Presentation to: INFORMS Railway Applications Group CAPACITY PLANNING FOR SHARED-USE CORRIDORS

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI (608) Fax: (608)

U.S. System Summary: EMPIRE CORRIDOR

B&P Tunnel Project Scoping Report. Sample Elected Official and Key Stakeholder Correspondence. Appendix B

USA: INFRASTRUCTURES DAY

Planned Safety and Security Systems. Jon Tapping, Director of Risk Management Board Meeting: Agenda Item 4 August 4, 2015 Sacramento, CA

TxDOT Project CTR: Integration of Data Sources to Optimize Freight Transportation in Texas

PRRIA PASSENGER RAIL REFORM AND INVESTMENT ACT OF 2014 TRANSPORTATION & INFRASTRUCTURE COMMITTEE

Northern New England Intercity Rail Initiative Stakeholder Meeting October 22, 2014, 11:00 1:00 PM Pioneer Valley Planning Commission, Springfield, MA

AASHTO First Take at the New Surface Transportation Bill FIXING AMERICA S SURFACE TRANSPORTATION (FAST) ACT December 2, 2015

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs

Environmental Impact Statement for the Washington Union Station Expansion Project

Central Minnesota Freight Plan December 2012

49 CFR Part 228 Passenger Hours of Service

Monitoring Train Position to Improve Emergency Response

PURPOSE AND NEED FOR ACTION

DRAFT Alternatives Analysis

AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility

Los Angeles San Diego. Coastal Rail Corridor. San Diego Segment. Building Today. Boarding Tomorrow.

Causal Analysis of Passenger Train Accidents on Freight Rail Corridors

Florida Transportation Commission: A Meeting of the Modes

Summary. Run By the Sea 226 Jeter Street Santa Cruz, CA Phone: Web:

Wilmington to Newark Commuter Rail Improvement Project

The Gateway Program and Hudson Tunnel Project

Virginia s Approach to Intercity Passenger Rail Development

Examples of Transportation Plan Goals, Objectives and Performance Measures

FISCAL YEAR 2014 SOLICITATION FOR PROPOSALS FOR FEDERAL JOB ACCESS AND REVERSE COMMUTE AND NEW FREEDOM PROGRAM FUNDS EVALUATION CRITERIA

Preapplication for HSIPR Program OMB No

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Rail Asset Management Business Plan

DRAFT Freight Performance Measures

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

Status of Statewide Models in the United States. Framework for More Discussion

VRE SYSTEM PLAN SUMMARY

Opportunities. Railway Transportation (Engineering and Operations) Areas of Study. University of Kentucky

IDOT Chicago - St. Louis High-Speed Rail Program Management

UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK

Metrolink Positive Train Control Program May 2012

Uptown Station - A Model For the Coming Train Feeding Craze

Planning Railway Safety in Canada

Multimodal Operations. Business Plan Fiscal Year 2014

Network System Operation

National Railroad Passenger Corp. (AMTRAK) Session 1 Threats and Constraints. Continuous. - Continuous Monitoring. - Continuous Assessment

Associated Students of the University of California, Merced Resolution #14. Resolution in Support of the California High-Speed Rail Project

New Haven Hartford Springfield Rail Corridor Glory Days: trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril

Section ALTERNATIVES. 3. Alternatives

Passenger Rail Regional Transportation Plan

Georgian Trade Exchange (GTX) December 21, 2011

SURFACE TRANSPORTATION FEDERALISM POLICY STATEMENT

Annual PTC Progress Report 2015

Models for Train Scheduling. Krishna C. Jha Vice President - Research & Development krishna@innovativescheduling.com

TESTIMONY OF DANIEL DUFF VICE PRESIDENT - GOVERNMENT AFFAIRS AMERICAN PUBLIC TRANSPORTATION ASSOCIATION BEFORE THE

Austin to Houston Passenger Rail Study

2.1 Prior Richmond to South Hampton Roads Rail Service

SYSTEMWIDE REQUIREMENTS

STAKEHOLDER INVOLVEMENT PLAN for Agency and Public Involvement

Strategic Economic Development Assets: Infrastructure in the East Valley

ENTERPRISE GIS FRAMEWORK. Ian Kidner, GISP GIS Systems Administrator Office of Technical Services

Railroad Job Vacancies Reported to the RRB June 21, 2016

OLTRE L INFRASTRUTTURA PER UNA NUOVA CULTURA DELLA MOBILITÀ

MOTION NO. M Contingency Increase for Flatiron West, Inc. Construction Contract for Tacoma Trestle Track & Signal Project

Overview of the Travel Demand Forecasting Methodology

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Federal Communications Commission Washington, D.C

Downtown Tampa Transportation Vision

Transportation Risk Management: International Practices for Program Development and Project Delivery

Michael I. Schneider Senior Vice President and Managing Director HDR / InfraConsult

A Quantitative Decision Support Framework for Optimal Railway Capacity Planning

Movement Planner * System

Regional Rail Briefing. March 24, 2010

Passenger Rail Service

Department of Transportation, Rail Division Records Retention Schedule Effective Date: June 2003 Table of Contents. Rail Safety...

Las Vegas to Los Angeles Rail Corridor Improvement Feasibility Study

SUSTAINABLE RETURN ON INVESTMENT SROI

How To Understand And Understand Transportation Engineering

Implementation Strategy

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/

Performance Goals and Objectives:

The Heartland Corridor: Crossing Mountains, Crossing Sectors

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

COLLABORATIVE DECISION-MAKING FRAMEWORK

Energy and. Resources

FloridaNOTAllAboard RESOLUTION NO

GLNX Corporation Complete Solutions for Railcar Management

analysis needs be met at the push of a button?

Railway Age, Passenger Trains on Freight Railroads. Negotiating Insurance and Liability Issues: Constructive Solutions. October 21-22, 2008

COMMENTS AND COORDINATION

An Overview of Federal Railroad Administration Research

Office of Inspector General Audit Report

Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation

S. ll. A bill to authorize elements of the Department of Transportation, and for other purposes. IN THE SENATE OF THE UNITED STATES

Northern New England Intercity Rail Initiative (NNEIRI) Public Meeting Pioneer Valley Planning Commission Springfield, MA 1/23/14 7:00 8:30 PM

BNSF Job Opportunities

AASHTO Equipment Management Technical Services Program. EMTSP Program Update

RESOLUTION NO BOARD OF DIRECTORS, PENINSULA CORRIDOR JOINT POWERS BOARD STATE OF CALIFORNIA ***

California State Transportation Agency Call for Projects for the Transit and Intercity Rail Capital Program

Simulation of modified timetables for high speed trains Stockholm Göteborg

The Relationship Between Asset Management and Performance Management

ownership We increase return on investment by We deliver reliable results by engaging

Transcription:

1

Justin Fox Senior Project Manager, CDM Smith David Simpson Principal at David P. Simpson Consultants LLC Paula Hirsch Senior Admin Assistant, CDM Smith 2

NCHRP Report 657 is the general guidebook for implementing passenger service on shared corridors This guidebook drills down on the issue of service capacity assessment and modeling as these elements often comprise the biggest challenge to developing a long-term partnership 3

AASHTO s Standing Committee on Rail Transportation (SCORT) 4

Justin Fox, CDM Smith David Simpson With assistance from Alan Bing Bruce Horowitz Andy Cebula Om Kanike Paula Hirsch 5

Public transportation agencies are increasingly considering rail service options to improve passenger mobility Agencies are engaging freight railroads given that new rail corridors are very costly and difficult to build Agency staff often lack knowledge of rail line capacity planning methods and issues 6

Produce a guidebook for public sector agencies that will help them interact more effectively with freight railroads and other track owners in planning and managing line capacity for shareduse operations 7

Three essential activities Outreach to stakeholders Description of capacity analysis tools and methodologies Illustrative case studies 8

Stakeholder target groups Freight railroads hosting passenger services Public agency sponsors of passenger trains on freight railroads and Amtrak s Northeast Corridor (NEC) Amtrak Federal Railroad Administration (FRA) 9

Standards for transparency of modeling inputs and outputs vary widely Long-term view of corridor needs is essential to ensure appropriate targeting of capital and to build confidence of all parties in the process Robust analysis of service capacity needs and issues, including modeling, is essential to building a solid foundation for a corridor partnerships 10

Manual methods String line analysis and grid time analysis Operations simulation Rail Traffic Controller (RTC), RAILSIM, RAILS2000, NCFRP s Web-based Freight- Passenger Rail Corridor Project Screening Tool, aka Shared-use Tool (SU Tool) Other methods Manual, statistical, simulation, etc. Proprietary, details less well known 11

Manual methods Pros: Easy to do, inexpensive, limited data requirements Cons: Not applicable to complex rail environments Simulation Pros: Robust, comprehensive analysis capability Cons: Intensive data and resource requirements; potentially very expensive; getting freight railroad data may require confidentiality guarantees 12

Also known as a time-distance diagram, a string line shows movements of trains over a track segment 13

One-way grid time: Time required for train to exit eastern siding at Point B and enter western siding and stop at Point D (30 minutes) 14

At top: Maximum allowable speeds in grey; train progress in black 15

Manual methods Feasibility studies Conceptual planning studies Alternatives screening Operations simulation Highly detailed operations analyses Planning for detailed improvements to enhance line capacity over time Reaching agreement between host railroad and public agency service sponsor on shared-use contract terms 16

Conceptual planning study Methodology: Grid time analysis Objective: Link capital investments to train volumes over a 15-year period LOSSAN study area in Southern California: Line thickness shows relative train volumes 17

Detailed planning study Methodology: RTC operations simulation Objective: Identify capacity improvements to support new commuter trains, high speed rail trains, and increasing freight train volumes Study area: Amtrak s Springfield Line highlighted 18

Conceptual planning study Methodology: Grid time analysis, RTC, and Shared-use Tool application Objective: Compare results of three analysis methodologies Study Area: BNSF s Scenic and Bellingham s Subdivisions 19

Detailed planning study Methodology: RTC operations simulation Objective: Deliver a long-term shared investment program for new intercity and increasing rail freight services Route shown in two segments: Chicago to Bloomington, then Bloomington to St. Louis 20

Build trust between stakeholders: this is a long-term relationship, not a purchase of space Take the long view. What is the vision of success 20 years out, and is it consistent with your short term requests? 21

Acknowledge the large scale network impacts of local passenger operations: the most cost effective mitigations may be remote from the direct service area May require agency to explain benefits of improvements made distant from a subject corridor Rigorous, detailed capacity assessment and modeling is a worthy investment, and delivers a framework to assess future changes in corridor needs 22

NCHRP Report 773 Capacity Modeling Guidebook for Shared-Use Passenger and Freight Operations http://www.trb.org/ Main/Blurbs/171662. aspx 23

Breaking down the barriers: the virtual automobile LA Workshop, 09/15 https://vimeo.com/album/ 3754857 24