1 Virginia s Approach to Intercity Passenger Rail Development Kevin B. Page Chief Operating Officer Virginia Department of Rail and Public Transportation June 14,
2 High Speed Rail Map 2
3 3
4 What do These Map Segments Represent for Virginia? Richmond to Washington, D.C. $1.8B MAS 90 MPH Richmond to Hampton Roads $.5B MAS 90 MPH Richmond to Raleigh $2.4B cost, $1.3B in VA MAS 110 MPH 4
5 State Rail Agency Challenges Balancing the perception of what should be achieved with the reality of what can be achieved. Wait for the federal program or go it alone. Advancing intercity passenger rail incrementally utilizing limited state resources while continuing project readiness in preparation for a sustainable federal program for high speed intercity passenger rail development Retaining existing regional intercity passenger rail in the advent of PRIIA Section 209 Virginia is one of a small handful of states that appear ready for October 2013 implementation 5
6 System Mileage Virginia Highway and Rail Miles Competition or Part of an Overall Transportation System? 80,000 70,000 69,114 60,000 57,865 50,000 40,000 30,000 20,000 10, ,191 4,395 3,929 3, Rail Miles Highway Miles 6
7 Virginia Gets It Virginia s Passenger and Freight Rail System is perceived as an integral part of the Commonwealth s Transportation System Virginia has some of the most innovative codified rail funding programs in the United States 1987 Rail Industrial Access Fund 2005 Rail Enhancement Fund 2007 Rail Preservation and Development Fund 2011 Intercity Passenger Rail Operating and Capital Fund Virginia initiated intercity passenger rail service starts 2009 Lynchburg 2010 Richmond 2012 Norfolk Within 4 years Roanoke Within 10 years Trains 2 and 3 Norfolk Through the support of the State Legislature and the Administration, DRPT continues to position Virginia to achieve a greater vision on passenger and freight rail development. 7
8 DRPT Legislative Actions HB1828 Codifies the Supreme Court decision that a state s rail system does provide a highway benefit Authorizes the Department of Rail and Public Transportation to acquire and hold title to land for constructing rail infrastructure Currently DRPT may lease, construct and improve rail infrastructure, but is not expressly authorized to own rail infrastructure. This legislation adds the authority for DRPT to hold title to abandoned rail way and to preserve it for future rail development. 8
9 DRPT Legislative Actions HB2152 Requires that the Chairman of the Commonwealth Transportation Board or his designee to be counted for a quorum on Transportation District Commissions Ensures that both the Chairman and the legislative members have a vote on those commissions. Also gives the Chairman of the Commonwealth Transportation Board or his designee equal voting weight on the Virginia Railway Express. In any year that the Commonwealth contributes as much or more as the largest local contributor, Virginia will receive the same voting weight as that jurisdiction. Effective on July 1,
10 Transportation Funding Bill HB2313 Impact to DRPT $300 million for the Dulles Metrorail Corridor Extension Designated revenue source for Intercity Passenger Rail Operating and Capital Fund (IPROC) Approx. $44.3M in the first year Operating funds for continued and expanded Intercity Passenger Rail Service Extension of passenger train service to Roanoke Addition of trains 2 & 3 for Norfolk-Washington route Capital funds for Intercity Passenger Rail Projects Track Performance Improvements» Newport News-Richmond» Richmond-Washington Increase of transit funding Approximately $66.5M in the first year Funding - 3% statewide sales tax increase and increased MTTF dollars from the TTF 10
11 Virginia Rail System Two passenger rail operators Amtrak and Virginia Railway Express Eleven freight railroads Two national Class I Railroads: Norfolk Southern and CSX Nine local shortline railroads 11
12 Corridor Passenger and Freight Rail Initiatives 12
13 Shortline Initiatives Rail Preservation and Development Program 9 shortlines in VA Provide last mile service Maintain FRA class 2 standards safety, signaling and reliability 13
14 Passenger Rail Service In Virginia Present and Future Amtrak VA Lynchburg, Richmond/Norfolk Amtrak Regional 2 Newport News, 2 Richmond All go into Northeast Corridor All same seat to Boston Amtrak Long Distance Cardinal, Crescent, Carolinian, Palmetto, Silver Meteor, Silver Star Auto Train 14
15 Virginia Regional Amtrak Passenger Service Projected Population Areas 15
16 State Sponsored Conventional Speed Train Service Lynchburg Service 2009 Richmond Service 2010 Next Stop Roanoke! Norfolk Service
17 Set the Vision and Show How to Get There States Need a Rail Plan and a Resource Allocation Plan Virginia s Rail Plan is accompanied by a Resource Allocation Plan Rail Plans need a vision of greater than the Six Year Improvement Program Constrained Six Year Program longer range vision plan of projects 17
18 Amtrak Virginia Near Future - 1 Lynchburg train extended to Roanoke (approx ) - 2 Richmond trains extended to Norfolk (approx. 2022) Amtrak Virginia Future - 1 new train to Lynchburg - 1 Roanoke train extended to Bristol - 1 Lynchburg train extended to Roanoke - 1 new train Richmond to Lynchburg Richmond to Hampton Roads Passenger Rail 1 new to Newport News + 6 total Norfolk from Richmond SEHSR 4 new trains DC to Raleigh Virginia State Rail Plan Intercity Passenger Rail 18
19 Virginia s Second Path Federal Funding In order to achieve the vision for higher speed passenger rail in Virginia, a strong federal participation is necessary, but comes with requirements: Lengthy federal environmental process can require more than eight years to complete Performance requirements are difficult to achieve without full funding for corridor-wide improvements Opportunities to apply for funding limited and may not coincide with planning/construction phases State-funded projects can advance faster, but not sufficient state funding available to meet all needs 19
20 Federal High Speed Rail Projects 20 20
21 Federal HSR Planning Process- Richmond Area to Washington, D.C. $45.5M in federal FY2010 high speed rail funds to advance environmental study and infrastructure improvements for entire corridor. $44.3M Richmond Area to Washington, D.C. Preliminary Engineering and Tier II EIS Agreement finalized with FRA on October 1, DRPT s GEC GPC consultant process being finalized. Total anticipated project cost of $55.4M CSX and DRPT will provide $11.1M match ~ 96 Month Project. $1.2M Appomattox River Bridge design Funds returned to FRA December 5, CSX and DRPT agree on improvements between Richmond and Petersburg for near/mid term capacity improvements to Norfolk. 21
22 Federal HSR Planning Process- Richmond Area to Potomac River Segment RAPS Tier II EIS 110 mile segment Extends from junction of CSX A-Line and CSX S-Line at Centralia (MP A-11) northward via the S-Line through Richmond's Main Street Station. Rejoins A-Line near Staples Mill Station. Extends northward along the CSX Richmond, Fredericksburg and Potomac Subdivision (RF&P) to Control Point RO in Arlington (MP CFP-110). Also includes the following improvement areas: - CSX Peninsula Subdivision in the Richmond area between AM Junction and Beulah to the east. - Buckingham Branch Railroad from AM Junction to Ruffin. 22
23 Richmond Area Passenger Rail Map Amtrak Station (Staples Mill) CSX Line to Washington, DC CSXT Acca Freight Yard (Rail Chokepoint) Capacity Constrained Dual Single Track Sections Buckingham Branch Railroad Amtrak Station (Main Street) A Line Current Amtrak Route S Line to Centralia to Main St. Station CSX Line to Newport News Current Amtrak Route 23
24 Virginia-North Carolina Interstate High-Speed Rail Compact Established in 1994 in VA by SB and in NC by NC General Statutes - Chapter 136 Article Made up of ten members of the VA and NC legislature To study, develop, and promote a plan for the design, construction, financing, and operation of interstate high-speed rail service through and between points in the Commonwealth of Virginia and the State of North Carolina and adjacent states To coordinate efforts to establish high-speed rail service at the federal, state, and local governmental levels To advocate for federal funding to support the establishment of highspeed interstate rail service within and through Virginia and North Carolina and to receive federal funds made available for rail development 24
25 Richmond to Raleigh Tier II EIS Current Status - DRPT and NCDOT continue to advance work on the Richmond to Raleigh Tier II EIS Completing Project Update Meetings in areas with revised roadwork designs DRPT has accommodated the third track alignment for high speed rail operations as a part of the Collier Connection alignment for the Norfolk train service extension Early Complete Tier II Final EIS Summer Record of Decision, Conduct Public Hearings Before SEHSR service is to begin, significant track capacity improvements must be made between Raleigh and Washington, D.C. 25
26 Southeast High Speed Rail (SEHSR) Complete Environmental and Design Track improvements on existing segments 1. Richmond, VA to Washington, DC Petersburg, VA to Richmond, VA 2. Petersburg, VA to Norfolk, VA* 3. Petersburg to Raleigh, NC Subject to funding Coordinate with FRA Amtrak Railroads Local Governments Property Owners Next Steps *Advancing under Hampton Roads EIS 26
27 Points of Discussion for Passenger Rail Development What is the policy for passenger rail development in Virginia? Affordability of conventional incremental service development VS high speed rail development State Program Good working relationship with both NS and CSX with Framework Agreements in place Incremental State service can be implemented quickly Track capacity is achieved through agreements, service is operated by Amtrak under Amtrak s access and performance agreements already in place Federal Program 20% capital match to FRA grants, 20 year Maintenance of Project Commitment, 20 year commitment to fund additional service operations, Corridor Service Development Programs VS individual projects (commitment to build entire corridor VS segments) Risk/Payback - Performance payback (on time performance), loss of passenger service payback (all Amtrak service ceases), and failure to provide additional service payback (additional trains committed) 27
28 Points of Discussion for Passenger Rail Development (Continued) Need for a National Rail Plan Guiding principles on defining passenger and freight rail development High speed intercity passenger rail and at what speed is it co-mingled with freight as high capacity corridors or right-of-way of its own? What is the federal role and participation both in planning and function? What is the definition of the SEHSR Corridor? Washington, D.C. to Charlotte with extension to Norfolk Do we stop here? 1994 MOU goes to Florida Sequencing of individual projects and who will pay for the improvements? (assuming Raleigh-Charlotte is fully funded) Washington, D.C. to Richmond Area Richmond Area to Petersburg and Norfolk Petersburg to Raleigh 28
29 Key Points Regarding Funding Virginia is competing nationally for federal funds but has some advantages: Framework agreements in place with railroads Agreement with Amtrak for state sponsored passenger rail service State funding program for rail capital projects Multi-state agreements in place VA High Speed Rail Corridor program links the Northeast Corridor to the south and demonstrates how the ARRA creates both short- and long-term outcomes and benefits Close working relationship with CSX, NS, VRE, Amtrak and FRA to develop key projects Local and Regional Governments will need to work to develop new station facilities though use of local, regional, and federal funding sources 29
30 Thank You! 30
2.1 Prior Richmond to South Hampton Roads Rail Service
2.0 BACKGROUND 2.1 Prior Richmond to South Hampton Roads Rail Service The Norfolk and Western (N&W), now NS, the Seaboard Air Line (SAL) and the Atlantic Coast Line (ACL), both now CSXT, previously operated
VRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development
Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
Performance Goals and Objectives:
Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,
SYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
[THIS PAGE INTENTIONALLY LEFT BLANK]
[THIS PAGE INTENTIONALLY LEFT BLANK] March 24, 2010 Thomas Carper Chairman of the Board National Railroad Passenger Corporation 60 Massachusetts Avenue, N.E. Washington, DC 20002 Joseph H. Boardman President
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs
457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS THE NEC IS THE BUSIEST RAIL CORRIDOR IN THE NATION, AND IS VITAL TO THE ECONOMY AND CITIES OF THE NORTHEAST. Why NEC FUTURE? The Northeast United
Planning and Development Committee Board Action Item III-A November 16, 2006 Master Agreements
Planning and Development Committee Board Action Item III-A November 16, 2006 Master Agreements Washington Metropolitan Area Transportation Authority Board Action/Information Summary Action Information
Virginia's Transportation Performance Management System
Virginia's Transportation Performance Management System Office of Intermodal Planning and Investment Commonwealth Transportation Board Presented by: David Tyeryar, Deputy Secretary of Transportation September
Florida Transportation Commission: A Meeting of the Modes
Florida Transportation Commission: A Meeting of the Modes Corridors of the Future: A National and I-95 Corridor Perspective George Schoener, Executive Director I-95 Corridor Coalition February 12, 2007
The Gateway Program and Hudson Tunnel Project
The Gateway Program and Hudson Tunnel Project Presented to: NJ State Senate Oversight Committee Stephen Gardner Executive Vice President NEC Business Development August 10, 2015 1 The Need for Gateway
NEW BLUE LINE CONNECTIONS
Washington Metropolitan Area Transit Authority NEW BLUE LINE CONNECTIONS 3/31/2014 A Major Capital Project of Momentum s Metro 2025 Program In support of its new strategic plan, Metro has considered the
Section ALTERNATIVES. 3. Alternatives
Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of
Environmental Impact Statement for the Washington Union Station Expansion Project
This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
Chapter 5 Financial Plan
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to
USA: INFRASTRUCTURES DAY
USA: INFRASTRUCTURES DAY Business Opportunities for Infrastructures in the US Market Business Conference 21th November 2014 Auditório do Banco Popular Rua Ramalho Ortigão, 51 Lisboa Organização: Patrocinadores:
Owner s Procurement Forum
Washington Metropolitan Area Transit Authority Construction Management Association of America National Capitol Chapter Owner s Committee Owner s Procurement Forum February 24, 2015 OVERVIEW of WMATA INFRASTRUCTURE:
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety...
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents Crossing Safety... 4 Rail Planning, Projects, and Operations... 5 Rail Safety...
Midwest Regional Rail Initiative Phase 7. South of the Lake Route Alternatives Analysis Report
South of the Lake Alternatives Analysis Report Table of Contents Midwest Regional Rail Initiative Phase 7 South of the Lake Route Alternatives Analysis Report Prepared for: Indiana Department of Transportation
UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK
UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK Testimony of HERZOG TRANSIT SERVICES, INC. Tuesday April 29,
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 15 Page 16 Executive Director Jane N. Kusiak Page 17 Page 18 Page 19 Page 20 How do we get organized
Associated Students of the University of California, Merced 2014-2015. Resolution #14. Resolution in Support of the California High-Speed Rail Project
Introduced By: Isaias Rumayor III, ASUCM Senator At-Large Authored By: Michael Lomio, ASUCM Senator At-Large Isaias Rumayor III, ASUCM Senator At-Large Sponsored By: Background: The California High-Speed
VTrans2035 Report to the Governor and General Assembly
Virginia s Long-Range Multimodal Transportation Plan VTrans2035 Report to the Governor and General Assembly Prepared for: Commonwealth Transportation Board Prepared by: Office of Intermodal Planning and
Financial Plan Status Report
Financial Plan Status Report Broward MPO Board March 13, 2014 Financial Sub-Committee Membership SFRTA (lead agency) Broward MPO FDOT Miami-Dade MPO Palm Beach MPO South Florida Regional Planning Council
Layover Facility Alternatives Analysis
Layover Facility Alternatives Analysis March 2013 Version 0 Back of cover page March 2013 South Station Expansion Massachusetts Department of Transportation Table of Contents 1. Introduction...1 1.1. Layover
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
technical memorandum Statewide Rail Capacity and System Needs Study Task 9 Asset Management Washington State Transportation Commission
Statewide Rail Capacity and System Needs Study technical memorandum prepared for Washington State Transportation Commission prepared by Cambridge Systematics, Inc. with HDR, Inc. December 2006 www.camsys.com
IDOT Chicago - St. Louis High-Speed Rail Program Management
1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff
Florida s Future Corridors Initial Study Areas
What is the Future Corridors Initiative? The Future Corridors initiative is a statewide effort led by the Florida Department of Transportation (FDOT) to plan for the future of major transportation corridors
FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?
FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving? Jose Gonzalez SVP - Florida East Coast Industries Wednesday, August 12, 2015 1 Florida East Coast Industries
EXECUTIVE SUMMARY... vi 1.0 PURPOSE AND NEED FOR PROJECT... 1
CONTENTS EXECUTIVE SUMMARY... vi 1.0 PURPOSE AND NEED FOR PROJECT... 1 1.1 Introduction... 1 1.2 Proposed Action... 3 1.3 Summary of Purpose and Need... 5 1.4 Project Area Description... 6 1.5 Sub-Project
Central Minnesota Freight Plan December 2012
6.0 RAIL PROFILE Statewide, Minnesota claims 4,481 miles of active railroad track in the state which ranks 8 th in the nation. Two Class I railroads and one switching/terminal railroad operate 391 miles
L E G I S L A T I V E A N A L Y S T S O F F I C E
November 29, 2011 High-Speed Rail Authority: The Draft 2012 Business Plan and Funding Plan L E G I S L A T I V E A N A L Y S T S O F F I C E Presented to: Assembly Transportation Committee Hon. Bonnie
AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility
FOR IMMEDIATE RELEASE: May 13, 2013, 5 AM ET ATK-13-039 Media Contact: Amtrak: 202 906.3860 Siemens: 917 622.2413 AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment
Rider Alert card distribution locations
Rider Alert card distribution locations Virginia Motorcycle Dealers Association Members Greater Richmond Area Commonwealth Power Sports 2000 Waterside Road Prince George, VA 23875 Colonial Harley Davidson
30 Years of Smart Growth
30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,
Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation
Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation FY 2017 Budget Summary The Obama s Administration s proposed budget for FY 2017, which was submitted to Congress February
Project R-4467 PROJECT DESCRIPTION PROJECT SCHEDULE PURPOSE OF THIS MEETING WHAT WILL BE DONE WITH THE COMMENTS? FOR MORE INFORMATION:
Workshop #3 Aug ust 2012 PROJECT DESCRIPTION The North Carolina Department of Transportation (NCDOT) proposes to maintain a direct highway connection between Hertford and Winfall along or close to US 17
A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission
A Presentation by the Project Managers: Rick Canizales Prince William County & Jana Lynott, AICP Northern Virginia Transportation Commission for the: Public Open House and Hearing December 6, 2005 George
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
An Interim Assessment of Achieving Improved Trip Times on the Northeast Corridor
An Interim Assessment of Achieving Improved Trip Times on the Northeast Corridor Prepared by Amtrak Under Section 212(d) of the Passenger Rail Investment and Improvement Act of 2008 (Public Law 110-432)
Dallas-Fort Worth Area Major Transportation Projects
Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional
Corporate Headquarters
Say Yes To Aerospace in Virginia Corporate Headquarters 1 Many of the Nation s Largest Companies Call Virginia Home: Virginia is home to 73 company headquarters that each have annual sales of more than
(Last revised 06/15) Form MP 227 - Hauling Permit Geographical Regulations Applicable for Travel Thru Cities/Towns/Counties
(Last revised 06/15) Form MP 227 - Hauling Permit Geographical Regulations Applicable for Travel Thru Cities/Towns/Counties Except when travel is upon the Interstate Highway System, no travel is permitted
SECTION 2 CORRIDOR A
SECTION 2 CORRIDOR A 2.1 CORRIDOR A (HILLSBOROUGH RIVER TO 40 TH STREET IN TAMPA) The boundaries for Corridor A can be seen in Figure 2-1. They are as follows: North: I-4 South: Crosstown Expressway (now
Triangle Transit Financial Plan. Durham Orange Light Rail Transit Project
Durham Orange Light Rail Transit Project September 2012 TABLE OF CONTENTS LIST OF TABLES... ii LIST OF FIGURES... iii 1. Introduction... 1 1 1.1. DESCRIPTION OF PROJECT SPONSOR... 1 1 1.1.1. Durham Transit
Austin to Houston Passenger Rail Study
Austin to Houston Passenger Rail Study Final Report December 2011 Prepared by Table of Contents Executive Summary... i Background... i Existing Conditions...ii Alternative Alignments Analysis...ii Improvements
FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING * * *
FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING By P. Jeffrey McQueen, P.E., Consulting Engineer Abstract The AREMA Manual for Railway Engineering, Chapter 30, Part 4, gives
New York Avenue-Florida Avenue- Galludet University Metro Station: A Case Study
New York Avenue-Florida Avenue- Galludet University Metro Station: A Case Study The New York Avenue-Florida Avenue-Galludet University Metro station in Washington DC is a result of planners and neighborhood
Questions and Answers about the Orange Bus/Rail Investment Plan
Why are transit improvements needed? Questions and Answers about the Orange Bus/Rail Investment Plan The Triangle Region is now home to 1.5 million people. The U.S. Census and the 2035 Joint Long Range
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
Arlington County Fiscal Year 2014 Summary Report on Capital Bikeshare
Arlington County Fiscal Year 2014 Summary Report on Capital Bikeshare Arlington County Commuter Services Department of Environmental Services Arlington County, Virginia October 6, 2014 Introduction Capital
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
Integrating the I-95 Vehicle Probe Project Data and Analysis Tools into the FAMPO Planning Program
Integrating the I-95 Vehicle Probe Project Data and Analysis Tools into the FAMPO Planning Program I-95 Corridor Coalition Background The I-95 Corridor Coalition is an alliance of transportation agencies,