Annual PTC Progress Report 2015
|
|
|
- Junior Skinner
- 9 years ago
- Views:
Transcription
1 Annual PTC Progress Report 2015 Capital Metropolitan Transportation Authority (CMTY) Docket No. FRA March 28, 2016 Page 1 of 11
2 Annual PTC Progress Report CMTY Name of Railroad or Entity Subject to 49 U.S.C (a): Capital Metropolitan Transportation Authority Railroad Code: CMTY Annual PTC Implementation Progress Report for: 2015 PTCIP Version Number of File with FRA (basis for goals stated): 2.6 Submission Date: March 28, 2016 Contents 1. Summary Update on Spectrum Acquisition Update on Hardware Installation Locomotive Status Infrastructure/Back Office Status Installation/Track Segment Status Update on Employees Trained Progress on Implementation Schedule/Milestones Summary Update of Challengers/Risks Progress on Revenue Service Demonstration (RSD) or Implementation Update for Intercity or Commuter Rail Passenger Transportation (if applicable) Update on Interoperability Progress and Other Formal Agreements Estimated PTC Safety Plan Submission Date (if not already submitted) Testing and Integration Efforts (if applicable: laboratory, integration and revenue service demonstration) Updated Information That FRA Can Use to Maintain its Geographic Information System (GIS) Database Segments Complete and Operable January 20, 2016 Rev 2.6 Page 2 of 11
3 1. Summary Please provide a narrative summary of overall PTC implementation progress during the proceeding calendar year (January 1 to December 31): CMTY has secured Mott MacDonald to act as the PTC Engineer through a 2014 procurement. CMTY will issue a RFP and award a contract for provision and installation of an E-ATC system in 2016, as described in Version 2.6 of its PTCIP. Category Installed Calendar PTCIP End Goal (If Applicable) Installed at End of Total Required for PTC Implementation Locomotives Fully Equipped (note 1) Installation/Track Segments Completed Radio Towers Fully Installed and Equipped (note 2) Employees Trained Back Office Locations Completely Installed and Fully Operable Route Miles in Testing or Revenue Service Demonstration Route Miles in PTC Operation Note 1: Note 2: The CMTY fleet consists of six Stadler GTW 2/6 train sets, with four additional trainsets having been purchased but not delivered. In addition, quantities include equipment operated by tenant railroads including 15 by the AWRR and 1 by the ATCX. CMTY will install an E-ATC system. 220 MHz PTC data radio will not be employed for wayside to train or wayside to back office communications. Additional towers will be installed for SCADA communications with CAD. March 28, 2016 Page 3 of 11
4 2. Update on Spectrum Acquisition The amount of spectrum acquired and available for use during the applicable calendar year and the cumulative amount acquired and available for use at the end of the applicable calendar year, as compared to the amount the railroad stated would be acquired and available for use by the end of that calendar year and in total for PTC implementation, in the applicable revised PTCIP, as amended The basis for how the railroad is determining that the acquired spectrum is available for use by PTC radios (e.g., ensuring non-interference with other radios) Spectrum Area or Location (E.g. county) Spectrum Coverage Area or Location Spectrum Acquired and Available for Use (Owed/Leased) Amount of Spectrum Acquired and Available for Use (Owed/Leased) at End of PTC End Goal for Spectrum Acquired and Available for Use Total Spectrum Required for PTC Implementation, as Reported in PTCIP Please provide any additional narrative for Spectrum Acquisition below: CMTY will install an E-ATC system. 220 MHz PTC data radio will not be employed for wayside to train or wayside to back office communications. March 28, 2016 Page 4 of 11
5 3. Update on Hardware Installation Separated by each major hardware category and subcategory identified below, the amount of PTC hardware installed during the applicable calendar year and the cumulative quantity installed at the end of the applicable calendar year, as compared to the amount the railroad stated would be installed by the end of that calendar year and in total for PTC implementation, in the applicable revised PTCIP, as amended. 3.1 Locomotive Status Category/Installation Feature Locomotive (Apparatus) On-board Computers (e.g., Train Management Computers) Software for Train Management and Other Installed Calendar PTCIP End Goal Installed at End of Total Required for PTC Implementation, as Reported in PTCIP Applications PTC Displays Event Recorders Onboard Antennas and/or Transponder Readers GPS Receivers Locomotive Radios Primary Communications (e.g., 220 MHz radios) Secondary Communications (e.g., cell or WiFi communications) Equipment Please provide any additional narrative for Locomotive Status below: The CMTY fleet consists of six Stadler GTW 2/6 train sets, with four additional trainsets having been purchased but not delivered. In addition, quantities do include equipment operated by tenant railroads including 15 by the AWRR and 1 by the ATCX. March 28, 2016 Page 5 of 11
6 Annual PTC Progress Report CMTY 3.2 Infrastructure/Back Office Status Category/Installation Feature Infrastructure (Back Office) Dispatching Locations (locations complete) Back Office Locations (locations complete) Locations Completed Calendar PTCIP End Goal Complete at End of Total Required for PTC Implementation, as Reported in PTCIP Please provide any additional narrative for Infrastructure/Back Office Status below: 3.3 Installation/Track Segment Status Category/Installation Feature Installed Calendar PTCIP End Goal Installed at End of Total Required for PTC Implementation, as Reported in PTCIP Infrastructure Wayside (by Installation/Track Segment) Installation/Track Segment Identification: Central Subdivision Wayside Interface Units Communications Towers or Poles Switch Position Monitors Planned Fiber or Ground Wiring (per mile) Wayside Radios Base Station Radios Please provide any additional narrative for Installation/Track Segment Status below: Additional towers will be installed for SCADA communications with CAD. January 20, 2016 Rev 2.6 Page 6 of 11
7 4 Update on Employees Trained Separated by each by each employee category identified below, the number of employees trained during the applicable calendar year and the cumulative number of employees trained at the end of the applicable calendar year, as compared to the number the railroad stated would be trained by the end of that calendar year and in total, in the applicable revised PTCIP, as amended. Employee Category Number of Employees Trained Calendar PTCIP End Goal Number of Employees Trained at End of Calendar Total Reported in PTCIP T&E Crew (Operations) Employees Mechanical Employees MOW/Engineering/ Roadway Worker Employees Management Employees Other Staff Please provide any additional narrative for Employee Training below: It is anticipated that training will begin in A total of 148 employees will require training. March 28, 2016 Page 7 of 11
8 5 Progress on Implementation Schedule/Milestones In its annual progress reports, each subject railroad and entity must provide a progress update with respect to its project schedule. A railroad should only submit schedule information demonstrating actual progress as measured against the schedule in its revised PTCIP, as amended. This could be accomplished by providing detailed project schedules and visual aids (e.g., a Gantt chart) if available or any other information documenting current progress as compared to the implementation schedule in the railroad's revised PTCIP, as amended. Details regarding any notable variances or trends that are affecting, or could possibly affect, PTC implementation goals should also be explained in the annual progress reports. Where circumstances are adversely affecting a railroad's implementation of PTC, the railroad must also provide an action plan to recover from, or mitigate, any adverse consequences. Schedule/Milestone Information as described above The extent to which the railroad or entity is complying with the implementation schedule provided in its revised PTCIP, as amended. Please provide any additional narrative for Progress on Implementation Schedule/Milestones below: The schedule provide with PTCIP Version 2.6 remains accurate. 6 Summary Update of Challengers/Risks Any update to the summary of remaining technical, programmatic, operational, or other challengers that the railroad or entity provided in its revised PTCIP, as amended, including challengers with availability of public funding, interoperability, spectrum, software, permitting, and testing, demonstration and certification Schedule risk updates (e.g., funding, technology, agreements) Please provide Summary Update of Challenges/Risks below: The challenges and risks remain as outlined in PTCIP Version 2.6 March 28, 2016 Page 8 of 11
9 Annual PTC Progress Report CMTY 7. Progress on Revenue Service Demonstration (RSD) or Implementation The total number of route miles on which PTC has been initiated for revenue service demonstration or implemented, as compared to the total number of route miles required to have a PTC system (see Section 1 Summary Table) Estimated start date (month and year) for RSD Segment Identification Number or Route Miles In Segment Status at End of Current status of installation/ track segment Estimated Start Date for Revenue Service Demonstration (if not already completed) Central Subdivision Not Started o Installing o Testing o Operational/Complet e After June 30, 2018, as authorized by the FRA. Please provide any additional narrative for Revenue Service Demonstration or Implementation below: 8. Update for Intercity or Commuter Rail Passenger Transportation (if applicable) If this section is not applicable to your railroad, please mark N/A. For each entity providing regularly scheduled intercity or commuter rail passenger transportation, a description of the resources identified and allocated to implement PTC Please provide Update for Intercity or Commuter Rail Passenger Transportation below, if applicable: Capital Metro has committed $28 million to fund the design and implementation of the E-ATC solution over 5 fiscal years. January 20, 2016 Rev 2.6 Page 9 of 11
10 9. Update on Interoperability Progress and Other Formal Agreements For each host railroads: provide updates to any agreements and key milestones for all tenant operations For tenant railroads: provide updates to any agreements and key milestones for all operations over tracks hosted by another railroad Please provide Update on Interoperability below: Austin and Texas Central Railroad (ATCX), Letter of Understanding dated January 13, 2016 Austin and Western Railroad (AWRR), Letter of Understanding dated January 13, Estimated PTC Safety Plan Submission Date (if not already submitted) If this section is not applicable to your railroad, please mark N/A. PTCSP Submission Date June 30, 2018 Please provide any additional narrative for PTCSP Submission below: 11. Testing and Integration Efforts (if applicable: laboratory, integration and revenue service demonstration) Please provide Update on Testing and Integration efforts below: March 28, 2016 Page 10 of 11
11 Annual PTC Progress Report CMTY 12. Updated Information That FRA Can Use to Maintain its Geographic Information System (GIS) Database Segments Complete and Operable In its annual progress reports, a subject railroad or entity may submit a geographic information system (GIS) shapefile to indicate where various rail segments that must have PTC are located, as long as it includes the following fields: (1) a PTC attribute field (coded Y if the line segment is to have PTC installed, otherwise left blank); (2) a SUBDIV attribute field (populated with subdivision name); (3) a MONTH attribute field (populated with the month in which PTC is to be installed); and (4) a YEAR attribute field (populated with the year in which PTC is to be installed). If a railroad chooses to submit the required information by means other than shapefile format, please inform FRA prior to the March 31 st annual reporting deadline. Please provide any additional narrative for GIS Information below: CMTY will be equipping the Central Subdivision with a PTC system, with the installation anticipated to be complete and tested by June 30, 2018 as indicted in Version 2.6 of the CMTY PTCIP. January 20, 2016 Rev 2.6 Page 11 of 11
Metrolink Positive Train Control Program May 2012
Metrolink Positive Train Control Program May 2012 Metrolink s aggressive Positive Train Control (PTC) program calls for installing a back-office system, replacing the current computeraided dispatch system,
Cisco Positive Train Control: Enhancing End-to-End Rail Safety
Solution Overview Cisco Positive Train Control: Enhancing End-to-End Rail Safety What You Will Learn Positive Train Control (PTC), one of many new safety measures mandated by the U.S. Federal Government,
Federal Railroad Administration Report to Congress. Positive Train Control Implementation Status, Issues, and Impacts
Federal Railroad Administration Report to Congress Positive Train Control Implementation Status, Issues, and Impacts August 2012 Contents Executive Summary... 1 1. Introductory Background... 3 1.1 System
Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and
Integration of PTC and Ride Quality Data Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier and dfuzion, Inc., rmetrix Ride Performance Assessment System Supplier The FRA mandate to implement
Montgomery County Bus Rapid Transit System Information Technology Needs
Montgomery County Bus Rapid Transit System Information Technology Needs Department of Technology Services Department of Transportation Montgomery County Government, MD 3/7/2012 2011 by Montgomery County
FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT
FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT Technical Memorandum and Concept of Operations Prepared for: Prepared by: March
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM
APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM W Form 1A, incorporated by reference in Florida Administrative Code Rule 60FF1-5.002 Rural County Grants, E911 Rural County Grant Application, effective
Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01
Notice of Public Hearing Docket B13-01 PROGRAM OF PROJECTS FOR FEDERAL FISCAL YEAR 2013 FUNDS AUTHORIZED UNDER THE MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY ACT (MAP-21) AND THE PASSENGER RAIL INVESTMENT
4. Technology Assessment
4. Technology Assessment KAT Transit Development Plan A technology study for KAT was prepared in 2005. That work provides the basis for this chapter as much of the information is germane and tied to the
STARCOM21 Master Contract #CMS3618850. Attachment D Pricing
STARCOM21 Master Contract #CMS3618850 This is attached to and made a part of the STARCOM21 Master Contract CMS3618850. No modification, amendment or waiver of any provision of this Attachment shall be
Improving Public Transport for Older Adults Using ITS & Other Technologies. Rosemary G. Mathias Carol L. Schweiger
Improving Public Transport for Older Adults Using ITS & Other Technologies Rosemary G. Mathias Carol L. Schweiger Overview What is ITS? What does ITS have to do with older adults? What is the underlying
ATTACHMENT G PRICE PROPOSAL FORM REVISED AND ISSUED 10/26/2011. Williamsburg Area Transit Authority Solicitation Number 12-005
ATTACHMENT G PRICE PROPOSAL FORM REVISED AND ISSUED 10/26/2011 Williamsburg Area Transit Authority Solicitation Number 12-005 PRICE SCHEDULE 1 PRICING FOR CORE SYSTEM COMPONENTS Offerors must complete
49 USC CHAPTER 211 HOURS OF SERVICE 2008 ( RSIA
49 USC CHAPTER 211 HOURS OF SERVICE (as amended by the Rail Safety Improvement Act of 2008 ( RSIA 2008 ), Public Law 110 432, signed October 16, 2008) 1 Sec. 21101. Definitions 21102. Nonapplication, exemption,
FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?
FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving? Jose Gonzalez SVP - Florida East Coast Industries Wednesday, August 12, 2015 1 Florida East Coast Industries
Section 2: Overview of Wireless Broadband Networks
Section 2: Overview of Wireless Broadband Networks 2.1 Introduction to Broadband Network Elements Over the past decade, technological innovation and a motivation to deploy broadband in new, efficient ways
Federal Communications Commission Washington, D.C. 20554
Federal Communications Commission Washington, D.C. 20554 Brian W. Higgins Wilkinson Barker Knauer, LLP 2300 N Street, NW Washington, DC 20037-1128 DA No. 16-742 RE: National Railroad Passenger Corporation
Assessment of NCTD Program Management Framework for Positive Train Control (PTC) Program. Subtask 1: Discovery Current State Revision 3
DELIVERABLE Assessment of NCTD Program Management Framework for Positive Train Control (PTC) Program Subtask 1: Discovery Current State Revision 3 Contract Number: 13025-OS Task Order 1 April 2013 Submitted
POSITIVE TRAIN CONTROL
POSITIVE TRAIN CONTROL Monthly Report CONTENTS 1. EXECUTIVE SUMMARY... 1 1.1. Project Overview... 1 1.1.1. PTC Inter-Agency Coordination... 1 1.1.2. PTC Operations and Maintenance... 2 1.2. Scope of Work
SYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS
ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS Audit Report OIG-A-2015-012 June 17, 2015 DRAFT REPORT Page intentionally left blank NATIONAL RAILROAD
Lesson 2: Technology Applications Major Transit Technologies Grouped by Function
Technology Tool Accounting Software Automatic Passenger Counters (APC) Automated Scheduling and Routing Software Automated Vehicle Location Systems (AVL) Communications Computer-Assisted Software for Demand
FISCAL YEAR 2014 SOLICITATION FOR PROPOSALS FOR FEDERAL JOB ACCESS AND REVERSE COMMUTE AND NEW FREEDOM PROGRAM FUNDS EVALUATION CRITERIA
FISCAL YEAR 2014 SOLICITATION FOR PROPOSALS FOR FEDERAL JOB ACCESS AND REVERSE COMMUTE AND NEW FREEDOM PROGRAM FUNDS EVALUATION CRITERIA Los Angeles County Metropolitan Transportation Authority (LACMTA)
ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)
ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle
SYSTEM SAFETY PROGRAM PLAN. Florida Department of Transportation District 5
SYSTEM SAFETY PROGRAM PLAN Florida Department of Transportation District 5 Draft Prepared By Revision # Date Issue / Revision Description Bombardier Rev A (O&M 9/4/13 revert to Original when no longer
From the FTA 5310 Circular (C9070.1F): 1. ELIGIBLE CAPITAL EXPENSES. Funds for the Section 5310 program are available for capital expenses as defined
From the FTA 5310 Circular (C9070.1F): 1. ELIGIBLE CAPITAL EXPENSES. Funds for the Section 5310 program are available for capital expenses as defined in Section 5302(a)(1) to support the provision of transportation
APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM
APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM W Form 1A, incorporated by reference in Florida Administrative Code Rule 60FF1-5.002 Rural County Grants, E911 Rural County Grant Application, effective
Industry Overview. Transportation
Industry Overview Transportation Rail L-com provides rugged wired and wireless communications solutions to address rail applications including in-car communications, car to car communications, wayside
APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL
DRAFT APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL Operations and Maintenance Cost Methodology and Results The Colorado Department of Transportation is conducting an Advanced Guideway System
City of Sacramento Community Wireless Broadband Network
Request for Information (RFI) (I15071011001) City of Sacramento Community Wireless Broadband Network RFI Submittals Due: August 22, 2014 by 3:00 p.m. (PST) (Submit electronically, in PDF format) via the
CalMod Design-Build Electrification Services
SECTION 01800 SYSTEMS INTEGRATION AND INTEGRATOR REQUIREMENTS PART 1 GENERAL DESCRIPTION A. This section specifies the system-wide integration requirements for the Caltrain Electrification system, i.e.
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of
The State of Maryland s Coverage and Data Collection for the Nationwide Public Safety Broadband Network
The State of Maryland s Coverage and Data Collection for the Nationwide Public Safety Broadband Network Objective: The Nationwide Public Safety Broadband Network (NPSBN) promises to provide critical broadband
Request for Proposal (RFP) The Management of CSIR Records. RFP Number: 336/30/05/2014 - Rev
Request for Proposal (RFP) The Management of CSIR Records RFP Number: 336/30/05/2014 - Rev Date of Issue 11 May 2014 Compulsory Briefing Session Closing Date and Time Place 15 May 2014 at Building 22 Central
Experts in Rail Maintenance and Infrastructure
Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail
OFFICE OF INFORMATION TECHNOLOGY 9-1-1 STATE GRANT COMPLIANCE SUPPLEMENT -----------------------------------------------------------
OFFICE OF INFORMATION TECHNOLOGY 9-1-1 STATE GRANT COMPLIANCE SUPPLEMENT ----------------------------------------------------------- TABLE OF CONTENTS ------------------------------- NJFIS Account Number
Spec. Standard: 11/27/06 01310-1 Revision: 11/27/06
SECTION 01310 CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. Construction Progress Schedule: The CONTRACTOR shall submit a detailed work progress schedule showing all work in a graphic format suitable
RFP for Asset Management Software and Implementation Answers to Questions
RFP for Asset Management Software and Implementation Answers to Questions 1. Is Android a must have for the field crew on the mobility piece? Or, will a dashboard that can be accessed from any connected
AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility
FOR IMMEDIATE RELEASE: May 13, 2013, 5 AM ET ATK-13-039 Media Contact: Amtrak: 202 906.3860 Siemens: 917 622.2413 AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment
Positive Train Control (PTC) Program Management Plan
Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information
CHICAGO REGION S INTEROPERABLE TRANSIT SIGNAL PRIORITY PROGRAM
CHICAGO REGION S INTEROPERABLE TRANSIT SIGNAL PRIORITY PROGRAM Daryl Taavola URS Corporation 25 th Annual Transportation Research Conference May 21, 2014 Presentation Overview Background Program Update
National Railroad Passenger Corporation AMTRAK. Fiscal Years 2013 2017 Five Year Plan. May 2013
National Railroad Passenger Corporation AMTRAK Fiscal Years 2013 2017 Five Year Plan May 2013 Table of Contents Introduction... 4 Background... 4 PRIIA Sections 209 and 212... 5 Amtrak s Strategic Plan...
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety...
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents Crossing Safety... 4 Rail Planning, Projects, and Operations... 5 Rail Safety...
Southern Utah Water SCADA Project and Dispelling Myths regarding 900MHz Spread Spectrum Technology:
Southern Utah Water SCADA Project and Dispelling Myths regarding 900MHz Spread Spectrum Technology: Problem: How to get reliable and accurate data from hundreds of IO points scattered throughout a very
RESOLUTION R2004-48. PASSED AT SYCAMORE, ILLINOIS, THIS 16th DAY OF JUNE 2004, A.D. Chairman, DeKalb County Board ATTEST: County Clerk
RESOLUTION R2004-48 WHEREAS, the Governmental Accounting Standards Board issued Pronouncement #34 which requires governmental entities to capitalize and report Fixed Assets on the annual audited financial
Wireless AVL Tracking Systems, The Benefits for Utilities and Service Fleets
Wireless AVL Tracking Systems, The Benefits for Utilities and Service Fleets Vehicle Tracking and 2-way 2 Messaging Service By Ryan Smith Welcome to the basics AVL = GPS vehicle tracking for fleets of
The HetNet Bible (Small Cells and Carrier WiFi) - Opportunities, Challenges, Strategies and Forecasts: 2013 2020 With an Evaluation of DAS & Cloud
The HetNet Bible (Small Cells and Carrier WiFi) - Opportunities, Challenges, Strategies and Forecasts: 2013 2020 Revision Date: 10 May 2013 2.1.3 HetNets: An Evolution of Network Topology Driven by both
I-29 Corridor ITS Architecture and Systems Engineering Analysis
430 IACC Building Fargo, ND 58105 Tel 701-231-8058 Fax 701-231-1945 www.ugpti.org www.atacenter.org I-29 Corridor ITS Architecture and Systems Engineering Analysis Technical Memorandum December 2001 Prepared
ATTACHMENT K 5310 ELIGIBLE COST
ATTACHMENT K 5310 ELIGIBLE COST Attachment K - Traditional 5310 Eligible Cost a. Rolling stock and related activities for Section 5310-funded vehicles (1) Acquisition of expansion or replacement buses
Austin to Houston Passenger Rail Study
Austin to Houston Passenger Rail Study Final Report December 2011 Prepared by Table of Contents Executive Summary... i Background... i Existing Conditions...ii Alternative Alignments Analysis...ii Improvements
1.264 Lecture 36 (Solutions)
1.264 Lecture 36 (Solutions) Telecom: Wireless networks Next class: Green chapter 31,33, 36, 39. No exercise. 1 Exercise Design a system for an intercity rail passenger train to provide Internet access
Rail Automation. What is ACSES? usa.siemens.com/rail-automation
Rail Automation What is ACSES? usa.siemens.com/rail-automation What is ACSES? Siemens, a specialist in the area of US Cab Signal design, offers a carborne product that provides both Civil Speed Enforcement
Performance Goals and Objectives:
Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,
Assessment of NCTD Program Management Framework for Positive Train Control Program
Assessment of NCTD Program Management Framework for Positive Train Control Program Subtask 2: Analysis Gap Analysis Prepared for: Brad Hansen, M.S., PMP Director, PMO Capital Projects May 2013 0 icfi.com/transportation
Presentation to Transportation, Technology & Infrastructure Committee
Presentation to Transportation, Technology & Infrastructure Committee Proposed Master License Agreement for Use of the Rights-of-Way by Distributed Antenna and Small Cell Systems Presented By: Department
National Railroad Passenger Corporation AMTRAK. Fiscal Year 2014 Budget Request Justification. Operating, Capital Programs And Debt Service Expense
National Railroad Passenger Corporation AMTRAK Fiscal Year 2014 Budget Request Justification Operating, Capital Programs And Debt Service Expense May 2013 Table of Contents Introduction... 4 Strategic
How To Plan A City Of Mason
Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work Briefing for Madison Area TPB/MPO June 6, 2012 TMP: Overview/Purpose Help Create Walkable, Bikeable, Livable City - Strengthen
Appendix A - Cost Estimate Spreadsheet
CCTV Camera, PTZ Per Each $18,500 $1,250 12 $33,500 Closed circuit television (CCTV) camera with pan, tilt, zoom (PTZ) functionality in a dome enclosure. CCTV Camera, Fixed Per Each $14,000 $1,250 12 $29,000
ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators. 19 September 2005
ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators 19 September 2005 1. General 1.1 General 1.1.1 Scope and Standard The Australian Metropolitan Railway
TAVORMINA & YOUNG, L.L.P. E-NEWS MARCH 2011 USE OF ELECTRONIC DEVICES ON THE RAILROAD
TAVORMINA & YOUNG, L.L.P. E-NEWS MARCH 2011 The new FRA regulations on Electronic Devices go into effect on March 26, 2011. The following article contains the entire regulation as well as explanatory questions
UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK
UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK Testimony of HERZOG TRANSIT SERVICES, INC. Tuesday April 29,
the amount of data will grow. It is projected by the industry that utilities will go from moving and managing 7 terabytes of data to 800 terabytes.
Before the Department of Energy Washington, D.C. 20585 In the Matter of Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart
AnNual Audit, Inspection, and
Amtrak Amtrak Office of Inspector General www.amtrakoig.gov AnNual Audit, Inspection, and Evaluation Plan Fiscal Year 2013 OIG-AIE Sept. 30, 2012 Amtrak Office of Inspector General I Semiannual Report
Basic Network Design
Frequency Reuse and Planning Cellular Technology enables mobile communication because they use of a complex two-way radio system between the mobile unit and the wireless network. It uses radio frequencies
Employment and Training Administration
DEPARTMENT OF LABOR Employment and Training Administration TA-W-60,370 MICROWAVE ANTENNA DIVISION INCLUDING ON-SITE TEMPORARY WORKERS OF UTI TA-W-60,370A CABLE ASSEMBLY DIVISION INCLUDING ON-SITE TEMPORARY
City of Hermosa Beach Notice Inviting Bids Electronic Patient Care Reporting System (epcr)
City of Hermosa Beach Notice Inviting Bids Electronic Patient Care Reporting System (epcr) Introduction The City of Hermosa Beach is seeking proposals from qualified proposers, also hereinafter referred
Utilizing IP & Data Services to provide Secure Global Push To Talk Communications
Utilizing IP & Data Services to provide Secure Global Push To Talk Communications Link Communications, Inc. 1035 Cerise Road Billings, MT 59101-7378 www.link-comm.com Who we are Link Communications global
GUIDANCE FOR TRANSIT FINANCIAL PLANS
U.S. Department of Transportation Federal Transit Administration GUIDANCE FOR TRANSIT FINANCIAL PLANS JUNE 2000 Prepared By: Federal Transit Administration Office of Planning Office of Program Management
Office of Safety and Compliance
The Federal Railroad Administration (FRA) was created by the Department of Transportation Act of 1966. It is one of ten agencies within the U.S. Department of Transportation concerned with intermodal transportation.
DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION 49 CFR PARTS 229, 234, 235, AND 236 [DOCKET NO. FRA-2006-0132, NOTICE NO
DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION 49 CFR PARTS 229, 234, 235, AND 236 [DOCKET NO. FRA-2006-0132, NOTICE NO. 1] RIN 2130-AC03 POSITIVE TRAIN CONTROL SYSTEMS REGULATORY IMPACT
Los Angeles Metro Rapid
Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it