1 Transmission Projects PG&E SCE 1. Build Shepherd Substation (MWC 60) Install 115 kv ring bus and loop 115 kv line, phase # 4 2. CDCR Mule Creek Prison Load Interconnection, phase # 1 3. Chowchilla Solar Generation Interconnection Project (Q644), phase # 1 4. Contra Costa-Moraga 230 kv Reconductoring, phase # 2 5. Corral_SCADA Switch, phase # 1 6. Eel River 60kV Sub- Add Bank 2, phase # 1 7. Eel River install SCADA SW 17, phase # 1 8. Henrietta Solar Generation Interconnection Project, phase # 1 9. Install Catlett Bk 2, phase # Install Jolon Bk 2 & 1-12kV, phase # Kern-Old River 70 kv # 1 & 2 Reconductoring, phase # Lathrop Irrigation District Load Interconnection, phase # Laytonville 60kV Circuit Breaker, phase # Newark - Ravenswood 230 kv Reconductoring, phase # Oakland D: 115kV Bus Reliability, phase # Rio Bravo Solar 1 - C5 (Q900), phase # Salado-replace 115/60kV Bank 1, phase # Sobrante: Add 2 Bus Sectnlzng 115kV CBs, phase # Weber - French Camp 60 kv Line, phase # Weber 60 kv Bus Reliability, phase # 1 1. Blythe Solar Power Project - Q MW Transmission, phase # 1 2. Oasis Gen Tie, phase # 1 3. Saugus Add new A-Bank, extend bus & reconfigure 1A, 2A & 3A banks to double-breaker Config, phase # 1 SDGE 1. Generator Interconnection - Pio Pico Energy Center, phase # 1 2. Generator Interconnection - Pio Pico Energy Center, phase # B VEA N/A External 1. NWMT: RIMROC Station needs updating as compared to Peak RC 2. CFE: CCM230 Station needs updating as compared to Peak RC 3. PAC: Harrison Emergency Model Update California ISO Public Page 1 of 7
2 Generation Projects 1. Bear Mountain Limited - Decrease EMS PMax from 55.3MW to 48.1MW Capacity: 48.1MW RES_ID: BEARMT_1_UNIT POD: 115kV Bus at BEARMT 2. Facility 1 - Increase EMS PMax from 33.7MW to 34.7MW Capacity: 34.7MW RES_ID: FRIANT_6_UNITS POD: 70kV Bus at FRIANT 3. FM O&G Welport Cogen CAISO Meter Capacity: 7MW RES_ID: TEMBLR_7_WELLPT POD: TEMBLOR 115KV SUB 4. Altamont Dyer - Decrease EMS PMax from 58.7MW to 45MW Capacity: 45MW RES_ID: USWND1_2_UNITS POD: 60kV Bus at USWND1 5. Altamont Ralph - Increase EMS PMax from 93.7MW to 110MW Capacity: 110MW RES_ID: USWND4_2_UNITS POD: USWND4 230kV Bus 6. Altamont Frick - Decrease EMS PMax from 15MW to 10MW Capacity: 10MW RES_ID: USWPFK_6_FRICK POD: Vasco 60kV tap Bus 7. Adera Solar RES_ID: ADERA_1_SOLAR1 POD: Le Grande-Dairyland 115kV tap (Pole 006/010) 8. RE Astoria Capacity: 100MW RES_ID: ASTORA_2_SOLAR1 POD: 220kV Bus at WHIRLWIND 9. RE Astoria 2 Capacity: 75MW California ISO Public Page 2 of 7
3 RES_ID: ASTORA_2_SOLAR2 POD: 220kV Bus at WHIRLWIND 10. Calipatria Solar Farm Pseudo Tie IMPER RES_ID: CALPSS_6_SOLAR1 POD: 92kV Bus at the Calipatria Solar Farm Sub 11. Golden Springs Building G Capacity: 1.3MW RES_ID: DELAMO_2_SOLAR3 POD: 230kV Bus at DEL AMO 12. Dracker Solar Unit 1 Capacity: 110MW RES_ID: DRACKR_2_SOLAR1 POD: 230kV Bus at Colorado River Sub 13. Dulles Capacity: 2MW RES_ID: ETIWND_2_SOLAR5 POD: 230kV Bus at Etiwanda Sub 14. New-Indy Ontario Existing QF Coversion Capacity: 33.6MW RES_ID: ETIWND_2_UNIT1 POD: 220kV bus at Etiwanda Sub 15. Cameron Ridge II Capacity: 11.9MW RES_ID: FLOWD_2_WIND1 POD: Windhub 230kV Sub 16. Corcoran 3 RES_ID: FRESHW_1_SOLAR1 POD: 115kV Bus at Freshwater Sub 17. Frontier Blackwell RES_ID: FRNTBW_6_SOLAR1 POD: 70kV Bus at Frontier Blackwell Sub 18. San Gorgonio Capacity: 12.6MW California ISO Public Page 3 of 7
4 RES_ID: GARNET_2_WIND3 POD: Devers 230kV Bus 19. Windustries Capacity: 9.8MW RES_ID: GARNET_2_WIND4 POD: Devers 230kV Bus 20. Lemoore 1 Capacity: 1.5MW RES_ID: HENRTA_6_SOLAR1 POD: Henrietta 70kV Bus 21. Kingbird Solar A RES_ID: KNGBRD_2_SOLAR1 POD: 230kV Bus at WHIRLWIND Sub 22. Kingbird Solar B RES_ID: KNGBRD_2_SOLAR2 POD: 230kV Bus at WHIRLWIND Sub 23. One Ten Partners Capacity: 2MW RES_ID: LITLRK_6_SOLAR3 POD: Antelope Sub 66kV Bus 24. Little Rock Pham Capacity: 3MW RES_ID: LITLRK_6_SOLAR4 POD: Antelope Sub 66kV Bus 25. Maricopa West Solar PV RES_ID: MARCPW_6_SOLAR1 POD: Maricopa West 70kV Bus 26. Brookfield Tehachapi 3 Capacity: 3MW RES_ID: MIDWD_2_WIND2 POD: 230kV Bus at WINDHUB 27. Citizen Solar B Capacity: 5MW California ISO Public Page 4 of 7
5 RES_ID: MNDOTA_1_SOLAR2 POD: MENDOTA 115kV Bus 28. Windstream 6111 Capacity: 6.5MW RES_ID: NZWIND_2_WDSTR5 POD: Windhub 230kV Bus 29. Oasis Solar RES_ID: OASIS_6_SOLAR2 POD: Antelope 66kV Bus 30. Potrero Hills Energy Capacity: 8MW RES_ID: PEABDY_2_LNDFL1 POD: 230kV Bus at Peabody Sub 31. Rio Bravo Solar 1 RES_ID: PMPJCK_1_SOLAR2 POD: PMPJCK 115kV Bus 32. Bowerman Power RES_ID: SANTGO_2_LNDFL1 POD: 220kV Bus at Santiago Sub 33. SKIC Solar Capacity: 10MW RES_ID: SKERN_6_SOLAR2 POD: 70kV Copus-Old River line tap (Pole No. 10/184A) Dacy Capacity: 1.3MW RES_ID: SYCCRK_1_SOLAR1 POD: 115kV Bus at SYCAMORE CREEK 35. Wind Wall Monolith I Capacity: 17MW RES_ID: TEHAPI_2_WIND1 POD: 230kV Bus at Vincent Sub 36. Wind Wall Monolith II Capacity: 22.5MW California ISO Public Page 5 of 7
6 RES_ID: TEHAPI_2_WIND2 POD: 230kV Bus at Vincent Sub 37. Golden Hills A Capacity: 43MW RES_ID: USWND2_1_WIND1 POD: 115kV Bus at Tesla Sub 38. Golden Hills B Capacity: 43MW RES_ID: USWND2_1_WIND2 POD: 115kV Bus at Tesla Sub 39. EUI Windpark I Capacity: 9.4MW RES_ID: VENWD_1_WIND1 POD: Devers-Garnet 115kV tap 40. EUI Windpark II Capacity: 16.1MW RES_ID: VENWD_1_WIND2 POD: Devers-Garnet 115kV tap 41. Painted Hills Wind Park Capacity: 19.3MW RES_ID: VENWD_1_WIND3 POD: Devers-Garnet 115kV tap 42. Nicolis RES_ID: VESTAL_2_SOLAR1 POD: Vestal Sub 230kV Bus 43. Tropico Capacity: 14MW RES_ID: VESTAL_2_SOLAR2 POD: Vestal Sub 230kV Bus 44. Calgren - Pixley Capacity: 11.2MW RES_ID: VESTAL_2_UNIT1 POD: Vestal 230KV Sub 45. Wildwood Solar 2 Capacity: 15MW California ISO Public Page 6 of 7
7 RES_ID: WLDWD_1_SOLAR2 POD: 115kV Bus at Wildwood Sub 46. Mojave Solar Project - Increase EMS PMax from 250MW to 275MW Capacity: 275MW Aggregated RES_ID: SANDLT_2_SUNITS Child RES_IDs: SANDLT_2_STGA (137.5 MW) SANDLT_2_STGB (137.5 MW) POD: Kramer 230 kv Bus California ISO Public Page 7 of 7
March 14, 2014. Subject: Southern California Edison 2014 Annual Progress Report
March 14, 2014 Mr. Tracy Rolstad, Chair WECC Technical Studies Subcommittee Avista Corp. 1411 East Mission Avenue Spokane, WA 99220-3727 Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Continue Implementation and Administration of California Renewables Portfolio Standard Program. ) ) ) )
Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations
Grid of the Future Integration of Renewables Energy Storage Smart Grid Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Current Power System Gen. Trans. Dist.Cust.
California s Energy Future
California s Energy Future 1 Sunrise Powerlink Commitment and Imperial Valley Renewable Energy Projects Project Name Technology Location Contract Capacity (MW) Flowing across Sunrise Today (MW) Project
Syed Ahmed Richard Krause Southern California Edison
An Electric Utility s Power Transmission Modernization Needs Syed Ahmed Richard Krause Southern California Edison 2 Presentation Outline Existing System Electric System Components, Basic Power System,
6. The estimated costs here do not include any applicable ITCC tax
General Notes and Clarifications: 1. The following estimated costs are based on past experiences and are intended to provide an order of magnitude of the total project cost given the major system components.
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective
Integration of Renewable Resources
Integration of Renewable Resources David Hawkins and Clyde Loutan PSERC Presentation October 2, 2007 Renewable Portfolio Standards Goals 2 Source: Kevin Porter; Exeter Associates, Inc Current Level of
How To Operate The Williston Uvls
WND Winter Operating Guide 2012/2013 1 WND Operating Study Using EQ-890-2012WIN- FINAL.sav developed through the 890 process Got load updates from MDU, Central Power, UM G&T Made several topology updates
Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources
Customer Name Basin Electric Cheyenne Power and Light City of Fort Morgan & Estimated Maximum Resource MW Point of Receipt Delivering Party & Voltage Antelope Valley 2 Yellowtail Basin Electric 115 kv
Evolution of Control for the Smart Transmission Grid
Evolution of Control for the Smart Transmission Grid Anjan Bose Washington State University Pullman, WA SCE Smart Grid Research Symposium California Institute Of Technology October, 2011 The Past (before
Generator Interconnection and Deliverability Study Methodology Technical Paper
Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:
Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach
Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach READ AND DELETE For best results with this template, use PowerPoint 2003 10 November 2015 Background and Importance of ICA Definition:
ADMS(Advanced Distribution Management System ) in Smart Grid
ADMS(Advanced Distribution Management System ) in Smart Grid 柯 佾 寬 博 士 Yi-Kuan Ke, Ph.D. 2014/03/28 Smart Grid Solution Smart Grid Solution Overview Smart Grid Solutions Smart Network Operation - Distribution
KERN COUNTY SOLAR PROJECTS. Approved Projects
KERN COUNTY SOLAR PROJECTS 03/14/2013 Name Case Number Consultant Acreage MW Location Application Deemed Complete Approved Substation Desert/Valley Approved Projects Chevron Energy Solutions Company by
Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.
Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine
Treasure Valley Electrical Plan
Treasure Valley Electrical Plan Community Advisory Committee January 25, 2006 Agenda 10 a.m. Welcome 10:10 a.m. Follow up DSM discussion 10:30 a.m. TVEP CAC process update 10:40 a.m. Transmission Presentation
Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
What Quanta Offers. Industry leader S&P 500 Company Ranked #1 utility specialty contractor by Engineering News Record. Confidential and Proprietary
Renewable Energy Services What Quanta Offers Complete renewable energy services Planning, engineering, procurement, construction, operations and maintenance Specialists in transmission, distribution and
The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development
GE Digital Energy The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development IEEE Fellow IEEE PES President (2006-2007) IEEE Division VII
SCE Experience with PV Integration
SCE Experience with PV Integration EPRI High Penetration PV Grid Integration Workshop April 19, 2012 Tucson, AZ Leading the Nation in Renewable Power Delivery Actual 2010 Renewable Resources 14.5 billion
About Southern California Edison
About Southern California Edison One of the nations largest investorowned utilities with 125 years of service. Service Area 50,000 square miles Over 430 cities and communities Population Served Nearly
A. 5MWp SPV Plant at Khimsar, Rajasthan. B. 5MWp SPV Plant Installed Technologies. D. 5MWp SPV Plant Challenges. E. 5MWp SPV Plant - Performance
An overview & Performance Analysis of 5 MWp Solar PV Plant at Khimsar, Rj Rajasthan Reliance Industries Limited June 2, 2011 July 2010 Contents A. 5MWp SPV Plant at Khimsar, Rajasthan B. 5MWp SPV Plant
Q140 Cluster Addendum
Cluster Addendum 1. INTRODUCTION This Interconnection Customer (IC), submitted a Small Generator Interconnection Request (IR) to Arizona Public Service Company (APS) for their proposed project, located
Strategic Microgrid Development for Maximum Value. Allen Freifeld SVP, Law & Public Policy Viridity Energy 443.878.7155
Strategic Microgrid Development for Maximum Value Allen Freifeld SVP, Law & Public Policy Viridity Energy 443.878.7155 1 MICROGRIDS Island Mode Buying and Selling Mode Retail Cost Structure to Maximize
Energy Systems Integration
Energy Systems Integration Dr. Martha Symko-Davies Director of Partnerships, ESI March 2015 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy,
16 West Coast Regional Plan
16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast
Distributed Generation and the Impact on a Distribution System. Brian Lassiter Technical Sales Engineer
Distributed Generation and the Impact on a Distribution System Brian Lassiter Technical Sales Engineer Company Overview Founded in 1989 in Abilene, TX Industry leader in Engineering and Operations Utility
Rule 5.500 Fast Track Analysis for National Life Insurance Co.
Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION
TERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
Sanjeev Choudhary SunEdison Advanced Solutions
Sanjeev Choudhary SunEdison Advanced Solutions Solar Focus 2015 Solar Plus Storage Introduction to SunEdison Topics What makes a viable energy storage market opportunity? SunEdison storage application
Tehachapi Wind Energy Storage Project (TSP)
Tehachapi Wind Energy Storage Project (TSP) Peer Review Presented by Mr. Loïc Gaillac October 20, 2011 San Diego, CA 1 Outline Policy Challenges SCE s Position SCE Smart Grid Vision Project Description
ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F
ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1
Emera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000
L75 & BW3 Rebuild ROW Phase I Keene Rd. Expansion for Oakfield Wind KR Transformer Addition Line Identification Line 75 - KR Sub Location Bangor Chester Chester Estimated Cost $201,464 $0 $3,200,000 Voltage
THE GEYSERS Renewable, Geothermal Energy. Mike Rogers, Senior Vice President Calpine Geothermal Operations
THE GEYSERS Renewable, Geothermal Energy Mike Rogers, Senior Vice President Calpine Geothermal Operations Impact Sonoma Energy: Plugging Into Sonoma County s Future 18 October 2012 Geothermal Fields: Resources
Proceedings of the 38th Hawaii International Conference on System Sciences - 2005
The use of Multi-Attribute Trade-Off Analysis in Strategic Planning For an Electric Distribution utility: An Analysis of Abu Dhabi Distribution Company Richard D. Tabors, Ph.D. Rick Hornby Tabors Caramanis
Enterprise Approach to OSIsoft PI System
Enterprise Approach to OSIsoft PI System Presented by Subbu Sankaran 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Copyr i g h t 2013 O S
Satellite-Based Software Tools for Optimizing Utility Planning, Simulation and Forecasting
Satellite-Based Software Tools for Optimizing Utility Planning, Simulation and Forecasting Tom Hoff, President, Research & Consulting ISES Webinar February 23, 2015 Copyright 2015 Clean Power Research,
IESO Supply Deliverability Guidelines
PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents
Smart Grid Overview How the smart grid will give customers the tools to create the new future for electricity use.
Smart Grid Overview How the smart grid will give customers the tools to create the new future for electricity use. Presentation to California Municipal Utilities Association Paul Lau Assistant General
Rocky Mountain Power Transmission Five Year Study Findings Meeting
Rocky Mountain Power Transmission Five Year Study Findings Meeting Study Areas for 2009 Goshen Idaho Study Area encompasses parts of Bingham, Bonneville, Butte, Clark, Fremont, Jefferson, Lemhi, Madison
Memorandum. This memorandum requires Board action. Executive Summary
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado
CLASS. Customer Load Active System Services
CLASS Customer Load Active System Services 1 Customer Load Active System Services Offer new services and choice for the future Maximise use of existing assets Delivering value to customers Innovative solutions
Promoting the Cross-Border Renewable Energy Market
Promoting the Cross-Border Renewable Energy Market Meeting report: Creating a Regional Renewable Market in the Californias Woodrow Wilson International Center for Scholars. Washington, DC January 25, 2010
San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, 2015. Electric Grid Operations
San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, 2015 Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission
ENERGYWORKS WINDPOWER PROFESSIONAL SERVICES
EnergyWorks North America, LLC 71 Old Mill Bottom Road Annapolis, MD 21409 Tel 410-349-2001 Fax 410-349-2063 www.energyworks.com ENERGYWORKS WINDPOWER PROFESSIONAL SERVICES STATEMENT OF QUALIFICATIONS
Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer
Size template Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer The average system size has doubled since 2010 Key Network Issues Reverse power on up to 12 off 11 kv feeders
Chapter 7 - Appendix A
Chapter 7 - Appendix A Transmission and Distribution Supplemental Information Table 7A.1 MTEP Transmission Projects in Missouri 1 Project Approved Project Title Project Description Category Estimated Cost
Power products and systems. Intelligent solutions for power distribution Zone concept
Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)
San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, 2015. Electric Grid Operations
San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, 2015 Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission
Intentionally left blank
Intentionally left blank Table of Contents Executive Summary... 7 Introduction... 7 The Transmission Planning Process... 9 Collaborative Planning Efforts... 10 Reliability Assessment... 12 33 Percent RPS
Distributed PV the road California is already on. Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011
Distributed PV the road California is already on Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011 1 John Geesman, Energy Commissioner, 2007 source: California
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:
FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003
F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify
Houston Region Import Capacity Project
Houston Region Import Capacity Project July 25, 2013 Prepared by: CenterPoint Energy Transmission Planning Executive Summary 3 1. Introduction 5 2. Methodology and Study Assumptions 7 2.1 Case Description
Tehachapi Renewable Transmission Project (TRTP)
SM Tehachapi Renewable Transmission Project (TRTP) February 2009 Why We Are Here Today Provide background on SCE s commitment to renewable energy Discuss the operational and economic importance of the
TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis
R103-11 TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis Prepared for Transmission Developers, Inc. Submitted by: Larry Eng, Staff Consultant
2014 EIA Energy Conference. Edward Randolph Director, Energy Division California Public Utilities Commission
2014 EIA Energy Conference Edward Randolph Director, Energy Division California Public Utilities Commission July 14, 2014 Clean Electricity Policy Initiatives In California (Partial) Wholesale Renewables
Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. [email protected]. [email protected]
Agenda do Mini-Curso Sérgio Yoshio Fujii [email protected] Ethan Boardman [email protected] Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network
California s Electricity Market. Overview
California s Electricity Market Law Seminar s International Tribal Energy and the California Market June 23, 2008 Denny Brown California Energy Commission Overview Role of the Energy Commission Electricity
PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES
Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE This section provides substation design information for Load Entities interconnected at transmission voltage
How To Get A Power Line In The United States
TRANSMISSION PROJECTS: AT A GLANCE Pacific Gas and Electric (PG&E) PACIFIC GAS AND ELECTRIC (PG&E) Company Background: PG&E serves over five million electric customers in northern California over a 70,000
SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE
SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE for solar energy management LEATEC Delivering Solutions for Energy Management SOLAR ENERGY DATA CENTER BUILDING 4 to8 String Monitoring with 0.% Accuracy
Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014
1 Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables Bob Yinger Southern California Edison April 15, 2014 Southern California Edison SCE provides power to: Nearly
An Airport Sustainable Energy Strategy
An Airport Sustainable Energy Strategy Addressing the Ecology, Equity & Economics of Airport s Energy Usage March 2015 Paul Manasjan - Director, Environmental Affairs San Diego County Regional Airport
White Paper #11: Devers-Palo Verde No. 2 Project
White Paper #11: Devers-Palo Verde No. 2 Project Project Sponsor: Project Status: Location: Southern California Edison Co. Under Construction (California only) California, Arizona Project Location Southern
Tri-State Generation and Transmission Association 2013 Annual Report. Powered by People. Powered. People Colorado, Nebraska, New Mexico and Wyoming.
Tri-State Generation and Transmission Association 2013 Annual Report Powered by People Powered Tri-State Generation and Transmission Association a wholesale Tri-State Generation and Transmission Association
Morris S. Stover, P.E. Sponsor, Transmission Area
Page 1 of 5 Job Function Morris has nearly 28 years in the power industry including design and construction of transmission line and substation facilities, He has extensive experience in contract development
March 2015. ComEd Grid Modernization
March 2015 ComEd Grid Modernization COMED S GRID MODERNIZATION VISION ComEd will fulfill the promise of grid modernization for northern Illinois consumers by: Improving system reliability and deploying
EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà [email protected]
EVN SMART GRID PLAN Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà [email protected] Frankfurt, 14 th November 2013 1 Content 1. Introduction of Vietnam Electricity (EVN) 2. EVN Smart
SmartSacramento. Green Summit 2011. Jim Parks Program Manager SmartSacramento Team. April 19, 2011
SmartSacramento Green Summit 2011 April 19, 2011 Jim Parks Program Manager SmartSacramento Team The Current State of the Grid Current grid tends toward dumb We typically learn about outages via phone Many
Renewable Energy: Essential terms terms and and concepts for citizens and a dvocates advocates
Renewable Energy: Essential terms and concepts for citizens and advocates Courtesy of NASA Contact Information Pete Shoemaker Pacific Energy Center 851 Howard St. San Francisco, CA 94103 (415) 973-8850
Telephone Company Lease Line Elimination. Dewey Day Principal Operational Technology Architect Pacific Gas & Electric
Telephone Company Lease Line Elimination Dewey Day Principal Operational Technology Architect Pacific Gas & Electric Lease Line Elimination What s Happening? Telephone Companies Eliminating Lease Line
Cyber Infrastructure for the Smart Grid
Cyber Infrastructure for the Smart Grid Dr. Anurag K. Srivastava, Dr. Carl Hauser, and Dr. Dave Bakken Smart Grid Use Cases: Part 2 SGIC Xcel Energy SG Xcel Energy A public Service company of Colorado
4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
Transmission Planning in the ERCOT Interconnection
Transmission Planning in the ERCOT Interconnection Warren Lasher Manager, Long-Term Planning and Policy Department of Energy Electricity Advisory Committee The ERCOT Interconnection The ERCOT Region is