Shingle Installation Guide



Similar documents
Asphalt Shingle Application Requirements

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Residential Roofing Guide

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

Titan Old World Spanish Tile

Detached accessory structures that contain no conditioned floor area are exempt.

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Directions For Applying Malarkey Laminate Shingles

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

SHINGLE APPLICATION GUIDE

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application

Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Chapter 9: INSTALLING ROOFING

G VYCOR DECK PROTECTOR

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

Installation Manual for STANDING SEAM ROOFING

METAL ROOFING INSTALLATION GUIDE

Classic Products, Inc. ClickLock Standing Seam Installation Manual

SECTION PREFORMED METAL STANDING SEAM ROOFING

Retrofitting an Insulated Cold Roof

INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

Screw Patterns Roof & Walls TR-36 MD-36 TSM-32. PBR-Panel

Section Page Section Page

Installation Guide MATTERHORN METAL ROOFING TO LAST A LIFETIME. MATTERHORN Standing Seam

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"

SECTION ROOFING TILE

ROOF INSPECTION REPORT

Please read the entire document before purchasing and installing any of these products

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

SECTION COMPOSITE ROOF TILE SYSTEMS

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra Includes:

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

How to Install UnderDeck The Original.

VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals Magnolia Ave. Chino, CA 91710

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

CHAPTER 5 ASPHALT-SHINGLE ROOFING

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Woodcrest. Shingles. Woodcrest Autumn Maple

How To Compare Roofing Material

4572 N Old US 31, Rochester, IN Toll Free: Fax: DETAIL MANUAL. and guide to Ramco Supply products

tamko.com RESIDENTIAL ROOFING PRODUCT GUIDE

Materials and Colors

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

PANELIZED HOME INSTALLATION GUIDELINE

RB271 06/07 R807.1 RB272 06/07 R Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN

ROOFS - Guidance for Repair, Maintenance and Replacement

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

Best Barns USA Assembly Book

Brick Veneer Construction

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Building it right like in the good old days.

DURATION STORM. TruDefinition. TruDefinition Duration STORM Shingles are a component of the Owens Corning Total Protection Roofing System.

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

The Wo rd. Shingle Warranties - Getting Real

How to Install GoBoard:

Inspecting to a higher standard.

Minimizing Water Intrusion Through Roof Vents in High-Wind Regions

DETAIL MANUAL. for Standing Seam East 23rd Street Chattanooga, TN South Lee Hwy. Cleveland, TN 37311

How To Build A Roof Tile Deck

CertainTeed. Self-Adhering Roof Systems for Low Slope Residential Roofs

ROOF ASSEMBLIES CHAPTER 9

CHAPTER 7: Building Systems ROOFING SYSTEMS

Clad Direct Glaze Window Installation Instructions

INSTALLATION OF A BAY WINDOW

ABSeam Panel Overview and Installation Instructions

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

tamko.com RESIDENTIAL ROOFING PRODUCT GUIDE

Mark Cramer Inspection Services, Inc.

Roof. Walking on roofs

SECTION STANDING SEAM METAL ROOFING

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

Build Your Own Smokehouse

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

Preventing Ice Dams on Roofs

CB-100 CB-150 CS-100 SL-100 SL-150 SLZ-1000

SUPER SHED. Indoor shelter for your outdoor tools.

How to Install Hardwood Flooring Over a Sub Floor

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

Chapter 6 ROOF-CEILING SYSTEMS

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

Preformed Metal Roofing and Siding

Herringbone Pattern Flooring

Tundra Series Windows January 2016

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

Roofing Signs that Your Roof Needs Repair/Replacement

Gerard Installation Manual Shingle Profiles

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

HCD DSA OSHPD 1 2 1/AC AC SS

ATLAS Roofing Products

Transcription:

Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of NewTech tiles prevents these materials from ending up in landfills. Because of their recycled content, NewTech roofing tiles feature incredible strength and flexibility and provide long-lasting performance. The use of NewTech products also preserves valuable natural resources, as no trees are used and no stones are quarried in the production of NewTech s products. When getting started, be sure that you have all the necessary material together with NewTech shingles. Additional Required Material: Decking: NewTech shingles must be installed over solid decking. A minimum of 15/32 plywood is recommended. A minimum 7/16 OSB or 1 X4 nominal lumber may be used instead of plywood if preferred. It is also recommended that all previous roofing materials be torn off prior to installation of NewTech Slate. Underlayment: A minimum of one layer of 30 lb non-perforated asphalt saturated felt of synthetic underlayment, meeting requirements of ASTM D266 must be installed over the entire roof. Any tar-based underlayment must be able to withstand high temperatures of 180 degrees F. The use of any other tar-based felt underlayment will void your warranty. Ice Water Shield: Ice water shield is not required in most areas. Please check with your county building code. It is not recommended if not necessary. In addition, all ice water shield used must be Page 1 of 9

able to withstand high temperatures of 180 degrees F. A layer of synthetic underlayment may be used in place of an ice water shield. The use of any other tar-based ice water shield will void your warranty. I understand fully that these shingles take 135 degree ambient temperature for 3 days on the roof to seal together. Signature, Flashing: Copper is the recommended flashing material on eaves and rake edges, although 26-gauge-clad steel can also be used. Flashing is required at all valleys, and the perimeter of the shingle layout. Nails: NewTech shingles can be secured with copper, stainless steel, or hot-dipped galvanized nails. For NewTech slate shingles, one square of roofing at 7 exposure will require about 344 nails. At 6 exposure would require about 400 nails. Required dimensions are detailed as below. Color Variation: Similar to real slate, NewTech slates fluctuate in color from pallet to pallet. For an authentic look, all slates should be mixed during installation. This will ensure any color contrast to be evenly spread and balanced throughout the roof; minimizing any blotching of colors for visual appeal. For best results create presorted bundles by selecting one bundle from every pallet, then selecting one slate from every bundle. Create these mixed bundles until the roof installation is finished. Mechanically mixing the slates evenly spreads out each bundle as far as possible. Page 2 of 9

Important Reminder: By taking one slate from each bundle and each bundle from a different skid, this will spread any color variation evenly. New Group Asia Construction Material Supply Inc. will not be held liable for improper installation of the slates. Roof Ventilation: It is imperative that your roof be vented appropriately. Without proper ventilation your roof is prone to condensation, mold mildew, warping of the roof deck, and/or deteriorating building materials. All roof structures should be vented in order to allow heat buildup and moisture to escape the attic area. Vents are to be placed proportionately at the eaves, i.e., soffits (for cold air in) and at or near the ridge (for hot air out). Cross-flow ventilation should be allowed for in valleys where Stress Skin roof panels or cathedral ceilings are in use. Metal, wood or polymer ridge vents are all acceptable. Important Reminder: Always ensure that your roof has adequate roof ventilation regardless of the roofing material being used. If not you may be at risk of serious structural damage Tools: Roof Brackets: Use roof brackets when installing shingles on a roof with slope greater than 6 rise over 12 run. When removing roof brackets, no sealant is required to seal the holes. NewTech shingles have a self-sealing property, and will seal itself over time. If sealant is preferred, Silicone based sealant is recommended. Hammer/ Nail Gun: Nail guns and all other tools to secure nails could be used with NewTech Shingles. Chalk Line: Chalk lines are required to ensure proper alignment. It is recommended to use a chalk line. Markings on shingles should be used as a rough guide only. Page 3 of 9

Utility Knife/ Saw: A simple utility knife could be used to cut shingles to the correct shape and size as necessary for gable ends, and valleys. NewTech shingles are solid all the way through, and would not leak even when cut. Details on NewTech shingles Page 4 of 9

Installation Procedure Prepare roof deck. Make sure all nails are nailed in, and remove all debris and dirt. If deck is not properly cleaned, the underlayment may not be able to be secured properly. Do all repairs to the roof deck if necessary before beginning. After the roof deck is ready and cleaned, you may begin to install the felt underlayment. When laying the felt underlayment, make sure that the underlayment is as flat to the deck as possible. Use wood blocks and similar objects to flatten underlayment. (1)Step one Installation of all shingle shapes and exposure are the same. Please contact one of our representaives if you require any special installations. Page 5 of 9

(2)Step two (3)Step three (4)Step four Page 6 of 9

(5)Step five (6)Various shape layouts Page 7 of 9

(7)Different effect of wood shake layout (8)Hip Page 8 of 9

(9)Valleys Closed valleys We recommend a closed valley system. Copper valley metal, broken in the middle and crimped on the outside edges, is recommended as part of the closed valley system. A minimum 26-gauge-clad steel may also be used if preferred. Slate shingles should be cut to fit flush with matching course on the opposite side. Wider slates should be used as valley cuts in order to ensure that nailing be kept as far from centerline as possible (at least 5" from centerline). An alternative version of a closed valley uses valley metal with a single narrow-based diverter in the middle. The diverter helps to keep the valley cuts straight and is hidden, for the most part, by the thickness of the shingles. See the picture on the right. Open valleys If you prefer open valleys, the copper valley metal broken with a one-inch diverter in the middle and crimped on the outside edges is recommended. A minimum 26-gauge-clad steel may also be used if preferred. In open valley applications, metal should be broken with a diverter at least 1" tall. Slates should be cut 3" from centerline. Valley metal with twin diverters may also be used as shown below. --The End-- Page 9 of 9

Flashing Flashing NewTech is suggest to be used copper around as one all of obstructions the most durable on the roof. material Such that as will dormers, last just chimneys,valleys, as long as the etc. shingle itself. Flashings will not be warranty by New Group Asia. Note: Wall) Apron (Roof to Flashing Apron flashing is used when a roof terminates to a wall causing a course to be cut and face nailed. It is installed over the shingles and behind siding or counter/cap flashing. Counter Flashing 1. Cut a minimum 1 deep reglet into the masonry material 2. 3. Custom Start by bend installing the counter lowest piece flashing first to and fit the work reglet 4. Fasten the counter using either expandable anchors upwards or masonry for proper screws water runoff

Step Flashing Step surface. flashing Step flashing is to be used should over extend or under under the the roof uppermost coverings row and of are the turned roof tile up the on the full vertical depth of the roof tile or at least 4 over the roof tile immediately below the metal. The vertical leg of the metal should be turned up a minimum of 4 and extend 4 on the roof tile with ¾ hem. Flashing should have a minimum length of 9 and must overlap a minimum of 2. Pitch Changes NewTech in the case Roofing of some tiles roof can designs, be installed drastic onto pitch rolling changes roofs will with require a gradual the use pitch of metal change. flashing However, where necessary.

Vent Flashing Normal pipes is type recommended. of roof vents Materials or pipe boot with flashing extended-life can be should used. A always lead or be PVC used. stack for plumbing Chimney Saddles With chimneys more than 2 feet wide it is recommended that a cricket or saddle be installed to divert water from the back of the chimney. Chimneys less than 2 feet may require only a simple pan flashing. New Group Asia is not responsible for correct or incorrect installations of any flashing materials.