Co.GE.PRI S.r.l General Building Enterprise www.cogepri.it



Similar documents
Proposed General Plan Update Goals, Policies, and Implementation Actions

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT

SECTION INLETS INLET LOCATIONS

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

Aquatera 2015/16 Business Plan Highlights

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Application for Approval to Construct or Upgrade and Operate a Storage Facility October 2015 CSB CSB13001

ITALY SYMPOSIUM 2007 PROGRAM

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Basements and Deep Building Construction Policy 2014

La Porta delle Meraviglie

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

MISSION AND ACTIVITY FIELDS

INDONESIA - LAW ON WATER RESOURCES,

RESUME Lee A. Knuppel, P.E.

REGISTERED OFFICE AND HEADQUARTER Via Melchiorre Gioia, Milano Tel: r.a. Fax:

Company Profile.

Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction

REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE

Storm water strategy of Turku City Citywater Storm water expert meeting Turku

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

IH-635 MANAGED LANES PROJECT, SEG. 3.2

REAL TIME SURVEILLANCE STATION OF DRINKING WATER QUALITY IN THE PROVINCE OF TERAMO (ABRUZZO REGION - ITALY)

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

Bond Release Process for New Subdivision Developments in Fairfax County

SECTION SITE PREPARATION

BONATTI: COMPANY OVERVIEW

Vehicle Tracking Control (VTC)

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

Tunnelling & Underground. Specialists

Role of the Environmental Management Representative (EMR)

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Emerging Technologies in Wastewater Collection Systems

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Floodplain Development Land Use Review

A new approach to rail asset management.

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

ISIC Rev.4 draft, Section E. Water supply; sewerage; waste management and remediation activities

SUBDIVISION AND DEVELOPMENT REGULATION

FLOOD PLAIN DESIGNATION AND PROTECTION

Facility Management according to Condotte Immobiliare

City of Valdosta Land Development Regulations. Table of Contents

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

SECTION XI OPINION OF PROBABLE COST

Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea.

16. Storm water drainage

CREATE. ENHANCE. SUSTAIN.

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Jackson Gulch Outlet Canal Rehabilitation Project

Granger Bay Boulevard and Green Point Roundabout

EXPENDITURES SUMMARY INCREASE BUDGET BUDGET (DECREASE) Over 2015 $ $ $

Town of Ware Board of Health. Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

HOMEOWNER S GUIDE. to LANDSLIDES. and MITIGATION RECOGNITION, PREVENTION, CONTROL, Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J.

Environmental Management Plan

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Construction Specification for Sewer Bypass Flow Pumping

Type of Sewer Systems. Solomon Seyoum

EUROPASS DIPLOMA SUPPLEMENT

The Boscastle Flood 2004

CITY UTILITIES DESIGN STANDARDS MANUAL

OVERVIEW PROJECT SUMMARY

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

THE SUSTAINABLE WASTE MANAGEMENT IN THE CITY OF RIO DE JANEIRO

Asbestos Storage Facility Plan Examples

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Trenching and Excavation Safety

Surface Transportation Program (STP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

Life cycle energy analysis of water use system in Ara river watershed

EXHIBIT A Accessible Truck Routes Map

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY SMART CITY CIP 5 YEAR SUMMARY BY VISION...

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

CHAPTER 17. Sewers and Sewage

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

Toma Danila Dragos. National Institute for Earth Physics Romania

Transcription:

ITALIA Tel. +39 0871.84114 +39 0871.84518 Fax +39 0871.801517 +39 331.6188375 +39 339.8513362 E-mail info@cogepri.it info@pec.cogepri.it Co.GE.PRI S.r.l General Building Enterprise www.cogepri.it COGEPRI Srl

ITALIA Tel.+39 0871.84114 +39 0871.84518 Fax +39 0871.801517 +39 331.6188375 +39 339.8513362 Sito internet: www.cogepri.it COMPANY The Company CO.GE.PRI S.r.l. is a General Building Enterprise which operates mainly in the field of public works such as: realization of plants for the waste treatment; special foundations; consolidation of land and special works in the subsoil; road construction and paving; hydraulic works as: aqueducts, sewers, irrigation systems, pipelines, special works for the construction of lifting plants, water treatment, water purification; earthmoving; demolition of earthworks; waterproofing of soils; drilling, wells and plants. It carries out all the activities related to the execution of the contract and directly performs the workings of greater technical content.the Company has been carrying out its activities since 1957, when it was an individual enterprise managed by Mr. Primavera Pietrino; later in 1997 it became a limited liability company with the engineer Primavera Paolo s entry into the administration. Its legal and administrative head office is situated in Via F. M. De Benedictis, 4 - Guardiagrele (CH) in a new prefab warehouse consisting of a storage shed on the ground floor of about 1,000 sm., and the offices on the first floor with a total surface of about sm. 700.The Company has got qualified professionals with great experience in relevant sectors. Within the Company organization there is a strictly administrative sector which carries out all the duties related to it, such as estimates, supplies, personnel management, administrative accounting, wages and contributions, budgets (with the support of an external accounting firm), forms for participation in tenders, forms for the maintenance and application of the quality management system. The Enterprise has got a staff of technicians who plan, organize activities in the yards, control production, carry out checks on materials and on the correct execution of works, make topographic surveys and stakeouts and cooperate in the office with the technical administration in the processing of accounting for the SAL, in the return of the reliefs and measures taken in the yard. The technical administration also provides all the documents concerning security on the yards in accordance with the Law 81/2008, it monitors and checks productivity in the yards directly referring to the Direction, works out technical-accounting documents for the drawing of improvement proposals and carries out every activity concerning the technical aspects of the yard. 2

ITALIA Tel.+39 0871.84114 +39 0871.84518 Fax +39 0871.801517 +39 331.6188375 +39 339.8513362 Sito internet: www.cogepri.it OBJECTIVES In the realization of the works, the Company aims mostly to obtain the customer s satisfaction. So the company aims to an organizational model which puts the customer at the centre of attention and tries to focus his needs and expectations so that they could be fulfilled in the best way, being sure that the customer s satisfaction represents the company success. With such purpose the Direction will ensure the achievement of this objective through: the constant attention to the customer s satisfaction with prompt measurement of his approval, the careful control of the phases in the provision of services, the care for the professional growth of all the company staff, the full involvement of the company personnel to pursue improvement and customers satisfaction, by supporting individual and collective creativeness and competence, the constant improvement of the management system not only as regards the quality of products and services, but also connected to any component of the organization: human and technical resources, the development of new services which can satisfy in a better way the customer s needs, the effectiveness and efficiency of the company management system, also through a proper control aiming to reduce costs related to products and processes, a commercial development aiming to the search of increasing market shares and the subsequent greater presence on the different market areas, by taking care of the company image, too. 3

ITALIA Tel.+39 0871.84114 +39 0871.84518 Fax +39 0871.801517 +39 331.6188375 +39 339.8513362 Sito internet: www.cogepri.it TECHNICAL REQUIREMENTS > The Company has got the qualification requirements prescribed by the art. 40 of the Law 12.04.2006, no. 163, as well as by the Titles I and II of the Regulations for the qualification of the building companies, specifically : the name of the SOA duly authorized which issued the certificate is DELO SOVIM S.P.A., the certificate has been issued on 07.10.2008 and the categories of qualification and the relative classifications are those shown in the table below: CATEGORY CLASSIFICATION Equal to Euro OG1 Civil and industrial buildings III 1.032.913,00 OG3 Roads, motorways, bridges.. V 5.164.569,00 OG6 Aqueducts, gas pipelines IV 2.582.284,00 OG8 - River works, works of defense and hydraulic III 1.032.913,00 OG11 Technological implants I 258.228,00 OG12 - works and implants for environmental III 1.032.913,00 remediation and protection OS21 Special structural works IV 2.582.284,00 In addition to the qualification categories listed above, the Company has got the qualification for Performance and Construction up to the V classification; > The Company has got the certificate UNI EN ISO 9001:2008 of the quality system under art. 40 paragraph 3 lett. a of the Law 12.04.2006, no. 163, and the data included in the SOA certificate have not been modified to prevent or limit the participation to invitations to tender. > The Company has been registered with the national Environmental Managers Albo within the category 2 class F from 28/07/2010 to 28/07/2015. 4

6 CO.GE.PRI. S.R.L. Tel. +39 0871.84114 +39 0871.84518 Fax +39 0871.801517 +39. 331.6188375 +39 339.8513362 Sito internet: www.cogepri.it WORKS The Company works in both public and private sectors and it mainly deals with: Construction of gas pipelines Road works drilling and reinforcement works Urbanization works Civil and industrial works Construction of water and sewage pipelines Lifting plans Landfills

6 CO.GE.PRI. S.R.L. Tel. +39 0871.84114 +39 0871.84518 Fax +39 0871.801517 +39. 331.6188375 +39 339.8513362 Sito internet: www.cogepri.it CONSTRUCTION OF GAS PIPELINES The CO.GE.RI. S.R.L. in its pluriannual activity has carried out the construction of pipelines to transport methane in different municipalities of the region, particularly it carried out the following works: - Works for extending the gas-methane network in locality Paolini, Quercia dei Corvi e San Fino. C/to Municipality of San Vito Chietino (CH).

6 CO.GE.PRI. S.R.L. Tel. +39 0871.84114 +39 0871.84518 Fax +39 0871.801517 +39. 331.6188375 +39 339.8513362 Sito internet: www.cogepri.it - Implant of gas distribution, realization of the media pressure connection network - Regional Law 84/2011 - Municipality of Bomba (CH). Completin of the methan gas supply in locality Fico San Martino and in the crafts area - Lama de Peligni (CH)

6 CO.GE.PRI. S.R.L. Tel. +39 0871.84114 +39 0871.84518 Fax +39 0871.801517 +39. 331.6188375 +39 339.8513362 Sito internet: www.cogepri.it - Works for the construction of the methane gas distribution system and connections for users in Canistro Inferiore and Canistro Superiore. Municipality of Canistro (AQ). - Works for the methane gas distribution system in the municipality of Capestrano (AQ)

Sito internet: www.cogepri.it ROAD WORKS Among the most important works in progress we can mention the following: > Works for the implementation of safety of the road axis Pretoro - Passolanciano. Pretoro - CH (Amount of work 2,930,000 ) work in progress - The works consist of a comprehensive set of interventions for the accommodation, adjustment and implementation of safety of the whole road axis. These works aim to the functional upgrading of the road and to the implementation of safety on the road infrastructure in relation to the traffic flo 10

CO.GE.PRI. S.R.L. I Sito internet: www.cogepri.it indirizzo E-mail info@cogepri.it Works for the construction of the route connecting the Regional Harbor of Ortona with the a14 (CH) 1st lotto. (Amount of work 7,850,000 ) work in progressthe artery to be constructed has the function to link the motorway exit in Ortona with the S.S. n. 16 Adriatica near the north entrance of the gallery Marrucina, in order to avoid the transit along a stretch of road of the ex S.S. 538 Marrucina which has become an urban road with several houses, commercial and crafts / industrial activities. 11

I Sito internet: www.cogepri.it indirizzo E-mail info@cogepri.it 12

I Sito internet: www.cogepri.it indirizzo E-mail info@cogepri.it Works on the ex S.S. 602. Realization of a link road with the motorway junction Chieti - Pescara in locality Dragonara. (Amount of work 4,815,761.53) work in progress This executive project on the S.S. 602 Di Forca di Penne, in the municipality of Cepagatti, concerns the realization of a link road between the state road and the motorway junction Chieti- Pescara in locality Dragonara. The layout of the project has a lenght of about 1755 m. (with the exception of the branches in the roundabout at the junction ramps on the Asse attrezzato). An intersection of rotary type is the initial characteristic element and in the project it is the most suitable choice to regularize and secure the existing junction, as well as to rationalize the traffic mobility. The final stretch of the route is also marked by a viaduct over the River Pescara, 173.45 m long, and by a roundabout which allows the sorting of traffic in "all directions". 13

I Sito internet: www.cogepri.it indirizzo E-mail info@cogepri.it 14

I Sito internet: www.cogepri.it indirizzo E-mail info@cogepri.it 15

I Sito internet: www.cogepri.it indirizzo E-mail info@cogepri.it Works of plano-altimetric adjustment between Km. 87+200 (crossroad of Corfinio) and 91+00 (new junction Roccacasale) in order to eliminate narrows and dangerous curves. (Amount of work 3,429,885.35 ) work in progress - This project is part of the works of improvement and implementation of safety of the main communication routes in Abruzzo, and deals with works of plano-altimetric adjustment of the S.S. n. 17 in the Appennino Abruzzese, road trunk from Navelli to Sulmona, between km 87+200 (crossroad of Corfinio) and km91+000 (Junction of Roccacasale). The main aspects are the widening of the roadway, the rectification and the implementation of safety of some curves, and the reconstruction of the junctions of Corfinio and Roccacasale, besides other smaller interventions of water regulation and implementation of safety of several secondary entries to houses and fields, through the widening of the roadway with the creation of an acceleration and deceleration lane. 16

I Sito internet: www.cogepri.it indirizzo E-mail info@cogepri.it 17

PERFORAZIONI ED OPERE DI CONSOLIDAMENTO DRILLING AND REINFORCEMENT WORKS > Works for the safeguard and consolidation of landslide risk areas in the municipality of Lanciano. (Amount of work 4,997,283.71 ) work in progress In view of the complex hydrogeological situation and the great size of the territory, different types of intervention have been adopted, both to mitigate the risk conditions now existing, and in order to restore security for the most critical sides. The choice of the interventions to be realized has been done adopting the following main project lines: The safeguard of the risk areas and the consolidation of the landslide risk areas. These interventions aim to avoid dangerous situations and damages like those which occurred in 2003, and thus they consist mostly in the realization of an orderly system of rainwater collection and regulation of the water flow up to the ultimate sinks. Such interventions have been planned in order to guard the existing buildings and the infrastructures situated in the areas at risk or immediately adjacent. On the other hand the consolidation works are intended to regulate the hydrogeological structure of the subsoil and to give the embankments and slopes conditions of safe stability. They are primarily drainage interventions in the deep layers, aiming to ensure the regular outflow of the groundwater, which in the past was made possible through the numerous springs and fountains at the foot of the slopes, at present mostly lost. In this context we can also include the interventions of renaturisation of the ditches and valleys that once modeled the various hills, aiming to encourage - even with the adoption of specific legal instruments - the establishment of specific areas intended for reforestation. 18

19

URBANIZATION WORKS > Infrastructural works AREA 21 - ROIO POGGIO - L AQUILA - 2009 - PROGETTO C.A.S.E. (EARTHQUAKE L AQUILA) (Amount of work 1,621,623.84 ) The intervention planned for locality Roio Poggio, in the municipality of L'Aquila, forms part of the provisions of the Decree Law no. 39 of 28 April 2009, as amended, and it consists in the construction of housing units intended for lasting use, as well as in the related infrastructure and services works. In particular, the company has focused on the construction of the underground utilities such as: - Realization of the aqueduct;- Realization of the white water network; - Realization of the sewage network; - Realization of the electric line for public lighting; - Realization of electrical installations for garages; - Realization of industrial floor screeds in the garages of the housing units; - Construction of roads, sidewalks, parking areas; - Accommodation of green areas. 20

CO.GE.PRI. S.R.L. 21

22

LIFTING PLANTS Realization of drainage works of the groundwater c/to the yard of Francavilla Al Mare (Ch) LANDFILLS Among the completed works, the CO.GE.PRI. LTD has also carried out works and installations for environmental remediation and protection, concerning the execution of works, punctual or at network, required to realize environmental remediation and protection. Among these works there are the following: > "Adjustment works at the MSW plant in compliance with the current regulations on safety (Law 626/94)."Contracting authority: Consortium C.I.V.E.T.A. (Vasto - CH) - work done > "Works for the widening of the MSW landfill 1st category in the municipality of Celano (AQ). "Contracting authority: Consortium of Environmental Health Marsicana ACIAM works done. Contracting authority: Municipality of Scafa - works done 23