INSTALLATION INSTRUCTIONS CLAD INSWING BI-FOLD DOOR AND WINDOW SYSTEM WITH U-CHANNEL

Similar documents
Clad Direct Glaze Window Installation Instructions

Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors

Installation Guide for Andersen Architectural Wood Inswing Entry Doors

Replacement Installation Instructions

DE Frame with C Series Sidelight

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Basement Window Installation Guide Hopper and Sliding

INSTALLATION OF A BAY WINDOW

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Brick Veneer Construction

4 5/16 Subframe Installation

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

March 14, Installation of Bay, Bow and Garden Windows

Premier & Deluxe 3-Season Room Sliding Glass Door

PANELIZED HOME INSTALLATION GUIDELINE

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Best Barns USA Assembly Book

Tundra Series Windows January 2016

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

All-Season Sunroom Sliding Glass Door Installation Instructions

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

WINDOW PANNING AND TRIMS

INSTALLATION INSTRUCTIONS for Swinging French and Patio Doors (JII105)

450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

DIY CABINET REFACING INSTALLATION GUIDE

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

Therma-Tru Slim-Line Sliding Patio Door. Assembly and Installation

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

Barewood Octagon and Elongated Windows Installation Instructions

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

INSTALLATION INSTRUCTIONS

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

WINDOW INSTALLATION GUIDE

Technical data sheet PVC Bi-fold doors

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

How To Install Your Frameless Shower Enclosure

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

SECTION 6. Glass Storefront Doors:

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

InsulView Window Installation Instructions

Ceiling Mounted Folding Attic Ladders Installation Instructions

Sash Replacement Guide

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

Heavy Glass Frameless Shower Door With Return Panel

Important Information for Installer & Homeowner

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors without Nailing Fin (JII015) IMPORTANT INFORMATION AND GLOSSARY

Information Technology Solutions

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

7. Installation. installation CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

Installing Window and Door Mouldings

Active and Passive Sash Replacement

Hinge Replacement & Hinge and Hardware Adjustment Guide for Andersen Frenchwood Hinged Patio Doors Manufactured Before November 2005

OUTSWING & INSWING ENTRANCE DOOR

ISSUE 2. Installation Guide

Retail Reception kiosk

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

AAMA Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

SERIES 238 WINDOWS. NOTE: Read instructions completely before attempting any installation.

Packaged Terminal Air Conditioner Wall Sleeve Installation

Hinge, Blocker, and Tab Adjustment Guide

WINDOW REPAIR MANUAL & REFERENCE GUIDE

Roll-Up Door Maintenance Guide

Installation Instructions

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

The WANZ Guide to Window Installation

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

MIAMI-DADE COUNTY PERFORMANCE TEST REPORT. Report No.: B Rendered to: AMERICAN PRODUCTS, INC Tampa, Florida

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

GARDEN WINDOW GLAZING AND DE-GLAZING INSTRUCTIONS

KITCHEN INSTALLATION GUIDE

Installation Window Building In Details

SUPER SHED. Indoor shelter for your outdoor tools.

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS WINDOWS

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model NOTICE TO USER

Superform Products Ltd.

How to Install UnderDeck The Original.

Transcription:

INSTALLATION INSTRUCTIONS CLAD INSWING BI-FOLD DOOR AND WINDOW SYSTEM WITH U-CHANNEL Please read these instructions in their entirety prior to beginning the installation process. Sierra Pacific Windows (SPW) is not responsible for site measurements or the structural requirements for the installation of the bi-fold door/window system. The weight of the panels/sash is carried by the header; therefore it is imperative that the head jamb be securely anchored to the header. SPW recommends the Sierra Pacific bi-fold door/window system be installed with a minimum of two people; one person handling the panels/sash and the other person attaching and adjusting hardware. CAUTION: Door panels can be extremely heavy and awkward to handle. SPW recommends that all wood surfaces be finished prior to installation. Otherwise, special care is needed in labeling components during the disassembly process, to ensure the reassembly is done correctly. All hardware holes have been pre-drilled. No additional drilling of holes is required in SPW product. Tools required: 6 #3 square tip bit 10-12 #2 Phillips screwdriver 10-12 3/8 standard screwdriver Drill and ¾ drillbit Framing square 3 level 6 level Laser level (recommended) Tape measure Caulking gun Ladders Materials Needed: SPW bi-fold drawing Shims Sill pan Self-adhesive backed 9 flashing SM-8500 acrylic sealant (supplied by SPW for frame assembly) SM-7108 polyurethane black (supplied by SPW for sill assembly) Polyurethane for installation into wall (supplied by others) Batt insulation 09-2016 Page 1

Assembling The Frame Refer to your SPW bi-fold door/window drawing to determine your specific panel/sash set-up and hardware placement. Load head track: Top pivot, left or right carrier sets, intermediate carrier set (see Figure 1). Clean the inside track along roller path before installing carriers. PAY SPECIAL ATTENTION TO ASSURE PROPER DIRECTION WHEN INSTALLING RIGHT OR LEFT CARRIER SETS (A) TOP PIVOT (B) INTERMEDIATE CARRIER (C) RIGHT CARRIER Left or Right Carrier Rollers should always be facing towards the center of the panel/sash Figure 1 09-2016 Page 2

Assembling The Frame (continued) Sill No pre-assembly preparation required. Side Jambs No pre-assembly preparation required. Head 1. Use SM-8500 acrylic sealant (supplied by SPW). 2. Apply a 1/4" bead of sealant as shown on the mitered corner joint. Install the corner key through the corner gasket and into the aluminum clad keyway. 3. Line up metal alignment pin in side jamb exterior stop with receiving hole in head jamb exterior stop. Fit corners of jambs tight against each other. 4. Insert the #6X1-1/4 flat head SST frame fastener (labeled #2) into the pre-drilled holes to secure each clad corner. 5. Use the #7x2-1/4 flat head grabber frame fasteners (labeled #1) to fasten the wood portion together (see Figure 2). 6. A slot must be cut into each corner of the accessory kerf to enable the drip cap to extend 1/32 past each side jamb. Install head drip cap. The bottom leg of the drip cap will snap into the accessory kerf on the frame. Use a rubber mallet or hammer and wood block to prevent damaging drip cap during application. #6x5/8 pan head self-tapping fastener (labeled #3) should be applied through the drip cap and head nail fin to prevent the drip cap from moving (see Figure 3). Figure 3 Figure 2 09-2016 Page 3

U-Channel 1. Install the u-channel before the frame. The u-channel is set into the floor by the installer. SPW recommends that sealant be applied to the bottom of the jambs before they are set onto the floor. It is recommended that sealant also be applied to each end of the u- channel (see Figure 4). Installing & Flashing the Frame Please read Frame & Flashing instructions carefully and thoroughly before installing frame. 1. It is the responsibility of the installer/contractor to verify compatibility of sealants, flashing and all envelope membrane drainage system components. 2. Check rough opening to insure that opening is level, plumb and square. Verify that width and height dimensions are correct. Rough opening should be ¾ taller and 1 wider than overall net frame size. Sill plate or concrete slab should be flat and level. Subfloor should be prepped for u- channel. Make sure opening, specifically the sub floor (or concrete), is dry, clean and free of dirt and debris. NOTE: Flashing and/or an appropriate method of sealing shall be designed as a part of an overall weather resistive barrier system. It is not the responsibility of the door manufacturer to design or recommend a flashing system appropriate for each job condition. Flashing material is recommended to be at least 9 wide. Any variance from this installation procedure signifies that proper waterproofing becomes the responsibility of the design professional and/or the installer. Figure 4 Exterior Stops 3. Dry fit frame in rough opening. 4. Apply a continuous generous bead of polyurethane sealant (supplied by others) along the backside of the nailing fin along both side jambs and head. Apply additional sealant across the 45 joint where the fins meet at the corner and tool in place (see Figure 6). 1. Exterior stops are applied to frame jambs at factory. See Figure 5 for u-channel placement. Figure 5 Figure 6 09-2016 Page 4

5. If weather barrier used, make 45 cuts at the top corners of the rough opening. Create a top flap in the weather barrier above the head jamb (see Figure 7). NOTE: We recommend that the header be installed with a slight upward bow (approximately 1/8 ) at the center of the door rough opening to allow for settling of the building. 7. Once the frame is square, level and plumb within an 1/8, finish securing the side jamb nailing fins to the sheathing with 1-1/2 (minimum) non-corrosive screws, beginning 4 from the corner and every 12 to 16 thereafter. 8. # 10x3 pan head SST fastener (labeled #5) to be used in the head, filling every pre-drilled hole inside the head track (see Figure 9). Figure 7 6. With the frame set into the rough opening, check to make sure it is centered. Tack the frame in place with one 1-1/2 (minimum) stainless steel (non-corrosive) screw in the side nailing fins within 3 to 6 of the top corners. Make sure that the sill is straight, flat and level. Use a tape measure to measure the horizontal and diagonal dimensions of the frame to ensure the frame is plumb and square within an 1/8 (see Figure 8). These measurements should be double-checked by using a framing square and level or straight edge to insure the jambs are straight. Shim at the side jambs as required. Figure 8 09-2016 Page 5

Figure 9 09-2016 Page 6

9. Once the frame is completely secured to the structure, apply a bead of polyurethane sealant (supplied by others) at the edge of the head and side jamb nailing fins, where it meets the sheathing. Tool the sealant into the joint to ensure the joint is filled. Apply additional sealant across the 45 joint where the fins meet at the corner and tool in place (see Figure 10). Place a small amount of polyurethane sealant over each screw head. 11. The length of the head flashing should equal width of rough opening + 2x width of the flashing material + 2. Extend 1 beyond edge of each side flashing (see Figure 12). Attach top edge of flashing to the wall. Smooth flashing so there are no wrinkles in the application. Run horizontal head flashing on top of and 1 past width of vertical side Vertical side flashing is under and ½ shorter than horizontal head flashing Figure 10 10. Apply a layer of flashing over the side jamb nailing fins (see Figure 11). The length of the flashing should equal the height of the rough opening + the width of the flashing material 1. Install the flashing so that the edge contacts the inside corner of the nailing fin. The top of the flashing should extend only 8-1/2 above the top edge of the door frame. Repeat for opposite side. Figure 12 12. Fold down weather barrier at head jamb after flashing has been applied (see Figure 13). Using approved weather barrier tape, seal the 45 cuts in the weather barrier. Figure 11 Figure 13 09-2016 Page 7

After The Frame Has Been Installed 1. Refer to your SPW bi-fold drawing to determine your specific door/window set-up. 2. The cylinder and screw holes are pre-drilled by SPW. Using a ¾ drill bit, you will need to pre-drill the trimmer prior to installing wall pivot into the frame (see Figure 14). Use pre-drilled hole in side jamb as a guide for placement of hole in trimmer. 3. Install wall pivot shaft/face plate (required only if bi-fold panel is taller than 88") in side jamb (see Figure 14). L pin and hinge leaf are installed on panel later. 4. Apply SM-7108 polyurethane sealant (supplied by SPW) in pre-drilled holes on the sill. Install bottom pivot block assembly at base of side jamb, placing bottom in sill channel (See Figure 15). Wall Pivot Figure 14 Wall Pivot Hinge Leaf Shaft and Face Plate L Pin Bottom Pivot Block Assembly Figure 15 09-2016 Page 8

Panel/Sash Preparation 1. Panels/sash are numbered at the top of each as shown below. Lay out in numerical order, always from left to right (see Figure 16). 1 2 3 4 Figure 16 VIEWED FROM EXTERIOR 2. Install hinges (hinge screw holes are pre-drilled). Use #10X1-1/2 flat head fastener (labeled #4) to attach hinges to panels/sash. Tighten the screws on the wood side before installing the screws into the clad. Do not over tighten screws into the clad (see Figure 17). Refer to the legend on the SPW bifold drawing of your door/window for proper hinge type placement. You will not be securing the top carriers loaded in the head track or pivot hinges until panel installation. Secure this screw first Fastener Labeled #4 Figure 17 09-2016 Page 9

Panel/Sash Preparation (Continued) 3. Install pile weather-strip on bottom of panels/sash. Push weather-strip into the kerf on the bottom of the panel/sash (see Figure 18). 4. Install flush bolts at the top and bottom of the interior face of the panels/sash to which they apply (see Figure 19). 5. Magnet and/or door hold placement is dependent upon operation configuration. Please refer to your SPW bi-fold door/window drawing. Center the magnet and/or door hold horizontally in the stile, at top of panel. Flush Bolt Plate (mounted into frame head jamb) Pile Weather-strip Figure 18 Flush Bolt Flush Bolt Figure 19 VIEWED FROM INTERIOR 09-2016 Page 10

Installing the Panels/Sash 1. Always start at the jamb and work towards the center. This may require working inward from both ends. 2. Place the 5/16" shim (supplied by SPW) on top of protected sill, allowing the panel/sash to rest on shim (see Figure 19). This helps pre-set the correct height of panel/sash and hinge screw alignment. 3. Begin panel/sash installation at the bottom pivot block located at the sill. Secure panel/sash to top pivot in the head track. Attach wall pivot(s). 4. Place next panel/sash in bottom sill track and secure bottom floor guide (Figure 21), top carrier, hinges and Interior D Pull Handle (Figure 22). Apply hinges using pre-drilled holes in panel/sash. Continue with next panel/sash (see Figure 20). After All Panels/Sash are Installed 1. Remove the temporary spacer weather-stripping prior to finishing panels/sash. After panels/sash have been stained or painted, install the permanent weather-stripping for the individual panels/sash (see Figure 21). 2. Weather-strip should fill the space between each hinge and be cut flush with the top and bottom of the panels/sash. 3. Apply hinge gaskets around one leaf of each hinge (see Figure 22). Panel Weather-strip Figure 23 Figure 20 Figure 21 Intermediate floor guide Hinge Gasket Figure 24 Figure 22 Interior D Pull Handle 09-2016 Page 11

Adjust the Panels/Sash 1. Open and close very slowly for the first time! Do not force anything. Make vertical and horizontal adjustments until the panels/sash operate smoothly without interference. 3. Horizontal adjustment is achieved by using a 10 to 12 Philips head screwdriver at top and bottom pivots (see Figure 25 and 26). 2. Use adjustment clip when making vertical adjustment. A pry bar can be used to carry weight of panel/sash. Use a 10 to 12 standard head screwdriver at the top pivots and carriers (see Figure 25). Making vertical adjustment without clip will damage the hinge. Bottom Horizontal Adjustment Figure 26 4. 3/16" gap between top of the panels/sash and the top track. 5/16" gap between the bottom of panels/sash and the bottom track (see Figure 27). Figure 25 Figure 27 09-2016 Page 12

Adjust the Panels/Sash Continued 5. 1/4" gap on side panels to frame (see Figure 28). Side Jamb Weather-strip Kerf Figure 30 Figure 28 6. After final adjustments, remove adjustment clip (save for future adjustments). 7. Install flush bolt plates in head. Flush bolt Plate Install Weather-strip in Exterior Stops 3. Cut weather-strip at a 45 angle so as to overlap the head jamb weather-strip and making it long enough so it butts up against sill (see Figure 31). 4. Install strike plate as required. Install door hardware as required. 1. The head and side jamb stops are factory applied 3/8" from the exterior face of the panel. You will be installing the weather-strip in a kerf on the back side of these stops (see Figures 29 and 30). 2. Install weather-strip into head jamb running full length of kerf. Install side jamb weather-stripping. Head Jamb Kerf Weather-strip Figure 31 Figure 29 09-2016 Page 13

Astragal (Not all doors will require an astragal) 1. As required, the underside edge of the astragal should be placed flush with the edge of the panel (see Figure 32). Figure 32 2. The top of the astragal should be 1/8" below the head stop and the bottom of the astragal should be flush with the bottom of the panel (see Figure 30). Figure 33 09-2016 Page 14