A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

Size: px
Start display at page:

Download "A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM"

Transcription

1 A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for socio economic and environmental purposes in Vietnam. Cua_Dat is a multipurpose scheme under construction in Vietnam. The main dam will be the highest CFRD in Vietnam (H= 119m, L= 1023m, V = 10hm 3 ). The dam will be constructed in 5 years ( ). The river diversity with an overtopping of the dam under construction while big flood in 2007 is described. The 3-dimensional stress and displacement analysis with the ANSYS software results in the arrangement of double, upper and downer layers of reinforcing bars in the facing concrete slabs. Brief on the Cua_Dat Dam. Cua_Dat dam is located in the middle of the basin of the Chu River, which is the biggest tributary of Ma River, which one of major rivers in the northern central.. The project had been waiting investment for many years It has kicked off again since 1997 and the dam has been newly located a little bit upstream with some construction disadvantages but the resettlement would be much more reduced and feasibly realized. The dam site is 230km far from Hanoi southward. The reservoir storage about 1.45 billion m 3 is designed with main functions as followings: (i) flood control; (ii) water supply for beneficial area of 37,000ha with a population of 2.5 million; the irrigated area will be 87,000ha; the discharge supplied to industrial production is about 8m 3 /s; (iii) hydropower generation with capacity of 97MW. The main CFRD dam is 119m high and 1023m long (Fig.1) and accordingly, has a body volume of 10million m 3. Apart from that, the project also composes (Fig.2): a reinforced concrete spillway, which consists of 5 gates with the dimension of 11m 17m, discharging a flow of 11,600m 3 /s at frequency of 0.01%. two tunnels with diameter of 9m, one of them is 820m long used as temporary diversion tunnel during construction period and entire reservoir discharge, the other with 600m long is to convey water into the hydropower plant. several supplementary dams with height ranging from 20m to 41m. additional irrigation canal system for 37000ha. 1

2 Fig.1 Designed cross section of the Cua_Dat CFR D Face Concrete Slabs of the Cua_Dat CFR D The construction duration is 5 years ( ). The project implementation involves number of domestic experts and contractors. Downstream view of the dam 1 Some foreign experts from China, Canada, France, helped with advices. The most difficulty that the project construction has to

3 cope with is rather complicated geological structure in the foundation of the main dam. Thus, in order to construct the dam foundation, it has been had to dig out a large grouting into 40m deep and constructing volume of surface layers of soil and badly weathered rock as much as 7millions m 3 along. It has been implementing many seepage prevention measures, such as: The average flow discharge is 89 m 3 /s at Fig.2. Layout of the main CFRD and other headwork a bentonite trench under the upstream toe of the concrete face slab; using highly qualified seepage prevention additives for the concrete face slab together with a geo-membrane below; creating cutoff footing layer on foundation surface; fulling the cushion compacted clay zone between coffer dam and block of the upstream toe and bottom slab. River Diversion Difficulties are also met with the river diversion because of big peak flow discharge in flood season (about 3 months per year). frequency 75% in comparison with the peak diversion one is 7520 m 3 /s at frequency 1%. The 20 year-flood, adopted as the construction flood, has a peak inflow discharge of 1230 m 3 /s during the dry season and 5050 m 3 /s during the wet season. In order the diversion work has been carried out by some steps to accelerate the construction work and make it more safe. The first low coffer dam was along the main stream channel to treat the large alluvial plain. The subplementary coffer dam has been located next to the diversion tunnel intake. To minimize the cost of the critical stage of the construction (wet season of 2

4 Fig.3 The cross section of CFRD under construction in the 2 nd year facilitates the peak flood diversion The first moment of flood overtopping in October 2007 Serious erosion of the dam portion in channel due to big flood over the design criteria the 2 nd year) by only one tunnel (L = 820m, diversion structures, it was admitted to D=9 m) with an overtopping of the upstream/ divert the flow. The cross section of CFRD 1

5 under construction in the 2 nd year facilitates the peak flood diversion (fig.3). Laboratory tests (scale 1/40), taking into account the zoning and materials of the three dams, have been performed in order to check their stability and to measure the pressure and velocity of the flows at different parts of the structures. These tests have permitted to verify the resistance of the dams and to define precisely the most suitable protections for their crest, upstream/downstream faces and toe during the overtopping. Different solutions have been contemplated (concrete face slabs, gabions, placing the rockfill by longitudinal steps,..). The tests carried out indicate that this diversion method is possible, so it leads to significant cost and delay savings compared to usual methods (high upstream cofferdam with several large diameter tunnels). The main coffer dam near to the upstream toe will also combine with the cushion compacted clay zone. In October 2007 a very big flood came with the discharge of more than 7000m 3 /s. It s bigger 37% than the designed one. The overtopping flow made about 30% of the dam portion in channel erosed seriously. So the downstream slope of the dam portion must be strengthened sufficiently to be safe in big flood overtopping. The stepping stone gabions seemed to be rather weak. Even in that disadvantageous case the expenditure to restore the erosed dam portion is about 20% of the cost of a diversifying tunnel only. 3 Displacement & Stress Analysis of Reinforced Concrete Face Slabs The displacement & stress analysis of reinforced concrete face slabs has been implemented by use of the Finite Element Method with the ANSYS software. The slabs have been divided into shell elements. The rockfill body has been divided into solid elements (Fig.4). The computation has been done in the case of static loading without gravity force. The slabs are divided into 121,000 shell elements and the dam body together with its foundation are divided into 847,000 solid elements. Numerical results of the second stage are showed in fig.5. Fig.4. Element network in numerical analysis 2

6 Fig.5. Numerical results of displacements & stresses Displacement u X Displacement u Y Displacement u Z 2

7 Stressv intensity σ= σ 1 - σ 3 with σ 1, σ 3 max & min principal stresses Von Mises equivalent stress σ e Some remarks can be derived from the above numerical results of the displacement & stress analysis of the face slabs: - The tensile strength would ocur at the two dam portions on the left & right shoal sides. - The region, where the maximum u X and u Y values occur, is in the dam portion on the river channel. It is at the level about less than half of the height. - The inluence of the strong rock foundation deformation on the face slabs can be negligible. It s noted that the slabs behave as bending plates, not membranes. So the reinforcing bars should be put in two layers and designed as ones in cross section of bending reinforced concrete elements. 3 Conclusion Cua_Dat is considered as one of the most important dam in the Dam Development Program of Vietnam because its scale and efficiency. It is not only among the first CFRD but also the largest CFRD in Vietnam. Besides the geological characteristics of the foundation is complicated. The river diversion using flow overtopping met with big flood. The dam work in the channel portions has to be halted in flood season due to the overtopping diversion. The cracks in the lowest part of the face concrete slabs by water pressure in the dam body were treated with difficulties They all should considered as useful experiences of CFRD construction.

8 REFERENCES [1] Feasibility Studies of Cua_Dat Dam, Hydraulic Engineering Consultancy Company, Hanoi, Vietnam [2] M.Ho Ta Khanh, Pham Hong Giang.Design of the Cua Dat CFRD in Vietnam and innovative river diversion system Int. Symp. ASIA 2006 Water Resources & Renewable Energy Development in Asia, Bangkok, Thailand, Pham Hong Giang, Nguyen Hoai Nam. Displacement and Stress Analysis of the Reinforced Concrete Face of the Cua_Dat Dam, Int. Symp. ASIA 2008 Water Resources & Renewable Energy Development in Asia, Danang, Vietnam,

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

Watershed Works Manual

Watershed Works Manual National Rural Employment Guarantee Act Watershed Works Manual DRAINAGE LINE TREATMENT: GABION STRUCTURE Baba Amte Centre for People s Empowerment Samaj Pragati Sahayog September 2006 Drainage Line Treatment:

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1)

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1) Engineering Geological Asset Management for Large Dams Yasuhito SASAKI (1) (1) Geology Research Team, Public Works Research Institute, Japan E-mail:ya-sasa@pwri.go.jp Abstract Comprehensive inspection

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur Module 3 Irrigation Engineering Principles Lesson 9 Regulating Structures for Canal Flows Instructional objectives On completion of this lesson, the student shall be able to learn: 1. The necessity of

More information

6.0 Results of Risk Analyses

6.0 Results of Risk Analyses 6. Results of Risk Analyses A risk analysis of the optimized embankment designs for the Salton Sea restoration project was conducted jointly by Kleinfelder and representatives from Reclamation. A risk

More information

Seismic Design and Performance Criteria for Large Storage Dams

Seismic Design and Performance Criteria for Large Storage Dams Seismic Design and Performance Criteria for Large Storage Dams Dr. Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design Poyry Switzerland Ltd., Zurich, Switzerland Integral Dam Safety

More information

Introduction to Architecture. Lesson 13: Hoover Dam

Introduction to Architecture. Lesson 13: Hoover Dam Introduction to Architecture Lesson 13: Hoover Dam Back in 2010, my family and I flew to California and then drove to the Grand Canyon via the Hoover Dam. Named after President Herbert Hoover, the Hoover

More information

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO) Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT 2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Project Layout & Design Features of the Project

Project Layout & Design Features of the Project Project Layout & Design Features of the Project 1 PROJECT LAYOUT DRI DAM DRI DAM TOE P/H U/G POWER HOUSE COMPLEX DRI DAM TOE POWER HOUSE TANGON DAM TOE POWER HOUSE TOTAL 3070 MW 19.60 MW 7.40 MW 3097 MW

More information

How To Build A River Restoration Project In North Korea

How To Build A River Restoration Project In North Korea Changnyeong Haman Weir Project for Nakdong-River Restoration 1. PROJECT A. Description Changnyeong Haman Weir Project for Nakdong-River Restoration stretched from Oisanri, Bukmyeon of Changwon City to

More information

XAYABURI HYDRO POWER PLANT, LAO PDR

XAYABURI HYDRO POWER PLANT, LAO PDR XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,

More information

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) *Reza Naghmehkhan Dahande 1 and Ahmad Taheri 2 1 Department of Civil Engineering-Water Management, Islamic Azad

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard

More information

PRC: Zhanghewan Pumped Storage Power Station Project

PRC: Zhanghewan Pumped Storage Power Station Project Environmental Monitoring Report Project Number: 28212-013 Quarterly Report January March 2006 PRC: Zhanghewan Pumped Storage Power Station Project Prepared by Hebei Zhanghewan Pumped Storage Co., Ltd.

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration

More information

EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements

EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements 1.0 INTRODUCTION Colorado Springs Utilities (Utilities) is requesting proposals to provide final engineering, design, and construction management

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.

More information

Hydrologic Engineering Techniques for Regional Water Resources Planning

Hydrologic Engineering Techniques for Regional Water Resources Planning US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17

More information

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water

More information

TRAVELING WAVE EFFECTS ON NONLINEAR SEISMIC BEHAVIOR OF CONCRETE GRAVITY DAMS

TRAVELING WAVE EFFECTS ON NONLINEAR SEISMIC BEHAVIOR OF CONCRETE GRAVITY DAMS TRAVELING WAVE EFFECTS ON NONLINEAR SEISMIC BEHAVIOR OF CONCRETE GRAVITY DAMS H. Mirzabozorg 1, M. R. Kianoush 2 and M. Varmazyari 3 1,3 Assistant Professor and Graduate Student respectively, Department

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft)

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft) Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft) by Nario Yasuda 1, Kazuhito Shimamoto 2, Yoshikazu Yamaguchi 3 and Takashi Sasaki 4 ABSTRACT On March 2005,

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Water in Africa: Hydro Pessimism or Hydro Optimism? Água em África: Hidro pessimismo ou Hidro optimismo

Water in Africa: Hydro Pessimism or Hydro Optimism? Água em África: Hidro pessimismo ou Hidro optimismo Water in Africa: Hydro Pessimism or Hydro Optimism? Água em África: Hidro pessimismo ou Hidro optimismo Centro de Estudos Africanos da Universidade do Porto Porto, Portugal, 2 3 October 2008 «WATER IN

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located

More information

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached

More information

ICOLD s revised seismic design and performance criteria for large storage dams

ICOLD s revised seismic design and performance criteria for large storage dams ICOLD s revised seismic design and performance criteria for large storage dams Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design, Poyry Energy Ltd., Hardturmstrasse 161 CH-8037

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL

DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL International Journal of Civil Engineering and Technology (IJCIET) Volume 6, Issue 11, Nov 2015, pp. 21-31, Article ID: IJCIET_06_11_003 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=6&itype=11

More information

Exercise (4): Open Channel Flow - Gradually Varied Flow

Exercise (4): Open Channel Flow - Gradually Varied Flow Exercise 4: Open Channel Flow - Gradually Varied Flow 1 A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa Review Report and Recommendations for the Remediation of Flood Damage at the Berg River Causeway and the Dam Bypass Channel on Portion of Farms 1646 and 1014, Franschhoek Contact person: Colin Whittemore

More information

COMPUTATIONAL FLUID DYNAMICS: DIVERSE APPLICATIONS IN HYDROPOWER PROJECT s DESIGN AND ANALYSIS

COMPUTATIONAL FLUID DYNAMICS: DIVERSE APPLICATIONS IN HYDROPOWER PROJECT s DESIGN AND ANALYSIS COMPUTATIONAL FLUID DYNAMICS: DIVERSE APPLICATIONS IN HYDROPOWER PROJECT s DESIGN AND ANALYSIS Efrem Teklemariam 1, Brian W. Korbaylo 2, Joe L. Groeneveld 3, David M. Fuchs 4, ABSTRACT Hydropower Dam designers

More information

WATER CONSERVATION TECHNICAL BRIEFS

WATER CONSERVATION TECHNICAL BRIEFS WATER CONSERVATION TECHNICAL BRIEFS TB 2 Rainwater Harvesting and Artificial Recharge to Groundwater SAI Platform August 2009 This document has been produced for internal information purposes only among

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods. Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

Neversink River East Branch

Neversink River East Branch Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station

More information

Numerical modelling of shear connection between concrete slab and sheeting deck

Numerical modelling of shear connection between concrete slab and sheeting deck 7th fib International PhD Symposium in Civil Engineering 2008 September 10-13, Universität Stuttgart, Germany Numerical modelling of shear connection between concrete slab and sheeting deck Noémi Seres

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction

More information

Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction

Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction Current opportunities of sprayed waterproofing membrane Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction 1 What would we like to achieve? 2 What is desired? 3 and

More information

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : sunilfah@iitr.ernet.in

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December,

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December, Guo, James C.. (004). esign of Urban Channel rop Structure, J. of Flood azards News, ecember, Guo, James C.., (009) Grade Control for Urban Channel esign, submitted to Elsevier Science, J. of ydro-environmental

More information

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015 EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015 Normal and Critical Depths Q1. If the discharge in a channel of width 5 m is 20 m 3 s 1 and Manning s n is 0.02 m 1/3 s, find: (a) the normal depth and Froude number

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM

WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM LeifBasherg (1) OlujZejlllJul Jessen (1) INTRODUCTION The current paper is the

More information

CORUH RIVER DEVELOPMENT PLAN

CORUH RIVER DEVELOPMENT PLAN CORUH RIVER DEVELOPMENT PLAN International Workshop on Transboundary Water Resources Management Tbilisi, Georgia 8-10 December 2009 Ubeyd Sezer Geological Engineer U. Sezer GENERAL DIRECTORATE OF STATE

More information

Fluid Mechanics: Static s Kinematics Dynamics Fluid

Fluid Mechanics: Static s Kinematics Dynamics Fluid Fluid Mechanics: Fluid mechanics may be defined as that branch of engineering science that deals with the behavior of fluid under the condition of rest and motion Fluid mechanics may be divided into three

More information

Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle

Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,

More information

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013 USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency

More information

Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT

Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT RECOVERY PLAN FORMAT Below is a suggested Table of Contents for an Internal Emergency Recovery (Response) Plan. This Internal Emergency Recovery Plan (IERP) is designed as a separate document which can

More information

Lecture 6. Jump as energy dissipation Control of jump.

Lecture 6. Jump as energy dissipation Control of jump. Lecture 6 Jump as energy dissipation Control of jump. Jump as energy dissipation The high energy loss that occurs in a hydraulic jump has led to its adoption as a part of high energy dissipater system

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

Chaudière Crossing Bridge Rehabilitation

Chaudière Crossing Bridge Rehabilitation Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation

More information

Using HEC-RAS for Dam Break Studies

Using HEC-RAS for Dam Break Studies Using HEC-RAS for Dam Break Studies August 2014 Approved for Public Release. Distribution Unlimited. TD-39 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this

More information

Simulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software

Simulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software Bulletin of Environment, Pharmacology and Life Sciences Bull. Env. Pharmacol. Life Sci., Vol 4 [1] December 2014: 67-72 2014 Academy for Environment and Life Sciences, India Online ISSN 2277-1808 Journal

More information

Integrated Water Resources Management. Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia

Integrated Water Resources Management. Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia Integrated Water Resources Management Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia Coordinated projects financed by 3 French Water Agencies (Loire Brittany,

More information

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University Introduction to Rainwater Harvesting Department of Biological and Agricultural Engineering Texas A&M University Rainfall in your watershed What is a watershed? An area of land that drains to a common point

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM

FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM Dr. Murat Ali HATİPOĞLU Fatih KESKİN Kemal SEYREK State Hydraulics Works (DSI), Investigation and Planning Department

More information

Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)

Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) I. An Example Culvert Design Design a concrete culvert using the

More information

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST CERTIFICATION 1. Did the engineer submit a certificate of completion utilizing the appropriate page of the issued

More information

Open channel flow Basic principle

Open channel flow Basic principle Open channel flow Basic principle INTRODUCTION Flow in rivers, irrigation canals, drainage ditches and aqueducts are some examples for open channel flow. These flows occur with a free surface and the pressure

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

The Verdura Wall check with your local building department

The Verdura Wall check with your local building department The Verdura Wall The Verdura Wall by Soil Retention Products, Inc of Carlsbad, California can be constructed as a gravity retaining structure or a geosynthetic reinforced segmental retaining wall, depending

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information