FIRESTOPPING & SMOKE SEALS



Similar documents
Tremco Fire Protection Systems Group Technical Bulletin

B. Product Schedule: For each penetration firestopping system. Include location and design designation of qualified testing and inspecting agency.

Terms and Definitions In Canada

The Source of Firestop Expertise SM

Fire Barriers & Fire Stopping

FIRE AND SMOKE PROTECTION FEATURES

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE 199

FIRE AND SMOKE PROTECTION FEATURES

ROXUL Board Insulation Section Master Guide Specification (CAVITYROCK ) Page 1 April 2016

Retardants Inc. The Decision You Make May Save A Life! 123 Columbia Court North Suite 201 Chaska, MN 55318

Flamesafe Firestopping Products. Firestopping Products.

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

Fire Barrier Duct Wrap 15A

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION METAL WALL PANELS

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

HVAC Air Duct Leakage. Eli P. Howard, III Group Director Technical Resources SMACNA

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

The City of Winnipeg Section Pan Am Pool Interior Renovations Page 1 of 2

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

WATERPROOFING FOR CONCRETE STRUCTURES

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

FIRE-RESISTANCE-RATED CONSTRUCTION

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

FIRE-RESISTANCE-RATED CONSTRUCTION

Roxul Board Insulation Section Master Guide Specification (CAVITYROCK DD) Page 1 October 2013

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER

Division 9. SignaFlor Pad and Pour Flooring System

SECTION EXPANSION CONTROL

PART 1 GENERAL 1.1 SECTION INCLUDES

eading Performance Solutions

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: TEC-WOOD ( )

SECTION STANDING SEAM METAL ROOF

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

Fiberglas, Exterior Wall Thermal Insulation

WATERPROOFING OF WET ROOMS

Passive Fire Protection

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

State of Connecticut Department of Public Health RADON PROGRAM

SECTION POLISHED CONCRETE FINISHING

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

FIRESTOPPING. Cable. Firestopping is the technology used to

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES

EcoTouch Insulation with PureFiber Technology

SECTION POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

Office of the State Fire Marshal. Fire Rated Doors

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SikaProof A Technology

Section Polished Concrete Finishing. Vexcon

Catalog Number Pillow Type Pillow Size

RECOATING AND RENEWING SPF ROOFING SYSTEMS

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

SECTION STANDING SEAM METAL ROOFING

SECTION FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

GigaCrete Specification PlasterMax

Composite Panel Firewall Systems

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Section EXTERIOR STONE VENEER Full Mortar

GUIDELINE SPECIFICATIONS

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.

How To Build A Two Hour Firewall In Calgary

GYPSUM AREA SEPARATION FIREWALLS GA

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

Dryvit Finish System For Exterior Soffits

SECTION PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

Set-Up Instructions. (Liner-Based System) UL LISTED. Important Read set-up instructions before assembly. Report any shortages within 72 hours

Colorado State University. Durrell Center Roof Repair

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

4 Installation Requirements

Avoiding Air Barrier Pitfalls

Excerpts from the Canadian National Building Code (NBC)

CREEK Technical Services, LLC

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

UPDATE October 8, 2012 Chicago Roofing Contractors Association CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS

INSULATION FOR PRE-ENGINEERED METAL BUILDINGS. ROXUL SAFE 55 & 65 and ROXUL PLUS MB. Insulation for Pre-Engineered Metal Buildings

GUIDELINE ON THROUGH-PENETRATION FIRESTOPPING

CertainTeed. Shaftliner For A rea Separation Firewalls

H-Stud Area Separation Wall System

Guide Specifications for Maple Flooring Systems

CHAPTER 6 ASPHALT ROLL ROOFING

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

RTV162. Electronic Grade Silicone Adhesive Sealant

Meeting the Fire Code with Continuous Foam Plastic Insulation

Waterproofing construction Joints

Fire-Rated Glass and Glazing START

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Transcription:

SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of this section of the specifications to establish a single, competent source to be responsible for providing all labour, materials, products, equipment and services, to supply and install the firestopping and smoke seal work for the entire project. 1.1.3 SUMMARY A. Provide firestop systems consisting of a material, or combination of materials installed to retain the integrity of fire-rated construction by maintaining an effective barrier against the spread of flame, smoke, and/or hot gases through penetrations, blank openings, construction joints, or at perimeter fire containment in or adjacent to fire-rated barriers in accordance with the requirements of the Building Code for this project. B. Firestop systems shall be used in locations including, but not limited to, the following: 1. Penetrations through fire-resistance-rated floor and roof assemblies requiring protected openings including both empty openings and openings that contain penetrations. 2. Penetrations through fire-resistance-rated wall assemblies including both empty openings and openings that contain penetrations. 3. Membrane penetrations in fire-resistance-rated wall assemblies where items penetrate one side of the barrier. 4. Joints in fire-resistance-rated assemblies to allow independent movement. 5. Perimeter Fire Barrier System between a rated floor/roof and an exterior wall assembly. 6. Joints, through penetrations and membrane penetrations in Smoke Barriers and Smoke Partitions. 1.2 RELATED SECTIONS 1.2.1 Related Sections to this Section include: 1. Division 3 - Cast-In-Place Concrete; Concrete Work 2. Division 4 - Unit Masonry 3. Division 5 - Expansion, Control, And Seismic Joints 4. Division 7 - Thermal And Moisture Protection 5. Division 8 - Glass, Glazing And Metal Curtain Wall Systems 6. Division 9 - Gypsum Wallboard

7. Division 15 - Mechanical 8. Division 16 - Electrical, Lighting, Power, Alarms And Communications 1.3 REFERENCE STANDARDS 1.3.1 Comply with applicable requirements of the following standards. Where these standards conflict with other specified requirements, the most restrictive requirement shall govern. 1. American Society for Testing and Materials (ASTM). a) ASTM E 119 -Test Method for Fire Tests of Building Construction and Materials b) ASTM E 136 - Test Method for Behaviour of Materials in a Vertical Tube Furnace at 750 F c) ASTM E 814 - Test Method of Fire Tests of Through-Penetration Fire Stops d) ASTM E 1399 Cyclic Movement and Measuring Minimum and Maximum Joint Widths e) ASTM E 1966 Test Method for Resistance of Building Joint f) ASTM E 2174 Standard Practice for On-Site Inspection of Installed Fire Stops g) ASTM E 2393 Standard Practice for On-Site Inspection of Installed Fire Stop Joint Systems h) ASTM E 2307 Standard Test Method for Determining the Fire Endurance of Perimeter Fire Barrier Systems Using the Intermediate-Scale, Multi Story Test Apparatus (ISMA) i) ASTM C 920 Standard Specification for Elastomeric Joint Sealants 2. Underwriters Laboratories, Inc. (UL): a) UL Qualified Firestop Contractor Program b) UL 263 Fire Tests of Building Construction and Materials c) UL 1479 Fire-Tests of Through-Penetration Fire Stops d) UL 2079 Tests for Fire Resistance of Building Joint Systems 3. Underwriters Laboratories of Canada (ULC): a) CAN/ULC-S101, Standard Methods of Fire Endurance Tests of Building Construction and Materials b) CAN/ULC-S115 - Standard Method of Fire Tests of Firestop Systems 1.4 SYSTEM DESCRIPTION 1.4.1 Firestopping Materials: Provide firestopping system(s) to provide and maintain a fire resistance rating, as indicated on drawings and in accordance with UL, WH, ULC, cul or FM design details. 1.5 SUBMITTALS 1.5.1 Submit Manufacturers Product Data Sheets for each type of product selected. 1.5.2 Verify that Firestop Material shall be asbestos free and complies with local regulations.

1.5.3 Submit [system design listings from a qualified testing and inspection agency] [shop drawings] that are applicable to each firestop configuration 1.5.3.1 Where there is no specific third party tested and classified Firestop System available for particular firestop configuration, the firestopping applicator shall obtain from [a professional engineer] [consultant] [the firestop manufacturer] an Engineering Judgment (EJ) or Equivalent Fire Resistance Rated Assembly (EFRRA) for submittal. Submit applicator qualifications as noted in Quality Assurance article. 1.6 QUALITY ASSURANCE 1.6.1 Manufacturer: Company specializing in manufacturing products of this Section with minimum three (3) years documented experience and quality management system registered in accordance with the requirement s of ISO 9001:2000. 1.6.2 Applicator: Company having a minimum of three (3) years experience in the installation of materials specified herein on projects comparable to this project. 1.7 REGULATORY REQUIREMENTS 1.7.1 Conform to [local Building Codes], [UL] [WH] [ULC] [cul] [FM] listings and [ANSI/UL 1479] [ANSI/UL 2079] [ASTM E814] [CAN/ULC-S115] fire test standard to achieve the required fire protection rating. 1.8 ENVIRONMENTAL REQUIREMENTS 1.8.1 Comply with manufacturer' s installation recommendations for temperature, humidity, and ventilation conditions. 1.9 DELIVERY, STORAGE AND HANDLING 1.9.1 Deliver materials to Site in manufacturer s sealed and labelled containers intact. Handle and store materials in accordance with manufacturer s instructions. 1.10 PROJECT/SITE CONDITIONS 1.10.1 Comply with manufacturer s recommended requirements for temperature, relative humidity and substrate conditions during application and curing of materials. 1.11 SEQUENCING AND SCHEDULING 1.11.1 Co-ordinate with other related Sections. Schedule work of other trades so that firestopping applications can be inspected prior to being covered by subsequent construction. 2 PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS 2.1.1 Provide firestopping materials or devices from the following manufacturer:

A/D Fire Protection Systems Inc. 2.2 MATERIALS 2.2.1 Material(s) shall be: A/D FIREBARRIER Acrylic Sealant A/D FIREBARRIER Collars A/D FIREBARRIER Inserts II A/D FIREBARRIER Intumescent Sealant A/D FIREBARRIER Pillows A/D FIREBARRIER Mineral Wool A/D FIREBARRIER Mortar A/D FIREBARRIER Putty II A/D FIREBARRIER Putty Pads II A/D FIREBARRIER Silicone or Silicone SL Sealants A/D FIREBARRIER Seal or Seal NS A/D FIREBARRIER SprayAcrylic A/D FIREBARRIER Wrap Strip A/D FIREBARRIER Collar Strip 2.2.2 Firestop system ratings: Comply with applicable Building Code requirements for locations and hourly ratings of [F] [T] or [F] [FT][FH][FTH] designations. 2.2.3 Damming and backup materials, supports and anchoring devices shall be in accordance with manufacturer s recommendations, tested firestop system/design and as acceptable to authorities having jurisdiction. 2.2.4 Primers: As required by firestopping manufacturer and compatible with selected system and contiguous materials. 2.2.5 Water: Potable. 3 EXECUTION 3.1 EXAMINATION 3.1.1 Examine substrates, openings, voids, adjoining construction and conditions under which the firestop is to be installed. Confirm compatibility of surfaces. 3.1.2 Verify penetrating items are securely fixed and properly located with the proper space allowance between penetrations and surfaces of openings. 3.2 PREPARATION 3.2.1 Surfaces to receive firestopping shall be free of dirt, dust, grease, oil, rust, loose materials, release agents, frost, moisture or any other matter which would impair the bond of firestopping material to the substrate and penetrating item(s). 3.2.2 Prime substrates in accordance with manufacturer s written instructions.

3.2.3 Do not apply firestopping and smoke seals to surfaces previously painted or treated with sealers, curing compounds, water repellent or other coatings unless tests have been performed to ensure compatibility of materials. Remove coatings as required 3.2.4 Ensure that anchoring devices, back-up materials, clips, sleeves, supports and other related materials used in the actual fire tests are provided. 3.2.5 Mask where necessary to prevent firestopping materials from contacting adjoining surfaces that will remain exposed upon completion of Work. Remove tape as soon as it is possible to do so without damaging firestop material or substrate. 3.3 INSTALLATION 3.3.1 Comply with [UL], [ULC], [cul], [WH] or [FM] Listings and manufacturer s instructions for the type of material and condition of opening in each case. Consult with the manufacturer to determine proper procedure for conditions not fully covered by printed instructions. Record in writing any oral instructions received, with copy to manufacturer. 3.3.2 Remove excess firestopping material promptly as the Work progresses and upon completion. 3.3.3 Provide leak-proof dams as required to seal openings and contain firestop until cured. Install damming in accordance with test design and manufacturer s instructions. 3.4 FIELD QUALITY CONTROL 3.4.1 Notify Consultant when completed installations are ready for inspection prior to concealing or enclosing an area containing firestopping materials. 3.4.2 Arrange for inspections by the Owners independent inspection and testing company appointed and paid for by Owner. 3.4.3 Following field inspections, provide all repair as required to ensure compliance with the Contract Documents. 3.5 CLEANING AND PROTECTION 3.5.1 Upon completion of this work, remove all materials, equipment and debris from the site. Leave work area and adjacent surfaces in a condition acceptable to the Consultant. End of Section