1 Metrolink Positive Train Control Program May 2012 Metrolink s aggressive Positive Train Control (PTC) program calls for installing a back-office system, replacing the current computeraided dispatch system, installing on-board equipment on 57 cab cars and 52 locomotives, installing stop enforcement systems at 476 wayside signals, and implementing a six-county specialized communication network to link the wayside signals, trains and centralized dispatch office. The Metrolink system operates seven routes providing 165 weekday commuter trains on more than 388 route miles through six counties in Southern California and carrying over average weekday riders. The Metrolink Operations Center is the dispatching hub for SCRRA, and handles all trains which traverse Metrolink property. This includes other passenger and freight carriers, making it one of the nation s busiest and most complex rail networks. The total number of Metrolink, Amtrak, BNSF UPRR trains dispatched on a daily basis exceeds 300. In October 2010, Metrolink procured a Vendor/Integrator (V/I) contractor to design, install and test the agency s PTC system. Given the significant challenges to implement the program, the contract s aggressive schedule has been impacted by a number of delays, including the development of the core interoperable back office server (BOS) for the major freight railroads. In addition, national industry standards for PTC messaging and product development for PTC radios have experienced challenges. As a result, the original December 2012 revenue service goal is now forecasted to be achieved by late However, steady progress is being made toward the revised completion milestone. Status of PTC Implementation: Below is the current status of some of the V/I s main system components: Metrolink formally submitted its request to the FRA to begin witnessing field validation of Metrolink s PTC database. The request marks an important milestone, as it signifies that a number of associated components are mature and ready for FRA review, including the development of test plans, the implementation of a Change & Configuration Management Plan, and the new Timetable No. 8. The draft PTC Safety Plan (PTCSP) was prepared to make the common product elements consistent with a template being developed by the Joint Rail Safety Team. The SCRRA-specific components are under review by SCRRA management prior to submitting to the FRA for informal review in July. The V/I contractor issued a purchase order for the production ITC 220 MHz radios which are expected to be delivered in July and August. The V/I contractor also participated with BNSF, UPRR, Meteorcomm and PTC 220 in radio testing that assessed radio propagation and handoffs between the different railroads. After participating in the FRA-witnessed ETMS VII brake testing in the February/March period, SCRRA again mobilized a test train and resources in preparation of ETMS VII functional testing to measure the train s response to wayside signals, dispatcher restrictions, and prove the crew authentication system. This testing is anticipated to begin the first week of June and continue through July. The installation of on-board equipment is well underway with twelve locomotives/cab cars and three hy-rails now equipped with Kit 1 hardware. A second round of pilot (prototypical) installations are being completed along with design documentation as the V/I contractor proceeds into full production installation. In order to overcome delays, plans are being developed to add additional installation crews to perform on-board installations.
2 The V/I contractor is in full testing and debugging mode as it continues its efforts to develop a new SCRRA CAD system. The system continues to face challenges as new issues are found during the testing which require additional software releases and testing. Although the V/I contractor is unlikely to meet its CAD Phase I cut-over milestone date in July, it is not anticipated that a delay would impact the overall PTC schedule. Radio Spectrum in the 220 MHz band is required to allow the wireless portion of the PTC to function. This function includes train to wayside signal links and train and signal to base station links. Although there are no updates at this time on SCRRA s acquisition of 220MHz radio spectrum and FCC licensure, SCRRA has negotiated a five-year lease of spectrum held by PTC 220 LLC. The agreement will be presented to the SCRRA Board for approval in July. Status of Related Components of PTC: Wayside Interface Unit (WIU) Installations During the period, crews completed nearly all WIU installations on the Valley, Ventura and San Gabriel Subdivisions. Prior to installing the modules, crews are programming, configuring and bench testing the WIUs. WIU installations remain ahead of successor activities on the V/I contractor s schedule. Communications Backhaul PTC project team continues to closely coordinate with the related Communications Backhaul Project for Valley, Ventura and East San Gabriel (VVSG) which has encountered a number of design and construction challenges. As a result, on a number of areas where there is overlap between the two programs, work will be performed under the PTC contract, in order to get the work completed sooner. Pomona Hardened Train Control Building A down-scoped version of the project was advertised for re-bid in April with bids due on June 8 th. Bids will be reviewed and Pre-Qualified responsible and responsive bids will be opened on June 15 th. Metrolink will be seeking Board approval in July for the award of a design/build construction contract for the TCOSF facility. Challenges: Spectrum Acquisition The planned purchase of 220MHz spectrum which began in 2009 was challenged by a third party, which may then result in impacts to the V/I system testing, acceptance and implementation of the PTC system. As the holding firm has since gone into bankruptcy, SCRRA and outside Counsel are pursuing legal remedy for both the spectrum purchase and subsequent FCC licensing process. SCRRA is developing alternative strategies should this purchase approach prove to be unsuccessful. Additionally, SCRRA is finalizing a lease agreement with the Class 1 freights regarding the shared use of frequencies that they control. PTC Radios PTC requires special radios that are being developed by Meteorcomm, a firm owned by the four largest freight railroads (BNSF, UPRR, CSX, NS). Software and hardware development delays impose potential impacts on the testing and commissioning process. To limit this risk, SCRRA has committed that prototypical radios will be available for proof of concept/pre testing and that sufficient quantities of approved and tested production radios will be available to support the V/I's implementation schedule. The review and approval of standard releases is now being submitted from the vendor for review by legal councils representing all parties involved. It is anticipated that radios will be available for initial testing on the San Gabriel Subdivison. Computer Aided Dispatch (CAD) The inability of the V/I Contractor to effectively develop the CAD software is impacting the implementation schedule and system certification. A phased installation approach is being followed to minimize
3 impacts to the PTC schedule. Continual issues arising from testing and debugging is threating the cut-over milestone for CAD Phase I however this delay is not anticipated to impact the overall PTC schedule.,. Back Office Server (BOS) In order to achieve interoperability, common standards and requirements must be developed by the ITC committee. The delay in the development in BOS software is on the critical path, resulting in overall project schedule delays. To mitigate additional impacts due to delays in the BOS development for Class 1 freight railroads, a decision has been made by SCRRA and the V/I contractor to implement BOS Version 3.2.M for Metrolink, which is built off of the core BOS and independent of additional administrative functions being developed for the freight railroads. Development of new software and Configuration Management System - Development of new software code carries inherent risks which, in spite of the best configuration management practices by the developer, will typically be released with some discrepancies or flaws ( bugs ). If these flaws are anything other than minor, the functionality of the system may be compromised and re work or re testing of system components may be necessary and could delay the system integration and acceptance testing. A defined set of practices and requirements that comply with SCRRA (and IEEE) standards are included in the V/I contract and will minimize disagreements over any impact resulting from SCRRA provided updates to system information throughout the PTC system lifecycle.
4 Positive Train Control Updated Timeline
5 PTC Funding Update In the April/May period, SCRRA s secured funding remained unchanged; $210.9 million including the $9.3 million in PTMISEA funds presented to the SCRRA Technical Advisory Committee in early April. The additional funds have been allocated to support the Pomona Campus contract re-bid and SCRRA staff, consultant, and V/I contractor staff extensions related to the schedule extension. SCRRA staff is working with the SCRRA Board of Directors on authorization to spend the PTMISEA funds. SCRRA is still concerned that additional delays out of our control may require additional costs not contemplated in our current projections. Next Steps Metrolink believes PTC is a life-saving technology and is committed to implementing PTC on our Southern California rail network in advance of the 2015 federal mandate. We would like to continue working with our Congressional, State Legislative, regulatory, freight and passenger rail partners. We request the support of our partners to be successful in the implementation of PTC. Contact: Metrolink Government Affairs Manager Patricia Torres Bruno at or [email protected]
Annual PTC Progress Report 2015
Annual PTC Progress Report 2015 Capital Metropolitan Transportation Authority (CMTY) Docket No. FRA-2010-0072 March 28, 2016 Page 1 of 11 Annual PTC Progress Report CMTY Name of Railroad or Entity Subject
Federal Railroad Administration Report to Congress. Positive Train Control Implementation Status, Issues, and Impacts
Federal Railroad Administration Report to Congress Positive Train Control Implementation Status, Issues, and Impacts August 2012 Contents Executive Summary... 1 1. Introductory Background... 3 1.1 System
Cisco Positive Train Control: Enhancing End-to-End Rail Safety
Solution Overview Cisco Positive Train Control: Enhancing End-to-End Rail Safety What You Will Learn Positive Train Control (PTC), one of many new safety measures mandated by the U.S. Federal Government,
POSITIVE TRAIN CONTROL
POSITIVE TRAIN CONTROL Monthly Report CONTENTS 1. EXECUTIVE SUMMARY... 1 1.1. Project Overview... 1 1.1.1. PTC Inter-Agency Coordination... 1 1.1.2. PTC Operations and Maintenance... 2 1.2. Scope of Work
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
Scalable and Reliable Communications Infrastructure For Positive Train Control (PTC) A Guide to LILEE Systems s PTC/ITCM Solutions and Services
Scalable and Reliable Communications Infrastructure For Positive Train Control (PTC) A Guide to LILEE Systems s PTC/ITCM Solutions and Services Table of Contents List of Abbreviations and Acronyms....
Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and
Integration of PTC and Ride Quality Data Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier and dfuzion, Inc., rmetrix Ride Performance Assessment System Supplier The FRA mandate to implement
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety...
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents Crossing Safety... 4 Rail Planning, Projects, and Operations... 5 Rail Safety...
Risk Management in the Development of a Penta-P Project
Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don
Experts in Rail Maintenance and Infrastructure
Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail
Project Management Manual. Volume 1: PM Desk Book
Project Management Manual Volume 1: PM Desk Book Revision 0: July 15, 2011 THE PROJECT MANAGER S TEN COMMANDMENTS PROJECT MANAGERS SHALL: 1. Draft the Project Charter to define the scope, schedule, budget,
Federal Communications Commission Washington, D.C. 20554
Federal Communications Commission Washington, D.C. 20554 Brian W. Higgins Wilkinson Barker Knauer, LLP 2300 N Street, NW Washington, DC 20037-1128 DA No. 16-742 RE: National Railroad Passenger Corporation
METROLINK SAFETY PEER REVIEW PANEL FINAL REPORT
METROLINK COMMUTER RAIL SAFETY PEER REVIEW PANEL SIX-MONTH REPORT CARD ON THE SCRRA S S PROGRESS ON THE PANEL S RECOMMENDED METROLINK ENHANCED SAFETY ACTION PLAN FINAL REPORT DECEMBER 31, 2009 Prepared
Rail Automation. What is ACSES? usa.siemens.com/rail-automation
Rail Automation What is ACSES? usa.siemens.com/rail-automation What is ACSES? Siemens, a specialist in the area of US Cab Signal design, offers a carborne product that provides both Civil Speed Enforcement
Monterey County Operational Area Emergency Communications System (NGEN) Project Background and Information
Monterey County Operational Area Emergency Communications System (NGEN) Project Background and Information Background: The Next Generation (NGEN) Radio Project replaces the existing public safety and local
Project Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
TRAIN WRAPS TIMETABLE ADS TICKETS STATION POSTERS METROLINK MATTERS NEWSLETTER STATION SAMPLING WEBSITE: METROLINKTRAINS.COM
METROLINK MATTERS TIMETABLES METROLINKTRAINS.COM HOW-TO-RIDE GUIDE DESTINATION GUIDE TICKETS TRAIN WRAPS STATION POSTERS ON-BOARD BANNERS & POSTERS STATION SAMPLING ADVERTISING RATES & INFORMATION METROLINK
UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK
UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK Testimony of HERZOG TRANSIT SERVICES, INC. Tuesday April 29,
Office of Safety and Compliance
The Federal Railroad Administration (FRA) was created by the Department of Transportation Act of 1966. It is one of ten agencies within the U.S. Department of Transportation concerned with intermodal transportation.
Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs
Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)
Securing Wireless Access for Vehicular Environments (WAVE)
Securing Wireless Access for Vehicular Environments (WAVE) May 7, 2009 CTST, New Orleans Tim Weil CISSP/CISA Security Architect ITS Engineering Booz Allen Hamilton 0 The concept of VII started upon the
Positive Train Control
Positive Train Control White Paper May 2012 TRANSIT TECHNOLOGY SERIES Contents Summary!... 3 About this White Paper... 3 About The Joint Council on Transit Wireless... 3 About the Author... 3 Acknowledgements...
IDOT Chicago - St. Louis High-Speed Rail Program Management
1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff
Information Security Assessment and Testing Services RFQ # 28873 Questions and Answers September 8, 2014
QUESTIONS ANSWERS Q1 How many locations and can all locations be tested from a A1 5 locations and not all tests can be performed from a central location? central location. Q2 Connection type between location
49 USC CHAPTER 211 HOURS OF SERVICE 2008 ( RSIA
49 USC CHAPTER 211 HOURS OF SERVICE (as amended by the Rail Safety Improvement Act of 2008 ( RSIA 2008 ), Public Law 110 432, signed October 16, 2008) 1 Sec. 21101. Definitions 21102. Nonapplication, exemption,
SYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators. 19 September 2005
ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators 19 September 2005 1. General 1.1 General 1.1.1 Scope and Standard The Australian Metropolitan Railway
APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM
APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM W Form 1A, incorporated by reference in Florida Administrative Code Rule 60FF1-5.002 Rural County Grants, E911 Rural County Grant Application, effective
Risk Identification and Mitigation
California High- Speed Rail Authority Revised 2012 Business Plan Chapter 8 Risk Identification and Mitigation Introduction Undertaking a program as large as the California high-speed rail (HSR) system
Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015
Title: Integrating Management of Truck and Rail Systems in LA Project Number: 3.1a Year: 2013-2017 INTERIM REPORT August 2015 Principal Investigator Maged Dessouky Researcher Lunce Fu MetroFreight Center
Around 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by 2019.
1. Introduction Transport for Greater Manchester oversees transport and travel across Greater Manchester, home of the UK s largest regional economy outside London and a diverse population of over 2.7 million
Joseph W. Luchi, Economic Development Coordinator
NEW BUSINESS Agenda Item No. : CC Mtg.: 11/8/05 DATE: August 18, 2005 TO: FROM: Mayor and City Council Joseph W. Luchi, Economic Development Coordinator SUBJECT: PRESENTATION REGARDING FEASIBILITY STUDY
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 13 DIVISION: Transit Services BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving Amendment #1 to Contract 2015-16 with Trapeze Software Group,
SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development
Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of
Basic Network Design
Frequency Reuse and Planning Cellular Technology enables mobile communication because they use of a complex two-way radio system between the mobile unit and the wireless network. It uses radio frequencies
EXHIBIT "A" INSURANCE REQUIREMENTS FOR RIGHT OF ENTRY AGREEMENTS
EXHIBIT "A" INSURANCE REQUIREMENTS FOR RIGHT OF ENTRY AGREEMENTS Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to Property,
FRA s Enforcement Process
FRA s Enforcement Process Prepared by: Stephen N. Gordon Trial Attorney Office of Chief Counsel Federal Railroad Administration [email protected] (202) 493-6001 1 Summary of Discussion Topics Organizational
Montgomery County Bus Rapid Transit System Information Technology Needs
Montgomery County Bus Rapid Transit System Information Technology Needs Department of Technology Services Department of Transportation Montgomery County Government, MD 3/7/2012 2011 by Montgomery County
NORTH COUNTY TRANSIT DISTRICT
NORTH COUNTY TRANSIT DISTRICT 810 Mission Avenue Oceanside, CA 92054 CONTRACTS & PROCUREMENT DEPARTMENT NORTH COUNTY TRANSIT DISTRICT CONTRACTS & PROCUREMENT DEPARTMENT 1. CONTACT INFORMATION Larry Frum
An Overview of Federal Railroad Administration Research
PHOTO: METROLINK Railroads and Research Sharing Track Crash Energy Management An Overview of Federal Railroad Administration Research The Metrolink train accident in Glendale, California, in 2005 involved
CERTIFICATION, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE GUIDELINES for BRITISH COLUMBIA COMMUTER RAILWAYS
CERTIFICATION, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE GUIDELINES for BRITISH COLUMBIA COMMUTER RAILWAYS Part 3 Accident/Incident Reporting for Commuter Railways NOTE: On the issuance of a minister
Motorola AirDefense Network Assurance Solution. Improve WLAN reliability and reduce management cost
Motorola AirDefense Network Assurance Solution Improve WLAN reliability and reduce management cost The challenge: Ensuring wireless network performance and availability Wireless LANs help organizations
ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements
ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER Responsible for performing entry level engineering analysis, design, plan, review and inspection for small to medium projects and/or designated segments of
Metro REVISED PLANNING AND PROGRAMMING COMMITTEE JANUARY 14, 2015 SUBJECT: METROLINK REHABILITATION AND RENOVATION PROGRAM
21 Metro Los Angeles County One Gateway Plaza zi3.gzz.z000 ',.:, Metropolitan Transportation Authority Los Angeles, CA gooiz-z952 metro.net REVISED PLANNING AND PROGRAMMING COMMITTEE JANUARY 14, 2015 SUBJECT:
Available online at www.sciencedirect.com. ScienceDirect. Procedia Technology 16 (2014 ) 186 191
Available online at www.sciencedirect.com ScienceDirect Procedia Technology 16 (2014 ) 186 191 CENTERIS 2014 - Conference on ENTERprise Information Systems / ProjMAN 2014 - International Conference on
Movement Planner * System
GE Transportation Optimization Solutions Movement Planner * System Rail s breakthrough network optimization solution GE imagination at work GE Transportation a leader in transforming rail For more than
Routing on Empirical Data (RED) Project
2011 NASCIO RECOGNITION AWARD NOMINATION Nomination Category: Cross-Boundary Collaboration and Partnerships Routing on Empirical Data (RED) Project California Technology Agency Public Safety Communications
English. Trapeze Rail System. www.trapezegroup.com
English Trapeze Rail System www.trapezegroup.com Trapeze Rail System Enabling future railway, tram and metro transport The worldwide growth in demand for travel and increasing competition between all modes
Statement of Objectives. Special Notice D15PS00295 Nationwide Public Safety Broadband Network (NPSBN)
Special Notice D15PS00295 Nationwide Public Safety Broadband Network (NPSBN) 4/27/2015 C Statement of Objectives First Responder Network Authority (FirstNet) Nationwide Public Safety Broadband Network
Skilled and Trained Workforce Mandates coming for School Construction. Contact your State Senator today (Sample Letter at end of message)
Skilled and Trained Workforce Mandates coming for School Construction Contact your State Senator today (Sample Letter at end of message) Three bills this year, AB 566, 1185 and 1358 containing skilled
Railroad Job Vacancies Reported to the RRB June 21, 2016
The following list provides information about job vacancies reported to the Railroad Retirement Board's (RRB) field offices. The list includes orders that the receiving field office does not expect to
The advantages of high accuracy GIS field data collection in the Transportation Industry. MGIS Overview Sergio Hernández
The advantages of high accuracy GIS field data collection in the Transportation Industry. MGIS Overview Sergio Hernández The big question: Where are our assets? Where do we need improvements? WHERE? Where
DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION 49 CFR PARTS 229, 234, 235, AND 236 [DOCKET NO. FRA-2006-0132, NOTICE NO
DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION 49 CFR PARTS 229, 234, 235, AND 236 [DOCKET NO. FRA-2006-0132, NOTICE NO. 1] RIN 2130-AC03 POSITIVE TRAIN CONTROL SYSTEMS REGULATORY IMPACT
Section 2: Overview of Wireless Broadband Networks
Section 2: Overview of Wireless Broadband Networks 2.1 Introduction to Broadband Network Elements Over the past decade, technological innovation and a motivation to deploy broadband in new, efficient ways
TAVORMINA & YOUNG, L.L.P. E-NEWS MARCH 2011 USE OF ELECTRONIC DEVICES ON THE RAILROAD
TAVORMINA & YOUNG, L.L.P. E-NEWS MARCH 2011 The new FRA regulations on Electronic Devices go into effect on March 26, 2011. The following article contains the entire regulation as well as explanatory questions
CHICAGO REGION S INTEROPERABLE TRANSIT SIGNAL PRIORITY PROGRAM
CHICAGO REGION S INTEROPERABLE TRANSIT SIGNAL PRIORITY PROGRAM Daryl Taavola URS Corporation 25 th Annual Transportation Research Conference May 21, 2014 Presentation Overview Background Program Update
*HB0380S03* H.B. 380 3rd Sub. (Cherry) LEGISLATIVE GENERAL COUNSEL Approved for Filing: C.J. Dupont 03-09-16 7:25 PM
LEGISLATIVE GENERAL COUNSEL Approved for Filing: C.J. Dupont 03-09-16 7:25 PM H.B. 380 3rd Sub. (Cherry) Senator Kevin T. Van Tassell proposes the following substitute bill: 1 UTAH COMMUNICATIONS AUTHORITY
SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER IV
Application No.: A.0-0-0 Exhibit No.: SCG Date: March, 00 Witness: Christopher R. Olmsted SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER IV INFORMATION SYSTEMS, APPLICATION DEVELOPMENT
Table 10-1 Travel Times Between Stations 1 10. OPERATING & MAINTENANCE PLAN
10. OPERATING & MAINTENANCE PLAN This section describes an operating plan that responds directly to anticipated commuter ridership patterns. Train schedules, type and capacity of rolling stock, and likely
Section ALTERNATIVES. 3. Alternatives
Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of
SOUTH SHORE BIKES ON TRAINS STUDY BIKES ON TRAINS STUDY PROJECT SUMMARY 3/17/2015
SOUTH SHORE BIKES ON TRAINS STUDY Jack Eskin Northwestern Indiana Regional Planning Commission March 18, 2015 BIKES ON TRAINS STUDY Project Summary Project Team Project Context Project Scope Tasks Completed
Wireless Ethernet LAN (WLAN) General 802.11a/802.11b/802.11g FAQ
Wireless Ethernet LAN (WLAN) General 802.11a/802.11b/802.11g FAQ Q: What is a Wireless LAN (WLAN)? Q: What are the benefits of using a WLAN instead of a wired network connection? Q: Are Intel WLAN products
Arkansas Wireless Information Network
Arkansas Wireless Information Network Report to the Joint Interim Committee on Advanced Communications and Information Technology For the period ending January 31, 2008 This report contains the following
Network Certification Body
Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56 Contents 1 Normative
Questions and Responses For Vehicle Tracking System, Software & Maintenance Service T-23189
1.0) 1. 2.0 2.1.1 20 2. 2.0 2.1.2 20 3. 2.0 2.1.7 20 4. s and s Should the unit be MIL spec or is there a definition of extremely durable? This should be waterproof to how many atmospheres? 1. Is the purpose
SYSTEM SAFETY PROGRAM PLAN. Florida Department of Transportation District 5
SYSTEM SAFETY PROGRAM PLAN Florida Department of Transportation District 5 Draft Prepared By Revision # Date Issue / Revision Description Bombardier Rev A (O&M 9/4/13 revert to Original when no longer
ADVISORY MEMORANDUM REPORT ON DEVELOPMENT OF THE LOAN MONITORING SYSTEM ADVISORY REPORT NUMBER A1-03 FEBRUARY 23, 2001
ADVISORY MEMORANDUM REPORT ON DEVELOPMENT OF THE LOAN MONITORING SYSTEM ADVISORY REPORT NUMBER A1-03 FEBRUARY 23, 2001 This report may contain proprietary information subject to the provisions of 18 USC
Open Payment Fare Systems Save money through operational efficiencies.
Open Payment Fare Systems Save money through operational efficiencies. Open Payment Fare Systems Save money and allow transit agencies to focus on their core mission. Like many businesses worldwide, transit
Case Study CENTRAL FLORIDA REGIONAL TRANSIT AUTHORITY (LYNX) ORLANDO, FLORIDA. Transit Agency Profile and Reason for Selection of Transit Agency
Case Study CENTRAL FLORIDA REGIONAL TRANSIT AUTHORITY (LYNX) ORLANDO, FLORIDA Transit Agency Profile and Reason for Selection of Transit Agency Overview The Central Florida Regional Transportation Authority
Contact: Henry Torres, (870) 972-3033
Information & Technology Services Management & Security Principles & Procedures Executive Summary Contact: Henry Torres, (870) 972-3033 Background: The Security Task Force began a review of all procedures
Radio Frequency (RF) Survey
Municipal Wireless Broadband and the Digital Community Report Radio Frequency (RF) Survey for the City and County of San Francisco July 21, 2006 Preface This document describes Civitium s findings and
GOVERNMENT USE OF MOBILE TECHNOLOGY
GOVERNMENT USE OF MOBILE TECHNOLOGY Barriers, Opportunities, and Gap Analysis DECEMBER 2012 Product of the Digital Services Advisory Group and Federal Chief Information Officers Council Contents Introduction...
December 21, 2012. The services being procured through the proposed amendment are Hosting Services, and Application Development and Support for CITSS.
Justification for a Contract Amendment to Contract 2012-01: Interim Hosting and Jurisdiction Functionality for the Compliance Instrument Tracking System Service (CITSS) December 21, 2012 Introduction WCI,
FSCJ Spectrum Information Memorandum Page 7 of 11 Attachment 1 to FSCJ ITN #2014-33 EDUCATIONAL BROADBAND SERVICE SPECTRUM INFORMATION MEMORANDUM: JACKSONVILLE, FL AND ENVIRONS April 30, 2014 Robert Finch