Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Similar documents
DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

The Need for Traffic Incident Management

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU

Maryland Invests $845 Million in New Highway and Bridge Projects

3 Tappan Zee Bridge Rehabilitation Options

3.1 Historical Considerations

Nashville Area MPO Regional Freight Study fast action projects

SCOTTSDALE TRANSPORTATION COMMISSION REPORT

I-66 Pavement Rehabilitation

STATE HIGHWAY 360. PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287

Transportation Management Plan Template

Light Rail Transit in Phoenix

SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

NON-TRADITIONAL UTILITY COORDINATION on KYTC Projects. KYTC Partnering Conference September 9, 2014

TRANSPORTATION MANAGEMENT PLAN

7.2 Warrants and Planning Considerations

P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT

RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)

8+ %!0"% 8+1!%"'$%,$"$

PRIORITIZATION PROCESSES

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

Brookdale Site. CB6 Update April 1, 2015

EXHIBIT A Accessible Truck Routes Map


I-94 Rehabilitation Project

Roadway Cost Per Centerline Mile Revised June 2014

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST


5.14 Floodplains and Drainage/Hydrology

The Corporation of the TOWN OF MILTON

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Michael B. Hancock Mayor. October 31, 2014

Appendix J Transportation Management Plan Report. Traffic Operational Analysis Report

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY

Illinois Tollway and Chicago Department of Transportation Construction Networking Event. March 13, 2015

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS

Draft Transportation Management Plan for Via Verdi Repair Project

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

I-25 / Rio Bravo Interchange

Background and Goals for the Project

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

MEMORANDUM E. Arkansas Ave., Room 262, Denver, CO P F

5 ALTERNATIVE SOLUTIONS AND EVALUATION

I-15 Ontario PCC Rehabilitation Project

2017 Budget and Grid Management Charge Initial Stakeholder Meeting

Wilmington to Newark Commuter Rail Improvement Project

;If jlllr ~M~E~M~O~T0~0~E~S~IG~N~E~R~S~1~-~3~7_ ~A~P~R~IL~1~9~9~5

US-95 Northwest Corridor Initial Financial Plan

APPENDIX J TRAFFIC STUDY

11 p.m. to. Tuesday, June. will remain open. 14. closed

Sector Design Concepts

FHWA Initial Financial Plan May 12, 2009

Capital Action Plan Status Thru Dec 2015

Auckland Motorways Network Performance Monitoring

WSDOT s Approach to Seismic Retrofit of Highway Structures

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

Construction Planning & Scheduling

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

Dulles Corridor Metrorail Project

Scope Management Guideline August, 2015

Planning Level Cost Estimation Tool. User s Manual

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Surface Transportation Program (STP) Projects

How To Improve Lrs Maintenance

GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121)

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

SECTION XI OPINION OF PROBABLE COST

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

Appendix. Change Management Plan. Communication Plan. QA/QC Plan. Transition and Closure Plan C-1

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

July 2010 Met Council contributes $1 million to small business loan fund More Downtown Downtown Minneapolis St. Paul

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Program Management. APWA North Carolina Chapter. Design-Build: Will it Work for You? William Palmieri, P.E.

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

DESIGN-BUILD PROCUREMENT AND ADMINISTRATION GUIDE

MIAMI-DADE EXPRESSWAY AUTHORITY (MDX) OPERATIONS COMMITTEE MEETING TUESDAY, AUGUST 27, :00 PM

Informational Workshop Public Meeting Kanawha Falls Bridge Project

United States Department of Transportation Federal Transit Administration

INDOT Long Range Plan

770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

Maryland SafeZones. Work Zone Automated Speed Enforcement Program. Eric Tabacek Deputy Director, Office of Traffic and Safety

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

PUBLIC INFORMATION MEETING SUMMARY

CHAPTER 27 New Public Road Connections. Table of Contents

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

How To Build A City Of Virginia Beach Arena

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

**The Winter 2010 edition of The Road Ahead newsletter is available online.

100 Design Controls and Exceptions

Transcription:

Needham Heights Neighborhood Association Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 June 9, 2014 1

Agenda Project Update Overview Bid and Contract Award Schedule Preliminary Construction Schedule 2

Bid and Award Schedule July 1, 2014 Contractors Bid Due Late August/Early September Contractor NTP October 2014 Construction Start January 2019 Construction Completion 3

Preliminary Construction Schedule Notice-to-Proceed to Contractor: Aug/Sep 2014 Estimated Completion Dates of Construction Stages: Stage 1: October 2015 Stage 2: September 2017 Stage 3: May 2018 Stage 4: September 2018 Stage 5: December 2018 Partial Opening of Kendrick St. Interchange: July 2016 Substantial Completion: December 2018 4

Existing Lane Configuration 5

Future Lane Configuration 4 Travel Lanes in each direction south of Highland Ave. 5 Travel Lanes in each direction between Highland Ave. and Rte. 9 New Kendrick Street Interchange Collector-Distributor Roadways between Kendrick St. and Highland Ave. Reconfigured Rte. 9 Interchange 6

Stage 1 Construction: Sept. 2014 Oct. 2015 7

Stage 2 Construction: Oct. 2015 Sept. 2017 8

Stage 3 Construction: Sept. 2017 May 2018 9

Stage 4 Construction: May 2018 Sept. 2018 10

Stage 5 Construction: Sept. 2018 Dec. 2018 11

Questions 12

Project Components Project Components South of Kendrick Street New Kendrick Street Interchange Kendrick Street to Highland Avenue Highland Avenue to Route 9 Route 9 Interchange Noise Barrier North of Route 9 Mitigation Parcel at Great Plain Avenue 13

Project Limits Project Limits: North of MBTA RR Bridge Project Limits: North of Rte. 9 14

Project Limits Off-Site Mitigation Site at Great Plain Avenue 15

Project Limits Noise Barrier Along I-95 SB north of Route 9 16

Proposed Roadway Improvements Widen roadway into median to add 1 travel lane in each direction Restore breakdown lanes and provide widened shoulder at median New Kendrick St. interchange New collector/distributor roads, Kendrick St. Highland Ave. Auxiliary lanes in each direction between Highland Ave. & Rte. 9 Reconfigure Rte. 9 interchange 17

Bridges and Walls Bridges 3 Replacement Bridges 1 Widening 1 Removal RR Bridge 1 New Bridge Retaining Walls 16 Locations Total Length 9,986 LF Noise Barriers 7 Locations Total Length 10,424 LF 18

South Project Limit to Kendrick Street 19

South Project Limit to Kendrick Street 20

South Project Limit to Kendrick Street 21

New Kendrick Street Interchange 22

Existing Kendrick Street Bridge 23

Proposed Kendrick Street Bridge Looking East 2 Span Similar to Existing Constructed in 2 Stages 24

New Ramp K-1 over Ramp K-2 Bridge 25

New Ramp K-1 over Ramp K-2 Bridge 26

New C/D Roads Between Kendrick Street and Highland Avenue Collector/ Distributor Road Collector/ Distributor Road 27

Existing Highland Avenue Interchange 28

Proposed Highland Avenue Interchange 29

Proposed Highland Avenue Bridge 30

MBTA Railroad Bridge & Retaining Wall at 32 Fremont Street Remove Existing Bridge New Retaining Wall P 31

New Auxiliary Lanes Between Highland Avenue and Route 9 Sudbury Aqueduct 32

New Auxiliary Lanes Between Highland Avenue and Route 9 33

Central Avenue Bridges 34

Central Avenue Bridges - Modifications 35

Route 9 Interchange 36

Reconfiguration of the Route 9 Interchange 37

Reconfiguration of the Route 9 Interchange Relocate SB offramp on improved alignment Remove I-95 SB loop ramp Relocate NB off-ramp on improved alignment Remove I-95 NB loop ramp 38

Proposed Route 9 Bridge 39

Incentives/Disincentives Milestone #2 Substantial Completion $30,000/day $4,020,000 maximum Milestone #3 Completion of Br. No. N-04-027 and Ramps K-3 and K-4 $11,000/day $407,000 maximum 40