Continuity of Protective Conductors

Similar documents
Polarity. Electrical Quals

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

chapter8 Testing and commissioning Unit 2 outcome 2

PROTECTION AGAINST ELECTRIC SHOCK by John Ware

A Guide to 17th Edition Testing

Trouble-shoot and repair faults in low voltage electrical apparatus and circuits

GUIDE TO THE AM2 EXAM

Candidate Self-Assessment Checklist

A B Brown. This sheet forms part of *Inspection Report Number/*Certificate Number NA/ * EC/ * PIR *Delete as applicable DB

ELECTRICAL INSTALLATION CONDITION REPORT (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

Pontyclun Electrotechnical Training Ltd. (P.E.T. Ltd.)

GUIDANCE ON ELECTRICAL INSPECTIONS

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

STREETLIGHT SYSTEM GROUNDING AND BONDING

Regulation IO-6.0: Electrical Safety Regulations

Introduction to Data Centre Design

FORMS for the 17th Edition

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

Dielectric Withstand Testing in a Production Environment

How Much Voltage Drop Is Acceptable?

Circuit Electrical Testing

TESTING AND COMMISSIONING PROCEDURE FOR ELECTRICAL INSTALLATION GOVERNMENT BUILDINGS THE HONG KONG SPECIAL ADMINISTRATIVE REGION

INSTALLATION ELECTRICIAN / MAINTENANCE ELECTRICIAN APPRENTICESHIP ASSESSMENT PLAN

TC Grounding and Bonding for Telecommunications Systems

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

A guide to our training courses and premises

By Mark Coles. This article looks at the temporary use of portable generators in floating, earthed and reference-earthing scenarios.

LOXONE 12 Channel Amplifier

APPLICATION FOR RENEWAL OF LICENCE TO USE OR OPERATE AN ELECTRICAL INSTALLATION (Please read Explanatory Notes before completing the Forms)

TABLE OF CONTENT

Douglas J. Reinemann, Ph.D. University of Wisconsin-Madison, Department of Agricultural Engineering Madison, Wisconsin. and

(2377) V H N IO T A IC IF L A U Q

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Section B: Electricity

Experiment 4 ~ Resistors in Series & Parallel

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority

Experiment 8 Series-Parallel Circuits

Electrical Safety Tester Verification

CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE

Electrical Contractors Association

1. Franklin Rod Performance 2. LEC/DAS Performance

AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System

Screened cable and data cable segregation

Chapter 9. Bonding and Grounding

Electrical Grounding. Appendix C

Experiment NO.3 Series and parallel connection

Electrical Essentials for HVAC&R Engineers. Wednesday, October 7

INSPECTION AND TESTING OF ELECTRICAL INSTALLATIONS RESIDUAL CURRENT DEVICES

CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS

Solar Panel Installations

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

WIRING MATTERS. EARTHING: Your questions answered. Electrical installations outdoors Ongoing accuracy of test instruments PAT testing of equipment

WORLDWIDE. GW400k SERIES MAINTENANCE MANUAL PROVEN PERIMETER PROTECTION

Document No: SRT-002. DigiTRON Single Connectors Site Recieved Test Manual.

Electrical Training Courses & Qualifications

Electrical safety requirements in DC distribution systems

Best Methods for Safe Hipot Testing

Article 10 - ADMINISTRATIVE SECTION

THE IMPORTANCE OF HIPOT ISOLATION ON INDUSTRIAL ETHERNET SWITCHES

Unified requirements for systems with voltages above 1 kv up to 15 kv

Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time

Experiment #5, Series and Parallel Circuits, Kirchhoff s Laws

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

ELPT 1419 FUNDAMENTALS OF ELECTRICITY I

employed to ensure the continuing reliability of critical systems.

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Good EMC Design Principles: cable routing

GROUND DETECTION CIRCUITS FOR STATIONARY APPLICATIONS (IN PLAIN DOWN TO EARTH LANGUAGE)

Series and Parallel Circuits

Mobile Device Power Monitor Battery Connection Quick Start Guide

Electronics. Basic Concepts. Yrd. Doç. Dr. Aytaç GÖREN Yrd. Doç. Dr. Levent ÇETİN

NEW Practical Courses for the Electrical Industry

Errors Related to Cable Resistance Imbalance in Three Wire RTDs

ONLINE VERSION ONLINE VERSION ONLINE VERSION edition. Electrical safety dwellings APPROVED DOCUMENT. The Building Regulations 2000

Electrical Practices for Construction Work

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

Physics. Cambridge IGCSE. Workbook. David Sang. Second edition Cambers & Sibley: IGCSE Physics Cover. C M Y K

Electrical Resistance Resistance (R)

White Paper: Electrical Ground Rules

Level 3 Certificate in the Certification of Electrical Installations (Design, Erection and Verification of Electrical Installations) ( )

ESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants. Installation instructions ESP M1/M1R mains protectors

Guidance notes for the installation of electrical supply in mobile trailers for breast screening

SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES

EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM

Lightning Arresters P KVA P KVA. Description & Installation

St Peter s College ELECTRICAL SAFETY. B. University Safety Office Policy Statement S4/10, Working safely with Electricity.

Fig. 1 Analogue Multimeter Fig.2 Digital Multimeter

Contractor Connect Scheme Electrical Contractor and Worker Handbook

Construction Electrical Terminology. Electricians

The Electricity Wiring Regulations 2007

Tips for connecting 24-volt power

Tutorial on Safety Standard Compliance For Hipot Testing

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & Instructions For Installation, Operation & Maintenance

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

PORTABLE GENERATORS AND OSHA CONSTRUCTION REGULATIONS

Fault Characteristics in Electrical Equipment

Transcription:

Continuity of Protective Conductors Electrical Quals 2007 1

Introduction This test is of great importance and arguably the most important of them all for many reasons, despite of this fact at times shortcuts are taken and things are over looked. Many electrical contractors who carry out testing very rarely understand the reasons for doing such a test, and the acceptable results obtained. In this section we will not only be showing you how to conduct the test but the reasons for doing it, and which method to choose for a particular installation/wiring system. This is the first test to be conducted in the sequence of tests, the reason for doing it as the first test in the sequence is because of the possible rise in potential across different metallic items that could arise if the CPC s and bonding were not in place or disconnected when carrying out other tests. An example of this is when doing an insulation resistance test, this typically puts 500V dc through the system, if metallic items were not bonded, then it could rise to a dangerous voltage. The Tests Before we talk about the individual tests, there has been a lot of confusion around the little things that need doing prior to even picking up an instrument. This test is only conducted on radial circuits H i n t Do we or don t we disconnect the main bonding conductors from the MET? Well this is dependent upon whether the installation is already connected to the supply. If it is an initial verification (new installation) then it is permissible to disconnect the protective and equipotential conductors from the main earthing terminal to carry out testing. If the installation is an existing one (Periodic) then testing, the protective and equipotential conductors Must Not be disconnected. If this is the case then a loop test may be conducted to verify the integrity of the system. There are 3 different methods that can be used to carry out this test, and is dependent upon a number of factors. Ω Is the protective conductor under test part of a final circuit or a sub circuit? Ω Is the protective conductor under test a bonding conductor? Ω Does the circuit under test form part of a metallic wiring system? Electrical Quals 2007 2

Test Method 1 Test method 1 uses the Phase as a return lead, otherwise known as the R1 + R2 method. This is the most common method used for final circuits. As in most final circuits, the phase conductor runs alongside a cpc conductor and this factor is utilised in the test. Instrument to be used: Low resistance ohmmeter The low resistance Ohmmeter is then connected at the most furthest point of the circuit, and a reading is obtained. This reading is made up of the resistance of the PHASE conductor and the PROTECTIVE conductor and is given the name R1 + R2. H i n t Guidance Note 3 published by the IEE gives a column for recording R1+R2 on the Schedule of Test results. Scale to be used: The Ohm Ω Method Before the test can begin, if the circuit to be tested is not isolated, then follow the correct safe isolation procedures. Step 1: A temporary link is made at the distribution board between the PHASE and PROTECTIVE conductor systems I m p o r t a n t Null the leads. This is very important as the wander lead will add a considerable resistance to the instrument reading. If your instrument does not have a null function, then simply subtract the resistance from the actual reading. But I only want the resistance of the cpc, why am I bothering with the resistance of the phase? This method has many advantages, not only to this test, but to other future tests. The main one being we can use phase conductor as part of the circuit as it eliminates any awkward and possibly dangerous wander leads draping everywhere. Also this (R1 + R2) reading can be used for working out our earth Fault Loop Impedance value if we decided not to measure it. Polarity of the circuit is also obtained at the same time. I m p o r t a n t Don t forget to remove the link once the test is finished! Electrical Quals 2007 3

Test Method 1 Test Method 2 Test method 2 uses the wander lead or R2 Method This test can be performed on Final circuits, but this test is mainly used on Equipotential bonding conductors. H i n t The only time where you would have to use method 2 on final circuits is where you have used the alternative method in determining the size of CPC (table 41C of the Regulations) for a 5 second disconnection time. sense, but how do we go about doing this? Can we adopt method 2 as above? The answer is no as we do not have a phase conductor as a return path. We do this by using a wander lead. What is a wander lead? A wander lead is simply a long length of conductor that can be moved to different points in an installation. Often a drum of cable is used however commercial ones can be purchased. As the title suggests, we must also confirm the continuity of Equipotential bonding conductors. This makes Electrical Quals 2007 4

Method As in test method 2, health and safety is a priority so ensure safe isolation procedures have been followed before you begin. Step 1: Disconnect any parallel paths (this can be done by disconnecting bonding conductor from the MET, ensure that you have the permission beforehand as this may have safety implications) I m p o r t a n t Null the leads. This is very important as the wander lead will add a considerable resistance to the instrument reading. If your instrument does not have a null function, then simply subtract the resistance from the actual reading. Step 2: Connect one end of the wander lead to the instrument and the other onto the bonding connection. The remaining end of the instrument can be then connected to the MET end of the bonding conductor. Step 3: Remember to reconnect parallel paths. This resultant reading can be recorded as the resistance of the cpc (R2) on the schedule of test results where the alternative method is used for final circuits. Safety Electrical Connection Do Not Remove Wander lead 0.02 Ω Ω TEST 500v Electrical Quals 2007 5

Test Method 3 Test method 3 is used where a metallic enclosure forms all or part of the protective conductor. It is highly possible that the protective conductor under test forms part of a steel conduit steel trunking or similar. If this is the case then a few problems arise. Due to possible corrosion or loose joints, the protective conductor resistance could rise to unsafe levels. Parallel paths will form if there is a separate cpc, this must also be taken into consideration. Because of this there are 3 tests that can be carried out. Only one need be adopted, but they differ due to the difficulty of gaining an accurate reading and increasing severity with regard to current carrying capacity. The 3 tests 1. A standard ohmmeter test as indicated in method 1 or 2 above. This will not exploit any high resistance joints in the enclosure, and if used after must be visually expected along the length of run. 2. Phase earth loop impedance test can be carried out if it is thought by the inspector that the soundness of the system is questionable. 3. If the protective conductor is suspect then a high current test can be used of around 1.5 times the design current, with a maximum of 25A to be used. The resistance of the protective conductor can be calculated from V R 2 = A The resistance between any extraneous conductive part and the main earthing terminal should be 0.05 Ohms or less; all supplementary bonds if required should also have the same resistance. The maths involved in the test When doing an inspection and testing course it is highly likely that you will encounter some form of maths involved while learning about the tests. At the end of the day, electricity is a form of Physics which deals with resistances voltages and currents. The duty holder whom carries out the inspection and testing must have a knowledge of why he/she is doing it, what to expect of the readings from the instrument and how to interpret these readings. Below we will look at the maths involved with this particular test. P r i o r l e a r n i n g Before we start we need to familiarise ourselves with a table form GN3, page 107. This table is table 1A (can also be found in the onsite guide page 158 as table 9A)

The table given in the Regulations is extremely useful and will be used both in the exam and in other tests. It is a table of values for resistances of R1 and R2 and is measured per metre in milliohms (one thousandth of an ohm). Some rows will have the resistance for R1 and some for just R2 and also for both, depending of the size of conductor. We are going to use this table for our calculations. When conducting a Continuity of protective conductor test, what kind of calculations could we be asked? Well let s take a look 1. The value of R2 can be found using a test result from method 1 above 2. The max Length & Actual Length of the circuit under test can be found when applying method 1 & 2 above. 3. Subtraction of the wander lead resistance form the reading in method 2 Electrical Quals 2007 7