1 Improving Reliability for High-Profile Customers By Mark Kimbell Chief Engineer at Murfreesboro Electric Department How important are commercial customers to an electric utility? Are you doing everything that you can to be sure your high profile customers have the most reliable power possible? Can you cost justify installing distribution automation that will help keep power on to the local hospital or the local convention center? What are the costs to customers when the power is off? These questions do not always have simple answers. Sometimes the solutions can be very expensive, then it becomes a question of how much money to spend or how much protection to provide. Distribution Automation (DA) has advanced to the point where you should not ignore the improvement in service that you can provide your most important customer by having fewer and shorter outages. The growth of Murfreesboro, Tennessee, presented Murfreesboro Electric Department (MED), a medium-sized municipal of 50,000 customers, with a unique opportunity. In 2005, the city constructed a new gateway from the interstate into the center of Murfreesboro. This new four mile road corridor started at Interstate I-24 and continued into the city. The road was built on farm land that included over 1000 acres of green-fields. Many new businesses were constructed along the new road, with the major player being a new 200+ bed hospital. The road was named Medical Center Parkway. After the hospital announced that they were purchasing land along the corridor, a new Embassy Suites Hotel with an attached 4000 person convention center was planned to be built at the new I-24 interchange. A new 100-acre outdoor lifestyle mall was built beside the new Embassy Hotel. Many other medical offices, shopping venues and restaurants have been added along this new gateway into Murfreesboro. To enhance the community and the area around Medical Center Parkway, city leaders determined that this area should be served by underground facilities. The city installed duct banks for MED to use to supply the area with electricity. The challenge had been issued to keep as much equipment below grade as possible. MED had never installed underground feeders that served more than 400 amps. Much electrical system planning would need to be done before the first building was constructed. Multiple 800 ampere feeder circuits would be needed to feed this area. The major questions to answer were what routes and wire size could MED use to serve this new load, what protection equipment could MED use to make the electric feed into the Medical Center Parkway area as reliable as possible, and how do you cost justify the decisions to purchase this protection equipment. MED decided to go with parallel runs of Okoguard EPR 500 Cu 15kV primary wire for the main feeders of underground electric service. Each feeder would supply approximately 800 amps of capacity. In 2006 there were three feeders and two substations available to supply the Medical Center Parkway corridor. The exponential growth that occurred has dictated feeds from several different substations. To date there are now four circuits that feed this area with plans for three more circuits and a new substation. A new 161/12.47kV substation has been planned along a Tennessee Valley Authority transmission line that crosses the center of this development area. The substation will supply load growth in the area for several years to come. With the load questions answered, MED then turned to the question of protection. Since the city leaders wanted to keep as much equipment below grade as possible, we investigated equipment that could accomplish the edict. We found out that below-grade equipment at the 800 to 900 ampere range was not readily available. Only a few vendors were able to provide the required switching equipment. MED decided to use S&C Vista equipment that could be installed below grade, inside a vault with spring loaded lids. The Vista switchgear is submersible and rated for 900 amps. The CDR vaults were large enough to accommodate Vista equipment with up to six switches or fused sections. When the lid tops are opened, you can treat the equipment as open air. This avoided all the rules and regulations for providing forced air for confined spaces. MED decided to look at the possibility of distribution automation for the 1042-R119

2 Medical Center Parkway area. S&C showed MED what some of the possibilities were and how reliability could be improved. Keeping the power on is becoming more critical to all customers, but the commercial and industrial customers are affected more monetarily. MED has a General Mills plant in the city that can potentially lose over $30,000 of product if there is an electrical outage lasting more than 30 minutes. This does not count lost production time, that increases the damage cost of an outage. You can see how improved reliability with automation equipment begins to pay for itself quickly. Power outages at hospitals are a matter of life and death. The new Middle Tennessee Medical Center (MTMC) had MED install a dual underground feed from two directions and two different circuits with automated Vista switchgear to ensure that their outage time is minimal. They shared the cost of this dual feed with MED due to the nature and importance of the healthcare business. Can you imagine what an outage of one hour would do to a shopping mall? Murfreesboro has three major shopping areas and a Super Wal-Mart within the automation area. Many restaurants are located around the malls and the convention center. While not life critical, all of these commercial businesses would have to consider closing if power was not restored quickly. The decision to automate distribution is both hard and easy. The quantitative justification is difficult, but the qualitative improvements to the customers and the community are significant. The biggest deterrent is how do you cost justify the equipment? Since one automated Vista switch can be over $100,000, the question becomes what is the payback? Monetary savings of kwh sold in outage times will not come close to justifying the cost of a Vista switch or an automated overhead switch. Lost revenue from a 30 minute outage of a 500 ampere load on a primary circuit would end up being around $100 for one outage. As you can see, it would take many outages to justify one piece of automated equipment if lost revenue was the only factor, but what about the customers on that circuit? What is the cost of their lost production for a 30 minute outage? That lost production number can be significant. If a circuit this size has 150 commercial customers and each customer losses $100 in revenue during the 30 minute event, then that event has caused an outage where the community lost $15,000 in revenue. The correct lost revenue cost is most likely much higher than $15,000. These numbers come much closer to cost justification for automation. Payback for a $100,000 piece of Vista gear is probably close to four to five events. Payback for a $25,000 overhead ScadaMate or IntelliRupter switch could end up being one or two events. The benefits of improved reliability are hard to measure, even when reliability can be measured. MED tracks SAIDI (System Average Interruption Duration Index) and CAIDI (Customer Average Interruption Duration Index) reliability numbers to see how we compare to the national average. These numbers help you track progress, but do not tell you how much automation is worth to your system. What is it worth to avoid an operation at a hospital? How much damage do you do to your own equipment (station transformers, distribution transformers, switch contacts, connections, etc.) by avoiding operations? What kind of safety factor can you consider when you prevent traffic chaos by keeping power on to traffic signals? What benefit does automation provide electric operations staff if an outage is minimized to a small part of a circuit versus the whole circuit being out? Does the community benefit from a small section of the city having automation? MED management can see the value of automating circuits to protect high profile customers. By installing DA equipment, MED believes that we have improved the quality of life in our community. How do you measure quality of life? DA can be used as an economic development tool. When potential commercial and industrial prospects discover that the local electric utility has distribution automation experience, you are guaranteed to make an immediate positive impression, and that is a recruiting plus. Many new businesses are placing a premium on electric reliability, which goes up with the use of distribution automation. Multiple feeds and automation are a necessity for a new hospital, call center or data center. Underground distribution protection is different than overhead distribution protection. When an outage occurs on overhead lines you can generally find the problem by sight. With underground lines, you have to rely on equipment that will isolate the problem to a smaller area and then take sections at a time to open equipment and test the underground wire. Fault detectors 2

3 can help locate the fault, but unless there are sectionalizing devices in the line, underground outages can take hours to locate, where overhead faults can be located in minutes. Automation helps the fault location process by sectionalizing the line automatically, which is exponentially more important with underground distribution because of the time involved; and less fault location time in turn improves reliability index numbers. With DA, underground feeders can possibly isolate with a minimum amount of outage time, allowing crews to pinpoint the outage, repair the outage during regular hours, and re-energized the feeder without any further interruption of service to any customers. Murfreesboro Chooses Automation The decision was made to begin to automate the area around the hospital. Once MED decided to go this route an initial plan was made for five Vista switchgear locations along Medical Center Parkway. CDR Vista vaults were installed at critical locations and a Vista 642 (six bays, four switches, two fault-interrupting bays) and Vista 633 (six bays, three switches, three fault-interrupting bays) were ordered from S&C. Plans were also made to install five overhead ScadaMate switches and one pad-mount switch with motor operators in the surrounding area to work in conjunction with the Vista equipment. Five breakers at two different substations were equipped with S&C Universal Interface Modules (UIMs), that allowed the breakers to talk to the other DA switches and work together to create automation zones of protection on the distribution system. All this equipment included S&C 5800 Series Automatic Switch Controls with IntelliTEAM II Automatic Restoration System software. The communications medium was Landis & Gyr spread-spectrum UtiliNet Radios that hopped communications from one radio to another. Each switch location communicates with its neighbors to form a mesh network, so that each switch knows what that next switch in the zone is doing. 3

4 Initial Murfreesboro Electric Distribution Automation Plan - October 2007 As additional customers continue to be added to the electric system in the Medical Center Parkway area, MED has added to the automation system. Murfreesboro has been one of the fastest growing cities in the nation the last 10 years. The growth in this Medical Center Parkway area of the city has reflected this growth. What was open land a few short years ago is now a thriving commercial center. Within the automation zone MED has installed six Vista switches, two IntelliRupter switches, six overhead ScadaMate switches, two pad-mount switches, and eight UIMs at the substation breakers. MED currently has two more Vista switches and one more IntelliRupter to install at key locations within the area and plans to expand the automation to additional circuits and customers. Some of the locations along Medical Center Parkway were pre-planned, but an automation system almost has a natural growth progression. The more area that is covered, the easier it is to see where the next piece of automated switchgear could be placed. MED will look at each circuit and try to break the load up into automation teams of 100 amps each. This will split each circuit up into five or six sections. If the customer, such as the new hospital, is large enough or is high profile enough, that customer would be in a zone of their own. Communications continues to be a key part of the DA technology. MED has gone through one complete change to newer, faster S&C SpeedNet radios. These new radios helped speed up communications exponentially, which is important to the speed of response of the DA equipment. Plans are being made to replace some of the radios with Ethernet fiber ports that will make communications almost instantaneous. All the radios report back to a head-end radio at MED s Primary Substation that is connected to MED s main office with fiber. This connection, in turn, supplies information to a Proxy Server that collects all the current switch data and reports it to MED s Advanced Control Systems (ACS) SCADA system. MED Operations staff can observe, record and operate all the automatic switches from the Operations Center at the MED main office through the ACS SCADA system. Engineers or Operations staff can also access the equipment remotely using the configuration and diagnostic software. This is a valuable engineering tool for maintenance and troubleshooting. 4

5 Current Murfreesboro Electric Distribution Automation Layout - December 2010 Lessons Learned To date there have been five automation events where portions of the distribution feeder were reconfigured to keep the power on to customers. Two of the events occurred when two separate tornadoes came through the city. All of the events to date have been weather related on the overhead distribution system. The largest automation event occurred this past summer in August when a violent lightning storm came through the city. MED s Primary and Blackman Substations are the two current substations that feed into the Medical Center Parkway area. Primary Sub has three breakers that feed into the automation area and Blackman has one breaker that feeds into the area. The storm caused an event that tripped the whole yard at Primary Sub, including Tennessee Valley Authority s 161kV switchyard. This means that MED lost three feeds into the automation area, which is about the worst case scenario. The one circuit feeder that was left picked up almost 60% of the circuits that were out in less than two minutes. The outage to the substation was over 45 minutes long. The process worked as planned. As another section energized, the system kept up with how much new load was being added. When the Blackman feeder got to around 760 amps the automatic switching stopped because there was no more capacity left. The automation logic looks at available spare capacity when making restoration decisions, so that the alternate feeder will not overload. Without automation this event would have left the new MTMC hospital in the dark. Since the automation was in place, the hospital was only out of power for less than a minute. MED was lucky that this event occurred on a reasonably mild summer day when the circuits were not heavily loaded. The lesson learned is that when you automate, feeder capacity is very important. You need to have excess capacity and feeders out there that can supply the automation zone. A month before the August event occurred, another lightning storm caused the same type event where the Primary Substation and TVA switchyard were tripped out. All the automation 5

6 switches opened on the Primary circuits, but the backfeed operation failed due to a bad battery on the motor operator at the OPEN point between Primary Substation and Blackman Substation. Battery maintenance and replacement are critical to keeping the automation system ready to operate at a moment s notice. Equipment continues to evolve where battery tests are now performed automatically, which would have prevented this failure. There have been lessons learned where the equipment has not worked as planned due to operator error. April 10, 2009 the weather was volatile all day. Early in the morning a small thunderstorm rolled through the city. The wind was very strong and caused an outage on one of the automated circuits served out of MED s Primary Sub. An open wire secondary streetlight circuit broke and was wrapped up in the primary line above. The automation worked almost to perfection and isolated the section where the fault occurred, but the backfeed to one section of the Primary Sub circuit did not operate due to a settings issue at the OPEN point between the circuits. This switch location is the open point between the Primary and Blackman substations. The settings and status of the switches at OPEN points in the automation scheme are critical to the proper operation of the system. Since the complete event did not operate correctly, snapshots of all the controls involved were taken back to the main office and careful analysis was done until the wrong setting was discovered. Reports of an impending weather front began to filter in before lunch that same day. With that knowledge, MED staff was encouraged to go to lunch early. The plan was to correct the automation settings at the OPEN point switch after lunch. At 12:32 pm an F4 tornado touched down and cut a 22-mile path across Murfreesboro. The tornado went through the first automation team at the Blackman Substation and locked out that circuit. The automation switches on that circuit all opened properly, but since the OPEN point switch between the Primary and Blackman substation had an incorrect setting, the automation backfeed could not be completed. MED lost over a third of the total electric system due to the tornado. It would have been great if the automation had worked correctly. The automation would have probably re-energized a mall and the new convention center if the setting had been corrected before lunch. 6 Murfreesboro Good Friday F4 Tornado April 10, 2009 Knowing what is happening in the automation zone is of utmost importance. If automation teams are not READY to switch, then automatic operations will not take place.

7 When crews are working on sections of line in the automation zone, automation will have to be shut down, but care must be taken to get the automation teams back to READY after the crew work is complete so that the switches are prepared for an automation event. Without SCADA information or network connection or both, keeping up with the status of the automation system can be difficult. Personnel would need to connect by radio or physically go to each switch location to check on the system to make sure the system was READY to operate. With SCADA you receive alarms that let you know when problems are present. Connecting through a radio is cumbersome at best due to network settings that will need to be changed to communicate with other automation radios. A network connection with a head-end radio is a much smoother way to look at each switch. It allows personnel to easily update and change settings from the main office at any PC on the network. The only real barriers on the network were radio settings issues and IT firewall issues allowing the correct IP addresses to punch through. The scale and experience with automation continues to grow at MED. The capabilities of the DA equipment, the software and the communications continue to improve. The IntelliRupter technology allows an electric system to drastically improve the operations and blinks that customers will see and to minimize the stress of fault current put on the electric system. Automation is about to reach the point where one section will isolate, the source side distribution will not operate and the load side portions of the circuit will backfeed with the closing of one switch if capacity is available. MED s distribution truly is a self-healing distribution system that improves reliability for all customers within the Automation Zone. 7

Power products and systems. Intelligent solutions for power distribution Zone concept

Power products and systems. Intelligent solutions for power distribution Zone concept Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,

More information

56 IEEE power & energy magazine 1540-7977/05/$20.00 2005 IEEE

56 IEEE power & energy magazine 1540-7977/05/$20.00 2005 IEEE 56 IEEE power & energy magazine 1540-7977/05/$20.00 2005 IEEE september/october 2005 UUNTIL THE 1990S, TECHNOLOGICAL BREAKTHROUGHS IN THE AUTOMATION OF electric distribution systems were slow to materialize.

More information

Fusible Disconnect Switch

Fusible Disconnect Switch Circuit Breakers Circuit breakers are used in panelboards and switchboards to provide circuit protection and provide a means of energizing and de-energizing a circuit. Siemens Sentron molded case circuit

More information

Availability and Disaster Recovery: Basic Principles

Availability and Disaster Recovery: Basic Principles Availability and Disaster Recovery: Basic Principles by Chuck Petch, WVS Senior Technical Writer At first glance availability and recovery may seem like opposites. Availability involves designing computer

More information

Underground vs. Overhead Transmission and Distribution

Underground vs. Overhead Transmission and Distribution electric power engineering Underground vs. Overhead Transmission and Distribution Your Power System Specialists June 9, 2009 1 NATIONAL TRENDS Municipalities have passed laws requiring new distribution

More information

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A Roberts, T Berry, W D Wilson Schneider Electric Ltd, UK SYNOPSIS This paper describes the features of a modern Distribution

More information

The calm after the storm

The calm after the storm The calm after the storm Human decision support in storm outage recovery Rafael Ochoa, Amitava Sen It s a fact of life that interruptions in an electrical distribution utility happen. Although they can

More information

Treasure Valley Electrical Plan

Treasure Valley Electrical Plan Treasure Valley Electrical Plan Community Advisory Committee January 25, 2006 Agenda 10 a.m. Welcome 10:10 a.m. Follow up DSM discussion 10:30 a.m. TVEP CAC process update 10:40 a.m. Transmission Presentation

More information

EVALUATION OF ALTERNATIVE BACKUP PROTECTION SCHEMES ON A 66KV DISTRIBUTION NETWORK

EVALUATION OF ALTERNATIVE BACKUP PROTECTION SCHEMES ON A 66KV DISTRIBUTION NETWORK EVALUATION OF ALTERNATIVE BACKUP PROTECTION SCHEMES ON A 66KV DISTRIBUTION NETWORK F. Malone*, P.D. Doyle *ESB International, Ireland fergus.malone@esbi.ie ESB International, Ireland paul.d.doyle@esbi.ie

More information

2014 ELECTRIC SYSTEM RELIABILITY REPORT CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT

2014 ELECTRIC SYSTEM RELIABILITY REPORT CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT 2014 ELECTRIC SYSTEM RELIABILITY REPORT CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT Contents Overview... 3 1.0 Electric System Reliability... 4 1.1 Annual Reliability Data with Utility Comparisons... 4

More information

Understanding the Auckland electricity network

Understanding the Auckland electricity network Understanding the Auckland electricity network Introduction This presentation describes how electricity reaches homes and businesses in Auckland, with a particular focus on the distribution network run

More information

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE for solar energy management LEATEC Delivering Solutions for Energy Management SOLAR ENERGY DATA CENTER BUILDING 4 to8 String Monitoring with 0.% Accuracy

More information

Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards

Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards Redundancy = Protection from Network Failure. Redundancy Standards WP-31-REV0-4708-1/5 Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards For a very

More information

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse How the National Grid System Operates Chris Gorman Lead Account Executive Syracuse 2 Parts of the Electric System Parts of the Electric System 1. Generating Station: Produces Electricity. 2. Transmission

More information

David Payne, P.E. Associate Director February 18, 2014

David Payne, P.E. Associate Director February 18, 2014 David Payne, P.E. Associate Director February 18, 2014 Overview of Texas A&M University State's first public institution of higher education, was opened on Oct. 4, 1876 as the Agricultural and Mechanical

More information

Root-cause analysis, often called RCA, is a way of thinking about how to

Root-cause analysis, often called RCA, is a way of thinking about how to Special Feature by Mark Lautenschlager, P.E. Using Root-Cause Analysis to Find Underlying Causes of Bad Outcomes Root-cause analysis, often called RCA, is a way of thinking about how to fix problems. By

More information

Inverter / Charger Installation General Operations and AC and DC Connections

Inverter / Charger Installation General Operations and AC and DC Connections Inverter / Charger Installation General Operations and AC and DC Connections The Inverter is just one piece. Sometimes, a tendency is to mount the inverter and batteries, and make it work It is better

More information

ECE 586b Course Project Report. Auto-Reclosing

ECE 586b Course Project Report. Auto-Reclosing ECE 586b Course Project Report Auto-Reclosing Srichand Injeti May 5, 2008 Department Of Electrical and computer Engineering University Of Western Ontario, London Ontario Table of contents 1. Introduction...1

More information

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories: Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission

More information

Pennsylvania Summer Reliability

Pennsylvania Summer Reliability A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured

More information

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com Agenda do Mini-Curso Sérgio Yoshio Fujii sergio.fujii@areva-td.com Ethan Boardman ethan.boardman@areva-td.com Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network

More information

A Changing Map. Four Decades of Service Restoration at Alabama Power. By G. Larry Clark

A Changing Map. Four Decades of Service Restoration at Alabama Power. By G. Larry Clark Four Decades of Service Restoration at Alabama Power Wikid77 (from National Atlas of the United States ogical su ates GEol United St rvey C.S. Ham mond an d Co., Ne w york R Digital Object Identifier 10.1109/MPE.2013.2285607

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

Monitoring Underground Power Networks

Monitoring Underground Power Networks Monitoring Underground Power Networks By Mark Stiles Merve Cankaya ABSTRACT Underground electric distribution systems are common in large cities throughout the United States. Power usage for the entire

More information

Medium voltage products UniSec for Smart Grid Air-insulated medium-voltage secondary distribution switchgear

Medium voltage products UniSec for Smart Grid Air-insulated medium-voltage secondary distribution switchgear Medium voltage products UniSec for Smart Grid Air-insulated medium-voltage secondary distribution switchgear Index 3 Overview 4 Standard Levels 6 Monitoring & Control 7 Measurements 8 Protection & Logic

More information

How To Keep An Eye On Electric Safety

How To Keep An Eye On Electric Safety Table of Contents Keep an Eye on Electric Safety................ 1 Safety in an Emergency...................... 1 Downed Power Lines...................... 1 Keep an Eye on Electric Safety Electricity is

More information

B&B ELECTRONICS WHITE PAPER. Managed Ethernet Switches - Key Features for a Powerful Industrial Network

B&B ELECTRONICS WHITE PAPER. Managed Ethernet Switches - Key Features for a Powerful Industrial Network Determinism is the assurance that control/communication will occur in a set period of time. Ethernet was nondeterministic at first, and not widely used for industrial purposes. Ethernet switches designed

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services

Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination

More information

Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection

Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection Storm Ready Prep and Safety Power Restoration Your Service Connection Generator Safety Power Outage Map Stay Connected with Gulf Power Storm Ready 3 Gulf Power Ready for the storm 4 Be prepared, be safe

More information

Implementing Low-Cost Distribution Automation Programs

Implementing Low-Cost Distribution Automation Programs Implementing Low-Cost Distribution Automation Programs By: Jai Belagur, P.E. Contact: Jai Belagur Power System Engineering, Inc. 1532 West Broadway, Suite 100, Madison, WI 53713 Phone: 608-268-3544 E-mail:

More information

Oncor Storm Restoration Questions/Answers

Oncor Storm Restoration Questions/Answers Oncor Storm Restoration Questions/Answers Oncor understands that electricity is an essential service to today s businesses and homes, and loss of power places a significant burden on everyone. Oncor performs

More information

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations Dana Louth, CL&P VP - Infrastructure Hardening December 14, 2011 0 Topics for today s presentation Review of

More information

AIS Power Reliability

AIS Power Reliability Case Study AIS Power Reliability How a Wayward Raccoon Sparked a Major Power Distribution System Upgrade Company executives welcome open, frank discussion and want to address all questions and concerns

More information

Utilities the way we see it

Utilities the way we see it Utilities the way we see it Advanced Distribution Management Systems How to choose the right solution to improve your utility s safety, reliability, asset protection and quality of service Photo provided

More information

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions

More information

New standardized approach to arc flash protection

New standardized approach to arc flash protection New standardized approach to arc flash protection Samuel Dahl Juha Arvola Tero Virtala Arcteq Relays Ltd Arcteq Relays Ltd Arcteq Relays Ltd Wolffintie 36 F 11 Wolffintie 36 F 11 Wolffintie 36 F11 65200

More information

PA PUC AERS & Metropolitan Edison Company Site Visit

PA PUC AERS & Metropolitan Edison Company Site Visit PA PUC AERS & Metropolitan Edison Company Site Visit October 26, 2010 Scott Lowry Director-Operation Services, Met-Ed Andrew Zulkosky Manager-Engineering, Met-Ed Curt Christenson Manager-York Customer

More information

WHAT TO DO IF THE LIGHTS GO OUT. PUBLIC SERVICE COMPANY OF OKLAHOMA

WHAT TO DO IF THE LIGHTS GO OUT. PUBLIC SERVICE COMPANY OF OKLAHOMA WHAT TO DO IF THE LIGHTS GO OUT. PUBLIC SERVICE COMPANY OF OKLAHOMA We all take reliable electric service for granted. Flip a switch, push a button, turn a knob; the lights come on; the home computer powers

More information

Backup Plan Examples. What s Your Backup Plan?

Backup Plan Examples. What s Your Backup Plan? Backup Plan Examples What s Your Backup Plan? A Guide for Developing a Strategic Emergency Power Plan 1 What s Your Backup Plan? Planning for the inevitable power outage can be thought of as a continuum

More information

Power to the adaptable data center

Power to the adaptable data center Business Unit Manager, Data Center Solutions, Eaton s electrical group IT managers have more options than ever to tailor the power infrastructure to their unique data center and business requirements.

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

Boost Your Broadband Wireless Revenue

Boost Your Broadband Wireless Revenue Boost Your Broadband Wireless Revenue This systems integrator s projected 33% sales revenue growth over the next two years will come from selling wireless networking solutions to utility companies. Business

More information

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI 1 Vision 2050 An Asset Management Strategy Jaclyn Cantler Manager, Transmission Planning, PHI 2 Agenda Case for Change About Vision 2050 Status Closing System Design Cybersecurity Interface with distributed/dispersed

More information

City of Buffalo Municipal Electric Utility Energy Emergency Response

City of Buffalo Municipal Electric Utility Energy Emergency Response City of Buffalo Municipal Electric Utility Energy Emergency Response Table of Contents Page 1. Goals 2 2. Types of Energy Emergencies..3 3. Utility Emergency Operating Plans.4 4. Link to General Reliability/Outage

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

DISTRIBUTION RELIABILITY USING RECLOSERS AND SECTIONALISERS

DISTRIBUTION RELIABILITY USING RECLOSERS AND SECTIONALISERS ABB DISTIBUTION ELIABILITY USING ECLOSES AND SECTIONALISES obert E. Goodin Chief Engineer ABB Inc. Lake Mary, FL Timothy S. Fahey, PE Sr. Application Engineer ABB Inc. aleigh, NC Andrew Hanson, PE Executive

More information

Reducing the Risk, Cost and Frequency of Production Stoppages Using Network Redundancy

Reducing the Risk, Cost and Frequency of Production Stoppages Using Network Redundancy Introduction Reducing the Risk, Cost and Frequency of Production Stoppages Using Network Redundancy By Mike Miclot, Vice President of Marketing, Industrial Solutions Division at Belden and John Mower,

More information

Power Problems? Let Us Know!

Power Problems? Let Us Know! Power Problems? Let Us Know! Power Problems? Contact Us! by phone: 1-800-75-CONED, 1-800-752-6633 through the Web: www.coned.com If you have power problems, please contact us right away Con Edison is committed

More information

6. The estimated costs here do not include any applicable ITCC tax

6. The estimated costs here do not include any applicable ITCC tax General Notes and Clarifications: 1. The following estimated costs are based on past experiences and are intended to provide an order of magnitude of the total project cost given the major system components.

More information

Chapter 1. Network Structures

Chapter 1. Network Structures Chapter 1 Network Structures Definition Standard IEC 60038 defines voltage ratings as follows: Low voltage (): for a phase-to-phase voltage of between 100 V and 1,000 V, the standard ratings are: 400 V

More information

Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents

Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...

More information

Using ODVA Common Industrial Protocol to Enhance Performance White Paper

Using ODVA Common Industrial Protocol to Enhance Performance White Paper Monitor & Control Multiple Groups Using ODVA Common Industrial Protocol to Enhance Performance White Paper Monitor & Control Multiple Groups Using ODVA Common Industrial Protocol to Enhance Performance

More information

Big Data: Using Smart Grid to Improve Operations and Reliability. LaMargo Sweezer-Fischer Power Delivery Grid Automation Manager FPL July 2014

Big Data: Using Smart Grid to Improve Operations and Reliability. LaMargo Sweezer-Fischer Power Delivery Grid Automation Manager FPL July 2014 1 Big Data: Using Smart Grid to Improve Operations and Reliability LaMargo Sweezer-Fischer Power Delivery Grid Automation Manager FPL July 2014 2 NextEra Energy is a premier U.S. power company comprised

More information

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation September 2010 Prepared for: By Sierra Energy Group The Research & Analysis Division of Energy Central Table of Contents Executive

More information

Quick, Easy and Inexpensive Monitoring a new MXN Service

Quick, Easy and Inexpensive Monitoring a new MXN Service Quick, Easy and Inexpensive Monitoring a new MXN Service If you run a large network and IT organization you know that it s difficult to stay on top of everything that goes on. So many moving parts! So

More information

Treasure Valley Electric Plan - Community Advisory Committee

Treasure Valley Electric Plan - Community Advisory Committee Treasure Valley Electric Plan - Community Advisory Committee What is a transmission line and why are they necessary? A transmission line is used to conduct electricity between two points. Without high

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

Substation Automation and Smart Grid

Substation Automation and Smart Grid GE Energy Substation Automation and Smart Grid John D. McDonald, P.E. GM, T&D Marketing IEEE PES Past President IEEE Division VII Director IEEE Fellow The Smart Grid POWERING POTENTIA L Current Situation

More information

Modern Power Distribution Systems

Modern Power Distribution Systems Modern Power Distribution Systems geindustrial.com Modern Business Runs on 24/7 Power Distribution Historically, engineers and architects have had to approach building design with the assumption that they

More information

Installation. S&C IntelliLink Remote Setup Software. Table of Contents. Instruction Sheet 1032-500

Installation. S&C IntelliLink Remote Setup Software. Table of Contents. Instruction Sheet 1032-500 S&C IntelliLink Remote Setup Software Installation Table of Contents Section Page Section Page Introduction Qualified Persons.... 2 Read this Instruction Sheet.... 2 Retain this Instruction Sheet.... 2

More information

SCADA Systems Automate Electrical Distribution

SCADA Systems Automate Electrical Distribution SCADA Systems Automate Electrical Distribution PC-based supervisory control and data acquisition systems increase uptime, cut costs and improve utilization. A White Paper from InduSoft Fabio Terezinho

More information

Hurricane Irene Response Before, During and After the Storm. John D. Rea Director of Operations Support, Penelec. October 12, 2011

Hurricane Irene Response Before, During and After the Storm. John D. Rea Director of Operations Support, Penelec. October 12, 2011 Pennsylvania Public Utility Commission Special Electric Reliability Forum Hurricane Irene Response Before, During and After the Storm John D. Rea Director of Operations Support, Penelec October 12, 2011

More information

ICM Project Station Infrastructure and Equipment

ICM Project Station Infrastructure and Equipment EB 0 00 Schedule B. ( pages) ICM Project Station Infrastructure and Equipment (THESL) EB 0 00 Schedule B. I EXECUTIVE SUMMARY 0. Project Description Many Municipal Substations (MS) located outside of downtown

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

Common Power Problems & Power Protection Solutions

Common Power Problems & Power Protection Solutions W H I T E P A P E R Common Power Problems & Power Protection Solutions Executive Summary All systems, from home theaters and office desktops to enterprise IT equipment in data centers, are prone to downtime,

More information

SPRINT MANAGED NETWORK SERVICES PRODUCT ANNEX ( MNS Terms and Conditions )

SPRINT MANAGED NETWORK SERVICES PRODUCT ANNEX ( MNS Terms and Conditions ) SPRINT MANAGED NETWORK SERVICES PRODUCT ANNEX ( MNS Terms and Conditions ) The following terms and conditions, together with the Sprint Standard Terms and Conditions for Communication Services ( Standard

More information

Optimizing and Securing an Industrial DCS with VMware

Optimizing and Securing an Industrial DCS with VMware Optimizing and Securing an Industrial DCS with VMware Global Process Automation deploys a new DCS using VMware to create a secure and robust operating environment for operators and engineers. by Doug Clarkin

More information

UK Interconnect White Paper

UK Interconnect White Paper UK Interconnect White Paper 460 Management Management Management Management 460 Management Management Management Management AI073 AI067 UK Interconnect White Paper Introduction The UK will probably have

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Internet 1. How does New Source Broadband Internet service work? 2. How is the Outdoor Unit wired into my home or business 3. Can I connect multiple computers to the connection?

More information

PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY

PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY Scope These program criteria apply to programs having titles involving Electrical Engineering Technology including: electrical engineering, electrical

More information

the amount of data will grow. It is projected by the industry that utilities will go from moving and managing 7 terabytes of data to 800 terabytes.

the amount of data will grow. It is projected by the industry that utilities will go from moving and managing 7 terabytes of data to 800 terabytes. Before the Department of Energy Washington, D.C. 20585 In the Matter of Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart

More information

Applying Mesh Networking to Wireless Lighting Control

Applying Mesh Networking to Wireless Lighting Control White Paper Applying Mesh Networking to Wireless Lighting Control www.daintree.net Abstract Recent advances in wireless communications standards and energy-efficient lighting equipment have made it possible

More information

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy

More information

Relion. Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE

Relion. Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE Relion Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE Fast substation busbar protection with IEC 61850 and GOOSE Falu Elnät AB applies new power

More information

DISTRIBUTION OPERATIONS AND MAINTENANCE

DISTRIBUTION OPERATIONS AND MAINTENANCE EB-00-00 Filed: 00 Aug Page of DISTRIBUTION OPERATIONS AND MAINTENANCE PREVENTIVE MAINTENANCE Preventive Maintenance is intended to maintain or improve customer service reliability, extend equipment life

More information

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China ELECTRIC POWER DISTRIBUTION SYSTEMS F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China Keywords: Distribution system planning, Load characteristics, Subtransmission Lines, Distribution

More information

Low Voltage Switchgear

Low Voltage Switchgear Arc Resistant Switchgear n Insulated and isolated bus n Separation barriers and top venting n Breaker shutters 12 SWITCHGEAR Arc resistant metal-enclosed low voltage switchgear is an optional product offering

More information

Help protect your home, possessions and family.

Help protect your home, possessions and family. Help protect your home, possessions and family. A guide to your Square D electrical distribution system SM Make the most of your energy Understanding your home s electrical distribution system As one of

More information

U.S. Department of Energy December 2012. Table of Contents

U.S. Department of Energy December 2012. Table of Contents Table of Contents Executive Summary... ii 1. Introduction... 1 1.1 Purpose and Scope... 1 1.2 Background on Electric Distribution Reliability... 2 1.3 Organization of this Report... 3 2. Overview of Systems,

More information

25 Distribution System Automation

25 Distribution System Automation Chap25 exe 21/06/02 8:30 Page 442 Distribution System Automation Introduction 25.1 Factors influencing the application of automation to distribution networks 25.2 Primary distribution system automation

More information

Disaster Recovery Strategies

Disaster Recovery Strategies White Paper Disaster Recovery Strategies Overview... 2 Why Cloud?... 2 Recovery Gaps... 3 Where To Find The Value... 5 Who Should Be Your Cloud Vendor... 6 Conclusion... 7 January 2013 Overview When people

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014 CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska February 10, 2014 QUESTIONS AND ANSWERS TO: Prospective Proposers FROM: Chugach Electric Association, Inc. 5601 Electron Drive Anchorage, Alaska SUBJECT:

More information

Emergency Restoration Plan (ERP) Components

Emergency Restoration Plan (ERP) Components Note: Each electric utility is different. The differences may include: System Configuration Designs and Construction Standards Construction and Line Materials Operating procedures and practices Work methods

More information

dpd Seattle Permits Tip Installation of Electric Vehicle (EV) Charger for Commercial Properties www.seattle.gov/dpd Things to Consider

dpd Seattle Permits Tip Installation of Electric Vehicle (EV) Charger for Commercial Properties www.seattle.gov/dpd Things to Consider dpd Department of Planning and Development Tip 133 Seattle Permits part of a multi-departmental City of Seattle series on getting a permit Installation of Electric Vehicle (EV) Charger for Commercial Properties

More information

The Importance of Proactive Network Management in Skype for Business

The Importance of Proactive Network Management in Skype for Business July 15 The Importance of Proactive Network Management in Skype for Business Michael F. Finneran How customers should consider Nectar s UC Management Platform components to support Skype for Business deployments

More information

Disaster Recovery Design Ehab Ashary University of Colorado at Colorado Springs

Disaster Recovery Design Ehab Ashary University of Colorado at Colorado Springs Disaster Recovery Design Ehab Ashary University of Colorado at Colorado Springs As a head of the campus network department in the Deanship of Information Technology at King Abdulaziz University for more

More information

APPLICATION CASE OF THE END-TO-END RELAY TESTING USING GPS-SYNCHRONIZED SECONDARY INJECTION IN COMMUNICATION BASED PROTECTION SCHEMES

APPLICATION CASE OF THE END-TO-END RELAY TESTING USING GPS-SYNCHRONIZED SECONDARY INJECTION IN COMMUNICATION BASED PROTECTION SCHEMES APPLICATION CASE OF THE END-TO-END RELAY TESTING USING GPS-SYNCHRONIZED SECONDARY INJECTION IN COMMUNICATION BASED PROTECTION SCHEMES J. Ariza G. Ibarra Megger, USA CFE, Mexico Abstract This paper reviews

More information

Technology White Paper Capacity Constrained Smart Grid Design

Technology White Paper Capacity Constrained Smart Grid Design Capacity Constrained Smart Grid Design Smart Devices Smart Networks Smart Planning EDX Wireless Tel: +1-541-345-0019 I Fax: +1-541-345-8145 I info@edx.com I www.edx.com Mark Chapman and Greg Leon EDX Wireless

More information

IntraVUE Diagnostics. Device Failure

IntraVUE Diagnostics. Device Failure IntraVUE provides a method to record and capture the issues that occur in the Ethernet networks being used for automation applications. Automation networks are susceptible to subtle disturbances due to

More information

Electric System Performance Review Trustees Briefing. April 2013

Electric System Performance Review Trustees Briefing. April 2013 Electric System Performance Review Trustees Briefing April 2013 Electric Reliability Indices All Metrics Continue to Perform Within Historical Range Reliability Index 2012 Trend to 5-Year Avg. LIPA MSA

More information

Directed Circuits Meet Today s Security Challenges in Enterprise Remote Monitoring. A White Paper from the Experts in Business-Critical Continuity TM

Directed Circuits Meet Today s Security Challenges in Enterprise Remote Monitoring. A White Paper from the Experts in Business-Critical Continuity TM Directed Circuits Meet Today s Security Challenges in Enterprise Remote Monitoring A White Paper from the Experts in Business-Critical Continuity TM Executive Summary With continued efforts to reduce overhead,

More information

Voice Over IP Digital Phone Concerns with Security and Fire Alarm Communications Systems

Voice Over IP Digital Phone Concerns with Security and Fire Alarm Communications Systems Voice Over IP Digital Phone Concerns with Security and Fire Alarm Communications Systems OMNI Fire and Security Systems LP, 9811 North Freeway #A101, Houston, T, 77037, (281) 591-1944 Disclaimer: The term

More information

When power interruptions happen.

When power interruptions happen. When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage

More information

On the Road to. Duke takes the road less traveled and arrives at a new level of distribution automation.

On the Road to. Duke takes the road less traveled and arrives at a new level of distribution automation. On the Road to Intelligent CONTINUOUS REMOTE MONITORING INTEGRATED VOLT/VAR CONTROL Duke takes the road less traveled and arrives at a new level of distribution automation. LAYING A SOLID FOUNDATION In

More information

Monitoring and diagnostics

Monitoring and diagnostics Monitoring and Diagnostics Monitoring and diagnostics Analyze the past, monitor the present, and predict the future! Asset Services/Monitoring and Diagnostics Switchgear Services Transformer Services Cable

More information

Engineering innovation

Engineering innovation Eaton's Electrical Engineering Services & Systems Solutions Focus Seamless Solutions for Reliable, Efficient and Safe Power Systems Engineering innovation Progressive solutions for today s power systems

More information

How to Turn an Industry on Its Head. Become Masters of Delivering On Big Promises. By Kevin Lawrence and David J. Greer

How to Turn an Industry on Its Head. Become Masters of Delivering On Big Promises. By Kevin Lawrence and David J. Greer How to Turn an Industry on Its Head Become Masters of Delivering On Big Promises By Kevin Lawrence and David J. Greer Introduction Marketing and advertising work best when you speak to the customer s biggest

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information