1 Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad Project History 1970s - Mekong secretariat identified the hydropower potential of the Nam Theun River 1989/91 - World Bank feasibility study undertaken by Snowy Mountains Engineering Corp Government of Lao PDR (GOL) and private sponsors (leader: Transfield) sign an agreement to develop the project GOL asks World Bank to participate to the project financing A first series of environmental and social safeguard documents is produced 1997/98 - Asian crisis: Laos and Thailand agree to delay the project development EGAT and NTPC (leader: EDF) agree on a proposed electricity tariff (May 2000) 1

2 Project History (continued) Shareholders agreement signed between EDFI, EDL, EGCO and ITD (September 2001) NTPC is created as a Lao company (September 2002) Concession agreement signed (October 2002) Joint work between GOL, World Bank and NTPC to finalize safeguards documents Power purchase agreement signed (November 2003) Project financing activities Completion of safeguards documents with the participation of WB, ADB and AFD Financial close (June 2005) and beginning of full construction activities Beginning of commercial operation (December 2009) Schematic Diagram 2

3 Project Details The development, construction, and operation of a 1,070 MW transbasin diversion power plant on the Nam Theun, a tributary of the Mekong. The project site is in the central provinces of Khammuane and Bolikhamxay, about 250 kilometers southeast of Vientiane, and stretches from the top of the annamite mountain chain along the Lao PDR-Viet Nam border, to the Nakai Plateau, and ultimately to the confluence of the lower Xe Bang Fai with the Mekong. It will capture the flow of water from the watershed of the Nam Theun and the Nakai Plateau by building a dam 39 meters (m) high at the northwestern end of the plateau. Project Details (continued) The project will create a reservoir of 450 square kilometers (km2) on the Nakai Plateau. Water from the reservoir will drop about 350 meters to a powerhouse at the base of the Nakai escarpment near the town of Gnommalat. The water discharged from the powerhouse will then flow through a 27 km channel to the Xe Bang Fai, which drains into the Mekong approximately 150 km south of the Nam Theun confluence. A regulating pond will be constructed downstream of the powerhouse to ensure smooth release of water into the downstream water courses. 3

4 Sponsors Franco-Lao-Thai partnership with multilateral support Nam Theun 2 Power Company Limited (NTPC) is a Lao company established in Sept 2002 with the following shareholders: 35% EDF International (EDFI) 25% Electricity Generating Public Company Limited (ECGO) 25% Government of the Lao PDR (GOL) 15% Italian-Thai Development Public Company Limited (ITD) EDF is also acting as head contractor, managing three civil work subcontracts and two electromechanical works subcontracts. Contractual Arrangements Concession agreement signed between GOL and NTPC on 3 October 2002 for a 25 year period following the beginning of commercial operation Power purchase agreements signed on 11 November 2003 for a 25 year operating period between EGAT and NTPC (5,600 GWh per year), between EDL and NTPC (300 GWh per year). 4

5 Contractual Arrangements (continued) Head construction contract between NTPC and EDF- CIH provides for a date certain, fixed-price turnkey contract and comprises five major sub-contracts NTPC will take full responsibility for O&M for the project All environment and social commitments described in the concession agreement: Long term Binding E&S : ~ 10% of total project costs 5

6 Summary of Project Base Cost Estimates ($ million) Item Foreign Exchange Local Currency Total a. Construction cost b. Environmental-social mitigation c. Development cost A d. Financing cost B e. Base contingencies Total base cost ,250.0 Total contingent costs Total , % 37% 100% Project Capital Structure US dollar THB Total % ($ million) ($ million ($ million) equivalent) Equity % Debt % Total , % % 63.6% 36.4% 100.0% 6

7 Financing Plan Exchange Rate Risk Debt and equity are denominated in a mix of dollars (63%) and baht (37%) to match the composition of the two currencies in project base costs. The 50/50 mix of US dollar and baht debt is designed to match the tariff paid by EGAT and EdL. EGAT and EdL will carry exchange rate risk. To the extent the Lao PDR government will receive royalty and taxes in dollars some of the risk will be mitigated. 7

8 million cubic meters Hydrology Risk Historic Flow Records Total Flow capacity Hydrology Risk The annual inflows have varied historically, on average, by approximately 20 percent from the long-term average of 7,526 million m3. This is almost double the capacity of the reservoir, so that in an average year, the reservoir should be fully replenished even after operating the plant at full capacity during the dry season. The minimum water flow recorded was 3,776 million m3 in This was the result of El Nino that brought droughts over much of Southeast Asia. 8

9 Hydrology Risk (continued) The reservoir s probable maximum capacity is 3,910 million m3 amounting to an annual mean energy of 5,700 GWh would have been the only year since 1950 when the flow would not have been sufficient to fill the reservoir from empty. However, as the reservoir will not be fully emptied during operations but will always retain a minimum water level, even in 1998 the reservoir s probable maximum active storage of 3,530 million m3 could have been filled by the water inflows At full supply level (FSL) at an elevation of m, the reservoir would have an area of 450 sq km and would hold 3,910 million cubic meters of water. The powerhouse would have an installed capacity of 1,070 MW. Annual energy generation of 5,462 GWh. 9

10 Energy Component Primary Energy (PE) Secondary Energy 1 (SE1) Secondary Energy 2 (SE2) Quantity GWh/year (1) EGAT Obligation to Purchase 4, % % 282 0% Total 5,636 95% Applicable Tariff 50% in USD, 50% in THB (2) 50% in USD, 50% in THB (2) 100 % THB Fixed over the Term Payment USD and THB respectively 100 % THB (3) 100 % THB Declarations NTPC makes periodic declarations to EGAT. Declarations contain information as to the energy availability which may be provided by NTPC. Declarations serve two main functions: to determine the amount of NTPC s revenues payable by EGAT; and to determine the amount of liquidated damages payable by NTPC to EGAT. Any unavailability reduces the revenues payable by EGAT, whilst any outage results in liquidated damages payable by NTPC 10

11 Dispatch EGAT has the flexibility to dispatch NTPC on a unit by unit basis as it requires, subject only to certain operational constraints. As EGAT is not required to dispatch all of NTPC s declaration, if it dispatches less, dispatch shortfall occurs. As EGAT would have paid NTPC based on all of that declaration, it has the right to make-up subsequently, i.e. the right to dispatch for electrical energy without incurring any additional payment obligation. Dispatch excess: EGAT may dispatch more than all of NTPC s declaration, subject to the limitations to be observed by EGAT in NTPC s declarations Excess Dispatch An excess energy month is: any month in which there is spillage of water from the reservoir; August or September and the water level is above m ASL on the last day of the preceding month; or as elected by NTPC. Increased risk of spillage during an excess energy month. All the dispatch excess energy as determined at the end of an excess energy month shall be accounted as SE2, provided, however, that the outstanding amount of accumulated dispatch shortfall energy is below 200 GWh. 11

12 12

13 Offtake Risk Thailand now has surplus generating capacity, because of the economic downturn in the late 1990s and the large amount of capacity that was then under development and could not be stopped on reasonable terms. On the basis of demand forecast, excluding new plant from end-2003, the capacity surplus will be consumed by By the time of NT2 COD, the project will supply about one-half year of energy demand growth. NT2 would provide about 6 percent of the incremental energy requirement over 2009 to

14 Offtake Risk 14

15 Graph shows comparative economic costs for the most prominent large-scale generation options available to Thailand. A screening curve shows the cost per kwh of a generation plant at a range of capacity utilization rates (or CU rates). While CCGT has a lower investment cost per kw of capacity than does NT2, it has variable operating and fuels costs that NT2 does not have. At CU rates above 30 percent, NT2 is the least-cost alternative for Thailand. 15

16 Liquidity Risk The debt has to be repaid within 15 years - much less than the life of the project. The royalty and tax rates to be applied in each year have been designed specifically for the project on the basis of NTPC s debt repayment schedule. NTPC is exempt from income tax over the period and then pays the following the rates over the remainder of the concession; 5.0% between 2015 and 2021, 15.0% between 2022 and 2027, and 30.0% between 2028 and Liquidity Risk The royalty and tax rates...(continued) The increase in the income tax rate from 5.0% to 15.0% is not implemented until immediately after all NTPC debt is repaid at the end of The royalty is applied at 5.2% between 2009 and 2024, 15.0% between 2025 and 2029, and 30.0% over the remainder of the concession. 16

17 Country Risk Loans are guaranteed by World Bank, ADB Export Credit Agencies Development agencies loans Only THB loan not guaranteed 17

NAM THEUN 2 HYDROELECTRIC PROJECT THE GOVERNMENT OF THE LAO PDR NAM THEUN 2 POWER COMPANY LIMITED

NAM THEUN 2 HYDROELECTRIC PROJECT THE GOVERNMENT OF THE LAO PDR NAM THEUN 2 POWER COMPANY LIMITED Nam Theun 2 Power Company Limited Lao PDR NAM THEUN 2 HYDROELECTRIC PROJECT SUMMARY OF THE CONCESSION AGREEMENT BETWEEN THE GOVERNMENT OF THE LAO PDR AND NAM THEUN 2 POWER COMPANY LIMITED As of November,

More information

XAYABURI HYDRO POWER PLANT, LAO PDR

XAYABURI HYDRO POWER PLANT, LAO PDR XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,

More information

Asian Development Bank Institute. ADBI Working Paper Series

Asian Development Bank Institute. ADBI Working Paper Series ADBI Working Paper Series Trends in National and Regional Investors Financing Crossborder Infrastructure Projects in Asia Prabir De, Muthi Samudram, and Sanjeev Moholkar No. 245 September 2010 Asian Development

More information

Lao PDR Development Report 2010 Natural Resource Management for Sustainable Development

Lao PDR Development Report 2010 Natural Resource Management for Sustainable Development Lao PDR Development Report 2010 Natural Resource Management for Sustainable Development BACKGROUND NOTE Hydro Power Background Summary Note and Sector Assessment This note was prepared by Julia Fraser,

More information

Clean Development Mechanism Project Opportunities in Indonesia

Clean Development Mechanism Project Opportunities in Indonesia Clean Development Mechanism Project Opportunities in Indonesia Pre-feasibility Report on a Micro Hydro Power CDM Project Center for Research on Material and Energy Institut Teknologi Bandung October 2002

More information

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region Glossary of Energy Terms Know Your Power 2012 Towards a Participatory Approach for Sustainable Power Development in the Mekong Region List of terms Terms Page Terms Page Avoided cost 10 Installed capacity

More information

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,

More information

How KASIKORNBANK Plans to Support Green Projects

How KASIKORNBANK Plans to Support Green Projects How KASIKORNBANK Plans to Support Green Projects Clean Power Asia 29-30 April 2013, Bangkok Thongchai Kangvanchai KASIKORNBANK Pcl. 1 Content Government s Policy of Promoting Green Energy KBank s Green

More information

CHAPTER 3 RESEARCH DESIGN

CHAPTER 3 RESEARCH DESIGN CHAPTER 3 RESEARCH DESIGN 3.1 Introduction In general, micro-hydropower systems operate as Run-of-River type which means that neither a large dam or water storage reservoir is built nor is land flooded.

More information

Daily report. April 26, 2013. BCEL-KT Securities Company Limited Page 1. Market Summary. Turnover by investor type (LAK m)

Daily report. April 26, 2013. BCEL-KT Securities Company Limited Page 1. Market Summary. Turnover by investor type (LAK m) Lao Securities Exchange Driven by the rise in both listed stocks, LSX moved into the positive territory after two days of stagnation, up by 10.18 points or 0.77 pct to close at 1,340.86 points. Coupled

More information

SIZING UP THE GRID: How the Mekong Power Grid Compares Against the Policies of the Asian Development Bank. International Rivers Network January 2004

SIZING UP THE GRID: How the Mekong Power Grid Compares Against the Policies of the Asian Development Bank. International Rivers Network January 2004 SIZING UP THE GRID: How the Mekong Power Grid Compares Against the Policies of the Asian Development Bank International Rivers Network January 2004 The Asian Development Bank (ADB) is promoting the development

More information

Pakse Urban Environmental Improvement Project (RRP LAO 43316)

Pakse Urban Environmental Improvement Project (RRP LAO 43316) FINANCIAL ANALYSIS 1. Financial viability was assessed for solid waste management (SWM) improvements, which is the project s only revenue-earning subcomponent. 1 A financial sustainability analysis was

More information

Thailand s Commercial Banks Role in Financing Dams in Laos and the Case for Sustainable Banking

Thailand s Commercial Banks Role in Financing Dams in Laos and the Case for Sustainable Banking Thailand s Commercial Banks Role in Financing Dams in Laos and the Case for Sustainable Banking Carl Middleton, 1 International Rivers 2 December 2009 1 Carl Middleton is Mekong Program Coordinator with

More information

Financing hydropower Introduction to the Specifics of Small Hydro Power Plants

Financing hydropower Introduction to the Specifics of Small Hydro Power Plants EFSE Annual Meeting 2012, Tiblisi GGF Technical Workshop on Small Hydro Power Financing hydropower Introduction to the Specifics of Small Hydro Power Plants May 2012 01 June 2012 Arnsburger Str. 64, 60385

More information

Integrated Water Resources Management. Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia

Integrated Water Resources Management. Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia Integrated Water Resources Management Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia Coordinated projects financed by 3 French Water Agencies (Loire Brittany,

More information

Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives

Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives Shigeru Yamamura( 山 村 繁 ), Energy Specialist, East Asia Department, Asian Development Bank GMS Power

More information

Clean Energy Project Financing. March 5, 2012

Clean Energy Project Financing. March 5, 2012 Clean Energy Project Financing March 5, 2012 Disclaimer This presentation is solely for discussion purposes. In preparing this presentation, we, KASIKORNBANK PLC. ( KBank ) have made crucial assumptions

More information

PORT REFORM TOOLKIT WORLD BANK

PORT REFORM TOOLKIT WORLD BANK WORLD BANK FINANCIAL MODEL MANUAL Concession Project in the port sector 1/ PRELIMINARY ADVICE Required Software : Excel 2000 for PC Data & parameters of modelling : It appears in blue colour and exclusively

More information

River Niger AFD Irène Alvarez. Reconciling biodiversity and development

River Niger AFD Irène Alvarez. Reconciling biodiversity and development AFD and biodiversity River Niger AFD Irène Alvarez Reconciling biodiversity and development BIODIVERSITY, A GLOBAL CHALLENGE FOR DEVELOPMENT Biodiversity is a local resource for development. It is the

More information

GMS Economic Cooperation Program

GMS Economic Cooperation Program GMS Economic Cooperation Program In 1992, six countries bordering the Mekong River Cambodia, People s Republic of China (specifically, Yunnan province and later, Guangxi Zhuang Autonomous Region), Lao

More information

Options Assessment for Structuring and Financing new Hydropower in PNG

Options Assessment for Structuring and Financing new Hydropower in PNG Options Assessment for Structuring and Financing new Hydropower in PNG Issues and Options Report - Revised Judith Plummer November 2011 CONTENTS Summary...3 1 Introduction...4 Purpose of this Paper...4

More information

3.0 OVERVIEW OF LAO POWER SECTOR

3.0 OVERVIEW OF LAO POWER SECTOR 3.0 OVERVIEW OF LAO POWER SECTOR 3.1 Setting 3.1.1 Development of the Power Sector In Lao PDR, the power sector serves two vital national priorities: (i) (ii) It provides a reliable and affordable power

More information

Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin

Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin Prepared by the Mekong River Commission under the Basin Development Plan 1 Basin Development Plan 1. Regional planning

More information

Quarterly Report. For the three month period ended. April 30, 2015

Quarterly Report. For the three month period ended. April 30, 2015 Quarterly Report For the three month period ended April 30, 2015 The attached unaudited interim condensed consolidated financial statements have been prepared by Management of International Datacasting

More information

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2 The Utilization of Geographic Information Systems and Multi-Criteria Decision Making with Local Community Participation for Selection of Site for Micro Hydropower Project: A Case Study of Chi River Basin,

More information

China s Small Hydropower in Rural Energy Development

China s Small Hydropower in Rural Energy Development China s Small Hydropower in Rural Energy Development Li Zhiwu National Research Institute for Rural Electrification, China Hangzhou regional (Asia & Pacific) Center for Small Hydropower 2012.8.1 As one

More information

Water Supply Authority. Regulatory Accounting Guidelines

Water Supply Authority. Regulatory Accounting Guidelines Water Supply Authority Regulatory Accounting Guidelines Edition 2 February 2004 Regulatory Accounting Guidelines Edition 2 February 2004 Contents 1 General... 1 1.1 Background and introduction... 1 1.2

More information

Western Power Networks Price Publication - Part E. Support Services Prices for the South West Interconnected System 1 July 2005 31 December 2005

Western Power Networks Price Publication - Part E. Support Services Prices for the South West Interconnected System 1 July 2005 31 December 2005 Western Power Networks Price Publication - Part E Support Services Prices for the South West Interconnected System 1 July 2005 31 December 2005 Page 1 of 29 WESTERN POWER NETWORKS PRICING PUBLICATIONS

More information

HeveaBoard Berhad (Company No. 275512-A) (Incorporated in Malaysia)

HeveaBoard Berhad (Company No. 275512-A) (Incorporated in Malaysia) NOTES TO THE FINANCIAL STATEMENTS FOR THE PERIOD ENDED 30 JUNE 2009 A. DISCLOSURE REQUIREMENTS AS PER FINANCIAL REPORTING STANDARDS ( FRS ) 134 (FORMERLY KNOWN AS MALAYSIAN ACCOUNTING STANDARDS BOARD (

More information

The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency

The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency Technical Assistance Report Project Number: 40137 December 2006 The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency The views expressed herein

More information

TAX ISSUES RAISED BY LNG PROJECTS

TAX ISSUES RAISED BY LNG PROJECTS TAX ISSUES RAISED BY LNG PROJECTS Jon Lobb Baker Botts L.L.P. ABSTRACT This paper discusses tax issues that may be encountered by a company investing in an LNG project. 1. Income Taxes A seller's income

More information

Asian Journal on Energy and Environment

Asian Journal on Energy and Environment As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable

More information

FINANCIAL AND OPERATING HIGHLIGHTS

FINANCIAL AND OPERATING HIGHLIGHTS Orca Exploration Group Inc. PO Box 3152 Road Town Tortola British Virgin Islands FOR IMMEDIATE RELEASE 30 April 2007 Orca Exploration (formerly EastCoast Energy Corporation) announces its results for the

More information

Integrated Water and Sediment Management of Yellow River

Integrated Water and Sediment Management of Yellow River Keeping Health Life of Yellow River: Integrated Water and Sediment Management of Yellow River Shang Hongqi Yellow River Conservancy Commission 18 March 2009 Istanbul, Turkey Outline: I. Yellow River Characteristic

More information

Hydropower in Myanmar: Moving Electricity Contracts from Colonial to Commercial

Hydropower in Myanmar: Moving Electricity Contracts from Colonial to Commercial 79 John F. Kennedy Street, Box 74 Cambridge, Massachusetts 02138 617-495-1134 www.ash.harvard.edu/myanmar Hydropower in Myanmar: Moving Electricity Contracts from Colonial to Commercial Prepared for Proximity

More information

Week 8: Raising and managing working capital

Week 8: Raising and managing working capital Managing Finance (MNGFIN) Week 8: Raising and managing working capital Raising capital There is no textbook reading for this topic. Pay special attention to the additional Web-based materials and journal

More information

Case Study More Money Please

Case Study More Money Please Case Study More Money Please Question Appeared in: ModelOff 2015 Round 2 Time allocated: 35 minutes INTRODUCTION You work for a Project Company that has an existing senior debt facility which is due to

More information

ASIAN DEVELOPMENT BANK PPA: LAO 22065

ASIAN DEVELOPMENT BANK PPA: LAO 22065 ASIAN DEVELOPMENT BANK PPA: LAO 22065 PROJECT PERFORMANCE AUDIT REPORT ON THE NAM NGUM-LUANG PRABANG POWER TRANSMISSION PROJECT (Loans 928-LAO[SF]/1308-LAO[SF]) IN THE LAO PEOPLE S DEMOCRATIC REPUBLIC

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Overview. Oil accounts for about a quarter

More information

PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT

PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT Investment Office ANRS PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT Development Studies Associates (DSA) October 2008 Addis Ababa Table of Contents 1. Executive Summary...1

More information

Quarterly Report of MAXIM POWER CORP.

Quarterly Report of MAXIM POWER CORP. Quarterly Report of MAXIM POWER CORP. First Quarter ended March 31, 20010 and 2009 (unaudited) MAXIM POWER CORP. Consolidated Balance Sheets (In Thousands of Dollars) Assets March 31, 2010 (unaudited)

More information

(1.1) (7.3) $250m 6.05% US$ Guaranteed notes 2014 (164.5) Bank and other loans. (0.9) (1.2) Interest accrual

(1.1) (7.3) $250m 6.05% US$ Guaranteed notes 2014 (164.5) Bank and other loans. (0.9) (1.2) Interest accrual 17 Financial assets Available for sale financial assets include 111.1m (2013: 83.0m) UK government bonds. This investment forms part of the deficit-funding plan agreed with the trustee of one of the principal

More information

FOREIGN DIRECT INVESTMENT IN CAMBODIA

FOREIGN DIRECT INVESTMENT IN CAMBODIA FOREIGN DIRECT INVESTMENT IN CAMBODIA PHNOM PENH SECURITIES PLC. No. 32, Monivong Bld, Phnom Penh, Cambodia Tel: +855-23-426-999 Fax: +855-23-426-495 Website: http://www.pps.com.kh In this Paper: Executive

More information

Financial Performance and Financial Statement Projections

Financial Performance and Financial Statement Projections Financial Performance and Financial Statement Projections A. Introduction and Approach 1. The Georgian State Electrosystem (GSE), EA of the project, is a 100% state owned Limited Liability Company responsible

More information

Hydropower Development in the Mekong Region Cycling through from Policy to Implementation

Hydropower Development in the Mekong Region Cycling through from Policy to Implementation Hydropower Development in the Mekong Region Cycling through from Policy to Implementation 12-13 September 2013, Bangkok, Thailand Workshop Documentation The Workshop Hydropower Development in the Mekong

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Uzbekistan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The energy sector underpins Uzbekistan s sustained

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

FINANCIAL STATEMENTS. Alberta Beverage Container Recycling Corporation. Contents

FINANCIAL STATEMENTS. Alberta Beverage Container Recycling Corporation. Contents 1 FINANCIAL STATEMENTS Alberta Beverage Container Recycling Corporation Contents 2 Independent Auditor s Report 3 Statement of Operations and Changes in Net Assets 4 Statement of Financial Position 5 Statement

More information

Examples of Good Practice

Examples of Good Practice Examples of Good Practice Cost Estimates and Financing Plans February 2015 Financial Management Unit Operations Services and Financial Management Department 1 TABLE OF CONTENTS 1 Introduction... 3 2 Investment

More information

6. Gross Domestic Product by Country

6. Gross Domestic Product by Country 6. Gross Domestic Product by Country The economies of the six countries studied for this report have flourished, allowing for the very high growth rates in research and development (R&D) investment and

More information

RISK FACTORS AND RISK MANAGEMENT

RISK FACTORS AND RISK MANAGEMENT Bangkok Bank Public Company Limited 044 RISK FACTORS AND RISK MANAGEMENT Bangkok Bank recognizes that effective risk management is fundamental to good banking practice. Accordingly, the Bank has established

More information

Xayaburi Dam: Timeline of Events (Last updated: July 2013)

Xayaburi Dam: Timeline of Events (Last updated: July 2013) Xayaburi Dam: Timeline of Events (Last updated: July 2013) 4 May 2007 Lao government signed memorandum of understanding with Thai company Ch. Karnchang to develop the Xayaburi Dam. 25-27 Sept. 2008 MRC

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long

More information

NEWS RELEASE. Avcorp announces 2014 Third Quarter Financial Results. November 13, 2014

NEWS RELEASE. Avcorp announces 2014 Third Quarter Financial Results. November 13, 2014 Avcorp announces 2014 Third Quarter Financial Results Avcorp Industries Inc. 10025 River Way Delta, British Columbia Canada V4G 1M7 (604) 582 1137 (604) 582 2620 Fax info@avcorp.com Common Stock Listed

More information

Khan Resources Inc. Interim Consolidated Balance Sheets (Expressed in United States dollars) (All dollar amounts are in thousands) (Unaudited)

Khan Resources Inc. Interim Consolidated Balance Sheets (Expressed in United States dollars) (All dollar amounts are in thousands) (Unaudited) Interim Consolidated Balance Sheets (All dollar amounts are in thousands) March 31, September 30, 2008 2007 Assets Current Cash $ 32,105 $ 33,859 Accounts receivable 52 47 Prepaid expenses and other assets

More information

Agreements, bonds and guarantees

Agreements, bonds and guarantees Agreements, bonds and guarantees SPV Formation The Special Project Vehicle (SPV) may take a variety of forms, including a corporation, limited liability company, general partnership, limited partnership,

More information

LAFE CORPORATION LIMITED Un-audited Q1 2014 Financial Statement and Dividend Announcement (All in US Dollars)

LAFE CORPORATION LIMITED Un-audited Q1 2014 Financial Statement and Dividend Announcement (All in US Dollars) LAFE CORPORATION LIMITED Un-audited Q1 2014 Financial Statement and Dividend Announcement (All in US Dollars) PART I INFORMATION REQUIRED FOR ANNOUNCEMENTS OF QUARTERLY (Q1, Q2 & Q3), HALF-YEAR AND FULL

More information

CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 (Unaudited) TSX-V: ANF. www.anfieldnickel.com

CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 (Unaudited) TSX-V: ANF. www.anfieldnickel.com CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 () TSX-V: ANF www.anfieldnickel.com NOTICE OF NO AUDITOR REVIEW The unaudited condensed consolidated interim financial statements,

More information

FINANCIAL PERFORMANCE AND PROJECTIONS

FINANCIAL PERFORMANCE AND PROJECTIONS Samarkand Solar Power Project (RRP UZB 45120) FINANCIAL PERFORMANCE AND PROJECTIONS A. Introduction 1. An analysis of the historical financial performance and financial statements projection of the State

More information

Condensed Interim Consolidated Financial Statements

Condensed Interim Consolidated Financial Statements Condensed Interim Consolidated Financial Statements Unaudited (Expressed in Canadian dollars) NOTICE TO READER: These condensed interim consolidated financial statements have not been reviewed by the Company's

More information

How To Get Power From Bhutan To India

How To Get Power From Bhutan To India Status of Bhutan cross border interconnection with India & Expected Benefits Presentation by Bhutanese team in SARI/EI workshop on competitive electricity markets design, implementation & benefits 18-20

More information

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION February 2012 DAWEI Sea PROJECT Port Project DAWEI AND THE REGION PROJECT LOCATION Kunming India Middle East / Europe Dawei Africa Asia Regional Hub DAWEI Sea PROJECT Port Project DAWEI PROJECT OVERVIEW

More information

Kyrgyzstan: Power Generation & Transmission

Kyrgyzstan: Power Generation & Transmission Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...

More information

DKSH Company Presentation

DKSH Company Presentation DKSH Company Presentation TO : OAV - German Asia-Pacific Business Association Delegation Ms. Claire Burgess General Director - Vietnam General Manager Healthcare Vietnam Regional Director Healthcare Indochina

More information

Comparison of Electricity Supply and Tariff Rates in South Asian Countries

Comparison of Electricity Supply and Tariff Rates in South Asian Countries Comparison of Electricity Supply and Tariff Rates in South Asian Countries By Faisal Jamil, Energy Specialist (Economics) Introduction A reliable, accessible and affordable supply of energy produced in

More information

THE ORIENTAL HOTEL (THAILAND) PUBLIC COMPANY LIMITED AND ITS SUBSIDIARY COMPANIES REPORT AND CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31

THE ORIENTAL HOTEL (THAILAND) PUBLIC COMPANY LIMITED AND ITS SUBSIDIARY COMPANIES REPORT AND CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 THE ORIENTAL HOTEL (THAILAND) PUBLIC COMPANY LIMITED AND ITS SUBSIDIARY COMPANIES REPORT AND CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2003 AND 2002 Report of Independent Auditor

More information

CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014

CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014 CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014 The following management s discussion and analysis ( MD&A ), prepared as of December 11, 2014, should

More information

Discussion on Institutional Arrangements for the FG and Next Steps

Discussion on Institutional Arrangements for the FG and Next Steps Summary of Discussions 1 st Meeting of the Focal Group (FG-1) of the Regional Power Trade Coordination Committee (RPTCC) Hanoi, Viet Nam, 12-13 January 2006 I. Background 1. The establishment of the Focal

More information

Northern Blizzard Resources Inc. Condensed Consolidated Interim Financial Statements For the Three Months Ended March 31, 2016 and 2015 (Unaudited)

Northern Blizzard Resources Inc. Condensed Consolidated Interim Financial Statements For the Three Months Ended March 31, 2016 and 2015 (Unaudited) Northern Blizzard Resources Inc. Condensed Consolidated Interim Financial Statements (Unaudited) CONDENSED CONSOLIDATED INTERIM STATEMENT OF FINANCIAL POSITION In Canadian $000s (unaudited) As at March

More information

eqube Gaming Limited Condensed Interim Consolidated Financial Statements For the Three and Nine Months Ended November 30, 2015 (Unaudited)

eqube Gaming Limited Condensed Interim Consolidated Financial Statements For the Three and Nine Months Ended November 30, 2015 (Unaudited) Condensed Interim Consolidated Financial Statements For the Three and Nine Months Ended November 30, 2015 Notice to Reader The following interim consolidated financial statements and notes have not been

More information

Guidelines on Implementation of the Procedures for Water Use Monitoring

Guidelines on Implementation of the Procedures for Water Use Monitoring For Sustainable Development Guidelines on mplementation of the Procedures for Water Use Monitoring P.O. Box 6101, Vientiane, Lao PDR Telephone: (856-21) 263 263 Facsimile: (856-21) 263 264 Email: mrcso,mrcmekon~.org

More information

Public-Private Partnerships

Public-Private Partnerships Public-Private Partnerships Closing Critical Issues Washington, Background In limited recourse finance, the primary source of debt service is the cash flow generated by the Project will evaluate all factors

More information

Electricity Business in the Asia-Pacific Region

Electricity Business in the Asia-Pacific Region Electricity Business in the Asia-Pacific Region Business Environment and Challenges (Regional) The opportunities in coming years for CLP to increase its presence in the power industry in the Asia-Pacific

More information

CEMATRIX CORPORATION Consolidated Financial Statements (in Canadian dollars) September 30, 2015

CEMATRIX CORPORATION Consolidated Financial Statements (in Canadian dollars) September 30, 2015 Consolidated Financial Statements September 30, 2015 Management s Responsibility for Financial Reporting and Notice of No Auditor Review of the Interim Consolidated Financial Statements for the Three and

More information

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS 122 HANDBOOK FOR THE ECONOMIC ANALYSIS OF WATER SUPPLY PROJECTS CONTENTS 5.1 Introduction...123 5.2 Financial Revenues...124 5.3 Project Costs...126 5.3.1 Investments...127

More information

IMPACT Silver Corp. Interim Consolidated Financial Statements March 31, 2009 Unaudited

IMPACT Silver Corp. Interim Consolidated Financial Statements March 31, 2009 Unaudited Interim Consolidated Financial Statements Statement 1 Consolidated Balance Sheets ASSETS March 31 2009 December 31 2008 Current Cash and cash equivalents $ 5,357,480 $ 5,433,480 Accounts receivable and

More information

Economic Analysis of Small Hydropower Project A Case Study of Lower Khare Small Hydropower Project

Economic Analysis of Small Hydropower Project A Case Study of Lower Khare Small Hydropower Project Economic Analysis of Small Hydropower Project Ravi Kishor Dutta, Tri Ratna Bajracharya, Shree Raj Shakya Department of Mechanical Engineering, IOE, Central Campus, Pulchowk, Tribhuvan University, Nepal

More information

The 500 MW Sale to WPS and the 250 MW Sale to MP as described in the Term Sheets in effect. Keeyask for a 2018/19 ISD (In-Service Date)

The 500 MW Sale to WPS and the 250 MW Sale to MP as described in the Term Sheets in effect. Keeyask for a 2018/19 ISD (In-Service Date) MANITOBA HYDRO 2009/2010 POWER RESOURCE PLAN Date: September 16, 2009 The purpose of this power resource plan is: To provide a recommended long-term development plan, and To provide an alternative long-term

More information

Nature of operations and basis of preparation (Note 1) Commitments and contingencies (Note 10) Subsequent events (Note 12)

Nature of operations and basis of preparation (Note 1) Commitments and contingencies (Note 10) Subsequent events (Note 12) Unaudited Interim Consolidated Financial Statements For the nine months ended September 30, 2005 Contents Interim Consolidated Financial Statements Interim Consolidated Balance Sheets Interim Consolidated

More information

RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES

RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES Page 1 of 8 Section 1. Purpose These Rules and Regulations are adopted by the Board of Governors pursuant to Article 13.3. of the Agreement Establishing the Black Sea Trade and Development Bank (Establishing

More information

CLIMATE CHANGE ADAPTATION ACTIVITIES

CLIMATE CHANGE ADAPTATION ACTIVITIES CLIMATE CHANGE ADAPTATION ACTIVITIES AND EXPERIENCE IN LAO PDR 5th APN Southeast Asia Sub-Regional Cooperation Meeting, Climate Adaptation Seminar, Proposal Development Training Workshop 22-26 October

More information

ABENGOA YIELD The sustainable total return company

ABENGOA YIELD The sustainable total return company Abengoa Yield announces second quarter 2015 results and a quarterly dividend above guidance Strong results for the period: Further Adjusted EBITDA including unconsolidated affiliates increased by 93% y-o-y

More information

1. Energy. 2. Power. 3. Regional cooperation. 4. Greater Mekong Subregion. I. Asian Development Bank.

1. Energy. 2. Power. 3. Regional cooperation. 4. Greater Mekong Subregion. I. Asian Development Bank. September 2012 2012 Asian Development Bank All rights reserved. Published 2012. Printed in the Philippines. ISBN 978-92-9092-836-2 (Print), 978-92-9092-837-9 (PDF) Publication Stock No. RPT124977-2 Cataloging-In-Publication

More information

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling

More information

Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows

Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows Contents Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows Paragraphs OBJECTIVE SCOPE 1 3 BENEFITS OF CASH FLOW INFORMATION 4 5 DEFINITIONS 6 9 Cash and cash equivalents 7 9 PRESENTATION OF

More information

Nufarm Finance (NZ) Limited Annual Report For the year ended 31 July 2013

Nufarm Finance (NZ) Limited Annual Report For the year ended 31 July 2013 Nufarm Finance (NZ) Limited Annual Report For the year ended 31 July 2013 NUFARM FINANCE (NZ) LIMITED 1 Contents 2 Directors report 3 Company directory 4 Corporate governance 5-6 Auditor s report 7 Statement

More information

Standard Chartered Bank (Thai) PCL & its Financial Business Group Pillar 3 Disclosures 30 June 2015

Standard Chartered Bank (Thai) PCL & its Financial Business Group Pillar 3 Disclosures 30 June 2015 Standard Chartered Bank (Thai) PCL & its Financial Business Group Registered Office: 90 North Sathorn Road, Silom Bangkok, 10500, Thailand Overview During 2013, the Bank of Thailand ( BOT ) published the

More information

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department

More information

INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2013

INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2013 ARBN 154 618 989 INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2013 CORPORATE DIRECTORY Directors Mr Keith Coughlan Mr Robert Timmins Mr David Porter Mr Colin Ikin Managing Director, CEO

More information

Dhanamitr Factoring Public Company Limited (Formerly: Dhanamitr Factoring Company Limited)

Dhanamitr Factoring Public Company Limited (Formerly: Dhanamitr Factoring Company Limited) Annual financial statements and Audit report of Certified Public Accountant For the years ended 31 December 2005 and 2004 DHANA MITR FACTORING COMPANY LIMITED Notes to Financial Statements (Continued)

More information

PPPs in Renewable Energy: IFC Advisory Perspective. April 2012

PPPs in Renewable Energy: IFC Advisory Perspective. April 2012 PPPs in Renewable Energy: IFC Advisory Perspective April 2012 IFC s Role Financing IFC is the world s largest multilateral provider of financing for private enterprises with over US$26 billion in outstanding

More information

FLUVICIDE: AN INDEPENDENT ENVIRONMENTAL ASSESSMENT OF NAM THEUN 2 HYDROPOWER PROJECT IN LAOS, WITH PARTICULAR REFERENCE TO AQUATIC BIOLOGY AND FISHES

FLUVICIDE: AN INDEPENDENT ENVIRONMENTAL ASSESSMENT OF NAM THEUN 2 HYDROPOWER PROJECT IN LAOS, WITH PARTICULAR REFERENCE TO AQUATIC BIOLOGY AND FISHES FLUVICIDE: AN INDEPENDENT ENVIRONMENTAL ASSESSMENT OF NAM THEUN 2 HYDROPOWER PROJECT IN LAOS, WITH PARTICULAR REFERENCE TO AQUATIC BIOLOGY AND FISHES By Dr. Tyson R. Roberts Consultant to the NT2 Project

More information

Income Measurement and Profitability Analysis

Income Measurement and Profitability Analysis PROFITABILITY ANALYSIS The following financial statements for Spencer Company will be used to demonstrate the calculation of the various ratios in profitability analysis. Spencer Company Comparative Balance

More information

-Translation- 2. Related Parties Vintage Engineering Public Company Limited ( Company or VTE ) Green Earth Power (Thailand) Company Limited ( GEP )

-Translation- 2. Related Parties Vintage Engineering Public Company Limited ( Company or VTE ) Green Earth Power (Thailand) Company Limited ( GEP ) Information Memorandum of Vintage Engineering Public Limited Company Regarding Related Transaction on the Rendering of Construction Service for The 220MW Solar Power Plant Project located in Minbu, Myanmar

More information

DEBT SUSTAINABILITY ASSESSMENT

DEBT SUSTAINABILITY ASSESSMENT Second Green Power Development Project (RRP BHU 44444) DEBT SUSTAINABILITY ASSESSMENT A. Background 1. Objective. The government of Bhutan has followed an investment driven approach for inclusive economic

More information

Manage water resources for on site hydro-electricity generation

Manage water resources for on site hydro-electricity generation Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water

More information

Mitsubishi Electric Announces Consolidated Financial Results for the First 9 Months and Third Quarter of Fiscal 2016

Mitsubishi Electric Announces Consolidated Financial Results for the First 9 Months and Third Quarter of Fiscal 2016 MITSUBISHI ELECTRIC CORPORATION PUBLIC RELATIONS DIVISION 7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo, 100-8310 Japan FOR IMMEDIATE RELEASE No. 2989 Investor Relations Inquiries Investor Relations Group

More information

International Accounting Standard 36 Impairment of Assets

International Accounting Standard 36 Impairment of Assets International Accounting Standard 36 Impairment of Assets Objective 1 The objective of this Standard is to prescribe the procedures that an entity applies to ensure that its assets are carried at no more

More information

NEPAL ACCOUNTING STANDARDS ON CASH FLOW STATEMENTS

NEPAL ACCOUNTING STANDARDS ON CASH FLOW STATEMENTS NAS 03 NEPAL ACCOUNTING STANDARDS ON CASH FLOW STATEMENTS CONTENTS Paragraphs OBJECTIVE SCOPE 1-3 BENEFITS OF CASH FLOWS INFORMATION 4-5 DEFINITIONS 6-9 Cash and cash equivalents 7-9 PRESENTATION OF A

More information

THIRTEENTH NORTHERN MARIANAS COMMONWEALTH LEGISLATURE AN ACT BE IT ENACTED BY THE THIRTEENTH NORTHERN MARIANAS COMMONWEALTH LEGISLATURE:

THIRTEENTH NORTHERN MARIANAS COMMONWEALTH LEGISLATURE AN ACT BE IT ENACTED BY THE THIRTEENTH NORTHERN MARIANAS COMMONWEALTH LEGISLATURE: THIRTEENTH NORTHERN MARIANAS COMMONWEALTH LEGISLATURE FIRST REGULAR SESSION, 2002 Public Law 13-17 13-041 H. B. NO. 13-001, HS1, HD1, SD1 AN ACT To authorize the Marianas Public Lands Authority in conjunction

More information