SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

Similar documents
General Fire Code Requirements Within Commercial Tenant Spaces

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Errata has been identified as follows:

Town of Bellingham Fire Department

Certification: Building Plans Examiner. Exam ID: B3

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

OCFRD TENT STANDARD This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems.

CANTON FIRE DEPARTMENT

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Minnesota State Department of Public Safety

Name Of Occupancy Date. Yes No Describe

Building Codes Update: The 2009 International Fire Code and the Apartment Industry

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

CHILD CARE CENTER INFORMATION SHEET

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

PLAN REVIEW GUIDE FOR FIRE ALARM

Walking and Working Surface Checklist:

CHAPTER 9 FIRE PROTECTION SYSTEMS

Commercial Fire Inspections

* Any required illumination shall be arranged so that the failure of any single lighting unit shall not leave any area in darkness.

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.

General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission

Requirements for Hydrogen Storage and Use

The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services

Fire Pump Plan Review March 2010

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Bold items are particular to the City of Euless

MINNESOTA STATE DEPARTMENT OF PUBLIC SAFETY

CAL FIRE/San Luis Obispo County Fire Fire Prevention Bureau

Building Permit Application

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

Overview of Hotel Fire Safety Requirements

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

Spray Booth Guideline

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

Winnipeg Fire Department Fire Prevention Branch

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

Ethanol Vehicle and Infrastructure Codes and Standards Citations

City of Riverside Building & Safety Division Phone: (951)

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection. OSHA Office of Training and Education 1

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

How To Make A House Safe

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors.

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02

city of edmonds development information

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

OREGON FIRE CODE Interpretations and Technical Advisories

Medicine Hat Fire Department. Special Event Requirements. medicinehat.ca/fire. August 2012

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS

Stationary Storage Battery Systems

Area of Rescue Assistance Communication System ADA Code Applicable excerpts:

Solar Panel Installations

FIRE SAFETY INSPECTION REPORT

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Los Angeles Fire Department Requirement No. 96 SOLAR PHOTOVOLTAIC SYSTEM

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

Healthcare Engineering. Code Summary Report

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

The Fire Safety Manager at (FAX ) can answer any questions or provide a set of fire code information.

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

Project Building Permit No. One complete set of Record or as-built drawings (electronic) One complete set of Record or as-built drawings (hard copy)

Current as of 11/10/08 1 of 1

PART II: New Construction Inspections and Acceptance Testing Procedures

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

2007 ICC FINAL ACTION AGENDA

MINNESOTA HEALTH CARE ENGINEERS IN ASSISTED LIVING FACILITIES

Monthly Inspection Checklists

An inventory of hazardous materials used in your workplace will prove useful.

HealthandSafetyOntario.ca. Introduction. Storage Containers. Storing Flammable Liquids

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

Development Services City of Lawrence, KS

Fire Safety Requirements for Child Care Centre

FIRE AND SAFETY REGULATIONS

2010 FLORIDA BUILDNG CODE, FIRE AND LIFE SAFETY i

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata Developer Premier Mica Mining And Manufacturing Company

Automatic Fire Sprinkler Submittal Requirements

Fire Alarm Systems Requirements by Occupancy Type

2014 Limited Plan Submittal Checklist

A. Fire Protection Plan. B. Access and Parking

City of Oviedo Commercial Shell Building Permit Application Guidelines

ENVIRONMENT, SAFETY, HEALTH, AND QUALITY DIVISION

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more

How To Build A Basement House

Transcription:

July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST NEW COMMERCIAL BUILDING Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments; I-Incomplete; D-Denied This Checklist outlines general requirements. Information contained herein applies to typical instances and may not address all circumstances. FILE REVIEW: 1. Review Permits Plus, Office Link, and the project folder for any previous fire department conditions. 2. Permit fees entered in Permits Plus. 3 rd or greater checks require an hourly fee for the review 3. Phase 1 Environmental Site Assessment approved. 4. Specific Conditions of Planning Permit apply. 5. Approved Alternate Materials or Methods of Construction apply. COVER SHEET: (THE FOLLOWING INFORMATION IS SHOWN AND IS ACCURATE) 6. Project Address 7. Owner contact information 8. Designer s contact information 9. Applicable Codes 10. Occupancy Type 11. Construction Type 12. Building Area COVER SHEET: (THE FOLLOWING INFORMATION IS LISTED AS DEFERRED SUBMITTAL) 13. Automatic sprinkler system to be provided per reference standard Page 1 of 7

14. Automatic fire alarm system to be provided per reference standard 15. Fire pump and/or standpipe system to be provided per reference standard 16. Special Extinguishing System to be provided per reference standard 17. Emergency Evacuation plans to be provided in E, B, E, H, I R and some M s (CFC 404) 18. Vegetation Management Plan to be provided (building is in WUI Fire Area) 19. In-Building Public Radio System to be provided if building >25,000 sf or >3 stories (SRCC 18-44: 511) 20. Hazardous Materials to be used or stored as part of this project 21. High Piled Storage to be part of this project SITE PLAN: 22. Drawn to scale and/or dimensions of Fire Service features noted 23. Apparatus access to within 150 feet hose-pull distance of all first floor exterior walls (CFC 503.3.1.1) 24. Apparatus access vertical clearance minimum 13 feet 6 inches (CFC 503.2.1) 25. Apparatus access minimum 20 feet wide for buildings to 30 feet tall (CFC 503.2.1) 26. Two apparatus access roads provided for buildings over 30 feet tall (SRCC 18-44: D104.1) 27. Two apparatus access roads provided for buildings over 62,000 sf (CFC D104.2) 28. Two apparatus access roads provided for more than 50 dwelling units (CFC D106.1) 29. Apparatus access minimum 26 feet wide for buildings over 30 feet tall (CFC D105.2) 30. Apparatus access 15 to 30 feet from building for buildings over 30 feet tall (CFC D105.3) 31. Apparatus access paved (CFC 503.2.3) 32. Apparatus turn-around per COSR Standard 203F is provided (CFC 503.2.5) 33. Apparatus access bridge or elevated surface per AASHTO Standards (SRCC 18-44: 503.2.6) 34. Apparatus access gates have Knox lock or Knox override if powered 35. Apparatus access gates 20 feet into site from public roadway 36. Fire lane curb markings and/or signage provided (FPB Standard ) 37. Site Map with building addresses provided at multi-building site entrances (FPB Standard ) 38. Fire hydrants every 300 ft on public roads and apparatus access roads (SRCC 18-44: 508.5.1) Page 2 of 7

39. Fire hydrants at least 40 feet from building (NFPA 24) 40. Sprinkler system FDC on street address side of building 41. Sprinkler system FDC within 50 ft of fire hydrant (SRCC 18-44.C105.1) 42. Guard posts provided where hydrants, tanks, generators, gas meters subject to vehicle impact (CFC 508.6) 43. All exterior doors have paved access walkway to required apparatus access road (CFC 504.1) 44. Twenty foot wide pedestrian access from main exit to public way in A and E Occupancies 45. Level ladder staging area provided at all emergency egress windows (FPB Standard ) 46. Fire Department key box provided at main building or site entrance (CFC 506) FLOOR PLANS: 47. Allowable height and area shall be per CBC Section 503 and Table 503 48. Mixed uses shall be separated as required by CBC Section 508 49. Exterior wall fire resistiveness shall be per CBC Section 704 50. Openings in rated exterior walls shall have protections as specified in CBC Section 715 FLOOR & ROOF: 51. Verify roof rating and surface comply with CBC Chapter 15 52. TJI/Composite Wood Joists. Composite wood joists in sprinklered buildings. Maximum 16 in depth or comply with one of the exceptions (drywall on underside, sprinkler within, fill joists with non-combustible insulation). 53. TJI/Composite Wood Joists. Open joists require fire stopping of channels into 300 ft/2 areas. Closes joists (ceiling on the underside) require fire-stopping into 160 ft/3 areas. 54. Draft stops shall be installed in attics per CBC 717.4. See exceptions for fire sprinklered attics 55. Skylights, if provided, are not installed within the area, based upon distance to property line, to be protected 56. Smoke and heat vents and draft curtains shall be provided, when required, by CBC Section 910. 57. Roof access shall be provided and new buildings four or more stories shall provide a stairway (CFC 504) GENERAL REQUIREMENTS, EXITING, DOOR SCHEDULE: 58. Two exits if >50 occupants or above/below ground floor (CFC 1015.1, CFC 1019) 59. Doors swing in direction of exit travel if serving >50 occupants (CFC 1008.1.2) Page 3 of 7

60. Panic hardware on doors of A, E occupancies with >50 occupants (CFC 1008.1.9) 61. No knowledge, single-action hardware on all exit doors, including gates (CFC 1008.1.8.3) 62. Manually operated flush or bolt locks are not permitted on egress doors (CFC 1008.1.8.4) 63. The number of doors for each room or area complies with CFC 1015, Table 1015.1, and 1019 64. Exits do not pass through laboratories, store rooms, kitchens, hazardous use areas (CFC 1014.2) 65. Exits separated min 1/3 diagonal of space if sprinklered or 1/2 diagonal if not sprinklered (CFC 1015.2) 66. Common Path of Egress Travel Distance per CFC 1014.3 67. Exit Access Travel Distance per CFC Table 1016.1 68. Egress Widths per CFC Table 1005.1 69. Occupant load calculations are provided for the rooms and assembly areas, and occupant load signs are processed for assembly areas (CFC 1004). 70. Maximum Occupant Load signage if >50 occupants in A Occupancies (CFC 1004.3) 71. Illuminated exit signs clearly delineate path of egress all spaces >50 occupants. Signs at directional changes in hallways, visible from any direction of egress travel and where necessary. (CFC 1011.1) 72. Exit signs are flush or perpendicular to mounting surface so they are in the field of view 73. Signage detail is provided for the landing areas of vertical stairways more than 3 stories. Signage states location East, West, etc., terminus-roof access or not, floor number and floors served by stairs. Signs to be 5 foot above floor landing (CFC 1020.1.6) 74. Type 1 hood with 1-hour exhaust duct installed at all commercial cooking appliances (CFC 609) 75. One 2A:10B-C fire extinguisher is provided per 3,000 sf, max 75 ft travel distance 76. Type, size, mounting height, and travel distance are appropriate for the hazard and are detailed on the plans, CFC 906. 77. Signage at HVAC, sprinkler, electrical, and fire alarm control location required (CFC 510) 78. SFM regulated occupancies: >2 stories or without straight-run stairs have at least one elevator sized for medical gurney - min 80 in x 54 in cab interior (CFC 807) INTERIOR ELEVATIONS AND FINISH SCHEDULE: 79. Wall and Ceiling finish material Classes per CFC Table 803.3 80. SFM regulated occupancies: decorative materials treated for flame spread and smoke production Page 4 of 7

EXTERIOR ELEVATIONS: 81. 12 inch illuminated address characters on street elevation (FPB Standard ) 82. Doors swing in direction of exit travel if serving >50 occupants (CFC 1008.1.2) MECHANICAL PLANS: 83. Air-handling units >2,000 cfm have smoke detector in supply duct for automatic shutdown 84. Fire Dampers are shown and detailed. Activation method is specified and listing is for passive or dynamic. 85. If handling hazardous materials, provide 1 cfm per ft/2. ELECTRICAL PLANS: 86. Path of egress from all spaces to the public way is illuminated to 1 foot candle (CFC 1006.2) 87. Egress illumination has 90 minute backup power per CFC 1006.3 88. Emergency alarm required in accordance with CFC 908 89. If to be equipped with a fire alarm system, reference the Fire Alarm Power Supply Standard specifically to address the need for a separate disconnect, locking of the disconnect, color and signage. 90. If to be equipped with a fire pump, reference the Fire Pump Standard to ensure the special electrical conductor protections are provided at the time of building construction 91. Provision for elevator shunt-trip, if required, are noted on the electrical drawings 92. If commercial cooking equipment, provisions are made for shunt-trip on appliance power circuit ALTERNATE OR CLEAN AGENT GAS: 93. Room use or type of hazard and/or process is detailed on the plans. 94. Equipment and devices data sheets, voltage and battery calculations are provided. 95. Concentration and discharge calculations are provided. USE AND PROCESS SPECIFICS: Group R Occupancies 96. Smoke detectors are located in sleeping rooms, hallway and adjacent room if vaulted ceiling, also at the top of stairs and lower level, 907.3.2. Assembly Use 97. Occupant loads certificates for assembly rooms are created, 1004.3. Page 5 of 7

98. Exit door hardware; panic hardware is on all exit doors except main entry, no other security bolt hardware allowed with panic hardware, 1008.1.9. 99. Data sheets for fire-resistive decorative materials are provided, 804, 806, and 807. Battery Rooms 100. Spill control method and materials are detailed, CFC 608.5. 101. When ventilation is required, calculations are provided to verify ventilation rate maintains the room atmosphere to 1 percent by volume of hydrogen or a minimum ventilation rate of 1 cfm/ft2 of floor area, 608.6.1. 102. Door signed stating room contains lead-acid batteries, energized electrical circuits, and corrosive liquids are detailed on the plans, 608.7. 103. Battery systems are seismically braced and room smoke detection is provided, 608.8 and 608.9. Fuel-Dispensing Station 104. Details for dispensing unit or island, and emergency shut-off location are provided, and tank construction is in accordance with CFC Chapter 22 and 34. Hazardous Materials 105. Hazardous Materials, CFC 27 always applies then the chapter specifics. 106. Spill control and secondary containment, CFC 2704.2, 2705.1.3, 2705.2.1.3, 2705.2.1.4, 3404.3.7.3, 3404.3.7.8.2, 3404.4.3, 3405.3.7.5.3 and 3405.3.7.5.6.3. 107. Spill control and secondary containment shall be liquid tight, i.e. compatible floor coating, 2704.2.1(1) and (2), 2704.2.2.1 (1) and (2). 108. Cryogenics, CFC 32. 109. Compressed Gases, CFC 30. 110. Flammable Combustible Liquids, CFC 34. 111. Highly Toxic and Toxic Materials, CFC 37. 112. Oxidizers, CFC 40. 113. Unstable and Water Reactive materials, CFC 43 and 44. HPM Workstations, Gas Cabinets Exhausted Enclosures, Silane Gas, and Ozone Systems 114. Complies with CFC Chapters 18, 27, and 37. High-piled Storage 115. Speculation buildings with potential to house high-pile storage but not designed for high-piled storage is requiring demarcation lines (12 ft. above floor level) and verbiage on walls ( No storage Page 6 of 7

permitted above this line by the authority of the Fire Marshal s Office. ) and letter from owner agreeing that building is not designed for nor will it be used for high-piled storage, 2304.3. 116. The 14 items in CFC 2301 are detailed or provided, 2301.1. 117. Aisle width and rack locations are on the plans, 2301.1. 118. Exterior fire access doors are on the plans, 2301.1. 119. Detection and suppression systems are provided, 2301.1. 120. Smoke removal system or heat vents or curtain boards are detailed on the plans, 2301.1. 121. Need product hazard classifications, quantities, location, etc, consult additional information in the High Pile Standard. 2301.1. LPG Tanks 122. Location on a site plan is provided, CFC 38 and NFPA 58. Consult the LPG Install Standard Medical Gases 123. Quantity, location and room construction are provided and detailed, CFC 30 and consult the Medical Gas Standard. Paint Booth, Powder Coating, Electrostatic Spray Operations 124. Manufacture data sheets for the booth and equipment are provided, CFC 15 and consult the Spray Booth Standard. 125. Construction and ventilation details for spray booths, areas or rooms are provided. Welding Operations 126. Location is detailed, signage detailed, type of gases, storage location and quantity of gases, CFC 26. Page 7 of 7