Figure 1. New Wafer Size Ramp Up as a Percentage of World Wide Silicon Area Versus Years Elapsed Since the New Size Was Introduced [1].

The Move to the next Silicon Wafer Size

Chapter 1 Introduction to The Semiconductor Industry 2005 VLSI TECH. 1

EUV lithography NXE platform performance overview

Welcome & Introduction

The Road to 450 mm Semiconductor Wafers Ira Feldman

DEVELOPMENTS & TRENDS IN FEOL MATERIALS FOR ADVANCED SEMICONDUCTOR DEVICES Michael Corbett mcorbett@linx-consulting.com Semicon Taiwan2015

First 40 Giga-bits per second Silicon Laser Modulator. Dr. Mario Paniccia Intel Fellow Director, Photonics Technology Lab

Sustaining profitable growth Business focus and update

Benchmarking Semiconductor Manufacturing. A Research Program at the University of California at Berkeley

Silicon-On-Glass MEMS. Design. Handbook

The Semiconductor Industry: Out in Front, but Lagging Behind Tom Mariano Published September, 2014

Thin Is In, But Not Too Thin!

AIMS EUV. Status of Concept and Feasibility Study. Ulrich Stroessner* Heiko Feldmann** Wolfgang Harnisch* Dirk Hellweg** Sascha Perlitz*

Surface Profilometry as a tool to Measure Thin Film Stress, A Practical Approach. Gianni Franceschinis, RIT MicroE Graduate Student

Substrate maturity and readiness in large volume to support mass adoption of ULP FDSOI platforms. SOI Consortium Conference Tokyo 2016

Nanometer-scale imaging and metrology, nano-fabrication with the Orion Helium Ion Microscope

MACHINE VISION FOR SMARTPHONES. Essential machine vision camera requirements to fulfill the needs of our society

Creating Affordable Silicon

ASML reports Q3 results as guided and remains on track for record 2015 sales Two new lithography scanners launched

The U.S. Semiconductor Industry: A Key Contributor to U.S. Economic Growth

PROVE, the next generation registration metrology tool, status report

SEMI Equipment and Materials Outlook. Daniel Tracy Senior Director Industry Research & Statistics Group at SEMI in San Jose, California

SEMI Microelectronic Manufacturing Supply Chain Quarterly Market Data - CYQ

How To Make Money From Semiconductor Production

Additional evidence of EUV blank defects first seen by wafer printing

The Power of [Taiwan]

SAP Gateway for Microsoft SAP AG or an SAP affiliate company. All rights reserved. I Copyright 2015 Microsoft Corporation. All rights reserved.

Grad Student Presentation Topics PHGN/CHEN/MLGN 435/535: Interdisciplinary Silicon Processing Laboratory

MARKET ANALYSIS AND KEY TRENDS FROM FD SOI PERSPECTIVE (SEPTEMBER 22, 2014)

Approaches for Implementation of Virtual Metrology and Predictive Maintenance into Existing Fab Systems

Wilma Online in a Nutshell

High tech spare parts management

SpeedLight 2D. for efficient production of printed circuit boards

INTELLIGENT DEFECT ANALYSIS, FRAMEWORK FOR INTEGRATED DATA MANAGEMENT

A Study of Haze Generation as Thin Film Materials

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

Unternehmerseminar WS 2009 / 2010

Embedding components within PCB substrates

How To Increase Areal Density For A Year

Complete ASIC & COT Solutions

Concevoir et produire des semiconducteurs en Europe: une Utopie? Let s have a look

Advanced Materials & Technologies for the Solar and Semiconductor industry. The Merger of Two Leading Technology Companies

MAKE BIG MONEY QUICKLY! Low Start Up Cost! Easy To Operate Business! UNLIMITED INCOME POTENTIAL!

3D NAND Technology Implications to Enterprise Storage Applications

Think Veranstaltung PG Tägerwilen & Gottlieben

Rapid Prototyping and Development of Microfluidic and BioMEMS Devices

DualBeam Solutions for Electrical Nanoprobing

Yield Is Everyone s s Issue. John Kibarian CEO, President and Founder PDF Solutions

EUV Source Technology: Challenges and Status

China s impact on the semiconductor industry: 2015 update

STARTUP NATION: Israel s Surprising Economic Success In The Face Of Adversity (And What It Means For SC)

to realize innovative electronic products 2 June 13, 2013 Jan Eite Bullema 3D Printing to realize innovative electronic products

Faszination Licht. Entwicklungstrends im LED Packaging. Dr. Rafael Jordan Business Development Team. Dr. Rafael Jordan, Business Development Team

ASML EUV Program. Jos Benschop Vice President System Engineering & Research. <file name> <version 00> <author> / Slide 1

How To Make A Profit From Semiconductors

Wafer Placement Repeatibility and Robot Speed Improvements for Bonded Wafer Pairs Used in 3D Integration

Chapter 01. The Financial Planning Process. Chapter 1 Learning Objectives. Personal Finance Basics and the Time Value of Money

Technical document. Group 3 Mate Tomin Pieter van Ede Raymond Weijermars Daniel Faustino Stefan Hospes

What is optical lithography? The optical system Production process Future and limits of optical lithography References. Optical lithography

Photomask SBU: 65nm Dry Etch has Arrived! Michael D. Archuletta Dr. Chris Constantine Dr. Dave Johnson

European Policies Affecting the Supply Chain for IoT. Andreas Wild Executive Director

Procedure for Equipment Calibration and Maintenance

TSMC s Business Continuity Management (BCM) Introduction

billion paid to private sector workers during Focus on Meeting and Convention Segment. The convention and

Developments in 900 MHz wireless connectivity systems. Guido Dolmans Holst Centre / Imec-NL

This page is a hidden page. To keep from printing this page, uncheck the checkbox for printing invisible pages in the printing dialog box.

Chapter 7-1. Definition of ALD

Medium Term Management Plan Next 100 Transform to Grow

Techniques for removal of contamination from EUVL mask without surface damage

How 4K UHDTV, 3G/1080p and 1080i Will Shape the Future of Sports Television Production How the production formats of today will migrate to the future

Introduction to M2M Technologies What Wireless or Wired Option is Right For Your Company or Products

Comparing Digital and Analogue X-ray Inspection for BGA, Flip Chip and CSP Analysis

History and Future of Hitachi s Plasma Etching System

Explore 2: Gathering Momentum

Introduction to Digital System Design

Samsung Joins ASML s Customer Co-Investment Program for Innovation, Completing the Program

Volumes. Goal: Drive optical to high volumes and low costs

Powerful ways to have an impact on employee engagement

1.Introduction. Introduction. Most of slides come from Semiconductor Manufacturing Technology by Michael Quirk and Julian Serda.

Wafer Level Testing Challenges for Flip Chip and Wafer Level Packages

CHAPTER 9. DEVELOPING IT SY STEM S Bringing IT System s to Life

Intel s Revolutionary 22 nm Transistor Technology

VLSI Fabrication Process

Samsung emcp. WLI DDP Package. Samsung Multi-Chip Packages can help reduce the time to market for handheld devices BROCHURE

Lecture 30: Cleanroom design and contamination control

Nikon Mini Steppers. For MEMS, LEDs, and More. Nikon Mini Steppers

Occupation Cluster: Manufacturing Technician Function or Job Duty: A Establish Internal/External Customer Needs

Transcription:

Semi CNSE open day, Jun 2013 Menachem Shoval Metro450

Business environment Why changing the wafer size? 450mm: IC community status and schedule The equipment vendors dilemma Metrology industry the Israeli example Metro450 consortium Boundaries: Focusing on the platform Metro450 metrology challenges and Goal Consortium plan: 5 work packages Options for collaboration between Metro450 and others Summary Wafers Metrology Equipment = Measurement and Inspection Tools for Lithography, Thin Film and Defect Inspection, Used on the Production Floor 2

Business environment Why change the wafer size? 450mm: IC community status and schedule The equipment vendors dilemma Metrology industry the Israeli example Metro450 consortium Boundaries: Focusing on the platform Metro450 metrology challenges and Goal Consortium plan: 5 work packages Summary 3

WW GDP (Gross Domestic Products) WW economy is struggling Although ups and downs, the semiconductor Industry continue growing

Market in Billions of Dollars Another look at the Semiconductor Market

Market in Billions of Dollars Another look at the Semiconductor Market ~ $350B market Exponential growth Ongoing technology improvements Need huge investments

Business environment Why change the wafer size? 450mm: IC community status and schedule The equipment vendors dilemma Metrology industry the Israeli example Metro450 consortium Boundaries: Focusing on the platform Metro450 metrology challenges and Goal Consortium plan: 5 work packages Summary 7

Why changing the wafer size? Component prices are trending down Manufacturing cost is trending up For how long can the silicon cow can be milked? As long as normalized die cost is trending down Increasing wafer size will enable it Daniel George MIT, 2005

It had happened before ITRS 2005 Gardner 2011

TSMC plan the first 450mm pilot line in 2017 Samsung invested in ASML 450mm EUV Intel Continue building its 450mm FAB in Portland, G450C, the 450mm consortium, continue in full gear in developing process modules ITRS 450mm Project is running G450C

Business environment Why change the wafer size? 450mm: IC community status and schedule The equipment vendors dilemma Metrology industry the Israeli example Metro450 consortium Boundaries: Focusing on the platform Metro450 metrology challenges and Goal Consortium plan: 5 work packages Summary 12

The Equipment vendors are expected to carry most of the development budget themselves Only limited orders for preliminary /one of a kind tools needed for 450mm process development have been issued For small and medium companies investing 6 years ahead without holding actual orders may be beyond their capability How can this gap be closed? Collaborating through consortia and using public/government money is one way to stay relevant The Metro450 consortium, now running in Israel is a good example

Business environment Why change the wafer size? 450mm: IC community status and schedule The equipment vendors dilemma Metrology industry the Israeli example Metro450 consortium Boundaries: Focusing on the platform Metro450 metrology challenges and Goal Consortium plan: 5 work packages Summary 14

Equipment sales in B$ 40 35 30 25 20 15 10 5 0 Wafer Fab Equipment = 35B$ Process Control Equipment = 3.5B$ * Not including 1) Mask Inspection/correction 2) Back End (AMAT, Pixer/Zeiss, Orbotech) 15

Equipment sales in B$ 40 35 30 25 20 15 10 5 0 Semiconductors $350B Fab Equipment $35B Metro Tools $3.5B Israel 1.3B Wafer Fab Equipment = 35B$ Process Control Equipment = 3.5B$ * Not including 1) Mask Inspection/correction 2) Back End (AMAT, Pixer/Zeiss, Orbotech) 16

Equipment sales in B$ 40 35 30 25 20 15 10 5 0 Semiconductors $350B Fab Equipment $35B Metro Tools $3.5B Israel 1.3B Wafer Fab Equipment = 35B$ Process Control Equipment = 3.5B$ * Not including 1) Mask Inspection/correction 2) Back End (AMAT, Pixer/Zeiss, Orbotech) 17

18

Business environment Why change the wafer size? 450mm: IC community status and schedule The equipment vendors dilemma Metrology industry the Israeli example Metro450 consortium Boundaries: Focusing on the platform Metro450 metrology challenges and Goal Consortium plan: 5 work packages Summary 19

5 Member companies: AMIL, Nova, Jordan Valley, Nanomotion and Intel. AMIL - Metrology division of AMAT: CD SEM, DR SEM, Defect Inspection Nova Integrated and stand alone: TF Metro, OCD technology Jordan Valley- X-ray based metrology: TF and Back End Nanomotion: Advance stage movement technology using Piezo electric elements Intel: Advanced parallel computing; Fab/User point of view 2 Observer companies: Mellanox, CI-Semi Mellanox: Fast inter-sever communication / Huge data transfer CI-Semi: Integrated temperature measurement techniques 4 Universities, 14 researchers from: The Technion, BGU, TAU, Haifa University Israeli Chief Scientist Office budget (~ 66%)

1. Focus on Metro tool platform, not on the core IP 2. Be ready to meet 2017 design rules (<10nm) 3. Focus on High volium Manufacturing (HVM) readiness on 2017 4. We develop technologies relevant for 450mm tools. We do not build toos The name of the game is TPT = 2.5X faster to meet CoO expectations 21

3 Year Goal: Develop and demonstrate the generic technologies needed for the best 450mm metrology platform The differences: The challenges: 300mm 450mm Dies out X 1.0 X 2.5 Stage accuracy 1.0 u 0.1 u Data Processing 1GB/S 100GB/s Backside Contamination 1 PWP /500nm 1 PWP/50nm Reaction response time 12 hours 1 hour 22

WP1: Wafer Handling / Chucking / Stepping WP 2: Sampling Optimization WP3: Wafer Damage and Contamination WP4: 450mm Standard Calibration Wafer WP5: Fast Data Collection and Processing 23

Business environment Why change the wafer size? 450mm: IC community status and schedule The equipment vendors dilemma Metrology industry the Israeli example Metro450 consortium Boundaries: Focusing on the platform Metro450 metrology challenges and Goal Consortium plan: 5 work packages Options for collaboration between Metro450 and others Summary 24

Collaborating with CNSE/ G450 An umbrella contract between OCS/Matimop and CNSE was signed First version of collaboration plan between CNSE/G450 and Metro450 had been agreed. Actual work started OCS/ISRD agreement with Eniac Enabling Metro450 companies to also work with Eniac More opportunities in Europe: IMEC, Fraunhoffer, Leti, TNO ASML, Zeiss, FP7, EEMI, Eniac..

Damage data; 450 mm wafers WP3 : damage /contamination prevention Damage precursor modeling Capability; Proof of Concept HVM Worthiness Metrology Performance Continual Improvement (EPM) 300+- 450 mm prototype fabrication WP4 : Standard Metro Calibration Wafer Design/Specs/ Usage model Metro450C Confidential 6/17/2013 26

Moving to a 450mm wafer is not an option, it is a requirement for the semiconductor industry. First 450mm Fab will run in the second half of this decade Converting Metrology tools to 450mm is not trivial, as X2.5 dies out @ >10nm design rules are expected Equipment vendors in general and metrology vendors specifically, need to carry most of the development burden Collaboration work, consortia and public / government money can help being prepared on time 27

28