PA PUC AERS & Metropolitan Edison Company Site Visit



Similar documents
Pennsylvania Summer Reliability

David Kline Manager, External Affairs

Hurricane Irene Response Before, During and After the Storm. John D. Rea Director of Operations Support, Penelec. October 12, 2011

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

Emergency Restoration Plan (ERP) Components

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman.

RESTORATION PROCESS. Step 1 Empire s storm restoration team assesses the damage to the system. This assessment allows Empire. = Location of damage

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations

DISTRIBUTION RELIABILITY USING RECLOSERS AND SECTIONALISERS

PUBLIC UTILITIES COMMISSIO~t~ Docket No. DE 15-

2014 ELECTRIC SYSTEM RELIABILITY REPORT CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT

Distributed Generation: Feeder Hosting Capacity. Dean E. Philips, P.E. FirstEnergy Service Corp Manager, Distribution Planning & Protection

Control Number : Item Number : 298. Addendum StartPage: 0

FIXED CHARGE: This is a cost that goes towards making the service available, including

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES

Potomac Electric Power Company. Comprehensive Reliability Plan. For. District of Columbia. Including

Implementing Low-Cost Distribution Automation Programs

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

Power Problems? Let Us Know!

Load Dispatcher (Class Code 5223) Task List

Washington DC Power Sector Overview

Big Data: Using Smart Grid to Improve Operations and Reliability. LaMargo Sweezer-Fischer Power Delivery Grid Automation Manager FPL July 2014

Underground vs. Overhead Transmission and Distribution

Monitoring Underground Power Networks

DMS - Breakthrough Technology for the Smart Grid

David Payne, P.E. Associate Director February 18, 2014

Hyperlinks are Inactive

ComEd Grid Modernization

Coordination between Electric and Water Utilities

Electric System Performance Review Trustees Briefing. April 2013

Utilities the way we see it

How To Integrate Firstenergy'S Integrated Grid

PPL Electric Utilities Summer Readiness Overview June 2016

CenterPoint Energy Robert B. Frazier Director of Electric Technology

U.S. Department of Energy December Table of Contents

the amount of data will grow. It is projected by the industry that utilities will go from moving and managing 7 terabytes of data to 800 terabytes.

Storm Ready: How to Prepare Your Business

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà

City of Buffalo Municipal Electric Utility Energy Emergency Response

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

Substation Automation and Smart Grid

PROJECT NO ORDER ADOPTING AMENDMENTS TO AS APPROVED AT THE OCTOBER 12, 2012 OPEN MEETING

NYSEG and RG&E Emergency Response Power Restoration Practices, Priorities and Interactions

The State of the Electrical Grid in Washington State. Michael Pesin, PMP, P.E. Seattle City Light

ComEd Grid Renewal Terence R. Donnelly

Siemens Fusesaver. Highest availability and cost savings for your MV distribution network.

CenterPoint Energy Executes Emergency Operating Plan. Hurricane Ike Restoration

Distribution Automation / Smart Grid. Kevin Whitten

TRANSMISSION Field Services (January 30, 2014)

Transmission Function Employees Job Titles and Descriptions 18 C.F.R 358.7(f)(1)

Seven-Year Electric Service Reliability Statistics Summary

ADMS(Advanced Distribution Management System ) in Smart Grid

PEND OREILLE COUNTY PUD. Quality Service at Low Cost RATES FOR ELECTRIC SERVICE

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

SOLUTION BRIEF. Outage Management. Leveraging the Smart Grid to Improve Reliability

ComEd Economic Development Initiatives

Oncor Storm Restoration Questions/Answers

Electric Field Operations Organization

Weather-readiness assessment model for Utilities. Shy Muralidharan Global Product Manager Energy Solutions Schneider Electric

TERMS AND CONDITIONS

Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection

Treasure Valley Electrical Plan

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

Jim Sheppard, Director of Business Processes CenterPoint Energy, Texas, USA

March ComEd Grid Modernization

Electric and Natural Gas Distribution Systems. Presented by Brian Beam New Jersey Board of Public Utilities Division of Reliability & Security

Advanced Distribution Grid Management for Smart Cities

A Changing Map. Four Decades of Service Restoration at Alabama Power. By G. Larry Clark

Rule Fast Track Analysis for National Life Insurance Co.

AORC Technical meeting 2014

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions

CenterPoint Energy responds to frequently asked questions

2012 Smart Grid R&D Program Peer Review Meeting Real-Time Distribution Feeder Performance Monitoring, Advisory Control, and Health Management System

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

New Hampshire Electric Cooperative s Smart Grid Project Frequently Asked Questions (FAQ)

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Storm Restoration. Bill Smeaton Distribution Superintendent Provincial Lines

Engineering innovation

ARRA Grant Case Studies SMUD s Smart Grid Program

Study Guide for Substation Operator

POWER QUALITY IN YOUR HOME

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

Systems Operation Department

Future of Electric Distribution Dialogue

Improving Distribution Reliability with Smart Fault Indicators and the PI System

Audit Report Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems

INTRODUCTION TO SYSTEM PROTECTION. Hands-On Relay School 2012

PowerStream Outage Communications and moving to the Cloud

End Point Devices to be Deployed for Each. AC Independence

When power interruptions happen.

Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems

Improving Reliability for High-Profile Customers

2. OVERVIEW OF CON EDISON SYSTEM AND LIC NETWORK. Con Edison delivers electricity to 3.2 million customers in New York City and

THE COMMISSIONING PROCESS FOR NEW SUBSTATION EQUIPMENT & PROTECTION SCHEMES ON THE BULK ELECTRIC SYSTEM. Lawrence P. Hayes FirstEnergy Corp.

WHAT TO DO IF THE LIGHTS GO OUT. PUBLIC SERVICE COMPANY OF OKLAHOMA

Verizon, 911 Service and the June 29, 2012, Derecho

Power products and systems. Intelligent solutions for power distribution Zone concept

Transcription:

PA PUC AERS & Metropolitan Edison Company Site Visit October 26, 2010 Scott Lowry Director-Operation Services, Met-Ed Andrew Zulkosky Manager-Engineering, Met-Ed Curt Christenson Manager-York Customer Operations Center, Met-Ed Steve Iseman Manager-Customer Service, Met-Ed Shayne Smith Advanced-Customer Service Specialist, Met-Ed

Agenda Welcome & Introductions FirstEnergy & Met-Ed overview Reliability Standards & Reliability Performance at Met-Ed Met-Ed Reliability Improvement Initiatives FirstEnergy Storm Restoration Process York Smart Grid Project Tour Harley Davidson Field Tour Met-Ed Reliability Initiatives CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

FirstEnergy Corp. Headquartered in Akron, Ohio Seven electric utility operating companies 5th largest investor-owned electric system in the U.S. based on 4.5 million customers served Ranked 179 among Fortune 200 companies in 2010 CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

FirstEnergy Summary Profile $13 billion in annual revenues and $34 billion in assets 4.5 million customers 17 generating g plants; nearly 14,000 MW Approx. 133,000 transmission and distribution circuit miles Approx. 13,500 employees CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

Metropolitan Edison Company Company Facts 549,000 customers 3,300 square miles 14 of 67 PA counties 13,607 million KWH delivered (2009) 40% Residential 34% Commercial 26% Industrial/Streetlight $1.4B assets net of depreciation 14,678 distribution circuit miles 1,422 transmission circuit miles CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

Met-Ed System Overview System Voltage Transmission: 500, 230, 115 KV Sub transmission: 69, 34.5 KV Distribution: 34.5, 13.2, 4.8 KV Met-Ed 216 Substations (physical locations) 762 Distribution Circuits 16,336 Circuit / pole miles 1,415 Transmission pole miles 14,921 Distribution circuit miles CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

Met-Ed Performance Reliability: SAIDI Reliability: SAIFI * 12 Month Rolling as of September 2010 * 12 Month Rolling as of September 2010 Reliability: CAIDI Customer Satisfaction Reliability Complaints * 12 Month Rolling as of September 2010 September CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

Met-Ed Focused Reliability Audit - 2007 Consultant s View of Met-Ed 90% of reliability statistics are Distribution Caused Outages Storm-proof the 3-phase Distribution Backbone Addition of Fuses & Reclosers Off-Corridor Priority / Danger Tree Program Additional Lightening Protection Prompt restoration of service (in particular the 3-phase backbone) Proactively manage Worst Performing Devices & Customers Experiencing Frequent Interruptions CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

2007 PA Focused Reliability Audit Recommendations 8 Primary Impact Recommendations Fuses/Reclosers, Priority / Danger Tree program, Lightning Protection, Lightening Mitigation, Partial Restoration, Emergency On-Shift Staffing, Call-Out Response, Pager Notifications 10 Secondary Impact Recommendations Reduce Substation CM backlog, Develop Mobile Transformer Installation Plans for Selected Substations, Investigate Causes/Remedies of Car Pole Accidents, Redirect OH Line Inspections Program to Worst Performing Circuits, Develop Solutions to Capacity Challenges in Stroudsburg Area, Proactively Manage Situations where Customers Experiencing Frequent Interruptions, Establish Back-up Plan for 28 MVA Spares, Develop Plan to Implement Adaptive Relaying, Improve Restoration Time Reporting, Hire 15-23 Linemen Annually/10 years CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

Power of Protection Reliability Improvement Results from the Fusing & Recloser Initiative Circuit Approximate SAIDI Savings Lockouts Prevented 2007 25 26 2008 48 72 2009 58 82 CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

Met-Ed 2010 Reliability Strategy Enhanced Vegetation Management Circuit assessments Recloser l Inspections Distribution Capacitor Inspections Distribution Regulator Inspections Wood Pole Inspections Priority Pole replacements Radio Controlled Switch Maintenance Switch Battery Checks/Replacements Condition Item Backlog Radio Controlled Switch Installations Regulatory Commitments Internal Preferred Practices Smart Grid / Energy Efficiency Initiatives Install Fuses Expand Off-Shift Staffing Condition Item Backlog Prioritized iti Targeted Fault Finder Application Quarterly Serviceman Meetings Abnormal Equipment Tracking Repair Monthly Reliability Review Meeting Targeted Fault Finder Installations CONFIDENTIAL AERS PA PUC Presentation October 26, 2010

FirstEnergy Storm Restoration Storm Process Goals Provide safety to our employees and the public Provide for prompt p assessment of damage and identification of resource requirements Provide for prompt restoration of service to our customer Provide for accurate reporting of restoration progress to company personnel, customers, media contacts and regulators. Distributed Dispatching Storm Process Workshop Strategic Objective PRIVILEGED & CONFIDENTIAL FOR INTERNAL USE ONLY 12

FE Storm Restoration Distributed Dispatching Restoration Priorities HAZARDS Eliminating verified safety hazards is always top priority Once hazard has been cut in the clear the priority of the hazard is reduced OUTAGE RESTORATION Transmission and Substation Outages Distribution Outages priority function of number of customers affected & type Consider following customers as priorities: Hospitals without emergency Fire departments generator backup Correctional institutions Critical life support customers Radio & TV stations and newspapers Telephone exchanges without t Hospitals with emergency generator backup emergency generator backup Telephone exchanges with Water supply & pumping stations emergency generator backup Sewage treatment system Rural Electric Cooperatives (REC s) / Rural Electric Associations (REA s) Police departments Distributed Dispatching Storm Process Workshop Restoration Priorities PRIVILEGED & CONFIDENTIAL FOR INTERNAL USE ONLY 13

FE Storm Restoration Distributed Dispatching Restoration Priorities OUTAGE RESTORATION Other Outages continued Single-phase outages Transformer outages Industrial, Commercial, and Residential (in that order) Secondary outages Service outages Street light outages Foreign companies Customer-owned equipment Distributed Dispatching Storm Process Workshop Restoration Priorities PRIVILEGED & CONFIDENTIAL FOR INTERNAL USE ONLY 14

FE Storm Restoration Distributed Dispatching Process Sequence Storm Start Relative Storm Time Line Field Personnel Work Assignments Storm End TROUBLEMEN Circuit Outages Recloser & Fuse Smaller Isolated Service Drop Work & Clean-up Hazards Outages Outages LINE Trouble & Hazards Primary outages Secondary outages Service Drop Work under RDO direction SUBSTATION Circuit Outages Hazard Responder Service Drop Work / Misc Line Support FORESTRY Tree Work needed d before Line Crews Tree Work needed d concurrently or after Line Crews METER Hazard Responder Service Drop Work Hazard Dispatch / Hazard Responder / Damage Assessment / Single Customer No lights ENGINEERING Assist RDO with duties as assigned: Storm Analyst, Load transfers, Call-backs, etc. Customer Services Hazard Responder / Public Protector / Crew Guides Revenue Ops & Misc Depts

FE Storm Restoration Organization Chart Director Customer Accounts Services Customer Service Reps Communications Liaison Hospitality Group SCC Shift Supervisor Regional Director Operations Services Manager RDO Regional Director Operations Support Services Supv Garage Services Supv Meter Services Supv Substation Services Supv Stores Services Hazard Coordinator Distribution ib ti Dispatcher Operations Supervisor Forestry Coordinator Storm Analyst Service Dispatch Coordinator Hazard Dispatchers Line Dispatcher Forestry Dispatcher Service Dispatchers Line Crew Public Protectors Hazard Responders Trouble Shooter Crew Guide (Bird Dog) Forestry Crews Service Crews (non-line physical workers) Distributed Dispatching Storm Process Workshop PRIVILEGED & CONFIDENTIAL FOR INTERNAL USE ONLY 16

Metropolitan Edison Company Smart Grid Modernization Initiative Project Overview: Distribution Automation Volt Var Control Direct Load Control January 7, 2010 Met-Ed SGMI Update PAPUC York, Pa 17

Smart Grid Modernization Initiative Cross-Cutting Technologies Distribution Automation Volt / VAR Control Integrated Distributed Energy Resource Direct Load Control Met-Ed ($30M) Period of performance = 60 months Clock started 6/2/10 with signed DOE Agreement Implementation = 36 months & data collection for balance of period Met-Ed SGMI Update PAPUC York, Pa 18

Smart Grid Modernization Initiative SGMI Technology Application /S Scope Qty Distribution Automation Substations 11 Distribution Automation Feeders 26 Distribution Automation Customers 26,000 Circuit Breakers DA 8 Line Reclosers DA 61 Volt/Var Control Feeders 22 Volt/Var Control Customers 12,000 Capacitor Controller VVC 43 Voltage Regulator VVC 6 Voltage Sensor VVC 100 Direct Load Control Customers 23,000 Direct Load Control Reduction (MW) 28.8 Estimates as submitted to DOE, subject to revision Met-Ed SGMI Update PAPUC York, Pa 19

Direct Load Control Summary Met-Ed DLC Program Confidential 20

Direct Load Control Summary AC Controller / Temp Sensors Data Concentrators / Repeaters Met-Ed DLC Program Confidential 21

DLC Summary DLC Control Software Met-Ed DLC Program Confidential 22