Final Safety and Health Inspectin and Certificate f Occupancy Guidelines U.S. Department f the Interir Bureau f Indian Affairs Divisin f Safety and Risk Management Previus Editin Obslete
Bureau f Indian Affairs Divisin f Safety and Risk Management Final Safety and Health Inspectin and Certificate f Occupancy Guidelines Final Safety and Health Inspectin 25 IAM, and BIA Safety and Health Handbk, Tpic 26.B.1 and Assistant Secretary Indian Affairs December 7, 1993 Memrandum (Subject: Facilities Cnstructin and Operatins and Maintenance Funding): Divisin f Safety and Risk Management r its authrized representative shall inspect the facility after cnstructin t verify it meets applicable cdes and standards. Final Safety and Health Inspectin Prcedures Request fr final inspectin and Certificate f Occupancy must be cmpleted using the Request fr Final Inspectin/Re-Inspectin and Certificate f Occupancy frm (Exhibit 1) by the Office f Facilities Management and Cnstructin (OFMC) prject manager, OFMC versight persn, r OFMC reginal prject manager verifying that all wrk is cmpleted and that all systems i.e., fire alarm, sprinkler, emergency systems, HVAC, water systems, elevatr, pressure vessels, etc., are fully peratinal and tested, and all required certificatins have been submitted t the Divisin f Safety and Risk Management (Authrity Having Jurisdictin). DO NOT cntact the Reginal Safety Manager r Agency Safety Officer r thers requesting fr final inspectin. Request fr final inspectins r re-inspectins shall be t the Divisin f Safety and Risk Management thrugh the prject manager. Divisin f Safety and Risk Management may delegate the final inspectin t the Reginal Safety Manager as its authrized representative. Minimum request time is 2 weeks. If the inspectr arrives at the site and the wrk is nt cmplete, the inspectin will be rescheduled nce the prject manager certifies all wrk is cmpleted. Upn cmpletin f the final inspectin, a Final Safety and Health Inspectin Reprt will be transmitted t the Chief, Divisin f Design and Cnstructin and a cpy f the reprt transmitted t the OFMC Prject Manager r OFMC versight persn. If serius vilatins are fund, written certificatin by the prject manager certifying that the deficiencies have been permanently crrected, is required befre a re-inspectin can be cnducted r the certificate f ccupancy can be issued. Previus Editin Obslete
Required final inspectin dcumentatin (as applicable) shall be prvided t Divisin f Safety and Risk Management PRIOR t scheduling the final inspectin: AUTOMATIC SPRINKLER PROTECTION SYSTEM 1. Cntractr s Material and Test Certificate fr Abvegrund Piping. (NFPA 13, 24.1(3)) 2. Cntractr s Material and Test Certificate fr Undergrund Piping. (NFPA 13, 10.10.1(3)) 3. Manufacturer s literature and instructin describing prper peratin and maintenance f equipment and devices installed. (NFPA 13, 24.4(1)) (Examine n site) 4. Publicatin NFPA 25, Standard fr the Inspectin, Testing and Maintenance f Water- Based Fire Prtectin Systems. (NFPA 13, 24.4(2)) (Examine n site) FIRE DETECTION ALARM SYSTEM 1. Written statement that the system has been installed IAW apprved plans and tested IAW manufacturer s specificatin and NFPA requirements. (NFPA 72, 4.5.1.2) 2. Recrd f Cmpletin. (NFPA 72, 4.5.2.1) 3. Owner s Manual and installatin instructins cvering all system equipment. (NFPA 72, 4.5.2.3(1)) (Examine n site) 4. Recrd drawings. (NFPA 72, 4.5.2.3(2)) (Examine n site) ASBESTOS (Educatin Facilities) 1. Written statement that building(s) is free f asbests. (AHERA 40 CFR 763.99(a)(7)) EMERGENCY SYSTEMS 1. Written recrd f emergency system (emergency lights and exit lights) tests. (NFPA 70, 700-4(D)) Previus Editin Obslete
ELEVATOR Certificate f Occupancy 1. Elevatr certificatin (ASME A171, Sec. 1000.1C and 1003) 2. Acceptance test by certified inspectr. 3. Certified inspectr s statement that required tests were perfrmed alng with reprt cpy f the results f inspectin. 25 IAM and BIA Safety and Health Handbk, Tpic 26.3A. The Chief, Divisin f Safety Management and Risk Management, is delegated the jurisdictinal authrity fr: (a) develping regulatins and prcedures; (b) interpreting; (c) implementing, and enfrcing the Bureau's Safety and Health Inspectin Prgram. The psitin is the "Chief Building fficial and Authrity Having Jurisdictin" fr cdes, standards, regulatins, and guidelines adpted by this Handbk. Building Cnstructin and Safety Cde - NFPA 5000, 1.7.6.7.1.1, Certificate Requirements: N building hereafter erected, altered, r relcated r fr which a change f ccupancy has been made, shall be used in whle r part until a certificate f ccupancy has been issued by the authrity having jurisdictin certifying that the building and ccupancy are in accrdance with the prvisins f the Cde and all ther laws and regulatins applying theret. When the building r part theref cmplies with the prvisins f all pertinent laws and regulatins, the authrity having jurisdictin shall issue the certificate f ccupancy fr the building r part theref. Building Cnstructin and Safety Cde - NFPA 5000, 1.7.6.7.1.3, Temprary Certificate f Occupancy: A temprty certificate f ccupancy shall be permitted t be issued by the authrity having jurisdictin. Previus Editin Obslete
United States Department f the Interir EXHIBIT 1 Bureau f Indian Affairs Divisin f Safety and Risk Management Request fr Final Inspectin/Re-Inspectin and Certificate f Occupancy Submit this frm t Divisin f Safety and Risk Management (DSRM) Prject N.: Prject Name: Prpsed Date fr Inspectin: Prject Manager: Required Dcumentatin. The fllwing dcumentatin has been submitted t the Chief Building Official and Authrity Having Jurisdictin (DSRM) prir t scheduling f final inspectin: Asbests Free Written Statement as required by AHERA (if applicable) [Applies t Educatin Lcatins) Elevatr Certificatins as required by ASME (if applicable) Emergency Systems Written Statement as required by NFPA 70 (if applicable) [Emergency Lighting and Exit Lighting} Fire Detectin Alarm System Certificatins as required by NFPA 72 (if applicable) Fire Sprinkler Prtectin System Certificatins as required by NFPA 13 (if applicable) In additin t the abve, Operatin and Maintenance Manuals fr all equipment are n site and there is an apprved cpy f plans and specificatins available at the jb site. I hereby certify that all cnstructin wrk fr this prject is cmplete and that the abve required dcuments are in place. Signature f Prject Manager Date Nte: If wrk has nt been cmpleted by the requested inspectin date, the inspectin will nt be cnducted. A reinspectin date will be requested and re-inspectin fees will apply. This sectin fr use by Divisin f Safety and Risk Management Scheduled Date fr Final Inspectin Assigned Inspectr Scheduled Time fr Final Inspectin Final Inspectin Re-Inspectin: 1 st 2nd 3rd Previus Editin Obslete