Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions



Similar documents
City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

Walking and Working Surface Checklist:

Architectural Condition Survey

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.


ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Street Audit Tool: Web 2.0 Tools

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

March 19, Ms. Jean McDonald CAP Management th Street, Suite 1010 Denver, Colorado 80202

Facility Assessment for East Main Street, Huntley, IL

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

17,280 square feet Overview:

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Facility Assessment Report, Montgomery Independent School District

Bicycle Parking Guide

Hanna delivers the technical and marketing expertise needed to produce a car wash that meets the car wash customer's expectations.

WALKING-WORKING SURFACES (SLIPS, TRIPS, AND FALLS)

Building Condition Assessment: North Howard Street Baltimore, Maryland

Architectural Inspection Site Structures

Goals & Objectives. Chapter 9. Transportation

ADA Checklist for Polling Places

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

How To Improve Safety

Building Condition Assessment: West Lexington Street Baltimore, Maryland

APPLICATION FOR OUTDOOR DINING

Slavic Village Building Condition Review

SECTION XI OPINION OF PROBABLE COST

3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet.

Area of Rescue Assistance Communication System ADA Code Applicable excerpts:

PROPERTY EVALUATION AND RESERVE FUND STUDY

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Vision Home Inspection

STICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation

October 5, 2015 Dear Client,

ACCESS AUDIT OF WESTPORT HOUSE

Topic 2 11/28/2012 Blocks & Street Network

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Building Foundation and Structure

American Academy of Physical Medicine and Rehabilitation Site Survey Report

PUBLIC MINUTES PROPERTY MAINTENANCE APPEALS BOARD. Wednesday, November 25, 2015, 3:46 p.m. Committee Room B, City Hall

SECTION 3 ONM & J STRUCTURAL ANALYSIS

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

VILLAS OF TRADITIONS AT GREY OAKS

Memorandum. July 16, To: Plan Commission City of Madison

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Items in red were complete Items in green were complete on Lined out items are Life Safety Codes.

VERTICAL SPEED CONTROL DEVICES

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

3 Tappan Zee Bridge Rehabilitation Options

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Expanding Your Market

Engineering Standard

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

WILSON TRANSFER STATION CONSULTING PARTIES MEETING. Chicago Transit Authority

PUBLIC RESTROOMS, DESIGN INTENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

REQUIREMENT 3. Usable Doors

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

AUSTRALIAN HUMAN RIGHTS COMMISSION NOTICE OF DECISION ON APPLICATION FOR TEMPORARY EXEMPTIONS: AUSTRALASIAN RAILWAY ASSOCIATION

Light Rail Transit in Phoenix

Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO

HOUSTON ELEMENTARY SCHOOL

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

MURCH ELEMENTARY SCHOOL

29 Broadway- 14 th Fl Tel: New York NY Fax: Due Diligence Report. New York, New York

Reference: BRM A0 July 18 th, Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

STRUCTURAL ASSESSMENT

Monthly Inspection Checklists

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

How To Prevent Water Damage To A Home

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

City of Riverside Building & Safety Division Phone: (951)

ATTACHMENT K 5310 ELIGIBLE COST

- FREE! - The Official San Francisco BIKE GUIDE. 1st Edition

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Inspecting to a higher standard.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

PART I TRAFFIC VIOLATIONS

Sample Drawing Package for One and Two Family Dwelling Applications

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT

De Beers Canada Inc. OP 050 SLIPS, TRIPS, FALLS AND PEDESTRIAN SAFETY - SURFACE

COMPREHENSIVE PROPERTY INSPECTIONS

The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services

ADA Scoping: New Construction

National Archives and Record Administration

WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204

Slip, Trip & Fall Program Table of Contents

Guidelines. Design and Placement of Transit Stops. Washington Metropolitan Area Transit Authority

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

Executive Director s Recommendation Commission Meeting: March 5, 2015

3.1 Historical Considerations

Transcription:

Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions

Table of Contents Station Locations and Approaches o Narrative description of the station locations o Aerial of area surrounding stations o Diagram of major approaches to the stations, including bus connection points o Diagram of adjacent intersections, pedestrian and traffic flow o Representative photos of station area APPENDICES CTA Main Street Station Conditions Assessment Ranking CTA Main Street Station Recommended Short-Term Maintenance Items Metra Evanston Main Street Station Conditions Assessment Ranking Metra Evanston Main Street Recommended Short-Term Maintenance Items CTA Main Street Station o Station Access Narrative description of station house and identification of entry and exit points Representative photos of station entry and exit points o Station Accessibility Narrative description of ADA compliance issues Representative photos of station conditions o Station Egress Narrative description of code compliance and egress issues Representative photos of station conditions o Station Material and Components Conditions Narrative description of maintenance issues Representative photos of station conditions Metra Evanston Main Street Station o Station Access Narrative description of station house and identification of entry and exit points Representative photos of station entry and exit points o Station Accessibility Narrative description of ADA compliance issues Representative photos of station conditions o Station Egress Narrative description of code compliance and egress issues Representative photos of station conditions o Station Material and Components Conditions Narrative description of maintenance issues Representative photos of station conditions TOD Plan and Study A 2 Existing Conditions

Station Locations and Approaches The CTA and Metra Main Street stations are located between Main and Washington streets and Chicago and Custer Avenues. CTA s bus 205 connections are available (north bound) on Chicago Avenue, north of Main Street. Shuttle buses to Northwestern University are available at this location, as well as in front of the CTA Main Street Station. CTA s Main Street station can be entered only from the west side of Chicago Avenue. The approach from the north is along a sidewalk that is approximately 8 feet wide. The first intersection from the north (Main Street) is fully signalized and has marked crosswalks and curb cuts at all corners. From the south, the approach is along a sidewalk that is approximately 11 feet wide. The intersection to the south (Washington Street) only has one marked crossing, the left one. Motor vehicle traffic on Washington Street is controlled with a sign. It is recommended that north and south crosswalks be added so that pedestrians may cross Chicago Avenue at this location. Metra s Main Street Station can be entered from four points at street level, two for each direction of travel. For Chicago-bound passengers, the platform can be reached by two sets of stairs, one at the intersection of Main Street and the Metra station driveway, and the other at the intersection of Washington Street and the driveway. The Washington Street stair can be reached by a sidewalk that is approximately 10 feet wide, either from the east or the west. The Main Street stair can be reached by a sidewalk that is approximately 14 feet wide. For North Shore-bound passengers, the platform can be reached by an Americans with Disabilities Act (ADA) compliant ramp or a stairway. The ramp is located at the intersection of Main Street and Custer Avenue. The stairway is located at the intersection of Washington Street and Custer Avenue. They are served by the same sidewalks as the stairs leading to the Chicago-bound platform. The intersection to the west on Main Street (Custer Avenue) has north and south crosswalks controlled with signs on Custer Avenue. The west crosswalk has no control and there is not an east crosswalk. It is recommended that signs be added to improve the west crossing. The intersection to the east on Main Street (Chicago Avenue) has already been discussed. The intersection to the west on Washington Street (Custer Avenue) has curb cuts, marked crosswalks, and stop signs at all four corners. The intersection to the east (Chicago Avenue) has already been discussed. TOD Plan and Study A 3 Existing Conditions

a. Diagrams of adjacent station area, intersections, pedestrian amenities, and traffic flow TOD Plan and Study A 4 Existing Conditions

TOD Plan and Study A 5 Existing Conditions

TOD Plan and Study A 6 Existing Conditions

b. Representative photos of station area EvanstonMainStreetStation TODPlanandStudy A 7 AppendixA.1: ExistingConditions

TOD Plan and Study A 8 Existing Conditions

EvanstonMainStreetStation TODPlanandStudy A 9 AppendixA.1: ExistingConditions

Signage clarifies intersection Parking lower cost than public transit Pedestrian crossing at Metra station driveway TOD Plan and Study A 10 Existing Conditions

CTA Main Street Station CTA Station Access The station can be entered from Chicago Avenue, between Main and Washington streets. The station and its signage are not clearly visible from the nearest intersections. From the sidewalk there is a single step up to reach the station. The stationhouse contains two fare array turnstiles, a keyed entry gate, a customer service kiosk, system maps and fare card equipment. The station does not have any apparent recent renovations. The entry leads customers a short run of stairs. For northbound passengers, the platform can be reached by one of two stairs. For southbound passengers, the platform can be reached by a short run of stairs, followed by one of two sets of stairs. The initial stairs are approximately 8 feet wide, while the stairs leading to the platforms are approximately 5 feet wide, with landings. TOD Plan and Study A 11 Existing Conditions

Station house interior TOD Plan and Study A 12 Existing Conditions

Doors leading from the platform stairs into the station house TOD Plan and Study A 13 Existing Conditions

Station Accessibility CTA s Main Street station is not currently accessible. There are many deficiencies within the station as well as the approaches to the station that would need improvement in order to make the station ADA compliant. Sole access to platforms is by stair Recommended changes begin at the street. The station can be entered through climbing one step from the sidewalk. Inside the station, the only access to the platforms is by stair. The addition of ramps or elevators would be required to make access to the platforms ADA compliant. The two platforms are nominally 10 feet wide. They include numerous impediments that frequently reduce the platform width to approximately 5 feet. This does not meet the requirement that 6 feet be available for the boarding of people with wheelchairs. The 2 foot wide detectable warning strip cannot be counted as part of accessible clearance, leaving a walking surface that is approximately 3 feet wide. These impeding elements would need to be relocated or removed to gain the required clearance for accessibility. One step up to reach station house Typical reduced platform width (approximately 3 feet wide, not counting the detectable warning strip) Station Egress CTA s Main Street station may be deficient, in terms of egress, for a number of reasons. While each platform has two exits, they are located in the center with very long dead end runs. The stairs themselves are also very narrow, approximately 5 feet wide. It is likely that the exits would not meet either current building codes or meet National Fire Protection Association (NFPA) tests. A complete code analysis should be performed as part of future station designs to confirm compliance. TOD Plan and Study A 14 Existing Conditions

EvanstonMainStreetStation TODPlanandStudy A 15 AppendixA.1: ExistingConditions

Platform pinch point: Shelter Single exit-only roto-gate Locked service gate Platform pinch point: Sand box EvanstonMainStreetStation TODPlanandStudy A 16 AppendixA.1: ExistingConditions

Station Material and Components Conditions The CTA Main Street station is in fair to poor condition. The station house envelope seems to be in serviceable condition, with fare collection equipment appearing to be in the best condition. Most of the other elements in the station house, stairs, corridor, and platforms are in disrepair. The following are examples, not a complete list, of deficiencies. Underside of station house eave The ceiling at the station level has peeling paint and areas of extensive efflorescence. At the roof level, wood appears to be water-damaged and wires are exposed. The concrete and tile stairs are cracking and concrete walls are spalling. At the platform level a portion of the platform is collapsing (this portion has been closed off to the public). Railings are corroding and the wood slats of the benches appear to be loose. Station level ceiling efflorescence Loose wiring, station house TOD Plan and Study A 17 Existing Conditions

Spalling along stairs Corroding railing Closed, collapsing platform Loose bench Metra Evanston Main Street Station EvanstonMainStreetStation TODPlanandStudy A 18 AppendixA.1: ExistingConditions

Metra Station Access Access to the platforms is unclear. While there is a station house, access to the platforms is almost exclusively through stairs and a ramp that are located as far as possible from it while still being on the same block. It is also effectively not open to the public, with no station agent and limited hours for the waiting room, which serves the Chicago-bound platform, only. The platforms can be reached from Main Street or Washington Street. Chicago-bound passengers can reach the platform by one of two sets of stairs. For North Shore-bound passengers, the platform can be reach either by an ADA compliant ramp or a set of stairs. The ramp is approximately 5 feet wide, while the stairs are approximately 6 feet wide, with landings. TOD Plan and Study A 19 Existing Conditions

Station Accessibility Metra s Main Street station is not fully accessible. Only the North Shore bound platform can be reached without assistance by an ADA compliant ramp. The Chicago-bound platform can be reached, in theory, by elevator. Access to the elevator, however, requires ringing a bell and being let into the station house. This requires the presence of people in the building, which cannot be TOD Plan and Study A 20 Existing Conditions

relied upon. Effectively, the Chicago-bound platform can only be reached by stairs. Unlimited access to the existing elevator or the addition of a ramp to the Chicago-bound platform is recommended to make the station fully accessible. The two platforms are never less than approximately 10 feet wide, which is sufficient for the maneuvering of people with wheelchairs. ADA compliant ramp, with landings, to the North Shore-bound platform The accessible route to the Chicago-bound platform is via an elevator that can only be reached there is staff in the station that answers a bell. The elevator can be found through a door at the left end of the building. Ramp to reach the North Shore-bound platform is to the left of this picture. However, there is no sidewalk on this side of the street to get to the ramp. TOD Plan and Study A 21 Existing Conditions

Station Egress Metra s Evanston Main Street platforms may largely meet building code requirements pass NFPA tests. Each platform has two exits, and the platforms are a minimum of approximately 10 feet wide. The exit stairs are approximately 6 feet wide. The most obvious possible flaw is the placement of the exits on the North Shore-bound platform. One is located towards the south end and the other one, in the middle. The north end of the platform has a dead end run of approximately 110 feet. A complete code analysis should be performed as part of future station designs to confirm compliance. Platform has ample width TOD Plan and Study A 22 Existing Conditions

Station Material and Components Conditions Partition corrosion The Metra Evanston Main Street station is in fair condition, with the caveat that it does not include as many elements as does CTA s Main Street. The concrete stairs and asphalt platforms have some cracking. Metal railings and partitions are corroding in places. There are few places to sit and, on the North Shore-bound platform, there is no protected seating. While the station was only inspected during the day, the number of fixtures may indicate adequate lighting. Cracked and repaired stair Bench with no shelter and shelter with no seating TOD Plan and Study A 23 Existing Conditions

High lighting Platform level lighting TOD Plan and Study A 24 Existing Conditions

Station Condition Assessment Ranking CTA Main Street Station Recommended Short-Term Maintenance Items CTA Main Street Station Good Fair Poor 5 4 3 2 1 Station Planning Accessibility 1 Aesthetics 3 Bird Control 3 Circulation & Capacity 2 Clearances & Dimensions 1 Configuration & Adjacencies 3 Context 3 Customer Comfort & Convenience 2 Illumination 3 Maintenance 1 Materials & Finishes 1 Noise Control 3 Resource Conservation 3 Safety & Security 2 Site Development 2 Systems Coordination 2 Wayfinding 3 Weather Protection & Climate Control 2 Station Components Standard Building Surfaces 2 Key Station Elements 2 Station Identity 3 Station Surroundings Add crosswalk and stop control to cross Chicago Avenue at Washington Street. Clarify the location of, and which buses stop, in front of the station house on Chicago Avenue. Consider adding signage to clarify the location of the station at the intersections of Chicago Avenue with Main Street and with Washington Street. Station House Replace the stationhouse signage with a larger, more legible sign. Clean and repaint entry doors inside and out. Inspect eaves for the source of water damage, address the source, and repair and paint the eaves. Run exposed wires through conduit. Circulation/Vertical Circulation Repair cracks on stairs. Replace scratched windbreaks with clear glass and perforated metal panels, as has been done elsewhere in the CTA system. Replace corroded metal railing. Clean and repaint remaining railing. Inspect concrete walls and ceilings and provide necessary repairs at areas of cracking and spalling. Inspect for sources of water intrusion that are causing efflorescence. Address the source and make repairs to the concrete. Platform Elements Scrape, prime and repaint all canopy structure and underside of canopy. Replace elements that are made unusable through corrosion. Remove or relocate storage elements (i.e., sand boxes) to widen the passing areas on the platforms. TOD Plan and Study A 25 Existing Conditions

Station Condition Assessment Ranking Metra Evanston Main Street Station Good Fair Poor 5 4 3 2 1 Station Planning Accessibility 1 Aesthetics 3 Bird Control Circulation & Capacity 2 Clearances & Dimensions 3 Configuration & Adjacencies 2 Context 1 Customer Comfort & Convenience 1 Illumination 3 Maintenance 3 Materials & Finishes 3 Noise Control 3 Resource Conservation 3 Safety & Security 2 Site Development 2 Systems Coordination 3 Wayfinding 2 Weather Protection & Climate Control 1 Recommended Short-Term Maintenance Items Metra Evanston Main Street Station Station Surroundings Add sidewalk to the east side of Custer Avenue so that people using wheelchairs may get to the ramp from the intersection with Washington Street. Remove signage that indicates that there is an accessible route to the Chicago-bound platform (unless elevator access is improved as stated under Station House, below). Add stop controls (signs) to Main Street at the intersection with Custer Avenue. Add signage to clarify the location of the station at the intersection of Chicago Avenue with Main Street. Station House/Vertical Circulation Make the elevator available to disabled patrons without relying on the presence of another person. Repair cracks on stairs. Platform Elements Replace corroded metal railing. Clean and repaint remaining railing. Provide seating that is protected from rain and wind on both platforms. Station Components Standard Building Surfaces 3 Key Station Elements 3 Station Identity 2 TOD Plan and Study A 26 Existing Conditions