Chapter 7 - Appendix A



Similar documents
6. The estimated costs here do not include any applicable ITCC tax

TRANSMISSION AND SUBSTATION PROJECTS

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

FINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project

Substations or Switching Stations

PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Q140 Cluster Addendum

Rocky Mountain Power Transmission Five Year Study Findings Meeting

Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA

Project Screening Results

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Radial Distribution Test Feeders

Hyperlinks are Inactive

Instructions for use:

Emera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000

TERMS AND CONDITIONS

CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE

Houston Region Import Capacity Project

16 West Coast Regional Plan

Transmission Related Station Power Use at Substations

How To Operate The Williston Uvls

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Seattle City Light s Asset Management Program

Approved Meter Sockets and Cabinets

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report

The Impact of Transmission Cable System Construction and Design on Commissioning Test Options & Results

INTRODUCTION TO SYSTEM PROTECTION. Hands-On Relay School 2012

Distributed Generation and Power Quality Case Study

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

Cross-Tie Transmission Line. Ravikanth Varanasi Principal Transmission Planner

IESO Supply Deliverability Guidelines

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

Distributed Generation and the Impact on a Distribution System. Brian Lassiter Technical Sales Engineer

Emergency Response Solution- Keyspan

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE

Electricity from the Power Plant To the Consumer

GPS Interfacing of Banediya Feeder (M.P) Using MI Power Software

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

EPCOR Distribution & Transmission Inc.

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS

Substation Department

SPP Notification to Construct

Bill is the author of 15 papers and lectures on transmission lines and other power system topics.

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

Full Network Model Scope for FNM DB2015Q4

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Network Interconnection of Offshore Wind

SPECIFICATION COG-2007

CSR REPORT 2016 Corporate Social Responsibility Report

Treasure Valley Electrical Plan

SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan)

ABB Power Systems. Substations References

January 23, Minimum Design Standards Task Force

Design Criteria Additions Related To PJM IPP R02 project

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

Electric system improvements near you South and West of Edmonton Area Transmission Development

Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System

Wide Area Monitoring Current Continental Europe TSOs Applications Overview

Customer Substation Manual 08/05/02

Rule Fast Track Analysis for National Life Insurance Co.

All routes and route segments included in this notice are available for selection and approval by the Public Utility Commission of Texas.

Electrical Considerations for HVDC Transmission Lines. Joe Mooney, PE

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development

BC Hydro. Electric Distribution System Cost of Service Study

Hendrix Spacer Cable

PowerWorld Simulator

Smart Grid Demonstration Program

DISTRIBUTION RELIABILITY USING RECLOSERS AND SECTIONALISERS

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016

WPS MEDICARE PART B INTERACTIVE VOICE RESPONSE (IVR) TELEPHONE SYSTEM

THE COMMISSIONING PROCESS FOR NEW SUBSTATION EQUIPMENT & PROTECTION SCHEMES ON THE BULK ELECTRIC SYSTEM. Lawrence P. Hayes FirstEnergy Corp.

2015 I n t e g r a t e d T r a n s m i s s i o n P l a n Y e a r A s s e s s m e n t R e p o r t

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN

Salt River Project Ten Year Plan Projects

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

When power interruptions happen.

Voltage Source HVDC Overview Mike Barnes Tony Beddard

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009

Underground vs. Overhead Transmission and Distribution

-1- PSEG-LI Update of LIPA SGIP Full Docw-NYISO reqmts above 10 MW

Oncor s Pioneering Transmission Dynamic Line Rating (DLR) Demonstration Lays Foundation for Follow-On Deployments

GROUND DETECTION CIRCUITS FOR STATIONARY APPLICATIONS (IN PLAIN DOWN TO EARTH LANGUAGE)

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

Addendum #2 Contract UK-11-13

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

Transcription:

Chapter 7 - Appendix A Transmission and Distribution Supplemental Information Table 7A.1 MTEP Transmission Projects in Missouri 1 Project Approved Project Title Project Description Category Estimated Cost Estimated In Service MTEP13 Overton Replacement MTEP13 Bland 345/138 kv MTEP13 MTEP08 MTEP11 Osage Replacement Fredericktown- AECI Fredericktown Northwest Cape Area 345/161 kv MTEP11 MVP # 8 - Adair-Palmyra Tap 345 kv Line Replace existing 300 MVA transformer with a new 560 MVA transformer Bland 345/138 kv - Install new 345/138 kv, 560 MVA transformer at Bland. Supply new substation from 4th position at the Bland 345 kv ring bus. Install 138 kv bus at Bland Replace the 2-100 MVA 161/138 kv transformers with a 300 MVA unit. Increase ground clearance on 12 miles of line Install 560 MVA, 345/161 kv. Provide 345 kv supply from 11 mile 345 kv line extension from Lutesville Adair - Palmyra Tap 345 kv, 58 miles, 3000A. Establish a new 345 kv substation at Palmyra Tap Multi Value $5,000,000 2014 $13,000,000 2015 $1,965,000 2014 $1,200,000 2016 $30,751,000 2016 $108,110,000 2018 1 4 CSR 240-22.045(3)(A)1; 4 CSR 240-22.045(3)(A)6 2014 Integrated Resource Plan Page 1

Chapter 7 Appendix A Project Approved Project Title Project Description Category Estimated Cost Estimated In Service MTEP12 MTEP12 Prairie Dell Wallen Creek High- Side Transfer Install 138 kv breakers, build 2.5 miles of new single circuit 138 kv and 3.1 miles of new 138 kv double circuit line Install 2-2000 A,138 kv PCBs $20,763,000 2018 $2,635,000 2014 MTEP11 MTEP13 MVP # 7 - Adair - Ottumwa 345 (The portion in MO is from Adair to the Iowa state line) Maurer Lake 161 kv Breaker MTEP11 MVP # 9 Palmyra Tap Quincy Meredosia Ipava & Meredosia Pawnee (The portion in MO is from Palmyra Tap to the Illinois state line) Adair - New 560 MVA, 345/161 kv. New 71 mile 345 kv line from Adair to Ottumwa with 3000 A summer emergency capability Maurer Lake 161-69 kv - Install 161 kv PCB on the Missouri City line terminal. Minimum capability - 1200 A. Palmyra Tap to Quincy to Meredosia to Ipava 345 line and Meredosia to Pawnee 345 kv line. Install additional transformers at Quincy, Meredosia and Pawnee. Multi Value Multi Value $171,114,000 2018 $1,775,000 2013 $505,693,000 2016-2017 Page 2 2014 Integrated Resource Plan

Table 7A.2 Transmission Projects under Consideration 2 Project Description Status Adair Wind Farm Connect Wind Farm at Adair Cancelled due to wind farm project cancellation Apache Flats - Scruggs Delivery Point Howard Bend Connection Enon 345 kv Breaker Addition Warrenton-Lincoln Bulk 161 kv Line Belleau 345/138 kv - Second Belleau 345/138 kv - Install 138 kv capacitor bank Mason Replacement Camden-Ullman 138 kv Line Overton-Columbia Terminal Upgrade Apache Flats 161 kv - Install 1-161 kv, 2000 A PCB and necessary metering and relaying to provide a delivery point for Associated Electric's Scruggs 161-69 kv. Howard Bend 138-12 kv - Provide 138 kv ring bus connection from Mason- Carrollton-8 138 kv line to new Howard Bend. Install 1-138 kv, 2000 A PCB at Carrollton as a bus-tie. Enon 345/161 kv - Install 2-345 kv PCB's on incoming 345 kv lines. Warrenton-Lincoln Bulk 161 kv - Establish a second 161 kv supply to Lincoln Bulk from Warrenton. 10 miles of new 161 kv line, 2-161 kv, 2000 A PCBs at Warrenton. Install 2nd. 560 MVA, 345/138 kv and Complete 345 kv Ring Bus Install 138 kv, 120 Mvar capacitor bank at Belleau Mason 345/138 kv - Replace 345/138 kv, 560 MVA #2 with a 700 MVA unit Camden-Ulman 138 kv Line - Construct approximately 16 miles of 138 kv line between Camden and Ulman (switching station connecting to Maries- Osage-1 138 kv line), with 1600 A summer emergency capability. Install 300 MVA, 161/138 kv transformer Overton-Huntsdale-Columbia 161 kv - Replace 800 A CT at Overton Terminal with 1200 A unit. Cancelled after further discussions with Associated Electric 2020 Cancelled after further discussions with Associated Electric 2022 2018-2020 2021 2023 2024-2026 2024 2018 2 4 CSR 240-22.045(6) 2014 Integrated Resource Plan Page 3

Chapter 7 Appendix A Project Description Status Labadie-Mason 345 kv Line #3 Pershall Mason-Carrollton- 8 Increase Relay Limit Cotter Creek 138-34.5 kv Supplies Viaduct-Clark 161 kv Conversion Labadie-Mason 345 kv Line #3 - New 25 mi. 3000 A summer emergency capability line designed for double-circuit. 345 kv PCBs: 1- Labadie, 1- Mason. Install WAMS - PMU at Labadie on new line terminal Install 4-2000 A breaker ring bus and connect to Berkeley-Sioux-1 138 kv to establish 138 kv connections for Pershall 138-12.47 kv Sub Mason-Carrollton-8 138 kv Line - Increase relay load limit on Mason-Mason 34 kv segment of line to permit carrying full line capability Cotter Creek 138-34.5 kv - Provide 138 kv supplies to new Cotter Creek. Install a 2000 A, 138 kv PCB at Joachim, and extend new 138 kv line from Joachim to Cotter Creek. Also, for the second 138 kv supply to Cotter Creek, a new 3-2000 A breaker 138 kv switching station (Olympian Village) will be established in the Joachim-St. Francois-2 138 kv line, with a 138 kv line extended from Olympian Village Switching Station to Cotter Creek. Cape Area (Viaduct and Cape Clark s) - Convert radial 115 kv line to 161 kv and remove 115 kv facilities at Viaduct and Cape Clark. Install 5-161 kv breakers at Viaduct Project deferred indefinitely 2021 2020 2023 Cancelled Fountain Lake 2nd. Install 2nd. 138-12.5 kv 2018 Montgomery- Spencer Creek- Palmyra Tap-Sub T-Hills - Increase Ground Clearance Maurer Lake 161 kv Capacitor Bank Montgomery-Spencer Creek-Palmyra Tap-Sub T-Hills 345 kv - Increase ground clearance on 187 miles of 795 kcmil ACSR conductor. Install 30 Mvar, 161 kv capacitor bank and PCB. Frist section in service approximately 2015 2015 Page 4 2014 Integrated Resource Plan

Project Description Status Pike Reconnection Reconnect Pike 161-69 kv #1 to 161 kv Bus #1. Cancelled Meramec-Watson- 2 138 kv Line Reconductoring Sioux-Huster-3 138 kv Reconductoring Rush-Joachim-2 345 kv Position Upgrade Reconductor 3.7 miles of 795 kcmil AA conductor between Watson and the Mackenzie Switch Rack with conductor capable of carrying 1200 A under summer emergency conditions. Reconductor 5.9 miles of 954 kcmil ACSR with conductor capable of carrying 1600 A under summer emergency conditions. Replace 1200 A terminal equipment (disconnect switches, CT's, bus conductor) at Huster with equipment capable of carrying 1600 A or better. Rush Island 345 kv Switchyard - Upgrade the Rush Island terminal of the Rush Island- Joachim-2 345 kv line to a minimum of 2500 A capability by replacing the 2000 A wavetrap and reconnecting the 2000:5A CTs to 2500:5A. 2021 2020 2017 2014 Integrated Resource Plan Page 5

Chapter 7 Appendix A Table 7A.3 Transmission and Distribution Avoided Costs 3 Avoided Distribution Avoided Transmission Year ($/kw-year) ($/kw-year) 2015 $17 $6 2016 $17 $6 2017 $18 $6 2018 $18 $6 2019 $18 $6 2020 $19 $6 2021 $19 $6 2022 $19 $7 2023 $20 $7 2024 $20 $7 2025 $21 $7 2026 $21 $7 2027 $21 $7 2028 $22 $7 2029 $22 $7 2030 $23 $8 2031 $23 $8 2032 $24 $8 2033 $24 $8 2034 $25 $8 3 4 CSR 240-22.045(2); 4 CSR 240-22.045(3)(A)3 Page 6 2014 Integrated Resource Plan

Compliance References 4 CSR 240-22.045(2)... 6 4 CSR 240-22.045(3)(A)1... 1 4 CSR 240-22.045(3)(A)3... 6 4 CSR 240-22.045(3)(A)6... 1 4 CSR 240-22.045(6)... 3 2014 Integrated Resource Plan Page 7