The Gateway Program and Hudson Tunnel Project
|
|
|
- Bryce Newman
- 10 years ago
- Views:
Transcription
1 The Gateway Program and Hudson Tunnel Project Presented to: NJ State Senate Oversight Committee Stephen Gardner Executive Vice President NEC Business Development August 10,
2 The Need for Gateway 2
3 The Northeast Corridor Today 3
4 4 The NEC in Context The Northeast Megaregion with 17% of the population on 2% of U.S. land area is North America s best rail market similar in density and population to successful rail corridors in Europe.
5 5 NEC Vital to Local Economies NEC and connected commuter networks provide access to: good jobs large labor market For some counties, commuter rail is the major means of transport to Manhattan jobs Income earned by rail commuters provides significant economic value to suburban areas: For some counties, such as Essex, income earned by rail commuters is in the billions of dollars
6 6 6 NEC Vital to Region Washington to New York Air-Rail Market 100% Air-Rail Market Share 90% 80% 70% 60% 50% 40% 30% 20% 10% 37% 45% 56% 50% 50% 51% 55% 56% 63% 61% 69% 75% 76% Air Rail 0% Fiscal Year Acela Service introduced Amtrak carries three times as many passengers DC-NY than all of the airlines put together
7 7 NEC Passenger Growth NEC passenger demand continues to grow How much of that demand the NEC can accommodate depends primarily on the level of investment.
8 8 Growth is Threatened By: Bottlenecks TRAINS per DAY VRE MARC LIRR NJT SEPTA CSX NS MBTA MN SLE P&W AMTRAK
9 9 Century-Old Assets Connecticut River Bridge, 1907 Hudson River Tunnel, 1910 Portal Bridge (NJ), 1906 Susquehanna River Bridge (MD), 1906 Pelham Bay Bridge (NY), 1907 B&P Tunnel (MD), 1873
10 10 Station Capacity PENN STATION 410,000 daily passenger trips Long Island Railroad 222,000 trips NJ Transit Amtrak 160,000 trips 28,000 trips PLUS NYC Transit - 344,800 daily trips at Penn Station 1/2/3-178,200 trips A/C/E - 166,600 trips
11 11 Super Storm Sandy Impacts Super Storm Sandy forced ~4-day closure of the NEC: Flooded substations Inundated East River and Hudson River Tunnel systems Ongoing damage to internal components requires complete renewal. Tunnel reconstruction requires closure of each tube for outages of >1 year. Rebuilding of the Hudson River Tunnel cannot begin until the new Hudson Tunnel Project is completed.
12 Super Storm Sandy Impacts 12
13 13 Decades of Underinvestment by All Source: NEC Commission 5-Yr Plan, FY16-20
14 Gateway Program Overview 14
15 15
16 Gateway Program Principles Service Preservation and Resiliency Secure critical alignments for future operations Undertake design /construction where required Preserve existing service to Penn Station Rebuild Existing Infrastructure Provide resiliency / storm protection Bring to State of Good Repair Capacity 100% increase trans-hudson River 38% increase at Penn Station Build redundancy for stable operations Priority to modular project designs permitting development of program elements with independent utility. Advance elements as funding and timing permits. 16
17 17 Gateway Program Studies Feasibility Study (completed) Systems Level Design (completed) Program Development (underway) NEPA/ Preliminary Engineering (underway)
18 18 Hudson Tunnel Project Study Area NEPA Environmental Review and Preliminary Engineering Expected 2-4 year process to start this year FRA will serve as USDOT Federal Lead Agency Evaluating options for expediting NEPA Requires regional participation
19 Hudson Tunnel Project NEPA/Design 19
20 20 ROW Preservation Hudson Yards Amtrak began construction in August 2013 to preserve a potential future pathway for a new Hudson River tunnel through Hudson Yards or risk losing Penn Station access forever.
21 21 Hudson Yards Concrete Casing Casing construction underway or complete from 10 th Ave to the western edge of 11 th Ave in Manhattan Funded primarily by Sandy Act grants to Amtrak of approximately ~$235m Additional ~$300m required to complete casing across Hudson Yards site. Design underway and construction needs to begin in advance of development
22 22 Early Actions: Portal Bridge / Sub 41 Portal North Bridge design and environmental work complete. ~$1 billion construction costs over 5 years Needs NJT/Amtrak/Federal funding Portal North Bridge rendering Substation 41 was flooded by Super Storm Sandy Will be rebuilt in conjunction with NJ TransitGrid Project
23 Expanded Penn Station Concourses Station plans evaluated for Train operations Station connectivity Future line extensions Development potential Confidential and deliberative material 23
24 24 NEC Future Environmental Study The Federal Railroad Administration (FRA) is currently leading NEC FUTURE Environmental Impacts Statement (EIS) and Service Development Plan process to study options for expanding capacity on the NEC. These studies are a pre-requisite for advancing any projects that significantly expand rail service levels on the NEC, including the new capacity elements of the Gateway Program. The Draft EIS is expected to be released this fall and a final EIS is expected in 2016.
25 25 Gateway Preservation & Resiliency Conceptual Timeline Portal North Bridge Begin construction Complete construction Open to revenue service Hudson Tunnel Project NEPA/PE Permitting Final design and begin construction Construction, Testing, Commissioning Open New Tunnel, Rehab Old Tunnel New and Old Tunnel Complete (4 Tracks Total) Sawtooth Bridges Preliminary Engineering Final Design Construction Open to Revenue Service Assumes adequate funding available for all activities
26 26 Gateway New Capacity Conceptual Timeline Penn South Concept Design NEPA and PE Final Design and property acquisition Demolition and Construction Construction Commission and Open to Service Secaucus Station and Loop Concept Design NEPA and PE Final Design and property acquisition Construction Commission and Open to Service Portal South Bridge Concept Design NEPA and PE Final Design Construction Commission and Open to Service Highline Renewal Concept Design NEPA and PE Final Design Begin Construction Commission and Open to Service Assumes adequate funding available for all activities
27 27 Thank you.
Briefing On New Jersey High Speed Rail Improvement Program. October 10, 2012
Briefing On New Jersey High Speed Rail Improvement Program October 10, 2012 Limits Of Work: Trenton To New Brunswick I Ladder In Pennsylvania Station New York New Frequency Converter At Metuchen Amtrak
Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs
457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS THE NEC IS THE BUSIEST RAIL CORRIDOR IN THE NATION, AND IS VITAL TO THE ECONOMY AND CITIES OF THE NORTHEAST. Why NEC FUTURE? The Northeast United
DECEMBER 10, 2014 FINAL AGENDA PUBLIC COMMENTS ON AGENDA ITEMS AND OTHER MATTERS
NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. REGULARLY SCHEDULED BOARD OF DIRECTORS MEETINGS CALL TO ORDER
National Railroad Passenger Corporation AMTRAK. Fiscal Year 2014 Budget Request Justification. Operating, Capital Programs And Debt Service Expense
National Railroad Passenger Corporation AMTRAK Fiscal Year 2014 Budget Request Justification Operating, Capital Programs And Debt Service Expense May 2013 Table of Contents Introduction... 4 Strategic
FOR IMMEDIATE RELEASE December 6, 2012. ATK-12-127 Contact: Media Relations 202 906.3860
FOR IMMEDIATE RELEASE December 6, 2012 ATK-12-127 Contact: Media Relations 202 906.3860 AMTRAK: INVEST AND BUILD MORE RAIL CAPACITY AND RESILIENCE IN NEW YORK REGION Requests $336 million for key Northeast
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
An Interim Assessment of Achieving Improved Trip Times on the Northeast Corridor
An Interim Assessment of Achieving Improved Trip Times on the Northeast Corridor Prepared by Amtrak Under Section 212(d) of the Passenger Rail Investment and Improvement Act of 2008 (Public Law 110-432)
Environmental Impact Statement for the Washington Union Station Expansion Project
This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
Design Changes in Queens Revision 14-4M
MTA Long Island Rail Road East Side Access Design Changes in Queens Revision 14-4M Environmental Analysis November 2005 United States Department of Transportation Federal Transit Administration Metropolitan
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development
Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of
[THIS PAGE INTENTIONALLY LEFT BLANK]
[THIS PAGE INTENTIONALLY LEFT BLANK] March 24, 2010 Thomas Carper Chairman of the Board National Railroad Passenger Corporation 60 Massachusetts Avenue, N.E. Washington, DC 20002 Joseph H. Boardman President
Enterprise Asset Management
Enterprise Asset Management Asset Management Strategy April 29, 2014 Craig Stewart, Senior Director Capital Program Metropolitan Transportation Authority Providing public transit is asset-intensive 5/15/2014
FY2014 Budget and Business Plan. FY2015 Budget Request Justification. FY2014 2018 Five Year Financial Plan
The National Railroad Passenger Corporation FY2014 Budget and Business Plan FY2015 Budget Request Justification FY2014 2018 Five Year Financial Plan April 2014 Table of Contents Section 1: Strategic Overview...
VRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
Cost and Financial Analysis
Chapter 19: Cost and Financial Analysis A. INTRODUCTION The purpose of this chapter is to present examples of financial resources available to the Metropolitan Transportation Authority (MTA), which may
Performance Goals and Objectives:
Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,
Virginia s Approach to Intercity Passenger Rail Development
Virginia s Approach to Intercity Passenger Rail Development Kevin B. Page Chief Operating Officer Virginia Department of Rail and Public Transportation June 14, 2013 www.drpt.virginia.gov High Speed Rail
National Railroad Passenger Corporation AMTRAK. Fiscal Years 2013 2017 Five Year Plan. May 2013
National Railroad Passenger Corporation AMTRAK Fiscal Years 2013 2017 Five Year Plan May 2013 Table of Contents Introduction... 4 Background... 4 PRIIA Sections 209 and 212... 5 Amtrak s Strategic Plan...
A GUIDE TO NEW YORK CITY REGIONAL TRANSPORTATION
H O W NEWYORK M O V E S A GUIDE TO NEW YORK CITY REGIONAL TRANSPORTATION RAIL NYC Subway NJ Transit PATH Amtrak LIRR Metro-North LOCAL TRANSIT NYC Subway......................... 5,086,833 Average weekday
Associated Students of the University of California, Merced 2014-2015. Resolution #14. Resolution in Support of the California High-Speed Rail Project
Introduced By: Isaias Rumayor III, ASUCM Senator At-Large Authored By: Michael Lomio, ASUCM Senator At-Large Isaias Rumayor III, ASUCM Senator At-Large Sponsored By: Background: The California High-Speed
Transit, Rail, Program, Project & Construction Management Experience
Point of Contact Peter M. Cipolla Vice President, Rail & Transit Mobile: 925.219.5235 Email: [email protected] Project Management Oversight Services Introduction & Background Hatch Mott MacDonald
The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.
Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority
Railroad Job Vacancies Reported to the RRB June 21, 2016
The following list provides information about job vacancies reported to the Railroad Retirement Board's (RRB) field offices. The list includes orders that the receiving field office does not expect to
SYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation
Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation FY 2017 Budget Summary The Obama s Administration s proposed budget for FY 2017, which was submitted to Congress February
Section ALTERNATIVES. 3. Alternatives
Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of
Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP
Lone Star Regional Rail Project - Update Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP August 20, 2015 Lone Star Regional Rail Project - Update Presentation
THE : SANDY DART Parsons Brinckerhoff s Disaster Awareness Report October 25, 2013
THE : SANDY DART Parsons Brinckerhoff s Disaster Awareness Report October 25, 2013 The Sandy Disaster Awareness Report (DART) presents a summary of key developments and funding priorities in the region
ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS
ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS Audit Report OIG-A-2015-012 June 17, 2015 DRAFT REPORT Page intentionally left blank NATIONAL RAILROAD
Security Strategy: A Layered Approach. Anthony Mercogliano Metropolitan Transportation Authority Assistant Director of Security New York, NY
Security Strategy: A Layered Approach Anthony Mercogliano Metropolitan Transportation Authority Assistant Director of Security New York, NY Protecting the System Operating Components System Overview Policing
Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
Ne w J e r s e y Tr a f f i c Co n g e s t i o n :
Ne w J e r s e y Tr a f f i c Co n g e s t i o n : A Growing Crisis January 2008 Cover photo : Route 3, Passaic County introduction A rising tide of traffic congestion threatens to increase roadway gridlock,
NEW BLUE LINE CONNECTIONS
Washington Metropolitan Area Transit Authority NEW BLUE LINE CONNECTIONS 3/31/2014 A Major Capital Project of Momentum s Metro 2025 Program In support of its new strategic plan, Metro has considered the
INFORMATION TECHNOLOGY: Reservation System Infrastructure Updated, but Future System Sustainability Remains an Issue
INFORMATION TECHNOLOGY: Reservation System Infrastructure Updated, but Future System Audit Report OIG-A-2015-010 May 19, 2015 This page intentionally left blank. NATIONAL RAILROAD PASSENGER CORPORATION
A. TAX AT A GLANCE B. TAX LEVY SOURCES TYPES AND LIMITS OF LEVIES:
A. TAX AT A GLANCE The maximum allowable levy for 2015 is $95.1 million. For 2015 the levy will be $73.0 million. The millage rate is estimated to be $0.1891. The 2015 levy will be used for: o General
Queens Midtown Tunnel Repair, Restoration, Rehabilitation Projects. Manhattan Community Board 6 Transportation Committee - June 2, 2014
Queens Midtown Tunnel Repair, Restoration, Rehabilitation Projects Manhattan Community Board 6 Transportation Committee - June 2, 2014 Opened to traffic in 1940 Two parallel tubes (North & South), each
NY State Rail Summit Alstom Transportation Inc.
NY State Rail Summit Alstom Transportation Inc. Chuck Wochele 06/14/2010 Two main activities 19.7 Billion Euro s in Sales (2009 FY) 81,500 Employees 70 countries Power Sector 13 Billion Euro Transport
Our Capabilities The EAC Advantage. May 20, 2008
May 20, 2008 Mr. John Bardwell, Contracting Officer Federal Transit Administration 1200 New Jersey Avenue, SE, Room E-42-331 Washington, D.C. 20590 RE: Project Management Oversight (PMO) (Reference No.
MOTION NO. M2015-63 WSDOT Task Order for Final Design Services PROPOSED ACTION
MOTION NO. M2015-63 WSDOT Task Order for Final Design Services MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee 07/09/15 Final Action Ahmad Fazel, DECM Executive Director Ron Lewis, East
Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)
Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations
2040 Southeast Florida Regional Freight Plan
2040 Southeast Florida Regional Freight Plan Presented to Palm Beach MPO Board Presented by Michael Williamson & Erin Kersh Cambridge Systematics, Inc. May 21, 2015 Southeast Florida Has Made Significant
Connecticut s Bold Vision for a Transportation Future
Connecticut s Bold Vision for a Transportation Future 1 Governor s Proposal: Presents bold vision Based on: technical analyses & public outreach done as part of TransformCT o 18-month strategic planning
The Army Corps of Engineers and the Flood Risk Challenge
The Army Corps of Engineers and the Flood Risk Challenge Presentation to Association of State Flood Plain Managers Steven L. Stockton, P.E. Director of Civil Works June 12, 2013 US Army Corps of Engineers
Planning and Development Committee Board Action Item III-A November 16, 2006 Master Agreements
Planning and Development Committee Board Action Item III-A November 16, 2006 Master Agreements Washington Metropolitan Area Transportation Authority Board Action/Information Summary Action Information
1. RECOMMENDATIONS. It is recommended that:
Clause No. 7 in Report No. 3 of was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on February 20, 2014. (Mayor Hackson declared an interest in this
Omni New Haven Hotel 155 Temple Street, New Haven, Connecticut 06510
*** Please note that most airlines are not charging customers to reschedule their flights, and may allow not only changes to day and time, but also which airport you are flying into. Omni New Haven Hotel
Infrastructure for Adapting to Climate Change Environmental Law Forum April 10, 2014. 2014 O Brien & Gere
Infrastructure for Adapting to Climate Change Environmental Law Forum April 10, 2014 1 Agenda Lessons Learned from Superstorm Sandy What are Northeast States Doing About It? State of our Power Grid Role
The Council of the City of New York. Economic Development Corporation
Hon. Melissa Mark-Viverito Speaker of the Council Hon. Julissa Ferreras Chair, Committee on Finance Hon. Daniel R. Garodnick Chair, Committee on Economic Development The Council of the City of New York
Connecticut s Bold Vision for a Transportation Future
Connecticut s Bold Vision for a Transportation Future Middlesex Chamber October 15, 2015 Commissioner Jim Redeker 1 2 The Challenge, Vision, & Plan The Challenge our infrastructure, our economy, our quality
APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL
DRAFT APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL Operations and Maintenance Cost Methodology and Results The Colorado Department of Transportation is conducting an Advanced Guideway System
Transit Service Assessment
Technical Memorandum #1 Transit Service Assessment June 213 Table of Contents 1. Existing Service Summary... 1 1.1 Service Overview... 1 1.2 Service Characteristics... 1 2. Ridership and Productivity...
NOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS
NOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS CALL TO ORDER NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT
Michael I. Schneider Senior Vice President and Managing Director HDR / InfraConsult
Senior Vice President and Managing Director HDR / InfraConsult Michael Schneider is co-founder and Managing Partner of InfraConsult LLC, a program management and strategic advisory firm with primary focus
Philadelphia County. Land Use and Growth Management Profile
Philadelphia County is located in the southeastern corner of Pennsylvania and is bordered by the Pennsylvania counties of Delaware, Montgomery, and Bucks, and the New Jersey counties of Burlington, Camden,
GREATER MEADOWLANDS. Transit Guide. HARMON MEADOW & MILL CREEK in SECAUCUS NJ TRANSIT Bus, Rail & Light Rail Service. njtransit.com Google Translate
KNOW BEFORE YOU GO Plan your trip there and back by consulting our online Trip Planner or a schedule to determine your departure time, location and fare. Plan your return trip before you leave. Remember
S.B. NO. JAN 2 2 2016
THE SENATE TWENTY-EIGHTH LEGISLATURE, 0 STATE OF HAWAII S.B. NO. JAN 0 A BILL FOR AN ACT RELATING TO STATEWIDE INFRASTRUCTURE CAPACITY BUILDING CONSTRUCTION FINANCING. BE IT ENACTED BY THE LEGISLATURE
MOTION NO. M2016-76 Contingency Increase for Flatiron West, Inc. Construction Contract for Tacoma Trestle Track & Signal Project
MOTION NO. M2016-76 Contingency Increase for Flatiron West, Inc. Construction Contract for Tacoma Trestle Track & Signal Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board 7/14/2016
USA: INFRASTRUCTURES DAY
USA: INFRASTRUCTURES DAY Business Opportunities for Infrastructures in the US Market Business Conference 21th November 2014 Auditório do Banco Popular Rua Ramalho Ortigão, 51 Lisboa Organização: Patrocinadores:
INSTITUTE FOR RATIONAL URBAN MOBILITY, INC.
INSTITUTE FOR RATIONAL URBAN MOBILITY, INC. George Haikalis One Washington Square Village, Suite 5D President New York, NY 10012 212-475-3394 [email protected] www.irum.org December 22, 2009 FOR IMMEDIATE
SECTION 2 CORRIDOR A
SECTION 2 CORRIDOR A 2.1 CORRIDOR A (HILLSBOROUGH RIVER TO 40 TH STREET IN TAMPA) The boundaries for Corridor A can be seen in Figure 2-1. They are as follows: North: I-4 South: Crosstown Expressway (now
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY AGENDA REGULAR MEETING To Be Held at 3:00 PM APRIL 24, 2014 1234 Market Street, Mezzanine Level Philadelphia, PA 1. Approval of Minutes of the Regular