1 Tanzania: Lower Kihansi Hydropower Station Ex post evaluation OECD sector BMZ project ID Project-executing agency Consultant / Hydropower plants Tanzanian Electricity Supply Company (TANESCO) Year of ex-post evaluation 2006 Project appraisal (planned) Ex post evaluation (actual) Start of implementation 3rd quarter rd quarter 1994 Period of implementation 63 months 70 months Investment costs EUR million EUR million Counterpart contribution EUR 23.4 million EUR 11.8 million Financing, of which Financial Cooperation (FC) funds Other institutions/donors involved Performance rating 4 Significance / relevance 5 Effectiveness 3 Efficiency 4 EUR 14.3 million EIB, NORAD, SIDA, World Bank EUR 15.1 million EIB, NORAD, SIDA, World Bank Brief description, overall objectives and project objectives with indicators The project comprises the construction of the Lower Kihansi hydropower station (3x60 MW) including the required infrastructure (access road, residential buildings) and the connection to the national interconnected grid. The project was implemented as a parallel financing with the World Bank, the European Investment Bank (EIB), the Norwegian Agency for Development (NORAD) and the Swedish International Development Agency (SIDA). The overall objective of the project was to ensure the sustainable, reliable, stable and macroeconomically efficient power supply for the customers in the interconnected grid of TANESCO. The project was mainly intended to benefit industry, trade and commerce (immediate target group). The indicators defined for the achievement of the objectives were the available capacity (687 MW), the ensured energy potential (2,997 GWh), achievement of an average tariff of US cents 9/kWh or at least 90% of long-run marginal costs (LRMC) and the reduction of outstanding accounts to 60 times the daily revenue. At the time of the final evaluation the third indicator was replaced by the indicator effective cost coverage. The project objective was the provision of additional capacity to cover peak loads and the feeding of this electrical energy into the national interconnected grid in accordance with the requirements of an optimal system operation. The indicators defined were a capacity of 180 MW of the hydropower plant units and a power production of 935 GWh in a normal year.
2 In addition to the target indicators, the guidelines of the World Commission on Dams, which had not existed at project appraisal, were also applied at the time of the final evaluation. According to these guidelines the people living in the project area would have had to be informed about the project and to be included into the planning. The population in the project area would have had to be given an adequate share in the benefit of the project and negative environmental impacts would have had to be minimised. This includes compliance with the Convention on Biological Diversity, in particular the protection of endemic species. Project design / major deviations from the original project planning and their main causes The Lower Kihansi power plant is located on the Kihansi river, a tributary of the Kilombero, about 460 km south-west of the capital of Dar es Salaam. The power station was designed as the first expansion stage to exploit the water power of the Kihansi river. For reasons of adjustment to the machine sizes of the interconnected grid already existing in Tanzania 3 hydropower units with 60 MW each were planned. To transport the electrical energy produced in the power plant 220 kilovolt high-voltage single lines were constructed, which feed the energy into the interconnected grid of TANESCO. In addition to the construction works for the power plant and the transmission lines financing was provided for the construction of an access road, possible expansion measures and accompanying consulting services and training measures. FC funds were provided for the 220 kv high-voltage cables and the 220 kv switchboard plants, and for a monitoring study on the spread of malaria caused by the construction measures. All components/measures to construct the hydro-power station were implemented largely as planned. During the execution of the construction works geological conditions turned out to be so difficult that the powerhouse cavern had to be relocated and it was necessary to prolong the fall shaft and the access, cable and underwater galleries. In the other hand, it was possible to shorten the pressure tunnel and, thus, the additional costs could be compensated for. The decision about the final lining/reinforcement of the tunnel was taken on the basis of the geological findings produced during the tunnel drilling works. The water losses of approx. 0.3 m3/s are in line with expectations. However, since the losses are stable over time they are still tolerable. Deficiencies were identified on the turbines and generators. These were, however, successively remedied and in individual cases lead to the extension of warranties by up to four years. In 1990 around 16,000 people were living in the project area. 380 families had to be relocated. Due to the remoteness of their villages the population of the highlands (3,000) was not so much affected by HIV and malaria. Until 1995 the number of inhabitants in the project region had increasesd by more than a third to 22,000 and has today reached 63,000. Social mitigation measures and measures on the health sector (e.g. containing HIV/AIDS and the establishment and maintenance of health stations) were implemented but should have been designed on a more sustainable basis and been embedded locally. After the donor-financed accompanying measures have been concluded the continuation of these social mitigation measures was heavily jeopardized and was already scaled down. Some measures, such as malaria protection for the population living in the highlands, were introduced too late and were not pursued vigorously enough. If accompanying low-cost health measures had been introduced in time (education, mosquito nets, drugs for treating persons who have contracted the disease, etc.) the spread of malaria in the highlands could at least have been considerably slowed. During the construction phase the ecological quality and importance of the gorge below the dam was recognised. Since then extensive measures have been taken to protect the gorge. The measures comprise the breeding of the Kihansi spray toad in the United States, the construction of a sprinkler system to irrigate the gorge and the undertaking to have 1.5m 3 /s flow off the - 2 -
3 reservoir into the gorge. Despite these mitigation measures, which reduce the annual quantity of electricity produced by the power plant by 116 GW (which means revenue losses of approx. EUR 6.6 million annually) it was not possible to restore the original state of the gorge. Due to the diversion of the river the ecosystem in the Kihansi gorge suffered lasting and irreversible damage and it is as yet unclear whether the Kihansi spray toad can be resettled in the gorge. Key results of the impact analysis and performance rating The performance rating of the project is based mainly on two target dimensions: On the one hand the hydropower plant can, from a mere energy perspective, be called a still successful project, which helped to avoid the capacity-related network failures that existed at the time of project appraisal. On the other hand, in spite of considerable progress made in the last three years, the situation in the energy sector as such deteriorated in some major areas as compared with project appraisal. In addition, the project had clearly negative impacts on nature and the ecology, which could not be remedied though considerable efforts were made in this respect. The socio-economic impacts were equally not compensated for, as would have been required in accordance with the guidelines of the World Commission on Dams, which were agreed, however, only after the conclusion of the project. Due to the fact that neither the loss of the ecosystem in the Kihansi gorge nor the effects of the occurrence of malaria in the highlands can by quantified in monetary terms, it is even more difficult to assess and weight the intended and non-intended impacts of the project. It even has to be questioned whether the funds provided for ecological compensation measures (approximately USD 15 million spent on compensation measures and another USD 8.2 million annually in the future in terms of revenue losses) can still be justified in view the wide-spread poverty in Tanzania. We consider these impact as so severe that they will be given specific attention in the context of a summary evaluation of all impacts and risks. Effectiveness The project objectives were (i) to provide additional capacity to cover peak loads and (ii) to feed electrical energy into the interconnected grid. Measured against the indicators, the project objective (i) was achieved, while project objective (ii) was slightly missed. The expected quantity of energy provided was missed by around 12%, but due to the good technical starting conditions this result is still acceplable. We rate the programme s overall effectiveness as sufficient (sub-rating 3). Relevance/Significance The overall objective of the project was to contribute to maintaining/improving the macroeconomic efficiency of the integrated grid of TANESCO. The indicators set to measure the achievement of the overall objective of the follow-up project were: (i) the available capacity, (ii) the ensured energy potential, (iii) the achievement of an average tariff of US cents 9/kWh or at least 90% of long-run marginal costs (LRMC) and (iv) the reduction of outstanding accounts. In addition, compliance with the guidelines of the World Commission on Dams (WCD), which had not been agreed at project appraisal, and non-intended effects were also taken into consideration. Objectives (i) and (ii) were achieved, though at a later stage than planned. Though, on the face of it, target (iii) was reached in the context of the definition developed at the time of the project appraisal, the intended objective of ensuring adequate cost recovery was missed. Target (iv) was missed entirely. These impacts have to be assessed in connection with the implementation of the WCD guidelines. Despite the extensive and expensive measures implemented, it was not possible to preserve the ecosystem in the Kihansi gorge. Though it was possible to protect the spray toad through appropriate breeding measures the ecosystem in the gorge suffered irreversible damage. The participation of the population in the project benefits was not achieved to the desired extent. Due to the accelerated spread of malaria individual population groups even suffered significant disadvantages. Taking into consideration these side effects we rate the relevance/significance of the project as clearly inadequate (sub-rating: 5)
4 Efficiency Given an installed capacity of EUR/kW the specific costs of the hydropower station are acceptable. However, due to the above-mentioned utilisation restrictions dynamic production costs rose by approximately 40% to 5.0 US cent per KWh (discount factor: 8%). Thus, the attractiveness of the power plant is limited. Nevertheless, in comparison with the existing thermal power stations the Lower Kihansi hydropower plant offers a favourable alternative. The production efficiency (system losses) and the allocation efficiency do not fulfil the operational evaluation criteria. Due to the conversion to gas and an improvement in the collection efficiency it was possible to improve marginal cost recovery to around 70%. However, it is not foreseeable for the time being how this rate can be further improved in the future. Overall, we rate the projects efficiency as slightly insufficient (sub-rating: 4). Overall, in consideration of the sub-criteria mentioned above, we rate the developmental effectiveness of the project as slightly insufficient (overall rating 4). General conclusions and recommendations Projects, which may have potentially strong environmental impacts, have to be included in the risk analysis conducted at the time of the project appraisal and to be further reviewed in the framework of the project monitoring to find out whether they might have any secondary or remote impacts on the project region and the population living in this region (damage to the ecosystem or to the health of the population). If risks are detected the required counter measures have to be introduced consistently and comprehensively. All necessary environmental impact analyses have to be concluded and evaluated before the start of project implementation. Moreover, it has to be ensured that the recommendations given can actually be translated into practice. In the case of the project Lower Kihansi Hydropower Station the environmental impact studies were obviously conducted too late. At the time of presentation of the environmental studies it was too late to implement the recommendations made to prevent irreversible damage. Equally, it would have been required prior to the start of the project measures to work out a comprehensive catalogue of instructions for social compensation measures to be taken with regard to HIV and malaria, among others. Remedial action introduced once the project implementation is under way will in many instances not be sufficient to prevent or effectively influence adverse developments. Accompanying studies have to be designed so as to ensure that continuous time series that cover the entire project period and comparable data on the development in other regions of the respective country are available. All mitigation measures have to be designed so as to ensure that they are truly sustainable. This includes in particular the early conclusion of agreements on the volume and length of payment obligations. The target groups of the project measures should be included in the process of designing of the project measures from the very beginning. Even if several donors combine their activities in the context of large-volume project it is possible only on a limited scale to bring about sectoral changes. The implementation of the required changes (e.g. a tariff reform) should be agreed as a prerequisite for the first disbursements of funds; it is not sufficient to request the implementation of such changes only in the medium term
5 When calculating the profitability of hydropower stations it should be examined whether the earnings calculated on the basis of historic precipitation records might be supplemented and improved by means of scenario calculations in the context of climate models. Legend Developmentally successful: Ratings 1 to 3 Rating 1 Very high or high degree of developmental effectiveness Rating 2 Satisfactory developmental effectiveness Rating 3 Overall sufficient degree of developmental effectiveness Developmental failures: Ratings 4 to 6 Rating 4 Overall slightly insufficient degree of developmental effectiveness Rating 5 Clearly insufficient degree of developmental effectiveness Rating 6 The project is a total failure Criteria for the Evaluation of Project Success The evaluation of the "developmental effectiveness" of a project and its classification during the ex-post evaluation into one of the various levels of success described in more detail below concentrate on the following fundamental questions: Are the project objectives reached to a sufficient degree (aspect of project effectiveness)? Does the project generate sufficient significant developmental effects (project relevance and significance measured by the achievement of the overall development-policy objective defined beforehand and its effects in political, institutional, socio-economic and socio-cultural as well as ecological terms)? Are the funds/expenses that were and are being employed/incurred to reach the objectives appropriate and how can the project s microeconomic and macroeconomic impact be measured (aspect of efficiency of the project conception)? To the extent that undesired (side) effects occur, are these tolerable? We do not treat sustainability, a key aspect to consider for project evaluation, as a separate category of evaluation but instead as a cross-cutting element of all four fundamental questions on project success. A project is sustainable if the project-executing agency and/or the target group are able to continue to use the project facilities that have been built for a period of time that is, overall, adequate in economic terms, or to carry on with the project activities on their own and generate positive results after the financial, organisational and/or technical support has come to an end
Egypt: Social Fund for Development Promotion of Micro and Small Enterprises I and II (EDP I and II)
Egypt: Social Fund for Development Promotion of Micro and Small Enterprises I and II (EDP I and II) Ex-post evaluation OECD sector 24030 Financial intermediaries of the formal sector BMZ project ID 1993
Malawi: Machinga District Hospital. BMZ project numbers 1989 66 467 (main project); 1994 66 384 (supplementary project)
Malawi: Machinga District Hospital Ex-post evaluation OECD sector 12 230 / Basic health BMZ project numbers 1989 66 467 (main project); 1994 66 384 (supplementary project) Project executing agency Consultant
Ex Post-Evaluation Brief Tanzania: Debt Repurchase Programme
Ex Post-Evaluation Brief Tanzania: Debt Repurchase Programme Programme/Client Debt Repurchase Programme BMZ ID 1998 65 551 Programme executing agency Ministry of Finance Tanzania Year of sample/ex post
Turkey: Adana Water Supply Project. Adana Büyüksehir Belediyesi Su ve Kanalizasyon (ASKI) GKW Consult Year of ex-post evaluation 2006
Turkey: Adana Water Supply Project Ex-post evaluation report OECD sector BMZ project number 1997 65 025 Project executing agency Consultant 14020/Water supply and sanitation, large systems Adana Büyüksehir
Ex-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of the Union of Myanmar Project: Urgent Rehabilitation and Upgrade Project Phase I Loan Agreement:
Brief description, overall objective and project objectives with indicators
H Indonesia: Improving Health in Nusa Tenggara Timur Ex post evaluation report OECD sector 12230 / Basic health infrastructure BMZ project ID 1998 65 049, 1998 70 122, 2001 253 Project executing agency
Chile: Microloans programme (CORFO) (interest rate reduction) 24030 - Financial intermediaries in the formal sector 2002 66 866 (2009 random sample)
Chile: Microloans programme (CORFO) (interest rate reduction) Ex post evaluation report OECD sector BMZ project ID Project executing agency Consultant 24030 - Financial intermediaries in the formal sector
Kyrgyzstan: Power Generation & Transmission
Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
Technical Consultant
Terms of Reference Technical Consultant Providing services in the framework of a Study for Rehabilitation of Zemo Samgori Irrigation System, Georgie (ref. ORIO13/GE/01) Introduction The Ministry of Agriculture
COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE
NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) GREECE COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE EVANGELOS DIALYNAS Professor NTUA Director of Electric Power Division 1 Competitive Electric European
Wind Power and District Heating
1 Wind Power and District Heating New business opportunity for CHP systems: sale of balancing services Executive summary - Both wind power and Combined Heat and Power (CHP) can reduce the consumption of
Hydro Power Projections Report. Jennifer Palmer
Hydro Power Projections Report Jennifer Palmer Abstract- The purpose of this report is to assess the current and future role of hydro power in the UK energy supply market. The historical trends and barriers
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Presented by M.M.C. Ferdinando, Secretary, Ministry of Power and Energy R.J. Gunawardana, Additional General Manager (Transmission),
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector C. Agert, Th. Vogt EWE Research Centre NEXT ENERGY, Oldenburg, Germany corresponding author: [email protected]
POWER AFRICA GEOTHERMAL ROADSHOW. Presented by Mekuria Lemma Ethiopian Electric Power Strategy & Investment Head SEP 28 Oct 3, 2014
POWER AFRICA GEOTHERMAL ROADSHOW Presented by Mekuria Lemma Ethiopian Electric Power Strategy & Investment Head SEP 28 Oct 3, 2014 Country in the horn of Africa Total area 1.13 million square km 90 million
INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN
INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN by Adib Geadah Senior Hydraulic Engineer and Consultant, P.O.Box 13-6195, Beirut, 1102-2801, Lebanon International Seminar
Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis
Renewable Electricity and Liberalised Markets REALM JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN By ICCS / NTUA K. Delkis October 1999 INTRODUCTION AND BACKGROUND Background to Renewable Energy
Asian Journal on Energy and Environment
As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable
The River Devoll Project
EVN Hydropower Development in Albania The River Devoll Project Dr. Michael Laengle, CFO Agenda > EVN Overview and strategy > Albania Electricity market in SEE > The River Devoll project 2 Company profile
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region
Glossary of Energy Terms Know Your Power 2012 Towards a Participatory Approach for Sustainable Power Development in the Mekong Region List of terms Terms Page Terms Page Avoided cost 10 Installed capacity
12 ENERGY. 12.1 Introduction
12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh
ELECTRICITY FROM RENEWABLE ENERGY IN VICTORIA 2011 June 2012
ELECTRICITY FROM RENEWABLE ENERGY IN VICTORIA 2011 June 2012 Executive Summary This report provides an overview of Victoria s electricity generation from renewable energy sources in 2012. The report presents
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : [email protected]
Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan
Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan South Sudan Electricity Sector Investment Opportunities Introduction Status of electricity supply in South
11- Benefits due to Power Generation
IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 11-02: Benefits due to Power Generation Large Scale Pumped Storage
Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy
Innovative Business Models for Market Uptake of Renewable Electricity unlocking the potential for flexibility in the Industrial Electricity Use Main variations of business models for Flexible Industrial
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Presentation Outline COUNTRY PROFILE KEY POWER SECTOR PLAYERS OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA ZAMBIA ENERGY SITUATION PRESENTLY RESULT
Solar Energy in Africa Experiences from Ghana
Solar Energy in Africa Experiences from Ghana AfricaSolar Conference 2015, 25 27 June 2015, Ouagadougou David A. Quansah Kwame Nkrumah University of Science and Technology (KNUST) Kumasi Ghana 26 June
COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
FINANCIAL AND OPERATING HIGHLIGHTS
Orca Exploration Group Inc. PO Box 3152 Road Town Tortola British Virgin Islands FOR IMMEDIATE RELEASE 30 April 2007 Orca Exploration (formerly EastCoast Energy Corporation) announces its results for the
Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority
Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities Yves Muyange Director General Energy Water & Sanitation Authority Rwanda: A Thousand hills between the two Major Drainage Basins
Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project
September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached
Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)
Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential
CONGESTION MANAGEMENT POLICY
1 (8) CONGESTION MANAGEMENT POLICY Contents 1 General... 2 2 Principles of congestion management... 2 3 Congestion management in the Finnish transmission grid... 3 3.1 Normal situation... 3 3.2 Planned
State of Renewables. US and state-level renewable energy adoption rates: 2008-2013
US and state-level renewable energy adoption rates: 2008-2013 Elena M. Krieger, PhD Physicians, Scientists & Engineers for Healthy Energy January 2014 1 Introduction While the United States power sector
Cogeneration Based District Heating Restoration Project in Avan District of Yerevan, Armenia
Ministry of Nature Protection of the Republic of Armenia Cogeneration Based District Heating Restoration Project in Avan District of Yerevan, Armenia Diana Harutyunyan, Climate Change Program Coordinator
Submission to the Queensland Competition Authority. Regulated Retail Electricity Prices 2013-14 Transitional Issues & Cost Components and Other Issues
Submission to the Queensland Competition Authority Transitional Issues & Cost Components and Other Issues January 2013 Queensland Farmers Federation Ltd. A.C.N. 055 764 488 A.B.N. 44 055 764 488 PO Box
Electronic Patient Management System epms Zimbabwe
Electronic Patient Management System epms Zimbabwe Collecting and Managing Data at the Patient Level for Better Treatment and Care Having access to patient health information enables medical professionals
Managing the nexus for a low carbon future. Prof Mike Muller Wits P&DM, NPC, DBSA
Managing the nexus for a low carbon future Prof Mike Muller Wits P&DM, NPC, DBSA Outline Context, low carbon for what, for whom? Origins of current water-energy-food nexus Linkages of nexus to low carbon
Erratic Power Supply and Socio- Economic Development in Ado- Ekiti, Ekiti State, Nigeria
The International Journal Of Engineering And Science (IJES) Volume 3 Issue 6 Pages 57-60 2014 ISSN (e): 2319 1813 ISSN (p): 2319 1805 Erratic Power Supply and Socio- Economic Development in Ado- Ekiti,
Overview on SEA output
1 st SEA workshop of the revised PDP VII Overview on SEA output of Project N a t i o n a l P o w e r D e v e l o p m e n t P l a n p e r i o d 2 0 11-2 0 2 0, v i s i o n 2 0 3 0 ( P D P V I I ) P r e
SPANISH EXPERIENCE IN RENEWABLE ENERGY AND ENERGY EFFICIENCY. Anton Garcia Diaz Economic Bureau of the Prime Minister
SPANISH EXPERIENCE IN RENEWABLE ENERGY AND ENERGY EFFICIENCY Anton Garcia Diaz Economic Bureau of the Prime Minister «Symposium on Strengthening Sino-Spain cooperation in multiple Fields» New Energy Cooperation
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Welcome to SREDA Siddique Zobair Member (EE & C) Sustainable & Renewable Energy Development Authority
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
Special Regional Session: Achieving water security for Asia and the Pacific through sustainable water management
Special Regional Session: Achieving water security for Asia and the Pacific through sustainable water management Introduction Session report, 15 th January 2015 The session was convened by ESCAP and UNOSD,
1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance
Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )
Half the cost Half the carbon
Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within
Comparison of hydropower options for developing countries with regard to the environmental, social and economic aspects
Comparison of hydropower options for developing countries with regard to the environmental, social and economic aspects Arthur Williams, Stephen Porter Nottingham Trent University / Metronet Rail, UK Abstract
ELECTRICITY MARKET ACT
1 NB: Unofficial translation Ministry of Trade and Industry, Finland ELECTRICITY MARKET ACT (386/1995; amendments up to 1172/2004 included) In accordance with a decision by Parliament, the following is
Hydroelectric Power Plant - Los Cóndores. Santiago, April 2014
Hydroelectric Power Plant - Los Cóndores Santiago, April 2014 Introduction Los Cóndores, a large hydro project of 150 MW with water flow regulation using the existing water reservoir of the Embalse Laguna
Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
Security of electricity supply
Security of electricity supply Definitions, roles & responsibilities and experiences within the EU Thomas Barth Chairman of Energy Policy & Generation Committee EURELECTRIC Outline Security of Supply a
Flat-land large-scale electricity storage (FLES) Lecture at the European Energy Conference 2012, Maastricht
EPJ Web of Conferences 33, 04010 (2012) DOI: 10.1051/ epjconf/ 20123304010 C Owned by the authors, published by EDP Sciences, 2012 Flat-land large-scale electricity storage (FLES) Lecture at the European
Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University
Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University Abstract Denmark is in a situation with many scattered sources of electricity,
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long
Latin America and COP20
ESSAY cities, Latin America and the Caribbean (LAC) increasingly try to engage in global environmental issues, particularly with regards to the challenge of climate change. Latin America and the Caribbean
1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS
1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS EXECUTIVE SUMMARY Energy policy in Greece has the potential to make a significant contribution to the country s economic recovery. Increasing competition and
NATURAL GAS DEMAND AND SUPPLY Long Term Outlook to 2030
1. Background On different occasions, Eurogas is asked to present its views on the future of the European gas industry. The forecasts are mainly needed for conferences and bilateral discussions with European
Methodologies for assessing Green Jobs Policy Brief
Methodologies for assessing Green Jobs Policy Brief Introduction By pioneering sustainable economic activities, both developed and developing countries stand to generate new jobs and strengthen their economies,
STORAGE ELECTRICITY. Improving the world through engineering
ELECTRICITY STORAGE Increasing the proportion of UK electricity supply from renewable energy sources is a critical part of achieving a sustainable energy framework for the nation. To date, relatively small
Contribution analysis of electrical energy management in the industrial and commercial sector: a challenge to the Tanzania utility industry
Contribution analysis of electrical energy management in the industrial and commercial sector: a challenge to the Tanzania utility industry A K Mohamed M T E Kahn Centre for Distributed Power Electronic
EUROPASS DIPLOMA SUPPLEMENT
EUROPASS DIPLOMA SUPPLEMENT TITLE OF THE DIPLOMA Técnico Superior en Energías Renovables TRANSLATED TITLE OF THE DIPLOMA (EN) (1) Higher Technician in Renewable Energy Sources --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corporate-Policy Project Rating (GPR )
Corporate-Policy Project Rating (GPR ) - Brief Description - (05.2013) Contents: 1. Preliminary remark 2. The four benchmarks of GPR 3. The GPR total index 4. The GPR range of application 5. The GPR profile
Manage water resources for on site hydro-electricity generation
Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water
EVN Conference Call Q. 1 3 2013/14 Results. 28 August 2014
EVN Conference Call Q. 1 3 2013/14 Results 28 August 2014 IFRS changes to the Scope of Consolidation Initial application of IFRS 10 12 Q. 1 3 2013/14 financial statements were prepared in accordance with
GREAT BARRIER REEF. Climate Change Action Plan
GREAT BARRIER REEF Climate Change Action Plan 2007 2011 Climate change is now recognised as the greatest long-term threat to the Great Barrier Reef. The Great Barrier Reef is internationally renowned as
During 2013, we had special advances in the main civil works, and the execution of the social and environmental commitments related to the license.
RICHARD: Welcome to the third quarter 2013 Endesa Colombia results conference call. My name is Richard and I will be your operator for today s call. At this time all participants are in a listen-only mode.
Impacts of large-scale solar and wind power production on the balance of the Swedish power system
Impacts of large-scale solar and wind power production on the balance of the Swedish power system Joakim Widén 1,*, Magnus Åberg 1, Dag Henning 2 1 Department of Engineering Sciences, Uppsala University,
THEME: PROMOTING GOOD PRACTICES IN DRUG POLICY DEVELOPMENT AND IMPLEMENTATION
Page 1 AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA Addis Ababa, ETHIOPIA P. O. Box 3243 Telephone 251-11-5517 700 Fax 251-11-5517 844 website: www. africa-union.org 5 th SESSION OF THE AU CONFERENCE OF
Wind & Mini-hydro Projects in Tanzania
Godfrey H. Chibulunje Principal Technical Engineer Electricity Division [email protected] Energy and Water Utilities Regulatory Authority (EWURA) Tanzania Wind & Mini-hydro Projects in Tanzania Presentation
THE GREAT RUAHA RIVER PROFILE
THE GREAT RUAHA RIVER PROFILE By Willie Mwaruvanda A Paper presented at the Clivet Project Inception Workshop,Blue Pearl Hotel Ubungo Plaza, Dar es Salaam 27 th November, 2009. 1 The Rufiji Basin Tanzania
FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION
FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION NOVEMBER 20, 2014 PRESENTATION OUTLINE Overview of Ghana s Energy Situation
Medium voltage products. Technical guide Smart grids
Medium voltage products Technical guide Smart grids Contents 2 1. Introduction 8 2 The different components and functions of a smart grid 8 2.1 Integration of distributed renewable energy sources 9 2.2
Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa
Finance, Mining & Sustainability The Gamsberg Zinc Project South Africa Project Summary Discovered in 1971 Anglo American purchased 33% interest in 1974 and increased interest to 100% in 1998 Feasibility
Fuel cell microchp: Greener and cheaper energy for all
Fuel cell microchp: Greener and cheaper energy for all Paddy Thompson General Manager Business Development Ceramic Fuel Cells Ltd. May 2013 1 What does our generation mix look like today? 2 Will the lights