1 Hydroelectric Power Plant - Los Cóndores Santiago, April 2014
2 Introduction Los Cóndores, a large hydro project of 150 MW with water flow regulation using the existing water reservoir of the Embalse Laguna El Maule, located in VII Region. With expected Commercial Operation in December 2018, will strengthen our leadership and growth strategy in the Chilean market with a profitable and sustainable project. Los Cóndores project is 100% owned by Endesa Chile. 2
3 Strategic view Los Cóndores project will be key for Endesa Chile in order to fulfill current and future contract commitments and support margins, with an optimal generation mix (maximizing margin and decreasing market risk). Los Cóndores project will start operations at the end of 2018, just at the highest expected spot price point for the next years. The project is expected to lower the average energy price of the SIC market in 5 US$/MWh aprox. Efficient and sustainable large hydro project with low generation cost will consolidate competitiveness of Endesa Chile and remark a strong message of commitment with Chile (Los Cóndores is the unique new large hydro project foreseen in the next 5 years). Average long term generation Attractive generation profile to profit with high average energy prices in summer and spring seasons by means of the water regulation capacity ( Embalse Laguna El Maule ). Capture operating synergies due to its proximity to current Endesa Chile assets. Low social and environmental involvement due to the absence of communities in the area and optimal engineering solution with underground civil works. Principal permits approved. Agreement signed with DOH relative to Convenio Regulación del Río Maule (1947) and JVRM about the optimization of water use in the basin of the river Maule. 3
4 Project key features and status The water-intake facilities are located at Embalse Laguna del Maule at 2,500 m.a.s.l. Expected average annual energy of 642 GWh (48% load factor). Design flow rate of 25 m³/s with a verified maximum operational flow rate of 28 m³ /s and Overall Height of 765 m. 2x220 kv H-V transmission line of 87 km to connect the power plant to the SIC market in the Ancoa substation facility. Adduction consist on intake, adduction tunnel (with a total length of 12,000m which will be excavated using a tunnel-boring machine (TBM)), head zone, lower tunnel and turbine cavern. Water rights: granted by DGA (Res. No 434 in 11/1988). Environmental Impact Assessment Gx: 150 MW approved in 04/2008 and DIA of the optimized project approved in 11/2011. Environmental Impact Assessment Tx: approved in 05/2012. Hydraulic Work Permit (POH): approved in November 28th 2013 with the agreement about a Operation Protocol. Definitive Electrical Concession Gx: not required by signing of rental contracts in 10/2013 (temporary works) and signing of surface easement agreement (permanent works) with the Goverment. Expected to sign in April Definitive Electrical Concession CED Tx: currently in process. Notice to proceed for Civil Works Contractor on March 31th, Running contract for rescue and relocation of the flora and wild animals. Laguna del Maule Bocatoma existente Obra de aducción subterránea Zona de descarga 4
5 Los Cóndores Project Budget and risk Investment cost of the project amounts to US$662 million 84% of total project budget is supported by firm commitments 25% of total budget allocates contingencies and risks. The amount included with high certainty considers a firm value. Focus on risks The budget of Los Cóndores project for contingencies includes: Risk Matrix: 16% Includes all potential risks not covered under the insurance program for the construction period. Social Geological Weather Contractual Land and easements Other minors and not identified risk Consolidation of learned lessons to lower financial deviation during the 6% Includes all uncertainty in quantities of civil work made by the level of project field studies It measures quantity variations with expected fixed prices of contracts Currency and Contract Indexation Risks: 3% Mitigation of 100% FX volatility and partial hedging for indexed variables in main contracts for domestic currency tranches 5
6 Mitigation measures included for the project Agreements signed with JVRM and DOH. The agreement with JVRM, about the optimization of water use in the basin of the Maule river, is part of a long term solution. Cost of forced stoppages was negotiated and agreed with bidders during the bidding process. Large scale field studies, geological survey, two Board of Consultants during design process (Gx), expert advice for TBM, transmission line layout modifications (Tx). Advanced negotiation in progress for transmission easements (49% of required easements are agreed with the owners and Endesa Chile owns additional 8,5%). Main contracts includes clauses to transfer relevant risks during construction to contractors. Insurance program negotiated by Endesa Chile which was adhered by the contractors. 6
Endesa Chile YE14 Results
Endesa Chile YE14 Results January 30th 2015 Highlights Operating revenues increased 21%, mainly due to higher energy sales, as a consequence of higher sale price of electricity in Chile, Colombia and Peru,
National Electric Power Regulatory Authority
National Electric Power Regulatory Authority MECHANISM FOR DETERMINATION OF TARIFF FOR HYDROPOWER PROJECTS Preamble Conservative estimates show total hydroelectric potential in the country to be 45000
AES GENER HIGHLIGHTS
1 AES GENER HIGHLIGHTS 2 Highlights 2013 VENTANAS IV Start-up of commercial operations in March 2013 COCHRANE PROJECT Financial close and start of construction in March 2013 CAPITAL INCREASE Shareholders
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation
INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN
INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN by Adib Geadah Senior Hydraulic Engineer and Consultant, P.O.Box 13-6195, Beirut, 1102-2801, Lebanon International Seminar
NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand
Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department
Introduction to the Chilean power sector
Introduction to the Chilean power sector Carlos Finat Diaz Executive Director - ACERA Santiago, March 2014 ACERA www.acera.cl Content Profile of the power sector of Chile and current issues. Policies and
Economics Training Series Introductory Course. Cost Estimation
Economics Training Series Introductory Course Cost Estimation 1 Project Cost Estimate: Feasibility/Detailed Design Identify project. Identify individual project components. Classify individual project
COMPANY PRESENTATION 1Q 2013
COMPANY PRESENTATION 1Q 213 Agenda Company Overview Business Strategy Financial Profile Chilean Electricity Sector Overview 2 Colbún at a glance Company Overview Business Power Generation & Trade Market
ELECTRICITY DISTRIBUTION TARIFFS The Chilean Experience. Hugh Rudnick Pontifícia Universidad Católica de Chile
ELECTRICITY DISTRIBUTION TARIFFS The Chilean Experience Hugh Rudnick Pontifícia Universidad Católica de Chile Brasilia, June 2009 Objective Describe the building of the electricity distribution tariff
During 2013, we had special advances in the main civil works, and the execution of the social and environmental commitments related to the license.
RICHARD: Welcome to the third quarter 2013 Endesa Colombia results conference call. My name is Richard and I will be your operator for today s call. At this time all participants are in a listen-only mode.
AES Gener 2013 Year-End Results
Contacts: Paola Lara (562) 2686 8713 [email protected] Constanza López (562) 2686 8968 [email protected] AES Gener 2013 Year-End Results AES Gener recorded EBITDA of ThUS$623.028 and net income
How To Profit From Power Production
CHILE TRIP-SANTANDER GBM September 2009 >> Agenda 1. Environment 2. Our Business 3. Current Scenario and Future Challenges 2 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Jun/09 Long Term Investment
USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013
USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency
enersis 1H 2012 results
26 07 2012 enersis 1H 2012 results Enersis consolidated results 1H 2012 Highlights in 1H 2012 Distribution: an increase in 1,582 GWh in physical sales and close to 377,000 new customers were added in the
The Brazilian Electricity Model: An Overview of the Current Structure and Market Design
The Brazilian Electricity Model: An Overview of the Current Structure and Market Design Élbia Melo 1, Evelina Maria de Almeida Neves 2, Luiz Henrique Alves Pazzini 3 Câmara de Comercialização de Energia
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is playing a great role in economic development since the last
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : [email protected]
Guidelines for Monthly Statistics Data Collection
Guidelines for Monthly Statistics Data Collection Final version Data Expert Group 31 May 2015 1. Table of contents 1. Table of contents... 2 2. Remarks... 3 3. Introduction... 3 4. Geographical perimeter
Sample Micro Hydro Initial Report
Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for
ENERGY NETWORKS ASSOCIATION. Electricity Industry EMF Measurement Protocol for High Field Areas
ENERGY NETWORKS ASSOCIATION Electricity Industry EMF Measurement Protocol for High Field Areas Contents 1 Introduction 1.1 Background 1.2 High Field Areas 2 High Field Area - Generation Businesses 2.1
Flat-land large-scale electricity storage (FLES) Lecture at the European Energy Conference 2012, Maastricht
EPJ Web of Conferences 33, 04010 (2012) DOI: 10.1051/ epjconf/ 20123304010 C Owned by the authors, published by EDP Sciences, 2012 Flat-land large-scale electricity storage (FLES) Lecture at the European
Tufts Consulting Group: Macedonian Energy
March 2010 CENTER FOR EMERGING MARKETS ENTERPRISES STUDENT RESEARCH SERIES Tufts Consulting Group: Macedonian Energy An Executive Summary Opportunity In the more than 18 years since its independence from
Financing hydropower Introduction to the Specifics of Small Hydro Power Plants
EFSE Annual Meeting 2012, Tiblisi GGF Technical Workshop on Small Hydro Power Financing hydropower Introduction to the Specifics of Small Hydro Power Plants May 2012 01 June 2012 Arnsburger Str. 64, 60385
Why solar is a good fit for mines: Pampa Elvira Solar project - Codelco
Why solar is a good fit for mines: Pampa Elvira Solar project - Codelco Who we are? Strong Track Record: Leaders on large scale solar thermal plants development & operation. Over 24 years of experience
The 10th Chile Taiwan Joint Business Council Meeting
The 10th Chile Taiwan Joint Business Council Meeting Carlos Finat Santiago de Chile Noviembre de 2014 Asociación Chilena de Energías Renovables A.G. ACERA Non-for-profit industry association created in
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
City of Vernon Request for Expressions of Interest and Information (RFI)
City of Vernon Request for Expressions of Interest and Information (RFI) Potential Wind Energy Project/Wind-Solar Energy Project City of Vernon Light & Power Department 4305 Santa Fe Avenue, Vernon CA
BTG Pactual& CelfinSouthern Cone Andean Conference 2013. Santiago, June 5 and 6, 2013
BTG Pactual& CelfinSouthern Cone Andean Conference 2013 Santiago, June 5 and 6, 2013 COMPANY STRUCTURE Affiliates that consolidate 60% 68% 50% 100% Besalco Construcciones Besalco MD Montajes Kipreos Hospital
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
HYDROPOWER POTENTIAL OF NEUQUÉN PROVINCE
HYDROPOWER POTENTIAL OF NEUQUÉN PROVINCE Hydropower potential of Neuquén province Existing structures Hydroelectric power plant Installed Power (MW) Annual Mean Energy (GWh/a) Alicurá 1.050 2.360 Piedra
Results of Electricity Sector Restructuring in Chile
Case Study From 1 Chile is a leader of the privatization movement in South America. In 1986, to meet the growing demand for energy, Chile began restructuring of the state-owned power sector. Before selling
CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market
CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive
Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-57 Requirements for an Excavation and Lateral Support Plan Building
: Promoters Contribution 950.00 : Term Loan 950.00 Total 1900.00 8 Profitability at optimum level. : Optimum Utilization(3 rd Year)
PROJECT SUMMARY 1 The Proposal : To set up a Small Hydroelectric Power Plant 2 Proposed Location of the project : The following factors need to be thoroughly examined before finalizing the location a.
Tanzania: Lower Kihansi Hydropower Station. 23065 / Hydropower plants
Tanzania: Lower Kihansi Hydropower Station Ex post evaluation OECD sector BMZ project ID 1996 66 108 Project-executing agency Consultant - 23065 / Hydropower plants Tanzanian Electricity Supply Company
How To Work For Stellar
Mining, Construction, Oil & Gas Specialists Stellar by the Numbers 3,481,500 Man hours worked to date 110,000 Qualified global mining, construction, oil and gas candidates 6,548 Placements made 99.03%
Pump Storage Technology
Energy Pump Storage Technology The Situation in Germany Dr. Albert Ruprecht Institute of Fluid Mechanics and Hydraulic Machinery University of Stuttgart, Germany www.german-renewable-energy.com Contents
Búrfell. hydropower station
Búrfell hydropower station Búrfell station The river Thjórsá is harnessed at Búrfell by a dam on the river which previously flowed south above Mt. Búrfell, diverting it northwards through the Sámsstadamúli
THE POWER MARKET IN CHILE WHAT IS GOING ON?
COMITÉ EMPRESARIAL CHILE-JAPON THE POWER MARKET IN CHILE WHAT IS GOING ON? SANTIAGO-CHILE APRIL 2009 CONTENT Overview of the Energy Sector Energy matrix Energy policy The Electricity Sector: regulatory
The River Devoll Project
EVN Hydropower Development in Albania The River Devoll Project Dr. Michael Laengle, CFO Agenda > EVN Overview and strategy > Albania Electricity market in SEE > The River Devoll project 2 Company profile
Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority
Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities Yves Muyange Director General Energy Water & Sanitation Authority Rwanda: A Thousand hills between the two Major Drainage Basins
APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan
APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and
Hydropower Projects Portfolio
Business Network Forum 18th Meeting, Iquitos- Peru, 04 March 2008 MINISTRY OF ENERGY AND MINES Hydropower Projects Portfolio By Jorge Aguinaga Diaz General Director for Electricity 1 Content I. GENERAL
U.S. Army Corps of Engineers Tulsa District
U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts
*This view is a sample image of electricity consumption.
Supply-demand balance of electricity is indicated based on the comparison between actual demand updated every five minutes and the maximum supply capacity. Demand forecast* is provided at around 8am, indicating
HYDROMETEOROLOGICAL AND MONITORING SERVICE
Regional Association VI, Forum Hydrology, Koblenz May 8 10, 2012 MINISTRY OF EMERGENCY SITUATIONS OF ARMENIA ARMENIAN STATE HYDROMETEOROLOGICAL AND MONITORING SERVICE Amalya Misakyan THE STRUCTURE OF ARMSTATEHYDROMET
J. Gaspar: Adapted from Jeff Madura, International Financial Management
Chapter5 Currency Derivatives J. Gaspar: Adapted from Jeff Madura, International Financial Management 5. 1 Currency Derivatives Currency derivatives are financial instruments whose prices are determined
Project Layout & Design Features of the Project
Project Layout & Design Features of the Project 1 PROJECT LAYOUT DRI DAM DRI DAM TOE P/H U/G POWER HOUSE COMPLEX DRI DAM TOE POWER HOUSE TANGON DAM TOE POWER HOUSE TOTAL 3070 MW 19.60 MW 7.40 MW 3097 MW
ESTIMATION OF PROJECT COSTS AND BENEFITS
SESSION 2.1 ESTIMATION OF PROJECT COSTS AND BENEFITS Introductory Course on Economic Analysis of Investment Projects Economics and Research Department (ERD) 2 Project Statements Comparison of costs and
Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system
Solar PV panels fitted to roofs Yearly cost of production Cost per kwh 12.5p Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system 430 per system Solar energy can be
Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community. www.fortisbc.
Welcome to our open house Thanks for coming Please sign in and help yourself to refreshments Integrated System Plan (ISP) Looks ahead 20 years to identify the energy and infrastructure needs of our customers
Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Callao Basic Metro Network
Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Mrs. Christy García Godos Naveda Head of Project December 2013 Diagnosis of the current situation Urban transport Buses Lack of
(NYSE-MKT:XRA, TSX:XRC,
For Immediate Release: NR 15-08 Corporate Update Vancouver, B.C., December 17 th, 2015 Exeter Resource Corporation (NYSE-MKT:XRA, TSX:XRC, Frankfurt:EXB Exeter or the Company ) is pleased to provide the
Overview on SEA output
1 st SEA workshop of the revised PDP VII Overview on SEA output of Project N a t i o n a l P o w e r D e v e l o p m e n t P l a n p e r i o d 2 0 11-2 0 2 0, v i s i o n 2 0 3 0 ( P D P V I I ) P r e
Electricity Market in Kazakhstan
Association of independent experts and consultants in fields of mineral resources, metallurgy and chemical industry Electricity Market in Kazakhstan Sample PDF Moscow January, 2012 Internet: www.infomine.ru
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
COMPANY PRESENTATION. BTG Pactual & Celfin Southern Cone / Andean Conference. Santiago, June 5 th -6 th 2013
COMPANY PRESENTATION BTG Pactual & Celfin Southern Cone / Andean Conference Santiago, June 5 th -6 th 213 Colbún at a glance Who are we? We are a Chilean company, leader in the generation of reliable,
Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project
September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached
Design Criteria & Service Goals
4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on
05-15-98 ELECTRICAL ENGINEERING ASSOCIATE, 7525
CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 ELECTRICAL ENGINEERING ASSOCIATE, 7525 Summary of Duties: Performs professional electrical engineering work in
XAYABURI HYDRO POWER PLANT, LAO PDR
XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,
Challenges to integrate Renewables In the French and European Power System. Michel Béna, SmartGrids Director
Challenges to integrate Renewables In the French and European Power System Michel Béna, SmartGrids Director EDF R&D, 7th november 2012 RTE, in a few words Owner and Operator of EHV and HV network from
Manage water resources for on site hydro-electricity generation
Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water
POWER NETWORKS. 2014-15 Electricity Network Tariffs and Charges and Future Price Trends
POWER NETWORKS 2014-15 Electricity Network Tariffs and Charges and Future Price Trends August 2014 Power and Water Corporation Table of Contents 1 Business Characteristics... 3 2 2014 Network Price Determination...
The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)
The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for
SCHEDULE 1-2 CONSTRUCTION AGREEMENT. between KEEYASK HYDROPOWER LIMITED PARTNERSHIP, - and - THE MANITOBA HYDRO-ELECTRIC BOARD. DATED, 2009.
SCHEDULE 1-2 CONSTRUCTION AGREEMENT between KEEYASK HYDROPOWER LIMITED PARTNERSHIP, - and - THE MANITOBA HYDRO-ELECTRIC BOARD. DATED, 2009. TABLE OF CONTENTS Page ARTICLE 1 - SCOPE OF WORK AND RELATED
Disclaimer. This presentation does not constitute financial advice.
Page 1 Mighty River Power Interim Results 2012 Disclaimer The information in this presentation was prepared by Mighty River Power Limited with due care and attention with every effort made to ensure its
2015 Third Quarter Results Webcast October 29, 2015
2015 Third Quarter Results Webcast October 29, 2015 Speaker Randall Oliphant Executive Chairman 2 Cautionary statements ALL AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED CAUTIONARY NOTE REGARDING FORWARD-LOOKING
Managing Foreign Exchange Risk
WHITE PAPER Managing Foreign Exchange Risk The Canadian dollar has made the headlines on numerous occasions in recent years. Its value has changed significantly and rapidly many times, greatly impacting
State of Renewables. US and state-level renewable energy adoption rates: 2008-2013
US and state-level renewable energy adoption rates: 2008-2013 Elena M. Krieger, PhD Physicians, Scientists & Engineers for Healthy Energy January 2014 1 Introduction While the United States power sector