Active Chilled Beam System Design & Layout



Similar documents
APPLICATION GUIDE. Moisture Management in Waterborne Climate Systems

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

APPLICATION GUIDE. Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

HVAC Systems: Overview

Dr. Michael K. West, PE 1 Dr. Richard S. Combes, PE 2 Advantek Consulting / Melbourne, Florida

Innovent LASER Packaged Fresh Air Conditioning Units

HVAC Simplified Approach Option

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

Chilled Beam Solutions ADVANCING THE SCIENCE OF AIR DISTRIBUTION. Redefine your comfort zone.

Active & Passive Beams

ENHANCED LABORATORY HVAC SYSTEM

Preliminary Final Proposal

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

By Tom Brooke PE, CEM

Measuring The Right Thing For Humidity Control It s the Dew Point Stupid!

ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE

Moisture Control. It s The Dew Point. Stupid! Its not the humidity.

How To Design A Building In New Delhi

85 F 80 F 50% 75 F 70 F 73.0/ F 10% Figure 1

Element D Services Heating, Ventilating, and Air Conditioning

Lesson 36 Selection Of Air Conditioning Systems

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

Mechanical Systems Proposal revised

Selecting the Supply Air Conditions for a Dedicated Outdoor Air System Working in Parallel with Distributed Sensible Cooling Terminal Equipment

Dedicated Outdoor Air Systems (D.O.A.S.)

HVAC Calculations and Duct Sizing

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

STULZ Water-Side Economizer Solutions

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client

Defining Quality. Building Comfort. Precision. Air Conditioning

LIQUID DESICCANT AIR CONDITIONING Saves energy, Controls humidity, Cleans air. Trevor Wende Vice President, Marketing Advantix Systems, Inc.

Enclosed Football Stadium Design History and Lessons Learned

SAM HOUSTON STATE UNIVERSITY

Energy Efficient Building Design College of Architecture Illinois Institute of Technology, Chicago. Relative Humidities RH%

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Integrated Solar Radiant Systems

HVAC Processes. Lecture 7

HVAC Checklist - Long Form

Bring the fresh in. Dedicated Outside Air Systems

Design Options for HVAC Distribution Systems

HVAC Characteristics. Test Space HVAC Characteristics

Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates

Building Energy Systems. - HVAC: Heating, Distribution -

Flexibility, Efficiency In San Antonio Arena

Radiant Panels and Chilled Sails.

Hospital Application Guide. Cost-effective climate control for hospitals

newsletter engineers energy-saving strategies for Water-Source Heat Pump Systems volume 36 2 providing insights for today s hvac system designer

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

Why Do I Need Precision Air Conditioning?

HVAC Basic Science - System Capacity

UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM

EnergyPro Building Energy Analysis. Assisted Living Building

Makeup Air For Exhaust Systems In Tight Houses. Tony Jellen Engineering Projects

Dehumidification Design

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Design Options For HVAC Distribution System

Residential HVAC Load Sizing Training October 14, David Kaiser Green Code Plan Reviewer

Commissioning - Construction Documents (Page 1 of 6)

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

Glossary of Heating, Ventilation and Air Conditioning Terms

Carnegie Mellon University School of Architecture, Department of Mechanical Engineering Center for Building Performance and Diagnostics

White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010

Principals of Condensing Boiler System Design

Mechanical Insulation. Hospitals and Schools

DOE FEMP First Thursday Seminar. Learner Guide. Core Competency Areas Addressed in the Training. Energy/Sustainability Managers and Facility Managers

Analysis of data centre cooling energy efficiency

Federation of European Heating, Ventilation and Air-conditioning Associations

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Air Conditioning Clinic

Chilled Water HVAC Systems

MECHANICAL SYSTEMS DESIGN. Team

VAV Laboratory Room Airflow The Lowdown on Turndown

Sustainable Preservation Practices for Managing Storage Environments Webinar: April 3, 2013

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

Comparing Energy Savings of Different VAV Systems

DEVELOPMENT OF AN OPEN SOURCE HOURLY BUILDING ENERGY MODELING SOFTWARE TOOL

Role of Economizers in Dedicated Outdoor Air Systems

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

Fan Applications & System Guide

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

FIRST RADIANT COOLED COMMERCIAL BUILDING IN INDIA CRITICAL ANALYSIS OF ENERGY, COMFORT AND COST

Element D Services Heating, Ventilating, and Air Conditioning

Dedicated Outdoor Air-Dual Wheel System Control Requirements

Energy Efficient HVAC-system and Building Design

HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

Venice Library Humidity Study. for Williams Building Diagnostics, LLC th Street West Bradenton, FL Report April 13, 2015

HIGH EFFICIENCY RTU. HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons

VertiCool Space Saver 2 to 15 tons Water-Cooled and Chilled Water

RADIANT COOLING SYSTEMS PRINCIPLES OF RADIANT COOLING SYSTEMS INSTALLATION, DESIGN, CONTROLS, CAPACITIES

Controlling Wrap-Around Heat Pipes for Systems with Strict Space Humidity Requirements. By Michael O. Davis, PE, November 2015

Dehumidification Frequently Asked Questions

Transcription:

Active Chilled Beam System Design & Layout Salt Lake City, UT ASHRAE Chapter December 2013 Nick Searle nsearle@dadanco.com

Contents Active Chilled Beam Basics Design Considerations Air System Design & Humidity Control Water System Design Heating with Active Beams Controls Beam Selection & Layout

Fan Energy Use in Buildings 4.5 Chiller/Compressor 7 Design Load KW/SF 4 3.5 3 2.5 2 1.5 Supply & Return Fans Chilled Water Pump Condenser Water Pump Cooling Tower Fan Condenser Fan Energy Use KWh/SF 6 5 4 3 2 1 0.5 1 0 Central VAV Central CAV Packaged CAV 0 Central VAV Central CAV Packaged CAV Energy Consumption Characteristics of Commercial Building HVAC Systems publication prepared for U.S. Department of Energy

Water = Efficient Transport 10 1 Ton of Cooling requires 550 CFM of air or ¾ diameter water pipe 4 GPM of water

Active Chilled Beams 1980 1990 2000 2010 Chilled Ceilings Passive Chilled Beams Active Chilled Beams Higher space loads Higher occupant densities Combined ventilation/cooling preferred Integration into fiber tile ceilings required

Active Chilled Beam 0 Operation Principle Primary air nozzles Primary air plenum 1 Part Primary Air Suspended ceiling Heat exchanger 4 Parts Room Air

Heat Removal Ratio Airflow requirement reduced by 70% 70% of sensible heat removed by chilled beam water coil

Active Chilled Beam 0 Airflow Pattern

Active Chilled Beams 0 System Highlights Very high cooling capacity Up to 100 BTUH/FT 2 floor space Up to 1500 BTUH per LF Integrated cooling, ventilation and heating All services in the ceiling cavity Suitable for integration into all ceiling types Reduces ceiling costs compared to Passive Beams

Active Chilled Beams 0 System Highlights Significant space savings Smaller ductwork saves space in shafts, plant rooms and ceiling Can be installed tight up against the slab Reduced floor to floor heights Reduced construction costs on new buildings Low noise levels Low maintenance No moving or consumable parts

Energy Savings 0 Compared to VAV Source Technology Application % Saving* US Dept. of Energy Report (4/2001) Beams/Radiant Ceilings General 25A30 ASHRAE 2010 Technology Awards Passive Chilled Beams Call Center 41 ACEE Emerging Technologies Report (2009) Active Chilled Beams General 20 ASHRAE Journal 2007 Active Chilled Beams Laboratory 57 SmithGroup Active Chilled Beams Offices 24 *Compared to VAV Energy Consumption Characteristics of Commercial Building HVAC Systems publication prepared for U.S. Department of Energy

Active Chilled Beams 0 Typical Installation

Active Chilled Beams 0 Typical Installation

Space Savings 12 A0 9 A10

Space Savings

Space Savings 9 A10 8 A0

Space Savings All Air HVAC System 5 Floors Exposed Chilled Beams 6 Floors

ACTIVE CHILLED BEAM DESIGN CONSIDERATIONS

Building Suitability Building Characteristics that favor Active Chilled Beams Zones with moderateahigh sensible load densities Where primary airflows would be significantly higher than needed for ventilation Sensible Heat Ratio s (SHR) of 0.8 and above Buildings most affected by space constraints Hi rises, existing buildings with induction systems Zones where the acoustical environment is a key design criterion Laboratories where sensible loads are driving airflows as opposed to air change rates Buildings seeking LEED or Green Globes certification

Building Suitability Characteristics that less favor Active Chilled Beams Buildings with operable windows or leaky construction Beams with drain pans could be considered Building pressurization control should be used Zones with relatively low sensible load densities Zones with relatively low sensible heat ratios and low ventilation air requirements Zones with high filtration requirements for the rea circulated room air Zone with high latent loads

SHR s for Typical Spaces SHR Range Auditoriums, Theaters 0.65-0.75 Apartments 0.8-0.95 Banks, Court Houses, Municipal Buildings 0.75-0.9 Churches 0.65-0.75 Dining Halls 0.65-0.8 Computer Rooms 0.8-0.95 Cocktail Lounges, Bars, Taverns, Clubhouses, Nightclubs 0.65-0.8 Jails 0.8-0.95 Hospital Patient Rooms, Nursing Home, Patient Rooms 0.75-0.85 Kitchens 0.6-0.7 Libraries, Museums 0.8-0.9 Malls, Shopping Centers 0.65-0.85 Medical/Dental Centers, Clinics and Offices 0.75-0.85 Motel and Hotel Public Areas 0.75-0.9 Motel and Hotel Guest Rooms 0.8-0.95 Police Stations, Fire Stations, Post Offices 0.75-0.9 Precision Manufacturing 0.8-0.95 Restaurants 0.65-0.8 Residences 0.8-0.95 Retail, Department Stores 0.65-0.9 Other Shops 0.65-0.9 School Classrooms 0.65-0.8 Supermarkets 0.65-0.85

Role of the Primary Air Ventilate the occupants according to ASHRAE 62A 2004 Handle all of the latent load in the space Primary air is only source of latent heat removal Create induction through chilled beam Pressurize the building

Primary Air Design Central AHU sized to handle: sensible and latent cooling/heating of the ventilation air portion of the sensible internal cooling/heating loads AND all of the internal and infiltration latent loads Primary air delivered continuously to the chilled beams VAV primary air can be considered for the perimeter if the sensible loads are high Chilled beam water coils provide additional sensible cooling/heating to control zones

Primary Air Temperature 0 Cooling 55 F or Lower 65 F or Higher Reduces lengths/quantities of beams Good for office buildings with high perimeter loads Reduces or eliminates reheat Ideal for labs or hospitals with code required minimum air changes Often used with VAV in applications with high sensible loads More or longer beams required in some applications Air must be suitably dehumidified whatever the dry bulb temp is!

Room Neutral Air Sensible recovery device (downstream of coil) Desiccant dehumidification units Passive dehumidification wheels

Reducing Primary Air Temperature Active Chilled Beams Primary Air Pressure Primary Air Flow Rate Supply Air Flow Rate Supply Air Temp Out (Cooling) Primary Air Sensible Cooling Secondary Air Sensible Cooling Nett Unit Sensible Cooling Chilled Water Flow Rate Qty Unit TAG Zone Name Unit Model 2 or 4 Pipe Coil Nominal Length (feet) P PA (Inch w.c.) Q PA (CFM) Q SA (CFM) t SAout ( F) q PAs (Btuh) q SCAs (Btuh) q s (Btuh) Q SCHW (GPM) 2 ACBA1 1 DADANCO ACB50 2 8 0.7 105 529 59.3 2281 6770 9051 1.3 Room Design Primary Air Secondary Chilled Water Secondary Hot Water Elevation % Propylene Feet Glycol Cooling 75 F 50% RH 55 F 80% RH 58 F 110 F 0 0 Heating 70 F 50% RH 55 F 83% RH Active Chilled Beams Primary Air Pressure Primary Air Flow Rate Supply Air Flow Rate Supply Air Temp Out (Cooling) Primary Air Sensible Cooling Secondary Air Sensible Cooling Nett Unit Sensible Cooling Chilled Water Flow Rate Water Pressure Drop Qty Unit TAG Zone Name Unit Model 2 or 4 Pipe Coil Nominal Length (feet) P PA(Inch w.c.) Q PA(CFM) Q SA(CFM) t SAout( F) q PAs(Btuh) q SCAs(Btuh) q s(btuh) Q SCHW (GPM) SCHW pressure drop (Feet w.c.) 3 ACBA1 1 DADANCO ACB50 2 8 0.5 70 359 59.4 760 5325 6085 1.1 7.9 Room Design Primary Air Secondary Chilled Water Secondary Hot Water Elevation Feet% Propylene Glycol Cooling 75 F 53% RH 65 F 70% RH 58 F 70 F 0 0 0 Heating 70 F 50% RH 107 F 83% RH Typically 25% + more chilled beams required when using 65 F primary air % Ethylene Gylcol

Latent Load Calculation The amount of cooling required to remove the moisture from the air Q L = 0.68 x q x w gr or QL = 4,840 x q x w lb Where A Q L = latent heat (Btuh) q = air volume flow (cfm) w gr = humidity ratio difference (grains water/lb dry air) w lb = humidity ratio difference (lbwater/lb dry air)

Dehumidification Air for 1 Person 0 200BTUH Primary air flow (CFM) 45 40 35 30 25 20 15 10 5 0 30% less air 44 45 46 47 48 49 50 51 52 Primary air dew point ( F) Room Design Condition 55% RH 52% RH 50% RH

Supply Water Temperature Safety Margin Passive Chilled Beams + 1 F Do not design below room dew point! Active Chilled Beams A 2.9 F Climatic Ceilings by Energie

Condensation Radiant Panel Test Condensation after 8.5 hours on a chilled surface intentionally held 7.8 F colder than the space DPT. Not one droplet fell under these conditions Chilled Ceilings in Parallel with Dedicated Outdoor Air Systems: Addressing the Concerns of Condensation, Capacity, and Cost Stanley A. Mumma, Ph.D., P.E.

Design Cooling Loads 0 Beware of Overrating! Building was designed for 80 BTUH/ft 2 perimeter load Actual load in building use was 40 BTUH/ft 2 Parameter Proposed in design Actual observed load Area(Sq.ft) 200 200 Sensible Load(Btuh) 16,000 8,000 Latent Load(Btuh) 400 400 Minimum Outside Air(CFM) 40 40 Quantity of ACB s 2 2

Design Cooling Loads 0 Beware of Overrating! Chilled beams selected for double actual required primary air to achieve overestimated load Primary air providing 65% of the total sensible cooling of the actual load 2 x beams at 115 CFM

Design Cooling Loads 0 Beware of Overrating! Therefore if load drops to 65% no waterside cooling will occur If load drops below 65% space will overcool unless reheat is used

Causes of Overrating Loads Assumptions on building materials performance Equipment loads that never eventuate Use of generic performance data Use of safety factors Lack of familiarity with load calculation software

Design Cooling Loads 0 Rules of Thumb Location Sensible Zone Load North East South West Interior 25A30 Btuh/Sq.ft 35A45 Btuh/Sq.ft 30A40 Btuh/Sq.ft 40A50 Btuh/Sq.ft 15A20 Btuh/Sq.ft Exclude loads:a Outside air load Plenum gain Fan motor gain Duct losses If loads exceed these values review closely

WATER SYSTEM DESIGN

CHW System Design Options Secondary loop Tap into district CHW loop Heat exchanger into return no GPM demand Can increase main plant efficiency Dedicated chiller & DX Dehumidification by DX AHU Significantly increased COP A 11+ Twin chillers One for AHU s 6 COP One for chilled beam circuit 11+ COP

Mixing Valve Supply temperature monitor Secondary chilled water supply to beams Primary chilled water supply S 58 F T 45 F SCHW Pump T Primary chilled water return Primary chilled water return 64 F Secondary chilled water return

Secondary Loop Supply temperature monitor Secondary chilled water supply to beams Primary chilled water supply 45 F S 58 F SCHW Pump T T 54 F Primary chilled water return Heat Exchanger 64 F Secondary chilled water return

Dedicated Chiller To chilled beam zones Bypass Valve T Chilled water pump 64 F Cooling Tower Dedicated Geothermal chiller Heat 11+ Pump COP 58 F Geothermal Loop

District Chilled Water Loops Tap into return pipe with heat exchanger and secondary loop No demand in district loop GPM Increases main chiller plant COP

Reverse Return Pipe Design S T

15 Minute Break

HEATING WITH ACTIVE CHILLED BEAMS

Advantages of 20Pipe Beams Versus 40Pipe Higher coil performance 4 pipe performance is compromised 75% Cooling (12 pipes) 25% Heating (4 pipes) Fewer or shorter beams Lower hot water temperatures 90 F for 2 pipe 130 F for 4 pipe

Boiler Efficiency 0 Lower Hot Water Temp Hot water typically 90A130 F Reduce boiler energy consumption by maximizing efficiency of a condensing boiler through very low return water temperatures Use of water to water heat pumps (KN boiler efficiency chart courtesy of Hydrotherm)

20Pipe Beams and Terminal Heating Chilled Water Supply Terminal Heating Coil Hot Water Supply 2APipe Active Chilled Beams Hot Water Return S T Chilled Water Return S

Heating Using 60Way Valves

60Way Valve

CONTROL CONSIDERATIONS

Airside Control Constant volume air Reduces cost Maintains constant control of humidity Guarantees minimum fresh air delivery Monitor room dew point Use small quantity of high quality sensors Do not use RH sensors Locate sensors in room not in ceiling Reduce primary moisture content to control room RH Avoid turning off or rescheduling SCHW temp

Waterside Control Variable water flow Pressure independent control Two position valves or modulating valves 6Away valves can be used on 4 pipe into 2 pipe chilled beams Reschedule or shut off SCHW only if primary moisture content cannot reduced

Waterside Control Sequence 76 Room Temperature ( F) 75 74 73 72 SCHW ON Dead Zone SCHW OFF SCHW ON SCHW OFF Dead Zone 71 Time HW ON

Typical Start Up Control Sequence Dry out cycle before engaging SCHW pumps Setback primary air humidity ratio ONLY initiate pumps when room dew point is within design limits

Condensation and Dew Point Sensors Dew point sensor Condensation sensor Drip sensor

ACTIVE BEAM SYSTEM DESIGN COST CONTROL

First Cost Control Many projects still designed with far to many beams Caused by confusing selection software or low performance beams 4Apipe system designs are costly 2Apipe system with terminal heating or 6Away valves reduce cost Mechanical contractors unfamiliar with system Install a mockup to show contractors

PEX Piping Significantly Reduces Costs 70% reduced pipe material cost $0.60 v s $1.95 per linear foot Reduced labor, much faster installation No torches or soldering, no glue Longevity 50 year life expectancy No corrosion Dampens water rushing noise and water hammer noise Does not require insulation Plenum rated systems available With 25 year warranty

Active Chilled Beam Selection & Layout

Room Load Data

ACB Selection & Layout Tips Select beams for minimum possible primary air 0.4 0.7 w.c. typical airside beam P Be aware of airside/waterside cooling ratio Maximize waterside cooling Chilled beams throw more air than VAV diffusers Be wary of air velocities Use ASHRAE standard 55 guidelines for thermal comfort

ACB Selection & Layout Tips Careful positioning near walls & columns Can interfere with beam if too close Chilled beams positioned closer than 6 centers may not cool correctly Minimum 2 x tile spacing rule of thumb Use manufacturers selection software Best software allows selection of the entire building

Tips to Minimize Primary Air Flow Be wary of overrating cooling loads Use low temperature primary air 45 48 F is possible but beam must be internally insulated Locate beams along perimeter to increase output Use a higher on coil temperature when beams are positioned along perimeter This additional capacity is often overlooked Use booster fans

DOAS with Booster Fans DEDICATED OUTDOOR AIR UNIT Outdoor Air + A A A FAN BOOSTERS Return Air Return Air ACTIVE CHILLED BEAM ZONES ACTIVE CHILLED BEAM ZONES

LAYOUT EXAMPLE @ OFFICE BUILDING @

Building With Exterior Cellular Offices Office 3 Office 4 Office 5 Office 6 50 BTUH/ft 2 30 BTUH/ft 2 30 BTUH/ft 2 Occupants: 1 Area: 144 ft 2 Ventilation: 15 CFM Cooling: 7200 BTUH Latent load: 288 BTUH Heating Load: 3000 BTUH Occupants: 1 Area: 144 ft 2 Ventilation: 15 CFM Cooling: 4320 BTUH Latent load: 288 BTUH Heating Load: 2100 BTUH Occupants: 1 Area: 144 ft 2 Ventilation: 15 CFM Cooling: 4320 BTUH Latent load: 288 BTUH Heating Load: 2100 BTUH 30 BTUH/ft 2 Occupants: 1 Area: 144 ft 2 Ventilation: 15 CFM Cooling: 4320 BTUH Latent load: 288 BTUH Heating Load: 2100 BTUH Office 7 30 BTUH/ft 2 Occupants: 1 Area: 144 ft 2 Ventilation: 15 CFM Cooling: 4320 BTUH Latent load: 288 BTUH Heating Load: 2100 BTUH Office 2 35 BTUH/ft 2 Occupants: 1 Area: 144 ft 2 Ventilation: 15 CFM Cooling: 5040 BTUH Latent load: 288 BTUH Heating Load: 2500 BTUH Office 1 35 BTUH/ft 2 Occupants: 1 Area: 144 ft 2 Ventilation: 15 CFM Cooling: 5040 BTUH Latent load: 288 BTUH Heating Load: 2500 BTUH 12 Office 8 20 BTUH/ft 2 Occupants: 15 Area: 1,512 ft 2 Ventilation: 170 CFM Cooling: 30,240 BTUH Latent load: 3024 BTUH Heating Load: 0 BTUH TOTAL AREA 2,520 FT 2 12

ACB Design Parameters Room Conditions: 75 F db/53% RH 70 F db winter Primary Air Conditions: 55 F db/51.6 wb(48.7 DP) Summer & Winter Chilled Water 57 F versus a 56.5 F room dewpoint(53% RH) Warm Water 110 F

Selection Software

ACB Layout ACBA3 PRIM. AIR Min. 15 CFM Max. 45 CFM Office 3 50 BTU sahr/ft 2 PRIM. AIR Min. 15 CFM Max. 25 CFM Office 4 ACBA4 ACBA5 ACBA6 ACBA7 30 BTU sa HR/FT 2 PRIM. AIR Min. 15 CFM Max. 25 CFM 30 BTU sa PRIM. AIR Min. 15 CFM Max. 25 CFM Office 5 HR/FT 2 Office 6 30 BTU sa HR/FT 2 Office 7 PRIM. AIR Min. 15 CFM Max. 25 CFM 30 BTU sa HR/FT 2 Min. O/A 275 CFM Max. O/A 485 CFM DOAS ACBA1 ACBA2 PRIM. AIR Min. 15 CFM Max. 35 CFM Office 2 35 BTU sahr/ft 2 PRIM. AIR Min. 15 CFM Max. 35 CFM Office 1 35 BTU sahr/ft 2 12 ACBA8b ACBA8a PRIM. AIR 270 CFM ACBA8d ACBA8c ACBA8f ACBA8e VAV Min. 105 CFM Max. 215 CFM Min. 170 CFM Max. 270 CFM Internal Offices 20 BTU sahr/ft 2 VAV S/A 12 TOTAL AREA 2,520 FT 2 R/A

Beam Layout Notes 1Away beam in the perimeter offices Captures solar load, increases beam output Higher onacoil temperature Free s up ceiling space for lighting Works well for heating Interior office 2Away throw beams Check velocity between colliding airstreams Minimum of 1 beam per 300 ft 2

10Way Perimeter Beam Increased on coil temp Increased cooling output Less primary air required

10Way Beams at Perimeter CFD Cooling

10Way Beams at Perimeter CFD Heating

10Way Beams at Perimeter CFD Heating

VAV Reheat Design Parameters Room Conditions: 75 F db/50% RH 70 F db winter Primary Air Conditions: 55 F db/55 wb Summer & Winter Chilled Water 45 F Hot Water 150 F

VAV Layout MAX 332 CFM MIN 63 CFM MAX 199 CFM MIN 50 CFM MAX 199 CFM MIN 50 CFM MAX 199 CFM Office 3 30 BTU sa 30 BTU sa Office 4 HR/FT Office 5 Office 6 50 BTU sahr/ft 2 2 HR/FT 2 MIN 50 CFM 30 BTU sa HR/FT 2 MAX 199 CFM Office 7 MIN 50 CFM 30 BTU sa HR/FT 2 O/A 275 CFM E/A 275 CFM VAV 4 VAV 5 VAV 6 VAV 7 S/A AHU MAX 232 CFM MIN 63 CFM VAV 2 Min. 693 CFM Max. 2986 CFM Office 2 35 BTU sahr/ft 2 VAV IO MAX 1,394 CFM MAX 232 CFM MIN 63 CFM Office 1 35 BTU sahr/ft 2 VAV 1 12 MIN 304 CFM Internal Offices 20 BTU sahr/ft 2 R/A 12 TOTAL AREA 2,520 FT 2

Summary Comparison VAV Total Air System Size 2986 CFM Airflow @ Max Turndown 693 CFM Max. Airflow 1.18 CFM/FT 2 Min. Average Airflow 0.27 CFM CFM/FT 2 Airflow @ 60% Load 0.71 CFM FT 2 ACB+DOAS Total Air System Size 565 CFM Airflow @ Max Turndown 275 CFM Max. Airflow 0.22 CFM/FT 2 Min. Average Airflow 0.11 CFM CFM/FT 2 Airflow @ 60% Load 0.11 CFM FT 2 84% airflow reduction at 60% load!

CFD Modeling Critical Applications

QUESTIONS?