Signage. Information / Admissions Desk. Gift Shop. Atrium. Scope Responsibility Architecture / Exhibit Design. Notes. Responsibility.



Similar documents
FIRE EXTINGUISHER DORM #1 SYMPHONY

Walmart 4th Wall. Advertising and Lease Line Guidelines. June Customerexperience

STICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation

Wenatchee Valley College Music and Arts Center Wenatchee, Washington 27, 696 SF

San Diego Convention Center Floor Plans

SECTION (16630) RESCUE ASSISTANCE TELEPHONE SYSTEM (Rev Jun 2011)

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Print Shop/Mail Room

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

A Project Description/Project Title and Data: Building Area: (sf) Addition 28,142 Renovation 14,302. Cost per Square Foot: +/- $106.

Wayfinding Study: The Wallace Center

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Issued: Friday, 21 February Deadline for queries: Midday, Tuesday, 4 March 2014

Acoustical Surfaces, Inc.

City of Peterborough

Building Condition Assessment Report

Fire Alarm System Plans Review Checklist Property location Date of Review

Schedule B to By-law

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Children s Medical Center Dallas, Lobby Renovation Dallas, Texas. Photo by: Chad M Davis, AIA

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

The work has continued on final Phase 4 and is nearing completion.

A1.5 Classroom Standards

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

ARCHITECTURAL PARTNERS, P.C. 10 Ninth Street, Lynchburg, Va / Fax 434/

AIA Convention 2016: May 19-21, Philadelphia SPONSORSHIPS.

Exhibit C Design Review Guidelines

Building Condition Assessment Report

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Wentz Concert Hall and Fine Arts Center 171 E. Chicago Avenue Naperville, IL Existing Electrical Systems Will Lesieutre

QUIKHOUSE. Quik Satisfaction.

Please note that exhibitor move out will not be permitted prior to 8:05 p.m and must be complete by 9:30pm.

aapexshow.com 2015 Sponsorship Opportunities NOVEMBER 3 5, 2015 SANDS EXPO LAS VEGAS, NEVADA

BECOME A SPONSOR AT DISPLAY WEEK 2013

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

Section 7: Elevators and Lifts. Main Entry Floor Outside the Elevator

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Product description NCC Data Center

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

BILL OF QUANTITIES Part No.: Part Description

Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation

17,280 square feet Overview:

SECTION XI OPINION OF PROBABLE COST

Factors in Considering a Shopping Centre Location

Agriculture & Business Multipurpose Classroom Building Prairie View A&M University. 100% Design Development Review Meeting.

Schedule B to By-law Part A Fees Payable for Permits

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Design Development Quality Management Phase Checklist Project Phase Checklist Series

SPONSORSHIP PROGRAM. May 16-18, 2016 Gaylord National Convention Center National Harbor, MD USA.

City of Riverside Building & Safety Division Phone: (951)

Items in red were complete Items in green were complete on Lined out items are Life Safety Codes.

Short Interval Production Schedule Research

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Mobile Home Pre-Inspection Checklist

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

SWAN POINT YACHT & COUNTRY CLUB

Hospital Patient Management System

FARBE, AUSBAU & FASSADE

Acoustical Design of a Conference Hall

Middleborough Police Electronic Security Narrative

CITY OF SHAKER HEIGHTS HOUSING INSPECTION DEPARTMENT 3450 LEE ROAD SHAKER HEIGHTS, OHIO (216) POINT OF SALE CERTIFICATE OF INSPECTION

University of California, San Diego CAL IT 2

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

GEORGETOWN UNIVERSITY LAW CENTER ADVERTISING POLICIES

Lighting Applications Guideline for LEDs

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

Welcome to AISB Created by IT Facilities Manager, Lylah Shelor and Updated on July 28, 2015

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

DEPLOSUN REFLECTORS. Carrer dels Vergós, Barcelona Spain Tel: (+34) Fx: (+34)

Quality alu LED profiles

Professional CAD System

DISPLAY & EXH I B I T

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

RR WORKGROUP. Requirements and Relocation Team (R&R) Friday March 4, 2011 President s Boardroom C111c 3:00 4:30 p.m. Agenda

Your Basement Remodeling Specialist LLC


101 Congress Parkway Federal Building

Hotel Accessibility Pack

2015 Chrysalis Awards Entry: Commercial Insurance Restoration. Gallo Center for the Arts. BELFOR Sacramento

Standard Comms Rooms Specification

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

UC Merced On Campus Publicity Checklist

Electrical. This section applies to the design and installation of building power distribution systems.

ARIE KEPETS - SR. VICE PRESIDENT MARCH 09

THE UNIVERSITY OF EDINBURGH. ECA Evolution House.

Element Z General Design Requirements Owner Standards and Other Requirements

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

EQUIPMENT OVERVIEW... 4 SETTING UP CALL MANAGER...5

Appendix G. Security management plan

MAGILL ASSOCIATES C.9 FIRST FLOOR PLAN. architecture / planning / interiors

Lake Charles Ward 3 Recreation Improvements To University Park

Order form for additional stand equipment and services 2012

Step 1: Application Instructions

2D & 3D TelePresence

Transcription:

ure / Exhibit Design Exterior Building Exterior Temporary Exhibit Graphics X X X Structure Exterior Life Safety/Room Wayfinding -Exterior Parking-related Wayfinding -Interior Staff Space Public Space Public Space: Life Safety Public Space: Wayfinding Life Safety and Room Designation Information / Admissions Desk Desk (Info and Ticketing) Today's Events Public Address System Gift Shop Fixtures Food Service Fixtures Atrium sfurman@ccadesign.com copyright free 1

ure / Exhibit Design ural (not Exhibit) Lighting Demising Donor Power Lighting Mounted Install conduit, power and J box Install Track Fixtures Install Overhead Lighting Overhead Icons, Conduit Power & Jbox Review Coordination and Review / Coordination and Review Exhibit Entry Power External Lighting Internal Lighting Doors Theater Entry Risers Seating Show Lighting Provide Power to Dimmer Panel Distribution Install Show Lighting Path Lighting (Safety) Data/Power for Show sfurman@ccadesign.com copyright free 2

ure / Exhibit Design General Special Effects (bass shakers, etc.) Interior Wall and Finishes Acoustic Interior acoustic treatment by Paint by. to review color. Floor Finishes Emergency / Exit Lighting and ural Lighting Lighting /Power Maintenance Only Lighting /Power for Function Use Data/Signal for Function Use Projection Booth / including acoustic treatment Data/Power for Show Power provided to panel Distribution Data/Power for Function Use Interior Finishes Flooring Emergency / Exit Lighting and Lighting /Power for Function Use Data/Signal for Function Use Entrance Hall Demising (Exhibits/) sfurman@ccadesign.com copyright free 3

ure / Exhibit Design to review/provide specs. Demising Wall (Hall/Theater) Acoustic Treatment Basic Custom for exhibit environments, etc. Finishes Power run from mechanical rooms Distribution from dimming racks Install Lighting ural Lighting Exhibits Power/Data Distribution To panel location To final location Emergency / Exit Lighting and Building Security Equipment Coord with Exhibit Security Equipment Stairs Stair Construction and Finishes ural Lighting sfurman@ccadesign.com copyright free 4

ure / Exhibit Design Exhibits Exhibits Demising (Exhibits/) Acoustic Treatment Exhibit Interior Basic Custom for exhibit environments, etc. Finishes / Paint out mechanical Install conduit, pulls and J box Install Lighting ural Lighting Exhibits Power/Data Distribution To panel locations in A/V rooms To final location Emergency / Exit Lighting and Building Security Equipment Exhibit Security Equipment Acoustical Separation by. Internal Acoustic by Power and data provided to space by and distrib by Exhibit Control of Lighting & Sound sfurman@ccadesign.com copyright free 5