THE SHIPYARDS - LOT 5

Similar documents
315 First Ave NE Minneapolis, MN 55413

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

RETAIL, OFFICE & MEDICAL SPACE FOR LEASE CONTACT: ABOUT THE BUILDING Elbow Drive SW, Calgary Alberta

Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal

Downtown Core Sub-district

Advantages and Disadvantages of One Way Streets October 30, 2007

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

PURPLE FLAG FOR BETTER TOWN CENTRES AT NIGHT

Lincoln Downtown Master Plan Update

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

800 EMAAR (36227) Marina Plaza

28.0 Development Permit Area #2 (Neighbourhood District)

East Somerville. What is important to me Survey Results

Cobourg Tourism Asset Feasibility Study

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Welcome to our exhibition

Opal Service District Plan

Smart Growth Illustrated: Developer s Guidebook. City of Bentonville Community Development Department October 2006


Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN Festival Plaza Drive, Las Vegas, Nevada 89135

05 AREA/SITE SPECIFIC GUIDELINES

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas

STAFF REPORT. December 20, North District Community Council. Director of Community Planning - North

BLOCK 400 PLANNED COMMUNITY DISTRICT

P u b l i c. Development Proposal And Rezoning

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

YERBA BUENA ARTS & EVENTS

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

WELCOME TO OUR EXHIBITION

Shaping Whanganui. Have your say, korero mai

Language Studies International 2009 Accommodation in Canada

Downtown Tampa Transportation Vision

IT S HARD TO BELIEVE THE INNER HARBOR IS 40 YEARS OLD

21.04 LAND USE. Managing amenity through land use strategies

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

Reimaging Nevada s Traveler Experience. Welcome Stations Rest Areas Rest Stops

6. Social & Community Facilities

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Topic 2 11/28/2012 Blocks & Street Network

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE

Fishermen s Market. Indoor Public Space. Shipping Container Follies. Under the Steps Gallery. Beach

CHAPTER 5 - "R1" SINGLE-FAMILY RESIDENTIAL DISTRICT

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

7 C1TY PLACE / COMMERCE MEETS NASHVILLE S NEW WEST SIDE

SELECTED SPECIAL EVENTS PROJECTS

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

CAPITOL RIVERFRONT BID. Marketing Video

Sydney Airport District

WELCOME THANK YOU FOR JOINING US BRENTWOOD SITE MASTER PLAN REZONING OPEN HOUSE

Recently Constructed, High Quality Office Space For Lease/Sale in Old Town

New Waterloo. Transforming the Elizabeth House site

GRADE A HEADQUARTER OFFICE BUILDING, LEEDS

Welcome & background.

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL

5 March 12, 2014 Public Hearing

STRATEGIC PLAN

A VISIONARY OFFICE LEASING OPPORTUNITY

CHIPPEWA FALLS RIVERFRONT PARK

FAUQUIER HIGH SCHOOL FAUQUIER HIGH SCHOOL 200 E MARKET STREET, CHARLOTTESVILLE, VA PH : WWW VMDO.COM

CITY COUNCIL PACKET MEMORANDUM

SÓLBORG. Traditional Icelandic female name meaning Sun City.

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

SOUTH ELM DEVELOPMENT GREENSBORO, NC. June 28, 2012

Sydney's most unique and versatile venue. 14,000m 2 of infinitely flexible event space set in stunning historic Locomotive Workshops

WHERE ENERGY MOVES. The Energy Corridor At-A-Glance. How We Measure Up

Downtown East Lansing

OFFICE, MEDICAL, HOSPITAL, ASSISTED LIVING, RESTAURANT, HOTEL SITE NEC COTTON LANE & ESTRELLA PARKWAY :: GOODYEAR, ARIZONA ±47.

GARFIELD BOULEVARD. concept planning 54TH PL CALUMET AVE ELLSWORTH DR CTA STATION STUDY AREA GAS STATION GARFIELD BLVD PRAIRIE AVE

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

Mississippi Drive Kickoff Event. 8/31/2015 & 9/1/2015 Meeting Minutes. Blue Zones: Dan Burden Presentation (Rotary Club Meeting)

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

REQUEST FOR PROPOSAL FOOD TRUCK SERVICES March 17, 2015

Schenk-Atwood Neighborhood Business District Master Plan

Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.

Economic Development Element

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Glossop Design & Place Making Strategy

CASTELLO DI POSTIGNANO REAL ESTATE PROPOSAL

Citizen Advisory Group Meeting #1 December 8, :00 p.m.

Brock University Dean, Faculty of Business

Hudson Square is the place to be

Theme 1: Activities. Background

CORTEX TOWER OPPORTUNITY STUDY /

Seeking Expressions of Interest

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

CHAPTER 15: NEIGHBOURHOOD PLAN AREAS

THE NEW FORMAT OF BUSINESS

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS

APPENDIX A BUILDING SETBACKS AND HEIGHTS

BULLETIN NO. 6. Car-Share Requirements and Guidelines for Car-Share Spaces ZONING ADMINISTRATOR. 1. Car-share Basics PURPOSE: OVERVIEW:

WELCOME WELCOME TO THE PUBLIC EXHIBITION FOR THE ILONA ROSE HOUSE REDEVELOPMENT. ILONA ROSE HOUSE

kaneggroup Building Services LEISURE & COMMERCIAL

1200 MAYFAIR ROAD, MILWAUKEE, WI HIGH POINTE :: MILWAUKEE S PREMIER LEED GOLD OFFICE BUILDING

Waterleaf Space Optimization Study

DIGITAL DISPLAY GUIDE & SPECIFICATIONS

Building Age-Friendly Communities

PREMIER GROCERY-ANCHORED RETAIL OPPORTUNITY IN THE HEART OF WHISTLER. Trattoria di Umberto GONDOLA. Pan Pacific Mountainside.

Transcription:

THE SHIPYARDS - LOT 5 Development Information Package DEVELOPER: QUAY PROPERTY MANAGEMENT CORP. Unit 210-24 East 4th Avenue, Vancouver, BC V5T 1E8 T: 604.685.2391 F: 604.685.0959 www.quayproperty.net TM

TM Quay Property Management Corp. ( QPM ) has been selected by the City of North Vancouver ( the City ) to develop the Shipyards Lot 5 in the City s central waterfront area in Lower Lonsdale. This waterfront development will include restaurants, cafes, retail shops and a boutique hotel (hotel use subject to rezoning), surrounding a public water play feature and outdoor skating rink. Through this development, QPM will provide the City with the world-class regional attraction it is seeking for the Shipyards precinct. The project will incorporate elements of the Machine Shop building for historic preservation, and provide a unique mix of commercial and community uses at the Site, and will be executed with a unique and spectacularly designed architectural experience. Exterior rendering water play activity in summer The Shipyards Lot 5 Development 1

DESIGN PRINCIPLES Through substantial public outreach and planning processes, the City has adopted a clear set of design principles for the Shipyards area, which QPM has integrated into this development; these principles are outlined below. PEOPLE The main objective for the area is that of a people place. The Lot 5 development will cater to a range of age and income groups by incorporating land uses and businesses that offer different products, food offerings and price points. The interior and exterior spaces have been designed to encourage social interaction; the commercial businesses will have spill-out uses; and the public realm will stimulate people watching. YEAR ROUND People will come to this development year round. The restaurants and cafes with heated outdoor patios, the programming of the public realm, the unique communityoriented businesses, presence of public resources and access such as WiFi in the public space; these elements combined with the stunning design and unbeatable location that will together make the project a destination for all ages and demographics, throughout the year. PROGRAMMED One of the key strengths of the QPM team is the great deal of experience in animating and programming public places both informally through design, and formally through events. The businesses at the development itself will offer an element of programmed activity, and ongoing programming will offer the structured activities that will attract and entertain people. Incorporating a mobile stage into the open space will allow for various types of entertainment, and assembly of crowds up to 5,000 people when combined with Shipbuilders Square, and closure of Wallace Mews for events. INTIMATE One of the key parameters of well-designed open spaces is to feel inviting. Places need to work for individuals as well as for crowds. To this end, the design of spaces within the development includes edges with places to sit, read, or just people watch. Outdoor patios ensure that there will always be activity for individuals even when nothing else is programmed. MONETIZED The mix of uses in this project, offering a variety of price points, will ensure that there are options for everyone to at the site. The design and configuration of the development will ensure presence of small businesses and kiosks, in addition to major anchors such as a hotel (hotel use subject to rezoning) and large restaurant. Exterior rendering winter skating scene viewed from the southwest of Lot 5 Interior rendering event programming The Shipyards Lot 5 Development 2

CULTURALLY RICH Arts and cultural uses will have a presence in the development; not only through ongoing programming, but also in selection of permanent tenants for the commercial space. The design respects the historical, economic and social culture of the former Shipyard site through the integration of heritage resources. HISTORICALLY RICH The reconstructed heritage Machine Shop has been positioned as the centre piece of the plan. This approach guarantees the continuity of history through the Shipyards and reminds all visitors of the built form that supported the ship building activities. Historical references will also be woven into the public open space and commercial components of the development with use of artifacts, and informational programming. From spring to fall when the skating rink is gone, bold lines etched into the surface of the plaza are visible. These lines are faithful in shape and scale to the tracings left on the floors of shipyard buildings, where the hulls of great ships were made during the early part of the 20th Century. VEHICLE PRESENCE To accommodate large scale events and festivals, Wallace Mews will be subject to regular closure to vehicular access; however, the development allows for vehicular traffic during off-peak periods (day time, weekdays). Closures will take place for evening, weekend and special event activity only. During times of closure, access will be maintained for emergency vehicles and service trucks. During quiet times maintaining traffic movement will provide a level of animation to the site, and convenience for patrons and the general public. The development will feature one level of underground parking for a minimum of 125 vehicles. INTEGRATION A core consideration for the design of this development, is its surroundings. This project will not be developed or programmed as an isolated site, but as a part of the larger Shipyards district and central waterfront area. This is inherently what good urban design is about and this project responds accordingly. There will be a symbiosis between the uses and design that works with the adjacent heritage components to the west, as well as the contemporary projects to the north and east. Together, the whole is greater than the sum of the individual parts. Exterior rendering SUSTAINABILITY The commercial component of the building will include several environmentally-friendly features and finishings in construction and ongoing operations, will be built to LEED performance equivalent standard, and will work with Lonsdale Energy Corporation. The Shipyards Lot 5 Development 3

PUBLIC SPACE The design of the public space, featuring the water play feature and outdoor skating rink, provides an attractive, dynamic and multifunctional public realm, rooted in its North Shore setting, and at once integrated with and complementary to the proposed architecture. Above all, it is conceived as a place that will attract people who, whether they are gathering, talking, eating, walking, skating, or shopping, are the universal element in great public space. In the summer the same route becomes a shallow pool that intermittently fills with water and grows in size, then drains and disappears, to the delight of kids of all ages. The landforms around the shallow pool feature various water play elements including spouts and jets. In the summer months the rink area becomes a plaza, animated by markets, car shows, performances and festivals. A cafe kiosk and patio at the south end, and seating along the circulation routes on the east, north and west edges, ensure that the entire area is vibrant and animated whether there are large crowds or intimate gatherings of a few people. In the landscape, hard elements are designed with robust materials in simple, durable, industrially inspired forms. In counterpoint to this formal and material language, the organic landforms and colourful materials of the water play area contribute to the conversation between old and new. SITE CONNECTIVITY Interior rendering event programming At the centre of the site is a major covered outdoor gathering space that provides amenity, attraction and delight for all seasons. The areas for the outdoor winter skating rink, and the summer water play feature are located side by side, and are deftly woven together where they intersect and overlap. During winter, skaters can glide off the main rink and follow a looping route through a series of organic landforms. Lot 5 is part of a procession of important places along the City s waterfront, which include Waterfront Park, the SeaBus station, Lonsdale Quay Market, future Polygon Presentation House Gallery, the Foot of Lonsdale Plaza, and Shipbuilders Square. As such, the public space is designed with its neighbours in mind. Its form an urban room extruded into and embraced by a gentle slope references both the existing Shipbuilders Square and the Foot of Lonsdale space under construction. It is also configured to open towards the Shipbuilders Square, so that the two can be jointly programmed for major events. The Shipyards Lot 5 Development 4

SPIRIT TRAIL To ensure the integration of the project into its surroundings, all of the important connections have been taken into account. Most important is the Spirit Trail which has been incorporated to the south and east of Lot 5. Improvements to the portion of the Spirit Trail that surrounds Lot 5 have been incorporated into the design and planning for this project. This is a key element to support the commercial and public space components, and will be celebrated as a main access option for the site. PEDESTRIAN ACCESS In order to heighten the level of pedestrian access to the site, a second floor connection is proposed from Esplanade (subject to final design and approvals). This would serve to bring people directly to the retail, arts and cultural spaces on the second level of the development, giving the project a main entry point on Esplanade. This route will also allow people to transit through the project all the way from the Esplanade north of the site to the Pier at the south. This pedestrian artery will also serves as a balcony overlooking the public space below. This approach heightens social interaction in the vertical dimension. Secondary routes provide ample axis for pedestrians north-south along Wallace Mews on each side of Lot 5, and east-west through the middle of the site. Interior rendering view from second level Exterior rendering the restaurants and hotel viewed from the Spirit Trail BICYCLES AND VEHICLES Convenient and visible bike parking will be featured prominently as a fundamental component of the project, in multiple locations. Vehicular access to the site is provided from the north edge of the property, with a ramp to the underground parking for both general public and hotel users (hotel use subject to rezoning). Loading will be handled with street-side loading using Wallace Mews, allowing service vehicles to reach their destination and avoiding long interior service corridors. Designed and managed properly, this style of loading similar to that in operation for years at Granville Island with Public Market visitors percolating through loading operations will contribute to the dynamic interest along this edge of the building. The Shipyards Lot 5 Development 5

COMMERCIAL COMPONENT Orientating the commercial buildings to the north and east sides of the site, surrounding the public space has been identified as the best use of the land, and will encourage maximum interaction between public and commercial areas of the site. This approach also allows for harbour views from Esplanade and areas to the north of the site. The commercial component of the project includes retail, restaurant and bars, and cafes on the ground floor, ensuring the site is activated from the ground up. Hand-selected services, arts and culture, and community uses for the second level will also follow the requirement to have the site operating and vibrant into the evening. A boutique hotel (hotel use subject to rezoning) on the third and fourth levels will provide further exposure to the site and area from the out of town guests, while serving the needs of the community to have expanded hotel offering. The commercial development will also include support space for the public skating rink and water play feature, including washrooms, change rooms, skate rentals, and complementary retail and services. PROJECT TEAM DESIGN TEAM Developer: Architectural & Structural Design: Landscape Design & Public Space: Transportation Planning: CONSTRUCTION TEAM Construction Management: Environmental Consultants: Geotechnical Engineers: Quay Property Management Corp. DIALOG Hapa Collaborative Bunt & Associates Bell Group International PGL Environmental Consultants Golder Associates Exterior rendering view from north-west corner The Shipyards Lot 5 Development 6