWENS RISK SOLUTIONS WATER DAMAGE PREVENTION October 2014 WATER DAMAGE PREVENTION: AVOID COSTLY WATER DAMAGE CLAIMS WITH A WATER DAMAGE MITIGATION PROGRAM Water damage is the number one source of property
with engineered reliability
Pelton turbines Cover picture Machined bucket backside, Workshop, St. Pölten, Austria Model test set up for dynamic measurements Akköy, Turkey Harnessing the power of water Pelton nozzle with engineered
REAL-TIME POWER SYSTEM SIMULATOR TRAINING PROGRAM
USAID ENERGY POLICY PROGRAM POST-TRAINING EVALUATION REAL-TIME POWER SYSTEM SIMULATOR TRAINING PROGRAM OCTOBER 5-29, 2015 November 2015 This program is made possible by the support of the American people
Chapter 4. Flood Control
Chapter 4. Flood Control As noted by their name, flood control measures control floodwaters and keep them from reaching damageable property. They are also called structural measures because they involve
Insuring your property and contents
A guide to Insuring your property and contents Contents Page No. Introduction 1 Contents insurance 1 How do I make a contents insurance claim? 1 Buildings insurance 2 How do I make a buildings insurance
ENERGY POLICY PROGRAM
ENERGY POLICY PROGRAM PARTICIPANT TRAINING PROGRAM POST-TRAINING EVALUATION BEST PRACTICES IN THERMAL OPERATIONS AND MAINTENANCE April 2014 This document is made possible by the support of the American
Design and manufacturing of Crossflow, Pelton, Kaplan and Francis turbines
Design and manufacturing of Crossflow, Pelton, Kaplan and Francis turbines Founded in 1990 as a manufacturer of hydro power plant equipment In 2005, the company underwent complete modernization and extended
Watershed Rehabilitation Program in Texas
Watershed Rehabilitation Program in Texas 1 Dams Constructed by Year (nationwide) 700 600 500 PL-566 Pilot/RC&D PL-534 400 300 200 100 0 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 Year 2 Number
MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid
MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid Presentation by Energy Regulation Board, Zambia 79 th IEC General Assembly Workshop for Industrialising
Exploring the potential of energy recovery using micro hydropower systems in water supply systems
Water Utility Journal 7: 25-33, 2014. 2014 E.W. Publications Exploring the potential of energy recovery using micro hydropower systems in water supply systems I. Kougias *, T. Patsialis, A. Zafirakou and
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
S.1 Introduction to the Case Study on Micro-Hydro Power Plants
S.1 Introduction to the Case Study on Micro-Hydro Power Plants Micro-Hydro power is an alternative technology for power generation. This section provides a case study on the design and development of a
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou
Discussion about the practicability of implementing flood risk management and urban flood insurance in China Longhua Gao, Xiaoqing Zhou Abstract: This paper explains the flood risk management at first,
ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES
ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects
Pöyry renewable energy. Energy through small hydropower
Pöyry renewable energy Energy through small hydropower We are hydropower The history of Pöyry Energy GmbH is founded in Austria upon more than 50 years of experience in engineering and power plant construction.
Flood After Fire Fact Sheet
FACT SHEET Flood After Fire Fact Sheet Risks and Protection Floods are the most common and costly natural hazard in the nation. Whether caused by heavy rain, thunderstorms, or the tropical storms, the
Overview of Tekeze hydroelectric power plant General
Overview of Tekeze hydroelectric power plant General The Ethiopian Electric power corporation constructed the Tekeze hydro electric power plant as part of the Country s general development plan with the
General Terms and Conditions of Sale and Delivery of Federatie Aandrijven en Automatiseren (Trading Companies)
General Terms and Conditions of Sale and Delivery of Federatie Aandrijven en Automatiseren (Trading Companies) Filed at the Registry of the Court of The Hague, the Netherlands, on 6 December 2011, under
Greater Los Angeles County Region Attachment 3
Introduction The (Project) includes improvement of three existing Los Angeles County Flood Control District facilities and the construction of a new interconnecting pipeline. The existing facilities are
Background Information: The Mamquam River Floodplain Restoration Project
Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries
Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž
The concept of ecological restoration of a sub-alpine river and its tributaries in Slovenia Suggestions for regulation of riverbed and reconstruction of hydrotechnical facilities Dr. Lidija Globevnik Luka
Renewable energies, Energy efficiency, Water collection and supply. Autonomous Region of Madeira, Portugal
Optimising the Multiple Purpose Function of the Socorridos Hydro Power Station for Use All Year Round to Produce Water for Public Supply, Irrigation and Electricity Key words: Renewable energies, Energy
Muskrat Falls Project Oversight Committee. Committee Report August 2015
Muskrat Falls Project Oversight Committee Committee Report August 2015 Table of Contents Introduction...2 Project Costs...4 I. Muskrat Falls Generation Facility...6 II. Labrador Island Transmission Link...8
ANNEX 7. Odra-Vistula Flood Management Project List of priority investments as of January 2015
ANNEX 7. Odra-Vistula Flood Management Project List of priority investments as of January 2015 Ref. No. 1A.1 Chlewice-Porzecze. Backwater embankment of Odra River at Myśli River 1A.2 Flood protection of
AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM
AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM Dumitru Dan POP 1, Vasile Simion CRĂCIUN, Liviu Neamţ, Radu Tîrnovan, Teodor VAIDA Technical University of Cluj Napoca, [email protected]
Vehicle Fire Protection. An Ownerʼs Manual for ANSUL Fire Suppression/Detection Systems
Vehicle Fire Protection An Ownerʼs Manual for ANSUL Fire Suppression/Detection Systems 002792 Off-road vehicles do have fires Statistics show that off-road vehicles burn with alarming frequency. These
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : [email protected]
Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2
The Utilization of Geographic Information Systems and Multi-Criteria Decision Making with Local Community Participation for Selection of Site for Micro Hydropower Project: A Case Study of Chi River Basin,
T5 CHARLOTTE REGION WEST DATA CENTER PARK
Additional!Sites Up to 120+ MW available to site from Duke Energy Low cost reliable power - 3.9-4.6 /kilowatt hour Dual Circuit 100 KV Grid Connector Low natural disaster risk Multiple l fiber carriers
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants
Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants I. Introduction and Purpose This document provides
Woodfibre Liquefied Natural Gas (LNG) Project. Review of Related Upstream Greenhouse Gas (GHG) Emissions Estimates
1 February 2016 Woodfibre Liquefied Natural Gas (LNG) Project Review of Related Upstream Greenhouse Gas (GHG) Emissions Estimates Summary The Canadian Environmental Assessment Agency (the Agency) sought
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
Distributed Generation: Frequently Asked Questions
Distributed Generation: Frequently Asked Questions 1) What is distributed generation (DG)? Generating technologies located close to where the electricity is being used that are connected to the electric