1 Overview of Tekeze hydroelectric power plant General The Ethiopian Electric power corporation constructed the Tekeze hydro electric power plant as part of the Country s general development plan with the aim of expanding the electric power generation capacity. The power plant was designed to accommodate four 75MW units, with three of these to be installed during the initial phase and the fourth to be added at some time in the future. However, during the early stages of construction, it was decided to add the 4 th unit, bringing the total capacity to 4 x 75 MW. With anticipated annual firm energy production of 981GWhr, the plant will play an important role in the development of the Ethiopian economy. A feasibility study carried out in 1997, investigated 6 potential dam sites and the one, designated Tk5, was selected, at coordinates North and East, approximately 80 km west of the town of Mekele. The dam is located in a steep, narrow gorge, which the river has carved through the surrounding plateau during the course of many millions of years. The powerhouse is located in an underground cavern, excavated in the rock on the downstream side of the dam, adjacent to the right bank of the river at an altitude of 970m above mean sea level, whereas the crest of the dam is 1145m above sea level and the substation on the right bank plateau is at approximately 1300 masl. Tekeze hydroelectric power plant location TK5 Dam site location
2 The Tekeze River, which forms the boundary between the Regions of Tigray and Amhara, flows northwards and is a major tributary of the Atbara River, which is itself a tributary of the Nile. Previously undeveloped, the Tekeze is now generating hydroelectric power and makes a significant contribution Ethiopia s economy. In addition, the reservoir that has been formed upstream of the dam has potential for the development of commercial fisheries and tourism, while, downstream, regulation of the river has potential benefits for the development of irrigation schemes. The development of Tekeze hydroelectric plant involved the construction of a 188m high, mass concrete double curvature arch dam, spanning 450m across a 350m deep natural gorge, two river diversion tunnels, an underground powerhouse, water conveyance tunnels and outlet works, a variety of hydromechanical and electromechanical equipment, substation and a 105 km long transmission line to link with the Ethiopian national grid at Mekele. In addition, a residential camp was constructed, together with access roads, water supply system and other necessary infrastructure. Procurement Realization of the Tekeze Hydroelectric Power Project required the awarding of seven contracts. The selection of the contractors and the consultant was by International Competitive Bidding (ICB). During the tendering periods of the various contracts, 20 contractors from 8 countries participated and those with lowest tender prices, with sufficient experience and sound financial capacity were selected. Tekeze 3D model The Consultancy Services Contract, encompassing design review and construction supervision of all the civil and electromechanical works was awarded to a joint venture of Harza Engineering Company Inc of the USA (now known as MWH Montgomery Watson Harza) and Energoproject- Hidroinzenjering of Serbia. The Lot 1A Contract for the design and construction of a new 35km access road to the site was awarded to Berta Construction Company, a local Ethiopian company. This
3 work was carried out under an advance works contract and was completed before the main construction contract commenced. The Lot 1B/2/3 Contract, encompassing the supply, erection and commissioning of the Main Civil works was awarded to the CWGS Joint Venture, comprising three companies; CWHEC (now Sinohydro) and CGGC of China and Sur Construction Company of Ethiopia. This Contract included the construction of access roads and tunnels, two river diversion tunnels, the dam, powerhouse, waterway tunnels, outlet works, Employers camp and the design, supply installation of mechanical and electrical equipment for the dam outlets (4x low level outlets, 2x Diversion Bonneted gates), Intake Gate cranes and Tunnel steel liners etc. The Lot 4/5 Contract, encompassing design, manufacture, supply, erection and commissioning of all powerhouse Electromechanical equipment including the 4 x 75 MW Turbine/ Generators with all the auxiliary plants was awarded to China Wanbao Engineering Company (CWBEC) of China. The Lot 6 Contract was awarded to a joint venture of Jilin Power Transmission and Substation Project Company (JPPC) and China National Electric Wire & Cable Import/Export Company (CCC), both of China, and covers the supply, erection and commissioning of civil and electrical equipment of the 230kV substation at Tekeze and an extension to Mekele substation. The Lot 7 Contract was awarded to JPPC and covers the supply, erection and commissioning of the 105 km long 230kV Transmission line between the Tekeze Substation and Mekele Substation. EEPCO was involved in coordinating and administering the activities of all these Contracts through its Tekeze Project Coordination Office and by assigning staffs to work as part of the Consultant s site supervision team. During the construction period, over 3500 workers were involved, of which, some 750 were expatriates from 4 countries. EEPCO s operations staffs were assigned during the latter stages of the construction period to become acquainted with the plant and equipment installed and to gain sufficient experience to be able to take over the day to day operation of the plant upon completion. Environmental mitigation measures involved investigating the extent of the adverse effects of the project, especially in the upstream catchment area, and implementing appropriate measures such as compensation for land and crop losses, construction of health centers, supply of boats for river crossing were carried out. Project funding The project cost was funded entirely by the Ethiopian government.
4 Implementation schedule The project implementation had two phases: The Preconstruction phase: July 1998 to July 2002 the feasibility study was reviewed and various deficiencies by the new Consultant and additional site investigations were performed, hydraulic model studies were carried out and the design was thoroughly reviewed and updated before the tender documents were prepared and issued. Then, the contractors were selected through International Competitive Bidding. During this period, the 35 km access road was constructed earlier to facilitate mobilization of the main contractor s plant and equipment. long before the dam was complete. Initial impounding commenced during the 2007 wet season but, at that stage, the dam was still only quite low, so much of that season s flood waters had to be discharged over low blocks in the dam, acting as temporary spillway. In the following wet season, of 2008, the dam was by then high enough to store the entire flood water for the whole season and, by the start of the 2009 wet season, the dam was complete. Unfortunately, both the 2008 and 2009 wet seasons were disappointingly dry by normal standards, so the reservoir did not completely fill. Nevertheless, the water level is well above the minimum operating level for the turbines, so power generation was able to commence in August The Construction phase: June 2002 to September 2009 the contractors started immediately mobilized and constructed infrastructures further and carried out their contract scope of works. As the civil works construction progressed, some unforeseen geological conditions were encountered at the designated quarry site and on the left abutment of the dam. These issues resulted in the opening of a new quarry and extensive additional work on the left abutment, which delayed project completion by almost two years and significantly increased the overall project cost. In addition, increases in world market material costs, inflation and exchange rate fluctuations during the 7½ year construction period also added significantly to the final outturn cost. In order to enable power generation to commence as early as possible, several changes were made to the design and the construction schedule. The main change involved the adoption of a staged dam construction and impounding sequence to enable reservoir impounding to commence as early as possible, Impounding was started before the dam was completed, in order to enable generation start as early as possible
5 Reservoir The reservoir is the biggest man made body of water in Ethiopia, with a total water storage capacity of 9,230 Million cubic meters. Lying on the eastern side of the Simēn Mountains range, the reservoir will be almost 70km long at full supply level, with two main branches reaching almost to Sekota in the east. It has a catchment area of over 30,000 square kilometers, with a long term average annual inflow of 3,750 Mm 3. At this rate of inflow, the reservoir would take almost three years to fill completely. However the average annual inflow recorded during the years 2008 and 2009 was abnormally low, so the reservoir was still only 52% full at the end of the 2009 wet season. Total storage: 9.3 Bm 3 Maximum retention level: 1140 masl Minimum operation level: 1096 masl Surface area at MRL: 147 km 2 Live Storage: 5.3 Bm 3 Dead Storage: 4.0 Bm 3 Catchment area: 30,000 km 2 Mean Annual rainfall: 850 mm Annual inflow: 3.75Bm 3 Sedimentation: 30Mm 3 /year Although the catchment area is highly susceptible to erosion, the sediment load will largely be suspended and deposited at far end of the reservoir where most of the tributaries are located and where flood velocity approaches zero, so will not have any significant effect on the reservoir live storage volume for a great many years to come. Project infrastructure Tekeze Arch Dam The infrastructure construction consists of: A 35 km permanent access road from junction of the main Agbe to Sekota road to the dam site, constructed by local contractor Berta. Employer s camp and Offices constructed by local subcontractors. The Employers camp has 114 houses with full facilities for staffs and guests accommodation. The Office buildings have 120 rooms for supervision staff and a meeting room. There is also a materials testing laboratory building with standard test equipment for testing construction materials. In the Employer s camp there is a dining hall, a
6 club house with TVs and various recreational facilities, a swimming pool, footballl field, basket ball court tennis court and squash court Water for domestic consumption is extracted from the reservoir and pumped to a water treatment plant in the Employer s camp and electric power is fed to the camp via an overhead distribution network fed from the Tekezee substation. Communications are provided by ETC through a variety of media, ncluding a mobile network tower, VSAT telephonee connections, wireless telephonee connections and a satellitee broadbandd internet connection. Dam and appurtenance structures The Arch Dam is a double curvature arch dam which is able to withstand the heavy pressure of the reservoir water. It is 188 meter high and 450 meters wide and was constructed from mass concrete. Currently it is tallest arch dam in Africa. The Dam is located in a narrow gorge and its construction was not feasible by the conventional construction machinery, so three special cable way cranes, each with carrying capacity of 20 tones, span across the gorge to transport/placement of dam concrete and other construction machinery and equipment along with work personnel. Arch Dam upstream view Tekeze project infrastructure
7 Construction of the dam required 1,100million cubic meters of concrete, which accounted for 75% of the project cost and required 42 months of continuous concrete placement, 24 hours a day, 7 days a week. discharge of 4500 m 3 /s under the maximum water level (MWL). The water will discharge into the river bed far from the dam toe. Four low level outlets (LLO) Arch Dam downstream view Low Level Outlets (Spillway) structure and gates The Low Level Outlets were designed to discharge the Probable Maximum Flood (PMF) after routing through the reservoir but they will also be used to empty a part of the reservoir in case of emergency for dam safety and to enable exceptional maintenance. The arrangement selected was 4 mid-level outlets located in the central part of the dam, capable of releasing a total The Low Level Outlets consists of: Four Radial gates were installed downstream of the dam and designed to open and close under full upstream water pressure and with clear outlet openings 5.6 m wide and 6.0 m high and a total weight of 114 tones. Each one is operated by two hydraulic cylinders, enclosed control modules and each module including a Hydraulic Power Units (HPU) and a local Electrical Control Cabinet.
8 Compensation Outlet valve Four Fixed Wheel Gates were installed upstream of the dam to facilitate maintenance of the Radial Gates and have clear outlet opening 5.6 m wide and 8.0 m high and a total weight of 195 tones. They are operated by hydraulic cylinders with extension stems and module including an HPU and a local Electrical Control Cabinet. Dam instrumentation 1.4 m diameter Howell-Bunger type valve was installed to release the compensation discharge water for the downstream side users during construction period and subsequently during maintenance of the units, and is designed to release regulated flows up to 45 m 3 /s. The installed valve disperses the water jet downstream of the dam, to avoid scoring of the dam toe. To assess the performance and continuing assurance of the safety of the dam and structural behavior during construction, first filling of the reservoir and during long-term service operation, dam instrumentation and monitoring equipment is basic. The Tekeze arch dam comprises pendulums, permanent long base multipoint borehole extensometers, jointmeters, electric piezometers - reservoir level, Long term thermometers, accelerographs, leakage measurement and monitoring data acquisition and storage Dam Traction Lifts: Main access to the dam inspection galleries between levels masl and masl is provided in two stages serviced by two traction lift. Emergency escape ladders with cross-over platforms also provided within the wells to cover complete descent of each lift travel.
9 Diversion tunnels and Bonneted gates Two diversion tunnels (No.1 & No.2) were designed to pass a 1 in 2 years flood (1026 m 3 /s) without overtopping the cofferdams. Larger floods that occurred during construction of the dam were allowed to flow over temporary spillways formed by leaving low blocks in the dam. When the dam was sufficiently high to allow reservoir impounding to commence, tunnel No.1 was plugged with concrete and tunnel No. 2, was closed by means of two bonneted slide gates with clear opening of 2.6 m by 2.6 and operated by a hydraulic hoist. During the early stages of reservoir impounding, these gates allowed the release of compensation flows into the river, downstream of the dam, until the reservoir level reached the low level outlets. They also provide a means of drawing down the reservoir level below the low level outlets, in an emergency situation. The diversion works include: a 25 m high concrete, upstream cofferdam a 8 m high earthfill, downstream cofferdam two 7 m diameter, an average of 433m long horseshoe shape diversion tunnels, Bonnet gate HPU inside the Dam Gallery Waterways, Power Intake structure and Intake gate Water to power the turbines enters the power waterways through the power intake structure and immediately passes into a 350 m long, concrete lined headrace tunnel, 7.25m in diameter. It then flows down a 120m deep vertical shaft before branching in the concrete lined manifold to the four steel lined penstock tunnels.
10 The penstocks are lined with 36mm thick steel plates and extend as far as the main inlet valves of the four turbines. The Power Intake structure is equipped with a trashrack and a fixed wheel gate operated by a hydraulic cylinder located on the top deck of the structure. A gantry crane is also provided at the top of intake deck to install the trashrack panels and is capable of removing the intake gate, extension stems, and hydraulic cylinder for major maintenance and re-installation. The gates size is 5.7 x 8.7 meter and weighs 120 tons Power intake gantry crane The trashrack is installed at the Intake entrance, upstream of the gate to prevent trash and debris which might damage the turbines from entering the waterway. Power intake Power intake trashrack
11 Underground powerhouse and Electro-mechanical equipment The Powerhouse was constructed underground, in a 68,000m 3 cavern, 98m long, 38m high and 18m wide, excavated inside the massive limestone rock on the right bank of the river, by conventional drilling and blasting method. Underground powerhouse: on service Underground powerhouse: Excavation completed view Four vertical Frances Reaction turbines, each having 75 MW capacities, were installed to convert the potential energy of the stored water in the reservoir into rotational mechanical energy. The runners are cast and welded stainless steel with a diameter of 2.75m with total weight of each is 13 tones.
12 Four Main Inlet Valves (Butterfly type) are installed at the spiral case inlet of each turbine to control water flow, to shut-off flow to the turbine and stop the unit as part of the automatic start-up and shutdown sequence in normal and emergency Conditions. Butterfly valve Shaft and runner assembly Each Governor installed is to control and adjust the water flow to maintainn the generating unit s speed and the system frequency. Each governor is an electronic, digital, programmable PID (proportional integrated derivative) type, capable of stable, safe and effectivee control of the turbines. Governor control system Shaft runner assembly installation
13 Generator and associated equipment installed in the powerhouse The four generators of Tekeze hydropower plant are totally enclosed, vertical salient-pole type, F class of insulation and an air cooled generator with guaranteed generator efficiency of 98.3% and rated out of 86.7/78 MVA/MW at rated generator voltage 13.8 kv, rated speed of 300 RPM, rated frequency 50 Hz, power factor cos ø 1. The generator includes: The stator which consists of frame, core and winding and weights 106 ton, were transported to site in split of three sections, assembled and tested at site. The stator has a diameter of 7.5m and a height of 1.45m is fabricated from steel frame and the core with inner diameter of 5.6m and height of 1.35m. Rotor whichh is F-class insulation consists of 20 poles, rims, and spider is the heaviest equipment installed at Tekeze project. The rotor parts were separately transported to site, stacked and stacked at site and the diameter is of 5.6 m and 1.73 m high and weights 185 tons. SCADA system for remote control of the units was installed in the control building of substation and powerhouse offices.
14 Each unit has its own Local and Remote Control and Protection systems. All auxiliary systems installed in the powerhouse were supplied in duplex, one in duty and the other standby for the balance of plant equipments including cooling water system, drainage and dewatering system, compressed air system, fire alarm and protection system, ventilation and air conditioning system (HVAC), sanitary system, service water system, emergency diesel generator, monitoring equipments etc for reliable, safe and stable operation of turbine-generator equipments and the power plant. In the Powerhouse, two overhead bridge cranes were provided, with total lifting capacity of 220 tons, and were used initially for intensive plant installation work and subsequently for maintenance duties. Each crane spans 18 meters. The two cranes are designed to work together when lifting very heavy loads, such as the generator rotors. Powerhouse bridge crane The Outlet structure comprises 4 tailrace tunnels to discharge water back to the river from the turbines, after generation. The Draft tube stoplogs and hoist are used to close each draft tube individually, to isolate a turbine from the tailrace water whenever it is necessary to perform an internal inspection and maintenance. The stoplogs are handled by an electrically driven gantry hoist running on rails above the gate slots.
15 The Transformer platform houses the four transformers and is located at the outlet structure, above the tailrace tunnels Outlet structure The four 90MVA Transformers each 90 tones were manufactured in China and transported to site with specially imported transport trucks so that the existing road bridges would not be damaged.
16 Substations and Transmission Line A new 230kV Substation and Control Building were constructed at Tekeze and at the existing substation at Mekele an extension 230 kv Substation were constructed to accommodate the new transmission line. The 105 km long, double circuit 230kV Transmission Line was constructed to transmit the generated power from Tekeze substation to Mekele substation and then to the National Grid. The Transmission Line includes a grounding line with OPGW fiber optic cables to enable communications with all of EEPCO s other hydropower stations and with the Load Dispatch Center in Addis Ababa. Tekeze Substation Environmental impacts and mitigation measures Both the Substations and the Transmission Line were constructed at an early stage in the project schedule to provide back-feed power from the National Grid from Mekele substation for the Main Civil and Electromechanical Contractors, to reduce costs and cut the amount of fuel used by the temporary diesel generators originally installed to supply construction power. Tekeze hydroelectric power project has both positive and negative impacts but, on balance, the positive impacts significantly outweigh the negative ones. There was no displacement or resettlement of the local population around the reservoir. The construction and operation of the project led to a variety of changes in the local and wider environment. Many of the effects are beneficial, particularly the impact at both regional and national levels of increasing the availability of electrical energy, and the potential to develop the local economy through improved infrastructure and employment opportunities. Major impacts of the project are summarized as follows.
17 Negative Impacts Loss of 900ha of crop land and grazing land due to the reservoir impoundment and construction sites (camp site, transmission line and access road ) Losses of river crossing and disruption of communications Risks of Health due to water born dieses and degradation of water quality Environmental mitigation discussion with local Positive Impacts Annual 981GWhr energy generation. Creation of employment opportunity during project construction. Potential for commercial fishery Potential for tourism Attracts water fowl and migratory birds Constant regulated flow throughout the year to the downstream of the dam is beneficial for irrigation and aquatic wildlife. Income generating tree plantation along the left and right bank of 70 km reservoir facilitates additional incomes for the local community and at the same time becomes part of the soil conservation measures. Mitigation measures Taken: Financial compensation for loss of crop lands is under investigation Provision of potable water for villagers near the reservoir is under investigation Two health posts and one health center is being constructed Supplied motor boats to replace river crossing for people and goods transport Construction of a river crossing downstream of the dam Arial view of Tekeze reservoir
18 Site Visit As the great chairman Mao Zedong said, The genuine knowledge originates in direct experience. Tekeze hydropower project successfully accomplished the saying during the construction period, by delivering the required practical education to university students, researchers, and every individual participated on the project and every visitors. The total number of people visited this project exceeds 50,000 to date. During the construction period of the project various visitors have made a trip to the project which includes. Higher Government officials: the President, the prime Minister and other State Ministers Regional Governors Universities, Colleges and High Schools Researchers from local and foreign universities Defense military from different region of the country Youth and women associations Investors from local and abroad NGO s Social Activities The project also played a great role creating awareness on HIV/AIDS preventing and control preparing World Aids Day ceremonies, organizing sport games, participating in tree plantation etc. American tourists crossing man made Tekeze Lake (August 2007)
APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan
APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and
HYDROMATRIX Jebel Aulia - Sudan
HYDROMATRIX Jebel Aulia - Sudan www.andritz.com HYDROMATRIX - Concept Jebel Aulia - Sudan HYDROMATRIX is a new concept of hydraulic energy generation, which has been developed by an American engineer in
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
What are the Benefits?
Micro hydro power system introduction Not everyone is lucky enough to have a source of running water near their homes. But for those with river-side homes or live-on boats, small water generators (micro-hydro
Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)
Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation
Sample Micro Hydro Initial Report
Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for
525-MVA Generator-motor and Thyristor Starter Put into Service at the Tokyo Electric Power Co., Inc. s Kannagawa Hydroelectric Power Station
525-MVA Generator-motor and Thyristor Starter Put into Service at the Tokyo Electric Power Co., Inc. s Kannagawa Hydroelectric Power Station 114 525-MVA Generator-motor and Thyristor Starter Put into Service
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Project Layout & Design Features of the Project
Project Layout & Design Features of the Project 1 PROJECT LAYOUT DRI DAM DRI DAM TOE P/H U/G POWER HOUSE COMPLEX DRI DAM TOE POWER HOUSE TANGON DAM TOE POWER HOUSE TOTAL 3070 MW 19.60 MW 7.40 MW 3097 MW
Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan
Mini & Micro Hydro Power Generation EBARA Hatakeyama Memorial Fund Tokyo, Japan Definitions Large Scale hydro power generation : Capacity 100(MW) Most of them involve major construction of dams. Small
U l t i m a t e e f f i c i e n c y D re D ging
1 Ultimate efficiency Dredging We have a deep attitude. 2 Ultimate efficiency 3 Growth of global population, tourism, transportation of people and goods together with increased awareness of the need to
BRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
HydroHelp 1 AN EXCEL PROGRAM DEVELOPED FOR TURBINE-GENERATOR SELECTION FOR HYDROELECTRIC SITES
HydroHelp 1 AN EXCEL PROGRAM DEVELOPED FOR TURBINE-GENERATOR SELECTION FOR HYDROELECTRIC SITES Selecting the correct turbine for a hydro site is difficult, particularly for small low-head sites. Manufacturers
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : [email protected]
Clean Development Mechanism Project Opportunities in Indonesia
Clean Development Mechanism Project Opportunities in Indonesia Pre-feasibility Report on a Micro Hydro Power CDM Project Center for Research on Material and Energy Institut Teknologi Bandung October 2002
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
Moving Small Mountains Vesuvius Dam Rehab
Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
Commissioning of 87,000-kW Kaplan Turbine and Generator for Otori Power Station
Commissioning of 87,000-kW Kaplan Turbine and Generator for Otori Power Station 126 Commissioning of 87,000-kW Kaplan Turbine and Generator for Otori Power Station Asami Sato Keiichi Goto OVERVIEW: The
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand
Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department
Búrfell. hydropower station
Búrfell hydropower station Búrfell station The river Thjórsá is harnessed at Búrfell by a dam on the river which previously flowed south above Mt. Búrfell, diverting it northwards through the Sámsstadamúli
USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013
USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency
MICRO HYDRO POWER GENERATING EQUIPMENT
MICRO HYDRO POWER GENERATING EQUIPMENT TOSHIBA TOSHIBA ENGINEERING In general, specifications of hydroelectric power system vary depending upon the installation location. The hydro turbine and generator
environment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES
ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
INDONESIA - LAW ON WATER RESOURCES,
Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in
Manage water resources for on site hydro-electricity generation
Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water
Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:
Current state of plant Functioning as a peak and emergency centre Statistics Accumulated operating hours: D1-2-3-6-7: 43000 to 48000 hrs D4-5: 53000 to 57000 hrs D8: 33000 hrs Layout of the plant Index:
HYDROELECTRICITY and DAMS
Definition Girotte lake, France Hydroelectricity or hydroelectric energy uses the potential energy of water flows (rivers, waterfalls, ocean currents, etc.). The kinetic energy of the water stream is converted
SMALL HYDRO PROJECT ANALYSIS
Training Module SPEAKER S NOTES SMALL HYDRO PROJECT ANALYSIS CLEAN ENERGY PROJECT ANALYSIS COURSE This document provides a transcription of the oral presentation (Voice & Slides) for this training module
Construction Phase Traffic Management Plan
Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land
Turbo generators Best quality for thermal power plants
Turbo generators Best quality for thermal power plants www.andritz.com ANDRITZ HYDRO Turbo generators International technology Group ANDRITZ is a globally leading supplier of plants, equipment, and services
National Electric Power Regulatory Authority
National Electric Power Regulatory Authority MECHANISM FOR DETERMINATION OF TARIFF FOR HYDROPOWER PROJECTS Preamble Conservative estimates show total hydroelectric potential in the country to be 45000
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
Seismic Design and Performance Criteria for Large Storage Dams
Seismic Design and Performance Criteria for Large Storage Dams Dr. Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design Poyry Switzerland Ltd., Zurich, Switzerland Integral Dam Safety
A Green Sector Overview
A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North
RECYCLED MICRO HYDROPOWER GENERATION USING HYDRAULIC RAM PUMP (HYDRAM)
IMPACT: International Journal of Research in Engineering & Technology (IMPACT: IJRET) Vol., Issue 3, Aug 23, - Impact Journals RECYCLED MICRO HYDROPOWER GENERATION USING HYDRAULIC RAM PUMP (HYDRAM) C.
Jackson Gulch Outlet Canal Rehabilitation Project
Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County
Standard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
Introduction to Architecture. Lesson 13: Hoover Dam
Introduction to Architecture Lesson 13: Hoover Dam Back in 2010, my family and I flew to California and then drove to the Grand Canyon via the Hoover Dam. Named after President Herbert Hoover, the Hoover
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Pico Power: A Boon for Rural Electrification
Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 7 (2013), pp. 865-872 Research India Publications http://www.ripublication.com/aeee.htm Pico Power: A Boon for Rural Electrification
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Gibe III won t affect Kenya: Ambassador
1870 MW January 2012 Volume IV Merry X-mass Gibe III won t affect Kenya: Ambassador Happy Ethiopian Epiphany The Ethiopian Herald on its issue on December 16, 2011 posted an interview with The Kenyan Ambassador
Q. Please provide resumes for Gary L. Murray, Sean LaCour, Glenn Samms, Trina L. Troke, Trina Cormier.
Requests for Information CA-47.0 NP NP 2007 CBA 1 2 3 4 5 6 Q. Please provide resumes for Gary L. Murray, Sean LaCour, Glenn Samms, Trina L. Troke, Trina Cormier. A. The resumes of Mr. Gary L. Murray,
Buildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
XAYABURI HYDRO POWER PLANT, LAO PDR
XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,
WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION
MULTI-DAM SYSTEMS AND THEIR OPERATION J.J. Cassidy Consulting Hydraulic and Hydrologic Engineer, Concord, California, USA Keywords: Dams, reservoirs, rivers, water storage, dam safety, floods, environment,
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
Ordinance on Railway Infrastructure. General provisions. Article 1
Based on article 15, par. 4 of the Railway Law (Narodne Novine no. 123/03 and 30/04), the Minister of the Sea, Tourism, Transport and Development has issued Ordinance on Railway Infrastructure General
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE
ATTACHMENT 9 REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE Requirements 1 The Professional Engineers Board will register a candidate as a professional
Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA
Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 198 Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 300-MW Pump-turbine
ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -
Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
PART 4: SITE INFORMATION
TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY
TYPE "A" AND TYPE "B" CONSTANT DOWNSTREAM LEVEL CONTROL GATES TYPE "A" FOR OPEN CHANNEL FLOWS F.P.O. TYPE "B" FOR ORIFICE APPLICATIONS WATERMAN
WATERMAN TYPE "A" AND TYPE "B" CONSTANT DOWNSTREAM LEVEL CONTROL GATES AUTOMATIC NO OPERATOR, NO MOTOR SIMPLE, ACCURATE, FAST AND RELIABLE FOR FLOOD CONTROL FOR WATER MANAGEMENT SYSTEMS FOR IRRIGATION
Small Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage
DOEIID-10360 Distribution Category: UC-22S ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage M. J. Sale G. F. Cada
Session 2: Hot Water Supply
MEBS6000 Utility Services http://www.hku.hk/mech/msc-courses/mebs6000/index.html Session 2: Hot Water Supply Dr. Benjamin P.L. Ho Department of Mechanical Engineering The University of Hong Kong E-mail:
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is playing a great role in economic development since the last
CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
Hydroelectric Power (3 Semester Hours)
ECET 3811 Hydroelectric Power (3 Semester Hours) I. Course Overview: Hydroelectric power is a form of hydropower which exploits the movement of water to generate electricity. Hydroelectricity is a well-established
Feasibility Study Report. India Muerta Small Hydro Power Plant. In Uruguay
Feasibility Study Report of India Muerta Small Hydro Power Plant In Uruguay Prepared by International Center on Small Hydro Power (ICSHP) for United Nations Industrial Development Organization (UNIDO)
MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid
MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid Presentation by Energy Regulation Board, Zambia 79 th IEC General Assembly Workshop for Industrialising
River Management 2013 Colorado Flood
River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,
Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration
Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria
CLIFTY CREEK PLANT MADISON, INDIANA
2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection
Preliminary Damage Assessment (PDA) Field Guide
Preliminary Damage Assessment (PDA) Field Guide INDIVIDUAL ASSISTANCE The Purpose of this Preliminary Damage Assessment Field Guide This field guide has been designed to serve as a quick reference tool
SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
Muskrat Falls Project Oversight Committee. Committee Report August 2015
Muskrat Falls Project Oversight Committee Committee Report August 2015 Table of Contents Introduction...2 Project Costs...4 I. Muskrat Falls Generation Facility...6 II. Labrador Island Transmission Link...8
Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT
RECOVERY PLAN FORMAT Below is a suggested Table of Contents for an Internal Emergency Recovery (Response) Plan. This Internal Emergency Recovery Plan (IERP) is designed as a separate document which can
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon
3D view of intake - looking upstream from the west bank New intake access track forming upstream bund The intake is located at grid ref 204791,888654. The intake screen arrangement is a drop bar type screen
Rehabilitation of Locks on the Kentucky River
Rehabilitation of Locks on the Kentucky River Joshua M. Repp, PE Bergmann Associates Presentation Overview River System History Evolution of Lock and Dams Structures Existing Condition of Structures Lock
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements
EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements 1.0 INTRODUCTION Colorado Springs Utilities (Utilities) is requesting proposals to provide final engineering, design, and construction management
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
Power Plant Electrical Distribution Systems
PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com
Offshore Platform Powered With New Electrical Motor Drive System
Offshore Platform Powered With New Electrical Motor Drive System Authors: Jan O. Lamell, M.Sc E.E. ABB Automation Technologies Presenters: Thomas Johansson, M.Sc E.E. ABB Automation Technologies Timothy
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada
An Introduction to Micro- Hydropower Systems Natural Resources Canada Ressources naturelles Canada Introduction Hydropower technology has been around for more than a century. Hydropower comes from converting