RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS
|
|
|
- Malcolm Dorsey
- 9 years ago
- Views:
Transcription
1 RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS Please provide the following information when applying to RPA 14/ATURA for Surface Transportation Program (STP) funding for projects you propose to include in the RPA 14/ATURA Transportation Improvement Program (TIP) FY by January 4, Applicant(s): Project Name: Lead Agency if Multi-Jurisdictional: Classification of project: (Check those that apply) Construction, reconstruction, resurfacing, restoration, and rehabilitation. Operation improvements Capital costs for transit projects and publicly owned intra-city and intercity bus terminals or facilities Highway and transit safety programs Surface transportation planning, highway and transit technology transfer activities, and research and development Capital and operating costs for traffic management and control Fringe and corridor parking facilities Most transportation control measures in the Clean Air Act Development and establishment of management systems Enhancements/Transportation Alternatives County/City borrowing ahead Provide a brief narrative describing your project: Explain why STP funds are needed and provide a preliminary budget showing the source of all funds: Federal Fiscal Year: Total Cost: $ Federal Participation Requested: $ % Non-FHWA Match: $ %
2 Roadway or bike/pedestrian Projects: County: City: Route/Street/Bridge ID#: Annual Average Daily Traffic: (Year of count ) Length (Miles): Beginning Point Termini: Type of Work: Contact Person / Phone / Please attach a narrative describing how this project addresses the following ranking criteria: 1. The degree to which the proposed project fulfills the intent of the Moving Ahead for Progress in the 21st Century Act (MAP-21) and the goals and priorities of RPA 14/ATURA and its most recent Long Range Transportation Plan. (See attached ATURA Action Plan & Priorities) 2. Projects that encourage economic vitality - jobs created through construction or ongoing use of project, promotes tourism, enhances freight movement, enhances movement of workers or consumers, or improves business opportunities. 3. Projects that enhance inter-connectivity through pedestrian/bicycle/sidewalk facilities, transit connections, or improves connectivity to a road classified as arterial or higher, improves freight connectivity or access to multiple modes of transportation. 4. Projects that demonstrate environmental justice (to what extent does the project serve minority, disabled or low-income persons or improve access to essential services for the population in general). 5. Projects that demonstrate significant system use and scale (# of persons/vehicles impacted by project, contribution to regional transportation system, impact of project on quality of life). 6. Projects with an assured local match (non-federal funds) of more than the minimum 20 percent or that leverage additional funding sources. 7. If the applicant is a jurisdiction that receives a sub-allocation of STP funds from RPA 14/ATURA and they wish to borrow ahead from the region, please address the following: Benefits that will be derived by borrowing ahead. CHECKLIST: The following items must be submitted along with this application Project Location Map(s) (if applicable) Resolution from Sponsoring Entity - Commitment of matching funds - Statement agreeing to project maintenance Reproducible site map that clearly outlines the project area (if applicable) Letter of Support from County Board of Supervisors (if City is Applicant) Narrative addressing ranking criteria Return By January 4, 2016 To: RPA 14/ATURA Southern Iowa Council of Governments 101 East Montgomery Street, PO Box 102 Creston, IA Fax IF YOU DESIRE ADDITIONAL INFORMATION OR WOULD LIKE TO DISCUSS THE APPLICATION OR YOUR PROJECT, PLEASE CONTACT: Becky Nardy, Transportation/Planner [email protected]
3 QUALIFYING CRITERIA SURFACE TRANSPORTATION PROJECTS 1. To be eligible as a Surface Transportation Program activity, any project or area served by the project must fit one or more of the following categories: Construction, reconstruction, resurfacing, restoration, and rehabilitation. Operation improvements Capital costs for transit projects and publicly owned intra-city and intercity bus terminals or facilities Highway and transit safety programs Surface transportation planning, highway and transit technology transfer activities, and research and development Capital and operating costs for traffic management and control Fringe and corridor parking facilities Most transportation control measures in the Clean Air Act Development and establishment of management systems Transportation Alternatives NOTE: This list is exclusive; a project must fit into one of the categories to be eligible for Surface Transportation Program funds. 2. Projects must have an assured local (non-federal funds) match of at least 20 percent of the estimated total cost of the proposed project. The Moving Ahead for Progress in the 21 st Century (MAP-21) Act requires a non-federal match of at least 20% of federal project costs. Assurance of this required local match by the applicant at the time of the application indicates a necessary level of support by the applicant to immediately proceed with the project development and implementation. 3. Projects must be submitted through incorporated cities or a public transit agency within the region. Moving Ahead for Progress in the 21 st Century (MAP-21) federal funds received by the State of Iowa will be received and disbursed by the Iowa Department of Transportation. RPA 14/ATURA provides Surface Transportation Program (STP) funding for projects within smaller cities and towns eligible for federal aid. STP funds are available as a reimbursement program administered by the Federal Highway Administration (FHWA). Reimbursement will be received from federal highway funds for the federal portion (up to 80 percent of total expenditures) of those expenditures for the project. All applications for STP funds by cities of less than 5,000 population, shall first be submitted to their respective County Board of Supervisors for review and a letter of support. (Financial support is not required from the Board of Supervisors.) Transit capital project reimbursements will not exceed the allowable federal level. 4. Projects/project bundles must have a minimum estimated total cost of $25,000. Project proposers can bundle projects together to meet this minimum. Communities may want to consider using joint powers agreements for implementing bundled projects, although it is not required as long as there is one lead county or city to oversee the project. 5. Roadway projects must be proposed on eligible roads. The STP provides flexible funding that may be used by States and localities for projects on any Federal-aid highway, including the National Highway System (NHS), federal aid eligible bridge projects on public roads, transit capital projects, and intracity and intercity bus terminals and facilities. Applicants should refer to the Federal Functional Classification map available at their county engineer s office, the Southern Iowa Council of Governments office, or the Iowa Department of Transportation website to check eligibility.
4 ATURA ACTION PLAN EXCERPTED FROM ATURA LRTP The following improvements are identified needs or suggested improvements to the regional transportation network. This is not a list of programmed activities and is not project specific. It is a tool to be used as justification for Transportation Improvement Program project development over the next 20 years. HIGHWAYS and BRIDGES Maintain the existing regional highway network, initiating improvements at the federal, state, county and city level as needed. As a complete network, preservation, reconstruction, bridge replacement and rehabilitation, and safety improvements are a higher priority than capacity building and new facility construction. TRANSIT Include Transit Advisory Committee & Passenger Transportation Plan Advisory Group input in decision-making process where applicable. Develop new areas of service, where feasible, and attract new patrons without compromising service to existing patrons. Replace the transit fleet as necessary and as funds allow. Study the feasibility of constructing or acquiring a new fleet maintenance/office facility for Southern Iowa Trolley that provides a secure covered parking area, maintenance and vehicle washing facility, and adequate office space with parking. RAIL Include railroads in decision-making process where applicable. Work with railroads to improve crossing safety, especially when improvements are being made on the regional transportation network. Support the widening of Iowa Highway 25 viaduct in Creston, should BNSF list the project as a priority. Support rail access development at new and existing industrial parks. Support expansion of passenger rail services within the region. AIR Support facility updates and expansions of the five public airports in the region. TRAILS & SIDEWALKS Focus new trail development at specific sites. Geographic distances and limited funding limit the extent of developing a locally funded and maintained regional trail network. Regional funding on trails is best spent at specific sites, or connecting adjacent sites and facilities. Place development priorities on facilities that address the greatest public use and need as well as enhance the safety of cyclists and pedestrians. INTERMODAL Investigate the opportunities of intermodal facility development in the region with emphasis on value-added agriculture development. ENHANCEMENTS Continued use of regional enhancement funding to support eligible projects. Place development priorities on facilities that address the greatest public use and need.
5 TECHNOLOGY Support continued development of Geographic Information System (GIS) services and other forms of technology throughout the region and further integrate them into the transportation planning process. YEARS 6-20 PRIORITIES EXCERPTED FROM ATURA LRTP Priorities are listed by transportation mode and are meant to complement items in the Action Plan and provide direction for the planning of future projects. Highway Continue ongoing rehabilitation of existing roads and bridges Develop or improve roadways as needed to enhance economic development Improve roadways as needed to enhance safety Transit Provide safe, efficient, effective and quality service Replace or expand Southern Iowa Trolley fleet as needed Promote mobility Study the feasibility of construction or purchase of a fleet maintenance and storage facility Pedestrian Facilities Develop trails to increase quality of life Maintain and promote connection of existing trails Promote community efforts to repair or construct sidewalks for safety and mobility Aviation Expand runways as needed to promote economic development Support facility updates and expansions at airport facilities to ensure quality services Rail Pursue safety improvements at rail crossings Support rail access development to enhance economic development Promote passenger rail opportunities throughout the region Support the widening of the Highway 25 viaduct in Creston, should BNSF pursue this project Intermodal Support opportunities of intermodal facility development in or near the region with emphasis on value-added agriculture
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of
Federal Guidelines for STP-U Funding
MPC 5.f Attachment 1 STP-U Eligibility Guidelines Page 1 of 5 Federal Guidelines for STP-U Funding SURFACE TRANSPORTATION PROGRAM (STP) ELIGIBLE EXPENDITURES PERIOD AVAILABLE: FY + 3 Years FUND: Highway
Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000
1 of 8 12/27/2013 8:21 AM U.S. Department of Transportation Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000 MAP-21 - Moving Ahead for Progress in the 21st Century
Program guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation
Program guidance that details the eligibility, criteria and application process. Ferry Boat Program Ohio Department of Transportation TABLE OF CONTENTS Program Overview Program Administration.........2
Chapter 5. Transportation. Decatur County Comprehensive Plan. Introduction. Goals and Objectives. Goal. Objectives. Goal.
Chapter 5 Transportation Chapter 5: Transportation Introduction The transportation system forms the backbone of a community. I-74 connects Decatur County with the large metropolitan areas of Cincinnati
Regional Surface Transportation Program Policy and Allocation
FY 2014-15 Regional Surface Transportation Program Policy and Allocation August 2015 Humboldt County Association of Governments 611 I Street, Suite B Eureka, CA 95501 Phone: 707.444.8208 www.hcaog.net
GENERAL. This manual addresses five local programs that are funded under the current Highway Act:
OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal
CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP)
Local Assistance Program Guidelines Chapter 4 CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP) CONTENTS Section Subject Page Number 4.1 INTRODUCTION... 4-1 4.2 ELIGIBILITY CRITERIA... 4-1 General... 4-1
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
14.0 AVIATION. I. Introduction 6/142010
14.0 AVIATION I. Introduction Aviation plays an important role in the MARC region. As a mode of transportation, aviation provides vital connections for people and goods to destinations inside and outside
Texas Freight Advisory Committee A PRIMER ON PUBLIC SECTOR FREIGHT PERFORMANCE MEASURES
Texas Freight Advisory Committee A PRIMER ON PUBLIC SECTOR FREIGHT PERFORMANCE MEASURES October 1, 2013 A PRIMER ON PUBLIC SECTOR FREIGHT PERFORMANCE MEASURES How Do Performance Measures Assist the Public
Implementation Strategy
Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination
Surface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
PRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016
Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016 Date of Release: September 14, 2015 Pre application
14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
A Legislative Briefing prepared by Volume 7, Number 1 February 2001
fiscal forum A Legislative Briefing prepared by Volume 7, Number 1 February 2001 Mitchell E. Bean, Director P. O. Box 30014, Lansing, MI 48909-7514 517-373-8080! FAX 517-373-5874! www.house.state.mi.us/hfa
Summary of MAP-21 Matrix
Summary of MAP-21 Matrix Overview On July 6, 2012, President Obama signed into law P.L. 112-141, the Moving Ahead for Progress in the 21st Century Act (MAP-21). Funding surface transportation programs
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
REFERENCE SERIES: Transportation in Connecticut ARTICLE NO. 02 Potential Federal-Aid Sources
REFERENCE SERIES: Transportation in Connecticut ARTICLE NO. 02 Potential Federal-Aid Sources THIS DOCUMENT IS IN TEXT ONLY FORMAT - A FULLY FORMATTED DOCUMENT WITH GRAPHICS IS AVAILABLE AT THE CT DOT WEBSITE
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
TABLE OF CONTENTS. INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal...2 Vision...
MCKENZIE COUNTY COMPREHENSIVE PLAN TABLE OF CONTENTS INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal....2 Vision...3 ECONOMIC DEVELOPMENT...4
Chapter VIII: Long-Term Outlook and the Financial Plan
A. Long-Term Outlook Chapter VIII: Long-Term Outlook and the Financial Plan When examining the long-term outlook for transportation planning and programming over the foreseeable future, there are several
2035 FINANCIAL RESOURCES FORECAST
2035 FINANCIAL RESOURCES FORECAST AKRON METROPOLITAN AREA TRANSPORTATION STUDY 806 CITICENTER BUILDING 146 SOUTH HIGH STREET AKRON, OHIO 44308 December 2012 This report was prepared by the Akron Metropolitan
HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001
AASHTO Transportation Estimator Association Conference October 16, 2001 HERS_IN HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA OVERVIEW HERS Background System Planning Tool Development HERS_IN Structure
MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda
MAP 21 themes Strengthens America s highway and public transportation systems Creates jobs and supports economic growth Supports the Department s aggressive safety agenda Simplifies and focuses the Federal
A. PAVEMENT MANAGEMENT SYSTEM
CHAPTER 9 PAVEMENT A. PAVEMENT MANAGEMENT SYSTEM A Pavement Management System (PMS) is a systematic process that collects and analyzes roadway pavement information for use in selecting cost-effective strategies
KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
Chapter 8 Funding Considerations
Chapter 8 Funding Considerations Expanding transit services into El Dorado Hills under any of the service alternatives has associated operating and capital costs. This chapter considers the funding sources
DEPARTMENT OF TRANSPORTATION
DEPARTMENT OF TRANSPORTATION UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION Funding Highlights: Invests a total of $74 billion in discretionary and mandatory budgetary resources for the Department
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures Prepared for: Prepared by: June 2013 TABLE OF CONTENTS 1. Introduction... 1 1.1 Baseline Understanding...
INDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)
TPC Agenda Item 6A Mailout - 10/16/15 RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) OCTOBER AMENDMENTS Amendment
Pedestrian & Bicycle Plan
RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left
Chapter 9: Transportation
Chapter 9: Transportation What is this chapter about? The goals and policies in this chapter convey the City s intent to: Create a coordinated, efficient, and more affordable multimodal transportation
REPORT ON CERTIFICATION THAT THE TRANSPORTATION PLANNING PROCESS COMPLIES WITH APPLICABLE FEDERAL LAWS AND REGULATIONS
REPORT ON CERTIFICATION THAT THE TRANSPORTATION PLANNING PROCESS COMPLIES WITH APPLICABLE FEDERAL LAWS AND REGULATIONS 2014 Prepared by: Assistance by: Reviews: Lincoln City-Lancaster County Planning Department
Technical Memorandum PERFORMANCE MEASURES. Prepared by:
Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP
FISCAL YEAR 2014 SOLICITATION FOR PROPOSALS FOR FEDERAL JOB ACCESS AND REVERSE COMMUTE AND NEW FREEDOM PROGRAM FUNDS EVALUATION CRITERIA
FISCAL YEAR 2014 SOLICITATION FOR PROPOSALS FOR FEDERAL JOB ACCESS AND REVERSE COMMUTE AND NEW FREEDOM PROGRAM FUNDS EVALUATION CRITERIA Los Angeles County Metropolitan Transportation Authority (LACMTA)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
2009-3. The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network
2009-3 The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network July 2009 This Goods Movement Challenges and Opportunities Report was prepared jointly
ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A
ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow
Airport and Aviation Funding Programs
Chapter 7 Airport and Aviation Funding Programs Airports and aviation projects across the nation benefit from many funding sources including the federal, state, and local units of government. Some improvement
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
Moving Ahead for Progress in the 21 st Century:
Moving Ahead for Progress in the 21 st Century: IMPLICATIONS FOR OREGON OREGON DEPARTMENT OF TRANSPORTATION Moving Ahead for Progress in the 21 st Century Implications for Oregon December 2012 Oregon Department
Cost and Financial Analysis
Chapter 19: Cost and Financial Analysis A. INTRODUCTION The purpose of this chapter is to present examples of financial resources available to the Metropolitan Transportation Authority (MTA), which may
Surface Transportation Program (STP)
Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface
Chapter 5 Financial Plan
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to
AGENCY OVERVIEW Date: 12/13/2006 627 UPPER GREAT PLAINS TRANS INST Time: 07:11:13. STATUTORY AUTHORITY North Dakota Century Code Chapter 54-53.
AGENCY OVERVIEW Date: 12/13/26 627 UPPER GREAT PLAINS TRANS INST Time: 7:11:13 STATUTORY AUTHORITY North Dakota Century Code Chapter 54-53. AGENCY DESCRIPTION The Upper Great Plains Transportation Institute
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
How To Understand And Understand Transportation Engineering
1 Transportation Engineering CEE 362 Spring 2006 Dr. Zong Tian, P.E. 2 ABOUT MYSELF Hello http://unr.edu/homepage/zongt/ 3 SYLLABUS Text: Traffic and Highway Engineering, 3rd Edition, Nicholas J. Garber
Virginia's Transportation Performance Management System
Virginia's Transportation Performance Management System Office of Intermodal Planning and Investment Commonwealth Transportation Board Presented by: David Tyeryar, Deputy Secretary of Transportation September
FINANCIAL PLAN. Any future earmarks are assumed to carry their own limitation and not reduce the regular limitation identified in these calculations.
VII. FINANCIAL PLAN FHWA Funds The Federal Highway Administration (FHWA) funds are appropriated by Congress. FHWA funding levels are identified in the six-year Transportation Act. Each year, a federal
Florida Transportation Commission: A Meeting of the Modes
Florida Transportation Commission: A Meeting of the Modes Corridors of the Future: A National and I-95 Corridor Perspective George Schoener, Executive Director I-95 Corridor Coalition February 12, 2007
How To Plan A City Of Mason
Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work Briefing for Madison Area TPB/MPO June 6, 2012 TMP: Overview/Purpose Help Create Walkable, Bikeable, Livable City - Strengthen
Iowa Smart Planning. Legislative Guide March 2011
Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The
Transportation Improvement Program FY 2006-2008
Transportation Improvement Program FY 2006-2008 Hidalgo County Metropolitan Planning Organization Adopted By Policy Committee: March 24, 2005 Public Meeting Date: March 1, 2005 Public Meeting Date: April
Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D
Open House Public Meeting for the State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D May 7, 2015 Old Glen Jean Bank Glean Jean, WV 4:00-7:00 PM www.transportation.wv.gov PROJECT
Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO
Executive Summary The Miami-Dade County Metropolitan Planning Organization (MPO) has prepared a Truck Route System Plan for Miami-Dade County. The MPO and its consultants have worked closely with the MPO
Environmental Impact Statement for the Washington Union Station Expansion Project
This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
LAWTON METROPOLITAN AREA
LAWTON METROPOLITAN AREA TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 2005, 2006, 2007 This report was prepared by the Lawton Metropolitan Planning Organization (LMPO) and was finance part through
Butch Wlaschin P.E. Director, Office of Asset Management, Pavements, and Construction FHWA
Butch Wlaschin P.E. Director, Office of Asset Management, Pavements, and Construction FHWA National Goals Focus the Federal-aid program on the following national goals: 1) SAFETY 2) INFRASTRUCTURE CONDITION
CONNECTICUT S TOP TRANSPORTATION ISSUES:
CONNECTICUT S TOP TRANSPORTATION ISSUES: Meeting the State s Need for Safe, Smooth and Efficient Mobility NOVEMBER 2015 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit
Where Do We Want to Go? How Can We Get There?
Where Do We Want to Go? How Can We Get There? The BRTB has adopted nine goals, with supporting strategies, performance measures, and performance targets. Together, these goals, strategies, measures, and
