1 VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: WORK ZONE SAFETY AND MOBILITY NUMBER: TED SPECIFIC SUBJECT: TRANSPORTATION MANAGEMENT PLAN REQUIREMENTS LOCATION AND DESIGN DIVISION APPROVAL: Mhammad Mirshahi, P.E. State Lcatin and Design Engineer Apprved September 19, 2011 DATE: SUPERSEDES: SEPTEMBER 19, 2011 IIM-LD TED TRAFFIC ENGINEERING DIVISION APPROVAL: Raymnd J. Khury, P.E. State Traffic Engineer Apprved August 10, 2011 Changes are shaded. CURRENT REVISION This memrandum has been revised t replace the Cncurrent Engineering Prcess with the Prject Develpment Prcess. Replaced Maintenance f Traffic Crdinatr with Wrk Zne Safety Crdinatr. Clarified duties and respnsibilities f the Prject Team. EFFECTIVE DATE These instructins are effective upn receipt. POLICY The Virginia Department f Transprtatin is cmmitted in prviding safe and efficient mvement f mtrized and nn-mtrized traffic thrugh r arund radway wrk znes as well as prviding prtectin fr wrkers and equipment lcated within wrk znes. VDOT will fcus n radway visibility and functinality f temprary traffic cntrl in wrk znes and traffic flw thrugh the wrk zne. Emphasis will begin with the preliminary engineering stages and carried thrugh t the cmpletin f all wrk, including pst cnstructin reviews.
2 Instructinal and Infrmatinal Memrandum Sheet 2 f 20 Cmpliance with this guidance is cnsistent with the Department s gal f reducing wrk zne crashes and imprving travel time thereby benefiting all citizens f the Cmmnwealth. This guidance utlines recmmended prcedures t be fllwed and identifies respnsibilities t achieve safer wrk znes with minimal impact n the traveling public. VDOT, thrugh this directive, is extending this requirement t all wrk zne activities within state right f way and n all streets and highways that have been accepted int the State Highway System regardless f the funding surce as well as all ther prjects receiving State and/r Federal funding. BACKGROUND In September 2004, the Federal Highway Administratin (FHWA) published the Final Rule n Wrk Zne Safety and Mbility, 23 CFR 630 Subpart J. This rule, referred t as Wrk Zne Safety and Mbility, applies t State and lcal gvernments that receive Federal-aid highway funding. Transprtatin agencies are required t cmply with the prvisins f the Rule by Octber 12, This rule updates and bradens the frmer regulatin, Traffic Safety in Highway and Street Wrk Znes, t address present and future wrk zne issues. The plicy prvisins in the Final Rule n Wrk Zne Safety and Mbility: Requires agencies t implement a plicy fr the systematic cnsideratin and management f wrk zne impacts n all Federal-aid highway prjects. Furthermre, it encurages agencies t implement the plicy fr nn-federal-aid prjects and prgrams. Requires the plicy t address wrk zne impacts thrughut the varius stages f the prject s develpment and cnstructin. The agency must cnsider wrk zne impacts during prject develpment, management f wrk zne impacts during cnstructin, and assessment f wrk zne perfrmance after implementatin. The agency must als cnsider cmmunicatin with the public befre and during the prject. Recgnizes the state plicy may vary based n the characteristics and expected wrk zne impacts f individual prjects r classes f prjects. Requires transprtatin management plans. Fr additinal infrmatin n the Final Rule n Wrk Zne Safety and Mbility, fllw these links: (Regulatin, Guidance and Examples); (Best Practices). NCHRP Synthesis 208, Develpment and Implementatin f Traffic Cntrl Plans fr Highway Wrk Znes:
3 Instructinal and Infrmatinal Memrandum Sheet 3 f 20 TYPICAL WORK ZONE MANAGEMENT STRATEGIES Varius wrk zne management strategies may be emplyed t minimize traffic delays, thereby imprving mbility as well as traveler and wrker safety and cmpleting the cnstructin wrk in a timely manner while maintaining access fr businesses and residents. The fllwing set f strategies is nt meant t be allinclusive, but t present a number f suggestins fr cnsideratin while develping transprtatin management plans. A mre extensive listing and general infrmatin n wrk zne management strategies may be accessed at the fllwing web sites: and mgmt_plans.pdf The strategies are divided int three brad grups which are captined as: 1) Temprary Traffic Cntrl, 2) Public Infrmatin; and 3) Transprtatin Operatins. Each f these grups is further defined by the specific items listed belw. Temprary Traffic Cntrl Strategies: Cntrl strategies Traffic cntrl devices Prject crdinatin, cntracting and innvative cnstructin strategies Public Cmmunicatin Strategies: Public awareness strategies Mtrist infrmatin strategies Transprtatin Operatins Strategies: Demand management strategies Crridr/netwrk management strategies Wrk zne management strategies Traffic/incident management strategies GENERAL GUIDELINES This sectin prvides guidelines t be used by Prject Managers, Radway Designers, Traffic Engineers, Wrk Zne Safety Crdinatrs and Public Affairs Managers fr acquiring the infrmatin t develp a Transprtatin Management Plan (TMP). Prject persnnel shall invlve the FHWA Area Engineer in each f the prject s milestnes n federal versight prjects. These guidelines require the evaluatin f wrk zne traffic cntrl and cmmunicatin strategies
4 Instructinal and Infrmatinal Memrandum Sheet 4 f 20 beginning at the Scping Activities and cntinued thrughut the Prject Develpment Prcess (PDP) and during all phases f cnstructin. Fr additinal infrmatin n the PDP, fllw this link: de.pdf. Als see LD-436 Quality Cntrl Check List, available at: Specific wrk requirements are nted in the Prject Develpment Prcess fr each milestne, as are the Prject Management frms that are t be submitted at the milestnes. All Temprary Traffic Cntrl Plans shall be in cmpliance with the infrmatin published in the Virginia Wrk Area Prtectin Manual. Any deviatins frm the Virginia Wrk Area Prtectin Manual must be apprved by the Reginal Traffic Engineer (RTE) and nted in the plans. Initial Scping Meeting The Prject team shall use field bservatins, available crash data, and ther relevant peratinal infrmatin t discuss preliminary wrk zne management strategies in cnjunctin with alternative prject ptins and design schemes. Relevant peratinal infrmatin shuld include but is nt limited t, prject definitin (scpe, prject s cmplexity level, radway and traffic characteristics, and TMP type), cnstructin phasing/staging f equipment and materials, as well as temprary traffic cntrl, public cmmunicatins and transprtatin peratins strategies. The Prject Manager shall request that the Reginal Traffic Engineer (RTE) begin acquiring traffic and crash data and explre pssible alternate/detur rutes. A preliminary cst estimate fr the prject s traffic management plan shall be develped by the Prject Manager at this milestne. The Prject Manager shall request that a preliminary Public Cmmunicatins Plan be drafted by the District Public Affairs Manager. Final Scpe / Preliminary Field Inspectin The Prject Team shall utilize traffic and crash data and the preliminary Sequence f Cnstructin (SOC) plans t identify safety and mbility issues during the prpsed cnstructin and begin develping the prject s preliminary TMP. The Reginal Traffic Engineer, wrking with the Prject Team, shall prpse the prject s TMP that cnsists f temprary traffic cntrl, public infrmatin, and transprtatin peratins strategies, as apprpriate. The Radway Designer shall incrprate the recmmended TMP int the prjects initial radway plans. Public Hearing Team Meeting Review f the preliminary TMP as incrprated by the Radway Designer (includes the Temprary Traffic Cntrl Plan as well as the Public Cmmunicatins Plan and Transprtatin Operatins Plan if required) must be cmpleted by the Reginal Traffic Engineer and Reginal Operatins Directr as applicable. Recmmendatins/crrectins submitted by the Reginal Traffic Engineer/Reginal Operatins Directr (ROD) that are accepted by the Radway Designer in cllabratin with the prject team are t be incrprated int the preliminary TMP by the Radway Designer prir t the Public Outreach/Public Hearing and Design Apprval.
5 Instructinal and Infrmatinal Memrandum Sheet 5 f 20 Field Inspectin Meeting The Radway Designer shall cmplete the prject s TMP fr review by the prject team during the Cnstructability and Wrk Zne Review stage fr the Detailed Design Phase f the Prject Develpment Prcess. Accepted recmmendatins/crrectins submitted by the prject team are t be incrprated int the TMP by the Radway Designer prir t prceeding t the next phase f the prject s develpment. The Prject Team shall review the TMP t ensure that all cmments and cncerns have been addressed. The Reginal Traffic Engineer shall review the TMP t check that all safety infrmatin and crash data have been incrprated int the TMP. Pre-Advertisement Cnference The Radway Designer shall cmplete the prject s final TMP fr review during the Cnstructability, Wrk Zne and TMP Review stage in the Final Design and ROW Acquistin Phase f the Prject Develpment Prcess. Accepted recmmendatins/crrectins submitted by the prject team shall be incrprated int the final TMP by the Radway Designer prir t prceeding t the next phase f the prject s develpment. The Prject Team shall review the TMP t ensure that all cmments and cncerns have been addressed. The TMP cst shall be finalized fr the cnstructability review held prir t the Pre-Advertisement Cnference milestne. Implementing the Transprtatin Management Plan During the first day f the new wrk zne traffic pattern, the prject s Manager and prject s Wrk Zne Safety Crdinatr shall inspect the wrk zne t ensure cmpliance with the TMP. On the third t fifth day f implementatin f the TMP s new wrk zne traffic pattern, the Reginal Wrk Zne Safety Crdinatr and the prject s assigned Wrk Zne Safety Crdinatr shall cnduct an n-site review f the wrk zne s perfrmance and infrm the cntractr all required changes t the TMP fr implementatin t enhance the wrk zne s safety and mbility. All such changes shall be dcumented. If the prject is a federal versight prject, the FHWA Area Engineer shall be affrded the pprtunity t review all such changes prir t implementatin. An n-site review f the prject s wrk zne traffic cntrl by the Reginal Wrk Zne Safety Crdinatr, Prject s Manager/Wrk Zne Safety Crdinatr, District Safety Engineer, and the Cntractr shall be cnducted within 48 hurs f any fatal incident/crash within the wrk zne. Evaluatin f the Transprtatin Management Plan A perfrmance assessment f the prject s TMP including area wide impacts n adjacent radways shuld be perfrmed by the Reginal Traffic Engineering and Operatins sectins during cnstructin as circumstances dictate. Any recmmendatins and cmments shall be cmmunicated t the cnstructin inspectin team in writing fr apprpriate changes t the TMP. A review f the verall effectiveness f the prject s TMP shall be cmpleted during the Pst Cnstructin Meeting and included with the Pst Cnstructin Reprt. A cpy f the specific infrmatin n the effectiveness f the prject s TMP will be frwarded t the State Traffic Engineer fr review. A cpy f the TMP Interim/Pst Cnstructin Reprt Frm is available at: TMP Pst Cnstructin Reprt.
6 Instructinal and Infrmatinal Memrandum Sheet 6 f 20 The fllwing guidance is prvided t ensure the Prject Team understands their rle and respnsibilities in the develpment f the prject s TMP. Team members frm the design disciplines/wrk grup nted belw shall have direct respnsibilities fr the prper develpment f the TMP during each stage f the Prject Develpment Prcess. The Prject Manager shall slicit cmments frm ther design disciplines such as Structure and Bridge, Envirnmental, Materials, etc, as apprpriate, t cnfirm that all safety and mbility cncerns are addressed. All team members shall be prvided an pprtunity t review the TMP prir t each milestne team meeting. Fr prjects that d nt fllw the Prject Develpment Prcess, the Designer, Prject Manager r the Cntract Administratr will ensure the TMP and the cmpnent plans (Temprary Traffic Cntrl, Public Cmmunicatin and Transprtatin Operatins Plans) are included in the prject and cntract dcuments. The develpment prcess shuld be established at scping with the plans develped based n cnsultatin with, and guidance frm, the applicable discipline. Prject Team: The Prject Manager, with the prject team, will review the prject at each milestne t ensure apprpriate actin is taken t reduce wrk zne impacts n the public. Respnsibilities f the prject team include a TMP Design Checklist Review Frm that is available at: TMP Design Checklist. Reginal Traffic Engineering (RTE): In rder t prmte the safety f wrkers as well as the safe and efficient mvement f traffic thrugh the prject s wrk zne, the RTE shall cnsider varius temprary traffic management strategies and prvide the prject team with the fllwing recmmendatins. The RTE shall review the TMP t assess that all that the applicable infrmatin is included in the prject s TMP: Temprary traffic management strategies Lane width(s) and the number f travel lane(s) and turn lane(s) t be maintained Traffic impact assessments/analysis n the temprary traffic cntrl plan Identify all signal phases within the wrk zne and n all detur/alternate rutes Allwable wrk activity hurs On-site and ff-site detur rutes Infrmatin n the use and placement f all temprary traffic cntrl devices including barrier and channelizatin devices Type and placement f all signs, message bards, arrw bards, and TMA s Type and lcatin f temprary pavement markings and markers Access t all businesses and private dwellings Pst cnstructin assessment f the Wrk Zne Traffic Impact Quantities fr all temprary traffic cntrl devices
7 Instructinal and Infrmatinal Memrandum Sheet 7 f 20 Reginal Operatins: In rder t prmte the safety f wrkers as well as the safe and efficient mvement f traffic thrugh the prject s wrk zne, the Reginal Operatins Directr shall cnsider varius transprtatin management strategies and prviding the Radway Designer and the prject team with the fllwing recmmendatins. The Reginal Operatins Directr shall review the TMP t check that the applicable infrmatin is included in the prject s TMP: Temprary transprtatin peratins strategies Incident/emergency management plan Use f ITS fr traffic mnitring Surveillance f wrk zne traffic using CCTV, lp detectrs, etc. Use f safety service patrls Cntact infrmatin fr Transprtatin Operatins Centers (TOC) and incident management Traffic impact assessments/analysis n the temprary traffic cntrl plan Identify all signal phases within the wrk zne and n all detur/alternate rutes Allwable wrk activity hurs Lcatin and Design (r Cntract Administratr as apprpriate): Shall ensure the prper design and presentatin f all aspects f the TMP by prviding the fllwing detailed infrmatin in the plan assembly: Prfile, alignment, superelevatin and lane widths fr all traffic lanes, turning lanes, lane shifts and diversins nt identified n existing radways Earthwrk/grading that must be cmpleted prir t the next cnstructin phase Utility wrk that can be cmpleted within the prject s guidelines fr the TMP Ensure that all utilities will nt cnflict with temprary traffic cntrl and ther safety devices fr all phases f cnstructin. Identificatin f all temprary pavement lcatins and temprary drainage items Illustratins f the placement f all temprary signs, message bards, arrw bards, TMA s, barriers, attenuatrs, temprary pavement markings and markers, existing pavement marking eradicatin, and placement f Grup I and II devices in the temprary traffic cntrl plans fr all cnstructin phases (excluding temprary lane and shulder clsings) Identificatin and ntatin f all signal phases within the wrk zne and all detur rutes Cmplete TMP typical sectins Cmplete special design details, special crss sectin and insertable sheets if applicable Prvide quantities fr all temprary traffic cntrl devices
8 Instructinal and Infrmatinal Memrandum Sheet 8 f 20 Structure and Bridge: Shall ensure the prper design and presentatin f specific aspects f the TMP pertaining t structures by prviding the fllwing: Mvement, staging and use f cranes, ther large equipment and materials Need fr and placement f temprary bridge parapet and traffic barrier service Need fr the setting f beams ver traffic Use f temprary bridges Need fr demlitin ver traffic Placement f the abve infrmatin in the plan assembly in narrative r illustrated frmat Public Relatins Shall ensure that the transprtatin management plan is cmmunicated t apprpriate key audiences (mtrists, plice, businesses, residents, elected fficials and media). Strategies will include: Develpment f prject-specific cmmunicatins plan t keep key custmers infrmed abut cnstructin-related impacts befre and during the cnstructin; Cmmunicatin and prmtin f ways cmmuters can avid cnstructin-related delays, i.e. rideshare, telewrk, public transprtatin; Develpment f a crisis cmmunicatins plan which utlines steps t be taken during a majr incident and includes emergency cntact infrmatin; and, Determinatin f the need fr and types f cmmunity meetings needed t infrm the public n the varius aspects f the cnstructin prject Right f Way: Shall ensure the prper design and presentatin f specific aspects f the TMP by prviding the fllwing: All temprary/permanent easements needed fr cnstructin are included in the plans Prject Cnstructability Wrk Grup: Shall ensure that the prject can be cnstructed accrding t the Plan Assembly, the Sequence f Cnstructin and the TMP by reviewing the prject dcuments and ensuring that: Right f way is prvided fr the placement f cnstructin equipment and materials
9 Instructinal and Infrmatinal Memrandum Sheet 9 f 20 Access is prvided t the wrk area(s) fr cnstructin equipment and materials Cnsideratin has been given fr, methds f deep utilities and large diameter pipe cnstructin. Adequate time is prvided t cmplete the cnstructin Utility plans have been crdinated with all phases f cnstructin Adequate drainage is maintained during cnstructin Apprpriate traffic cntrl and an infrmatin campaign is prvided fr the setting f bridge beams r ther peratins requiring ttal radway clsures and deturs All safety and mbility issues have been addressed fr any unusual cnstructin methds The prject can be built as designed with the minimum necessary rad clsures and deturs t avid majr recurring traffic impacts PLAN REQUIREMENTS This sectin prvides guidance t Prject Managers fr establishing a prject s TMP requirements based n the prject s level f cmplexity. These guidelines categrize a prject int ne f three types f transprtatin management. The prject s type identifies the minimum TMP requirements and recmmendatins t be used by Prject Managers, Radway Designers, Reginal Traffic Engineers, Reginal Operatin Directrs and Public Affairs Managers fr develping TMP. In general, the TMP shall cnsist f a traffic cntrl plan and, as required, a public infrmatin and a transprtatin peratins plan. The specific prject level requirements fr plan cntent are listed by prject type. Any deviatin frm the requirements nted belw will require the review and apprval f the State Traffic Engineer. Wrk Area Access Cnsideratins: The Temprary Traffic Cntrl Plan (TTCP) shuld address the need fr access t the wrk area. This is a cnstructability issue in which the designer addresses the questin f hw the cntractr will mve materials and equipment int the wrk area safety with a minimum f disruptin t traffic. This is a particularly critical issue n high speed radways such as Limited Access highways, especially if traffic barrier service cncrete (barrier wall) is used t prtect wrk areas. Cnsideratin shuld be given t the design and cnstructin f temprary acceleratin and deceleratin lanes fr the cnstructin equipment. The fllwing shuld be cnsidered in the planning, design and peratin f wrk znes. Anticipate types f wrk znes that typically create ingress/egress prblems. Examples are wrk spaces requiring wrk vehicles t merge in/ut f high-speed traffic and wrk activities that will generate frequent delivery f materials such as paving prjects, bridge prjects, and the delivery/mvement f fill materials.
10 Instructinal and Infrmatinal Memrandum Sheet 10 f 20 Access int/ut f the wrk space meeting the requirements in the Virginia Wrk Area Prtectin Manual shall be included in the Temprary Traffic Cntrl Plan. Adequate acceleratin/deceleratin space fr wrk vehicles shuld be prvided. The lcatin f access penings shuld meet the sight distance requirements listed in Appendix A f the Virginia Wrk Area Prtectin Manual. In extreme cnditins, lane clsures may need t be cnsidered. Cnstructin access penings in traffic barrier service cncrete (barrier wall) shuld be planned per Appendix A f the Virginia Wrk Area Prtectin Manual t ensure that the blunt ends f barrier walls are prperly prtected. The barrier r channelizatin devices shuld be planned in a manner as t nt create a sight distance prblem fr equipment peratr r mtrists. Ingress/egress cnditin may justify a lwering f the speed limit during this activity. Any reductin in the psted speed limit must be authrized by the Reginal Traffic Engineer and based n an engineering study per Traffic Engineering Memrandum TED-350. Warning signs ( Trucks Entering Highway ) are available fr ingress/egress cnditins at wrk area accesses and shuld be used when apprpriate. Special warning signs may be necessary. All warning sign(s) nting wrk zne access activities shall be cvered/remved when the daily wrk activity ceases. Type A Prjects (Prject Management Prject Categry I & II) Typical Prjects: N-Plan, Minimum Plan, Single Phase Cnstructin, Maintenance Prjects, Utility and Permitted Wrk Prject Type: Simple prject widening f pavement r adding turn lanes r entrances. Sequence cnsists f temprary lane clsures and flagging peratins with n shifting f traffic nt temprary pavement and with tw-way traffic peratin maintained at all times r at new cnstructin lcatins with n existing traffic. Impact n Traffic: Lane clsures and time restrictins shuld cmply with the Reginal Operatin s lane clsure plicies. If the prpsed wrk cannt be cmpleted within the Reginal Operatin s allwable lane clsure time perids an assessment f the Wrk Zne Traffic Impact will be cmpleted using a sketch planning traffic analysis tl such as Quick Zne, QUEWZ and/r an peratinal-level traffic analysis sftware prgram as apprpriate. Lane clsures, the use f traffic cntrl devices and their placement, Public Infrmatin and Traffic Operatins Plans will be apprved by the Reginal Operatins Directr with implementatin based n the traffic impact evaluatin and the Reginal Operatins Directr s apprval.
11 Instructinal and Infrmatinal Memrandum Sheet 11 f 20 Majr Cmpnents: Temprary Traffic Cntrl Plan Majr cmpnents will cnsist f General Ntes, Typical Sectins, and if needed Special Details. Each cmpnent shuld prvide the fllwing infrmatin (this infrmatin may be presented in a narrative frmat with illustratins/sketches as necessary): General Ntes which: Identify the prject s TMP Type Identify the wrk zne lcatin. Identify the length and width f the wrk zne. Identify the lanes affected by the prject wrk. Nte the hurs the wrk zne will be active. Identify ptential lcatin(s), within the R/W, fr cnstructin equipment and material strage. Define the prpsed traffic cntrl by referencing the specific Typical Traffic Cntrl Standard(s) listed in Virginia s Wrk Area Prtectin Manual and/r by referencing a Special Detail(s). Nte any entrances, intersectins r pedestrian access pints that will be affected by the wrk zne r by the traffic cntrl devices. Identify the majr types f travelers (such as truckers, cmmuters, residents, etc.) Typical Sectins which: Illustrate lane cnfiguratin(s) in the wrk zne. Special Details which: Shw schematically the placement f all traffic cntrl devices and lcatins f safe access int/ut f the wrk space by wrk vehicles. Place all traffic cntrl devices in accrdance with the standards cntained in Virginia s Wrk Area Prtectin Manual and the Manual n Unifrm Traffic Cntrl Devices. Detail fr any traffic cntrl device nt illustrated in the Virginia Wrk Area Prtectin Manual will be included in the plan. Fllw symbl cnventins fr identifying traffic cntrl devices per Virginia s Wrk Area Prtectin Manual and the Manual n Unifrm Traffic Cntrl Devices. Shw all details, dimensins and explanatry ntes required t execute the traffic cntrl plan.
12 Instructinal and Infrmatinal Memrandum Sheet 12 f 20 Public Cmmunicatins Plan A Public Cmmunicatins Plan is recmmended fr radways when traffic vlumes exceed the minimum number f vehicles/hur/lane r delay times established by the Reginal Traffic Engineer fr lane clsure perids. The Public Cmmunicatins Plan shall prvide the fllwing infrmatin (this infrmatin may be presented in a narrative frmat): A prcess t ntify the Prject Manager/Residency Administratr f scheduled wrk plans and traffic delays. A prcess t ntify the Prject Manager/Residency Administratr, Reginal Operatins Manager and the Public Affairs staff f any unscheduled traffic delays. Transprtatin Operatins Plan A Transprtatin Operatins Plan is recmmended fr radways when the wrk zne is greater than ½ mile in length and/r with reduced-width travel lanes. The Transprtatin Operatins Plan shall prvide the fllwing infrmatin (this infrmatin may be presented in a narrative frmat as part f the Temprary Traffic Cntrl Plan): A prcess t ntify the Reginal Transprtatin Operatins Center (TOC) t place lane clsure infrmatin n the 511 system and VA-Traffic. A cntact list f lcal emergency respnse agencies. Prcedures t respnd t traffic incidents that may ccur in the wrk zne. A prcess t ntify the Prject Maintenance f Traffic Crdinatr/Prject Manager/Resident Administratr, District Wrk Zne Safety Crdinatr/Reginal Traffic Engineer, the Reginal Operatins Manager and Public Affairs Manager f any incidents and expected traffic delays. Prcedures t clear the incident and restre nrmal prject traffic peratins. Details f the prcess t review incidents fr the purpse f mdifying the Temprary Traffic Cntrl Plan t reduce the frequency and severity f such incidents. Type B Prjects (Prject Management Prject Categries III & IV) Typical Prjects: Mderate level f cnstructin activity with the primary traffic impact limited t the radway cntaining the wrk zne. Prject Type: Mderately cmplex prject pavement widening r bridges fr additinal thru lanes and pavement rehabilitatin. Sequence cnsists f lane clsures t ne r bth directins with shifting traffic that may include temprary pavement r deturs fr the duratin f the wrk. If
13 Instructinal and Infrmatinal Memrandum Sheet 13 f 20 detur rutes are used they typically will remain in place 24 hurs per day fr the duratin f the wrk. Prject will be cnstructed ver several phases and may include bridge replacements r new bridges, new interchanges, mdifying existing interchanges r a new cnstructin lcatin with existing traffic crssing the cnstructin area. Impact n Traffic: An assessment f the Wrk Zne Traffic Impact will be cmpleted using sketch planning traffic analysis tl such as Quick Zne, QUEWZ and/r an peratinal-level traffic analysis sftware simulatin prgram such as CORSIM, Synchr r ther applicable prgrams. Lane clsures and detur rutes will be implemented based n this evaluatin. All lane clsures and time restrictins shall cmply with the Reginal Operatin s lane clsure plicies, with any deviatins requiring the apprval f the Reginal Operatins Directr. Majr Cmpnents: Temprary Traffic Cntrl Plan Majr cmpnents shall cnsist f Detail Plans, Typical Sectins, and as required Special Details/Crss Sectins/Prfiles. Each cmpnent shall prvide the fllwing infrmatin per cnstructin phase. This infrmatin shall be placed n a plan sheet. Detail Plans which include all the infrmatin listed fr Type A Prjects plus: Detail drawing(s) cntaining the fllwing infrmatin: Identify the prject s TMP Type Narrative describing the sequence f cnstructin Type and lcatin f all temprary signs fr the wrk zne and all detur rutes Type and lcatin f all temprary pavement markings Type and lcatin f all temprary pavement Type and lcatin f all temprary barriers Type and lcatin f all impact attenuatr/end treatments/fixed-object-attachments (FOA) Lcatins f safe access int/ut f the wrk space by wrk vehicles. Dcument/detail hw all entrances, intersectins r pedestrian access pints/rutes that will be affected by the wrk zne r by the traffic cntrl devices will be maintained r by prviding acceptable alternate rutes. Identify all rad(s) t be used as a detur rute. Prvide ntes regarding all traffic cntrl changes such as temprary signals r signal timing changes required within the wrk zne r the detur rute.
14 Instructinal and Infrmatinal Memrandum Sheet 14 f 20 Typical Sectins shall cntain all the infrmatin listed fr Type A Prjects. Special Details/Crss Sectins/Prfiles shall cntain all the infrmatin listed fr Type A Prjects. Public Cmmunicatins Plan A Public Cmmunicatins Plan is required fr radways when traffic vlumes exceed the minimum number f vehicles/hur/lane r delay times established by the Reginal Traffic Engineer fr lane clsure perids. The Public Cmmunicatins Plan shall prvide the fllwing infrmatin (this infrmatin may be presented in a narrative frmat as part f the Traffic Cntrl Plan r as a separate Special Prvisin Cpied Nte): All the infrmatin listed fr Type A Prjects. A prcess fr ntifying Public Safety, Emergency Management and mass transit rganizatins f detur rute(s) and available alternate rutes during cnstructin. Transprtatin Operatins Plan A Transprtatin Operatins Plan is required fr radways when the wrk zne is greater than ½ mile in length and/r with reduced width travel lanes. The Transprtatin Operatins Plan shall prvide the fllwing infrmatin (this infrmatin may be presented in a narrative frmat as part f the Traffic Cntrl Plan r as a separate Special Prvisin Cpied Nte): All the infrmatin listed fr Type A Prjects. Type C Prjects (Significant Prjects Prject Management Categry V) These types f prjects are anticipated t cause sustained and substantial wrk zne impacts greater than what is cnsidered tlerable based n plicy r engineering judgment. They shuld be identified early in the design prcess in cperatin with the FHWA. Typical Prjects: Lng duratin cnstructin r maintenance prjects n Interstate and freeway prjects that ccupy a lcatin fr mre than three days with intermittent r cntinuus lane clsures within the fllwing Transprtatin Management Areas; Nrthern Virginia (including the cunties f Arlingtn, Fairfax, Ludun, Prince William, Sptsylvania and Staffrd), Richmnd (including the City f Richmnd, Chesterfield and Henric Cunties), and Hamptn Rads (including the Cities f
15 Instructinal and Infrmatinal Memrandum Sheet 15 f 20 Chesapeake, Hamptn, Newprt News, Nrflk, Prtsmuth and Virginia Beach as well as James City and Yrk Cunties). Als includes Interstate and Principle Arterial Radways with cmplex multi-phase cnstructin, high accident rates, full clsures, r multiple wrk znes (tw r mre) within tw miles f each ther. Prject Type: Cmplex prject adding additinal thru lanes, bridge rehabilitatin, interchange cnstructin and recnstructin. Sequence cnsists f lane clsures with several traffic shifts that may include temprary pavement r deturs fr the duratin f the wrk. Impact f wrk zne n traffic peratins extends beynd the wrk zne and affects alternate and/r detur rutes. Multi phase cnstructin bridge replacements r new bridges. Rebuilding interchanges with additinal ramps r extensive mdificatin t existing ramps. Impact n Traffic: An assessment f the Wrk Zne Traffic Impact shall be cmpleted using an peratinal-level traffic analysis sftware simulatin prgram such as CORSIM, Synchr r ther applicable prgrams. Lane clsures and detur rutes shall cmply with the Reginal Operatin s lane clsure plicies, with any deviatins requiring the apprval f the Reginal Operatins Directr. Majr Cmpnents: Temprary Traffic Cntrl Plan Majr cmpnents shall cnsist f Detailed Plans, Typical Sectins, and as required Special Details/Crss Sectins/Prfiles. Each cmpnent shall prvide the fllwing infrmatin per cnstructin phase. This infrmatin will be placed n a crdinate plan sheet. Detail Plans which include all the infrmatin listed fr Type B Prjects including the prject s TMP Type as well as a list identifying the lcatin f reduced width lane(s) with the width reductin specified. Typical Sectins which include all the infrmatin listed fr Type B Prjects. Special Details/Crss Sectins/Prfiles which include all the infrmatin listed fr Type B Prjects. Public Cmmunicatins Plan The Public Cmmunicatins Plan is required and shall prvide all the infrmatin required fr Type A and B Prjects. This infrmatin may be presented in a narrative frmat as part f the Traffic Cntrl Plan r as a separate Special Prvisin Cpied Nte. Transprtatin Operatins Plan The Transprtatin Operatins Plan is required and shall prvide all the infrmatin required fr Type B Prjects. (This infrmatin may be presented in a narrative frmat as part f the Traffic Cntrl Plan r as a separate Special Prvisin Cpied Nte.)
16 Instructinal and Infrmatinal Memrandum Sheet 16 f 20 EXAMPLES The fllwing link will pen flders cntaining examples f TMP recmmendatins and Temprary Traffic Cntrl Plans fr previusly develped prjects. These examples are fr illustrative purpses nly and may nt ttally reflect current plicy. ples_f_temprary_traffic_cntrl_plans.pdf RESPONSIBILITIES The fllwing guidance is prvided t ensure that all individuals invlved in the planning and cnstructin f all wrk activities within state right f way and n all streets and highways that have been accepted int the State Highway System. understand their rle and respnsibilities in the develpment, implementatin and review f the prject s TMP. VDOT persnnel, cntractrs and permittees frm the design and cnstructin disciplines/wrk grups nted belw shall have direct respnsibilities fr the prper develpment and implementatin f the TMP during each preliminary engineering and cnstructin stage f the prject. Prject Manager The Prject Manager is respnsible fr fllwing the current Prject Management Prcedures established by the Prject Management Office. In accrdance with the Prject Management Prcedures, the Prject Manager will be respnsible fr ensuring that the prject s Transprtatin Management Plan (TMP) Type fr the prject is defined at the scping meeting. Traffic Engineering Divisin The Traffic Engineering Divisin is respnsible fr prviding temprary traffic cntrl standards and wrk zne guidance and recmmendatins, as well as identifying and cmmunicating issues related t the design and usage f temprary traffic cntrl devices. Specific respnsibilities f this ffice include: Cnducting annual prcess reviews f tw regins each year. Evaluating wrk zne safety by tracking the number f fatalities and injuries in wrk znes annually. Reviewing TMP pst-cnstructin reprts t ascertain the effectiveness f the TMP and nting the reslutin f wrk zne and/r temprary traffic cntrl prblems.
17 Instructinal and Infrmatinal Memrandum Sheet 17 f 20 Revising temprary traffic cntrl standards, prcedures and guidance based n the abve cllected data t imprve wrk zne safety and mbility. Defining the apprpriate wrk zne safety training fr VDOT persnnel, design cnsultants, cnstructin wrkers, flaggers, etc. Area Cnstructin Engineers Specific respnsibilities f the Area Cnstructin Engineer include: Ensuring that the implementatin f all TMPs in the district is in accrdance with the plans, specificatins, Virginia Wrk Area Prtectin Manual and any ther pertinent dcuments. Supprting the Wrk Zne Traffic Cntrl Crdinatr and the Regin s Wrk Zne Safety Crdinatr(s) in perfrming their assigned duties. Verifying that all cntractr persnnel are trained and hld valid certificatins as required by the Department. Advising the apprpriate VDOT persnnel, as nted in this guidance, f wrk requiring lane shifts, lane clsures and/r phase changes tw wrking days prir t implementing this activity. Ensuring that the prject s assigned Wrk Zne Traffic Cntrl Crdinatr cmpletes and submits the TMP pst-cnstructin reprt. Reginal Wrk Zne Safety Crdinatrs The reginal wrk zne safety crdinatrs are a resurce t be utilized by the reginal and district staff t ensure that wrk znes perate safely and efficiently with the least amunt f incnvenience and impact t the traveling public. Specific respnsibilities f the Reginal Wrk Zne Safety Crdinatr include: Prviding district and reginal staff with guidance and recmmendatins n wrk zne design and peratin. Perfrming wrk zne reviews t prmte cnsistency and ensure cmpliance with wrk zne prcedures, standards and guidance. Mnitring wrk zne inspectins cnducted by field persnnel and identifying areas that need imprvement. Assisting and supprting the prject s assigned Wrk Zne Traffic Cntrl Crdinatr in perfrming their assigned duties Residency Administratrs Specific respnsibilities f the Residency Administratr include: Ensuring that residency staff receives the apprpriate training related t their duties in the develpment, implementatin and review f Transprtatin Management Plans (TMP). Supprting the Wrk Zne Traffic Cntrl Crdinatr and the Regin s Wrk Zne Safety Crdinatr(s) in perfrming their assigned duties. Ntifying the Reginal Operatins Directr f wrk requiring lane clsures tw wrking days prir t implementing the lane clsure.
18 Instructinal and Infrmatinal Memrandum Sheet 18 f 20 Ntifying the Reginal Operatins Directr f height, width and weight restrictins ten wrking days prir t the impsitin f such restrictins. Reginal/District/Residency Permit Staff Specific respnsibilities f the Reginal/District/Residency permit staff include: Cntractr Ensuring that the permittee s temprary traffic cntrl plan is in cmpliance with this dcument, VDOT specificatins, Virginia Wrk Area Prtectin Manual and any ther pertinent dcuments. Crdinating lane clsure needs and height, width and weight restrictins with the permittee and reprting any requests t the Reginal Operatins Directr tw wrking days prir t the lane clsure and ten wrking days fr radway restrictins befre any nn-emergency wrk cmmences. Ensuring that prpsed lane clsures are in cmpliance with the reginal lane clsure plicy. Specific respnsibilities f the cntractr include: Permittee Designating a persn assigned t the prject wh will have the primary respnsibility, with sufficient authrity, fr implementing the TMP. Ensuring that cntractr persnnel assigned t the prject are trained in traffic cntrl t a level cmmensurate with their respnsibilities in accrdance with VDOT s wrk zne traffic cntrl training guidelines. Advising the apprpriate VDOT persnnel, as nted in this guidance, wrk requiring lane shifts, lane clsures and/r phase changes tw wrking days prir t implementing this activity. Advising the apprpriate VDOT persnnel, as nted in this guidance, f height, width and weight restrictins ten wrking days prir t the impsitin f such restrictins. Perfrming, at a minimum, daily reviews f the wrk zne t ensure cmpliance with cntract dcuments and establish specificatins and standards. Recmmending traffic cntrl imprvements t the apprpriate VDOT persnnel t address field cnditins pertaining t traffic flw, visibility, and wrker/mtrist/pedestrian safety. Specific respnsibilities f the permittee include: Submitting a temprary traffic cntrl plan that prescribes the necessary traffic cntrl measures fr the wrk t be perfrmed. This plan shall have the apprval frm the apprpriate VDOT Permit r Land Develpment ffice fr apprval prir t the cmmencement f wrk activities within VDOT right f way.
19 Instructinal and Infrmatinal Memrandum Sheet 19 f 20 Identifying a pint f cntact wh shall be available at all times that the permittee is wrking within the public right f way. This persn shall have the training and authrity t crrect any traffic cntrl deficiencies. Designating a persn assigned t the prject that will have the primary respnsibility, with sufficient authrity, fr implementing the temprary traffic cntrl plan and ther safety and mbility aspects f the permit wrk. Ensuring that permittee persnnel assigned t the wrk activity are trained in traffic cntrl t a level cmmensurate with their respnsibilities in accrdance with VDOT s wrk zne traffic cntrl training guidelines. Ntifying the apprpriate VDOT persnnel, tw days prir t the cmmencement f wrk and prir t implementing lane clsures and ten days prir t the impsitin f height, width and weight restrictins. Maintaining a cpy f the temprary traffic cntrl plan at the wrk site. Perfrming, at a minimum, daily reviews f the wrk zne t ensure cmpliance with temprary traffic cntrl plan and establish specificatins and standards. Special Prvisin Cpied Ntes The fllwing Special Prvisin Cpied Ntes shuld be included in a prject s cntract as nted. Cntractr Alternate Traffic Cntrl Plan All Type B & C Prjects and select Type A prjects. Wrk Zne Traffic Cntrl Management All Type C Prjects and select Type B Prjects as determined by the Prject Manager. The determinatin shall be based n traffic vlumes, TMP cmplexity, and need fr increased and devted traffic cntrl management. TRAINING REQUIREMENTS The Department has established a Wrk Zne Safety Training Cmmittee (WZSTC) that will present recmmendatins n prcedures, standards, and specificatins invlving wrk zne traffic cntrl training issues. The cmmittee will review fr apprval training curses submitted in cmpliance with established prcedures. The cmmittee will als review and apprve Wrk Zne Traffic Cntrl Training instructr qualificatins. Training curses apprved in accrdance with this prcedure shall be the nly training accepted as meeting the standards fr qualifying persns t plan, design, implement, inspect, and/r supervise the selectin, placement, r maintenance f wrk zne traffic cntrl schemes and devices in wrk znes n streets and highways within the Cmmnwealth f Virginia State Highway System right f way. The State Traffic
20 Instructinal and Infrmatinal Memrandum Sheet 20 f 20 Engineer s Office shall maintain a list f apprved curses and their spnsrs/prviders. The fficial list f apprved curses, categry descriptins, and addresses f curse spnsrs/prviders and apprved instructrs are prvided n the Department s Web site at:
THIRD PARTY PROCUREMENT PROCEDURES
ADDENDUM #1 THIRD PARTY PROCUREMENT PROCEDURES NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS TRANSPORTATION DEPARTMENT JUNE 2011 OVERVIEW These prcedures establish standards and guidelines fr the Nrth Central
Service Level Agreement (SLA) Hosted Products. Netop Business Solutions A/S
Service Level Agreement (SLA) Hsted Prducts Netp Business Slutins A/S Cntents 1 Service Level Agreement... 3 2 Supprt Services... 3 3 Incident Management... 3 3.1 Requesting service r submitting incidents...
How To Write An Ehsms Training, Awareness And Competency Procedure
Envirnmental, Health & Safety Management System (EHSMS) Dcument Number: 00122 Issue Date: 05/07/2014 Training, Awareness and Cmpetency Prcedure Revisin Number: 7 Prepared By: Stalcup, Bryce Apprved By:
Request for Resume (RFR) CATS II Master Contract. All Master Contract Provisions Apply
Sectin 1 General Infrmatin RFR Number: (Reference BPO Number) Functinal Area (Enter One Only) F50B3400026 7 Infrmatin System Security Labr Categry A single supprt resurce may be engaged fr a perid nt t
MSB FINANCIAL CORP. MILLINGTON BANK AUDIT COMMITTEE CHARTER
MSB FINANCIAL CORP. MILLINGTON BANK AUDIT COMMITTEE CHARTER This Audit Cmmittee Charter has been amended as f July 17, 2015. The Audit Cmmittee shall review and reassess this Charter annually and recmmend
IT CHANGE MANAGEMENT POLICY
IT CHANGE MANAGEMENT POLICY Effective Date May 19, 2016 Crss-Reference 1. IT Operatins and Maintenance Plicy 2. IT Security Incident Management Plicy Respnsibility Apprver Review Schedule 1. Plicy Statement
CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT
CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT Plicy Number: 2.20 1. Authrity Lcal Gvernment Act 2009 Lcal Gvernment Regulatin 2012 AS/NZS ISO 31000-2009 Risk Management Principles
COUNTY OF SACRAMENTO PLANNING AND ENVIRONMENTAL REVIEW
COUNTY OF SACRAMENTO PLANNING AND ENVIRONMENTAL REVIEW REQUEST FOR PROPOSAL fr ON-CALL CULTURAL RESOURCE SERVICES Release Date: Tuesday, March 10, 2015 Submittal Deadline: Mnday, April 13, 2015 by 5:00
Multi-Year Accessibility Policy and Plan for NSF Canada and NSF International Strategic Registrations Canada Company, 2014-2021
Multi-Year Accessibility Plicy and Plan fr NSF Canada and NSF Internatinal Strategic Registratins Canada Cmpany, 2014-2021 This 2014-21 accessibility plan utlines the plicies and actins that NSF Canada
Sources of Federal Government and Employee Information
Inf Surce Surces f Federal Gvernment and Emplyee Infrmatin Ridley Terminals Inc. TABLE OF CONTENTS General Infrmatin Intrductin t Inf Surce Backgrund Respnsibilities Institutinal Functins, Prgram and Activities
7/25/14 FAIRFAX COUNTY PUBLIC SCHOOLS SUPPORT EMPLOYEE PERFORMANCE ASSESSMENT HANDBOOK
7/25/14 FAIRFAX COUNTY PUBLIC SCHOOLS SUPPORT EMPLOYEE PERFORMANCE ASSESSMENT HANDBOOK A Resurce Fr Supprt Emplyees Cpyright 2014, Fairfax Cunty Public Schls http://www.fcps.edu/hr/epd/evaluatins/supprt.shtml
Systems Support - Extended
1 General Overview This is a Service Level Agreement ( SLA ) between and the Enterprise Windws Services t dcument: The technlgy services the Enterprise Windws Services prvides t the custmer. The targets
NEW YORK STATE DEPARTMENT OF HEALTH BUREAU OF DENTAL HEALTH SCHOOL-BASED HEALTH CENTER DENTAL PROGRAM PERFORMANCE EFFECTIVENESS REVIEW TOOL (PERT)
NEW YORK STATE DEPARTMENT OF HEALTH BUREAU OF DENTAL HEALTH SCHOOL-BASED HEALTH CENTER DENTAL PROGRAM PERFORMANCE EFFECTIVENESS REVIEW TOOL (PERT) March 1, 2007 TABLE OF CONTENTS SECTION I: INTRODUCTION
Army DCIPS Employee Self-Report of Accomplishments Overview Revised July 2012
Army DCIPS Emplyee Self-Reprt f Accmplishments Overview Revised July 2012 Table f Cntents Self-Reprt f Accmplishments Overview... 3 Understanding the Emplyee Self-Reprt f Accmplishments... 3 Thinking Abut
Loss Share Data Specifications Change Management Plan
Lss Share Data Specificatins Change Management Plan Last Updated: 2/27/2013 Table f Cntents I. Purpse... 3 II. Change Management Apprach... 3 III. Categries f Revisins... 4 IV. Help and Supprt... 6 Lss
Accessible Service Policy
Accessible Service Plicy Date Created Revisin Oct. 16, 2012 1 Gal This plicy is intended t meet the requirements f the Accessibility Standards fr Custmer Service, Ontari Regulatin 429/07 under the Accessibility
Johnston Public Schools Special Education Procedural Manual. IEP Overview
Jhnstn Public Schls Special Educatin Prcedural Manual IEP Overview Definitin The Individualized Educatin Prgram (IEP) is a written plan fr the apprpriate educatin f students with disabilities. It is a
SECTION J QUALITY ASSURANCE AND IMPROVEMENT PROGRAM
Audit Manual Sectin J SECTION J QUALITY ASSURANCE AND IMPROVEMENT PROGRAM Ref. Plicy and Practice Requirements IIA Standards and Other references J 1 Plicy: The Head f Internal Audit shall develp and maintain
UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES
UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES REFERENCES AND RELATED POLICIES A. UC PPSM 2 -Definitin f Terms B. UC PPSM 12 -Nndiscriminatin in Emplyment C. UC PPSM 14 -Affirmative
Plan Transfer Procedures for Utility Submissions 11 24 2015 OVERVIEW
Plan Transfer Prcedures fr Utility Submissins OVERVIEW Abbreviatins The fllwing will be used thrughut this dcument: CADD MicrStatin r GDOT Bentley Navigatr PPG Plans Preparatin Guide DUO District Utilities
Community Support Programs N9 Organizational Internship Program
NAVY REGION SOUTHWEST Cmmunity Supprt Prgrams N9 Organizatinal Internship Prgram April 2011 Cntents Prgram... 3 Purpse... 3 Outcme... 3 Duratin... 3 Definitins... 3 Eligibility... 4 Prcess... 5 Participating
Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013
Versin: Mdified By: Date: Apprved By: Date: 1.0 Michael Hawkins Octber 29, 2013 Dan Bwden Nvember 2013 Rule 4-004J Payment Card Industry (PCI) Patch Management (prpsed) 01.1 Purpse The purpse f the Patch
Audit Committee Charter
Audit Cmmittee Charter Membership The Audit Cmmittee (the "Cmmittee") f the Bard f Directrs (the "Bard") f Philip Mrris Internatinal Inc. (the "Cmpany") shall cnsist f at least three directrs all f whm
Symantec User Authentication Service Level Agreement
Symantec User Authenticatin Service Level Agreement Overview and Scpe This Symantec User Authenticatin service level agreement ( SLA ) applies t Symantec User Authenticatin prducts/services, such as Managed
.100 POLICY STATEMENT
Treasury Management Operatins Sectin: Treasury Management Number: 105.100 Title: Treasury Management Operatins POLICY Index.100 POLICY STATEMENT.110 POLICY RATIONALE.120 AUTHORITY.130 APPROVAL AND EFFECTIVE
FIREFIGHTER HEART AND CIRCULATORY MALFUNCTION BENEFITS PROGRAM STANDARD OPERATING GUIDELINES Approved by the DOLA Executive Director July 1, 2014
FIREFIGHTER HEART AND CIRCULATORY MALFUNCTION BENEFITS PROGRAM STANDARD OPERATING GUIDELINES Apprved by the DOLA Executive Directr July 1, 2014 Prgram Overview: As f July 1, 2014, the Department f Lcal
NHVAS Mass Management Spot Check Checklist
Legal Entity Name f NHVAS Operatr: DTMR Representative: Lcatin: NHVAS Mass Management Spt Check Checklist Spt Check Date: Spt Check Number: DMS Number: 540/ The fllwing surces f evidence have been identified
Internal Audit Charter and operating standards
Internal Audit Charter and perating standards 2 1 verview This dcument sets ut the basis fr internal audit: (i) the Internal Audit charter, which establishes the framewrk fr Internal Audit; and (ii) hw
OBJECTIVE 10: ALERT AND NOTIFICATION OBJECTIVE 10: ALERT AND NOTIFICATION OBJECTIVE
OBJECTIVE 10: ALERT AND NOTIFICATION OBJECTIVE Demnstrate the capability t prmptly alert and ntify the public within the 10-mile plume pathway emergency planning zne (EPZ) and disseminate instructinal
17 Construction environmental management plan (CEMP)
17 Cnstructin envirnmental management plan (CEMP) Bur Happld Cntents 17 Cnstructin Envirnmental Management Plan (CEMP) 17-1 17.1 Intrductin 17-1 17.2 Intrductin t EMS 17-1 17.2.1 Plicy 17-2 17.2.2 Planning
Purpose Statement. Objectives
Apprved by Academic Affairs Cuncil, June 24, 2014 Faculty Handbk Part VI: Other Plicies and Prcedures Sectin R. Intellectual Prperty Classified Emplyee Handbk Part VI: Other Plicies and Prcedures Sectin
THE CITY UNIVERSITY OF NEW YORK IDENTITY THEFT PREVENTION PROGRAM
THE CITY UNIVERSITY OF NEW YORK IDENTITY THEFT PREVENTION PROGRAM 1. Prgram Adptin The City University f New Yrk (the "University") develped this Identity Theft Preventin Prgram (the "Prgram") pursuant
ENTERPRISE RISK MANAGEMENT ENTERPRISE RISK MANAGEMENT POLICY
ENTERPRISE RISK MANAGEMENT POLICY Plicy N. 10014 Review Date Octber 1, 2014 Effective Date March 1, 2014 Crss- Respnsibility Vice President, Reference Administratin Apprver Executive Cuncil 1. 1. Plicy
POLICY 1390 Information Technology Continuity of Business Planning Issued: June 4, 2009 Revised: June 12, 2014
State f Michigan POLICY 1390 Infrmatin Technlgy Cntinuity f Business Planning Issued: June 4, 2009 Revised: June 12, 2014 SUBJECT: APPLICATION: PURPOSE: CONTACT AGENCY: Plicy fr Infrmatin Technlgy (IT)
TITLE: Supplier Contracting Guidelines Process: FIN_PS_PSG_050 Replaces: Manual Sections 6.4, 7.1, 7.5, 7.6, 7.11 Effective Date: 10/1/2014 Contents
TITLE: Supplier Cntracting Guidelines Prcess: FIN_PS_PSG_050 Replaces: Manual Sectins 6.4, 7.1, 7.5, 7.6, 7.11 Cntents 1 Abut university supplier cntracting... 2 2 When is a cntract required?... 2 3 Wh
Information Services Hosting Arrangements
Infrmatin Services Hsting Arrangements Purpse The purpse f this service is t prvide secure, supprted, and reasnably accessible cmputing envirnments fr departments at DePaul that are in need f server-based
CMS Eligibility Requirements Checklist for MSSP ACO Participation
ATTACHMENT 1 CMS Eligibility Requirements Checklist fr MSSP ACO Participatin 1. General Eligibility Requirements ACO participants wrk tgether t manage and crdinate care fr Medicare fee-fr-service beneficiaries.
Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd
Audit Cmmittee Charter St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd Versin 2.0, 22 February 2016 Apprver Bard f Directrs St Andrew
FINANCE SCRUTINY SUB-COMMITTEE
REPORT FOR: PERFORMANCE AND FINANCE SCRUTINY SUB-COMMITTEE Date f Meeting: 6 January 2015 Subject: Staff Survey and Sickness Absence Mnitring Results and Actin plans Respnsible Officer: Scrutiny Lead Member
IT Help Desk Service Level Expectations Revised: 01/09/2012
IT Help Desk Service Level Expectatins Revised: 01/09/2012 Overview The IT Help Desk team cnsists f six (6) full time emplyees and fifteen (15) part time student emplyees. This team prvides supprt fr 25,000+
General Records Authority 33. Accredited Training
General Recrds Authrity 33 2012/00579704 Accredited Training February 2013 This is an accurate reprductin f the authrised recrds authrity cntent, created fr accessibility purpses CONTENTS INTRODUCTION
Request for Proposal. Saskatchewan Arts Board. Database Development. RFP Reference Number S AB-ADMIN001. Release Date Februar y 9, 2016
Request fr Prpsal Saskatchewan Arts Bard Database Develpment RFP Reference Number S AB-ADMIN001 Release Date Februar y 9, 2016 Clsing Date March 1, 2016 Clsing Time 2:00 pm, Lcal Sask. Time Page 2 f 7
Financial Accountability Handbook
Financial Accuntability Handbk >> Vlume 5 Reprting Systems Infrmatin Sheet 5.2 Preparatin f Financial Statements Intrductin The Financial Accuntability Act 2009 (the Act) and the Financial and Perfrmance
Peratr Accreditatin and Services in Queensland
Infrmatin Bulletin PT 204/09.15 Operatr Accreditatin fr Limusine Services What is peratr accreditatin? The Transprt Operatins (Passenger Transprt) Act 1994 requires peratrs f public passenger services
Change Management Process For [Project Name]
Management Prcess Fr [Prject Name] i 1 Intrductin The is fllwed during the Executin phase f the Prject Management Life Cycle, nce the prject has been frmally defined and planned. 1.1 What is a Management
IMHU-HRM-A February 15, 2012 PAI SOP. Ft. Huachuca Personnel Asset Inventory - SOP
Ft. Huachuca Persnnel Asset Inventry - SOP I. Respnsible agencies are: Unit Battalin r separate cmpany S1 (S1) Brigade S1 Military Persnnel Divisin (MPD) Persnnel Autmatin Sectin (PAS) G1, AG, Military
Nuance Healthcare Services Project Delivery Methodology
NUANCE PROFESSIONAL SERVICES Nuance Healthcare Services 2008 Nuance Cmmunicatins, Inc. All rights reserved. Nuance Healthcare Services 1 INTRODUCTION This dcument describes the prject management methdlgy
Accident Investigation
Accident Investigatin APPLICABLE STANDARD: 1960.29 EMPLOYEES AFFECTED: All emplyees WHAT IS IT? Accident investigatin is the prcess f determining the rt causes f accidents, n-the-jb injuries, prperty damage,
Malpractice and Maladministration Policy
TR340 Malpractice and Maladministratin Plicy This plicy aims t: Define malpractice and maladministratin in the cntext f CIM/CAM studying members, Accredited study centres (ASCs), examinatin centres, invigilatrs
Business Continuity Management Policy
Business Cntinuity Management Plicy Versin: 1.0 Last Amendment: Apprved by: Library Cuncil f New Suth Wales Plicy wner/spnsr: Directr, Operatins and Chief Financial Officer Plicy Cntact Officer: Senir
BLUE RIDGE COMMUNITY AND TECHNICAL COLLEGE BOARD OF GOVERNORS
BLUE RIDGE COMMUNITY AND TECHNICAL COLLEGE BOARD OF GOVERNORS SERIES: 1 General Rules RULE: 17.1 Recrd Retentin Scpe: The purpse f this rule is t establish the systematic review, retentin and destructin
Nebraska Parenting Act Divorce and Separation Parenting Education Provider Information 2015 Application
Nebraska Parenting Act Divrce and Separatin Parenting Educatin Prvider Infrmatin 2015 Applicatin A. Apprval Prcess: Please submit the fllwing in the rder listed: 1. Prvider infrmatin sheet: Please cmplete
Business Continuity Management Systems Foundation Training Course
Certificatin criteria fr Business Cntinuity Management Systems Fundatin Training Curse CONTENTS 1. INTRODUCTION 2. LEARNING OBJECTIVES 3. ENABLING OBJECTIVES KNOWLEDGE & SKILLS 4. TRAINING METHODS 5. COURSE
Chapter 7 Business Continuity and Risk Management
Chapter 7 Business Cntinuity and Risk Management Sectin 01 Business Cntinuity Management 070101 Initiating the Business Cntinuity Plan (BCP) Purpse: T establish the apprpriate level f business cntinuity
FHWA Compliance Assessment Program (CAP) Guidance
See 2015 updates at http://www.fhwa.dt.gv/federalaid/stewardship/feb2015update.cfm FHWA Cmpliance Assessment Prgram (CAP) Guidance Backgrund ed ed The gal f risk-based prject stewardship and versight is
Heythrop College Disciplinary Procedure for Support Staff
Heythrp Cllege Disciplinary Prcedure fr Supprt Staff Intrductin 1. This prcedural dcument des nt apply t thse academic-related staff wh are mentined in the Cllege s Ordinance, namely the Librarian and
PENETRATION TEST OF THE INDIAN HEALTH SERVICE S COMPUTER NETWORK
Department f Health and Human Services OFFICE OF INSPECTOR GENERAL PENETRATION TEST OF THE INDIAN HEALTH SERVICE S COMPUTER NETWORK Inquiries abut this reprt may be addressed t the Office f Public Affairs
Connecticut State Department of Education 2014-15 School Health Services Information Survey
Cnnecticut State Department f Educatin 2014-15 Schl Health Services Infrmatin Survey General Directins fr Cmpletin by Schl Nurse Crdinatr/Supervisr This Schl Health Services Infrmatin Survey was designed
WORKPLACE INJURY/ILLNESS/INCIDENT INVESTIGATION & REPORTING POLICY (BC VERSION)
WORKPLACE INJURY/ILLNESS/INCIDENT INVESTIGATION & REPORTING POLICY (BC VERSION) Intrductin: Hw t Use This Tl As d all ther jurisdictins, BC requires emplyers t investigate and reprt specific kinds f wrkplace
CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF UPLAND SOFTWARE, INC.
CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF UPLAND SOFTWARE, INC. PURPOSE The purpse f the Cmpensatin Cmmittee f the Bard f Directrs (the Bard ) f Upland Sftware, Inc. (the Cmpany
Chris Chiron, Interim Senior Director, Employee & Management Relations Jessica Moore, Senior Director, Classification & Compensation
TO: FROM: HR Officers & Human Resurces Representatives Chris Chirn, Interim Senir Directr, Emplyee & Management Relatins Jessica Mre, Senir Directr, Classificatin & Cmpensatin DATE: May 26, 2015 RE: Annual
Change Management Process
Change Management Prcess B1.10 Change Management Prcess 1. Intrductin This plicy utlines [Yur Cmpany] s apprach t managing change within the rganisatin. All changes in strategy, activities and prcesses
GUIDELINE INFORMATION MANAGEMENT (IM) PROGRAM PLAN
Gvernment f Newfundland and Labradr Office f the Chief Infrmatin Officer Infrmatin Management Branch GUIDELINE INFORMATION MANAGEMENT (IM) PROGRAM PLAN Guideline (Definitin): OCIO Guidelines derive frm
OE PROJECT MANAGEMENT GLOSSARY
OE PROJECT MANAGEMENT GLOSSARY ACCEPTANCE CRITERIA : thse criteria, including perfrmance requirements and essential cnditins that must be met befre the prject deliverables are accepted. ACTIVITY: an actin
Purchasing Policy Checklist for Procurement with Federal Grants Eileen Youens, JD
Purchasing Plicy Checklist fr Prcurement with Federal Grants Eileen Yuens, JD T cmply with the Unifrm Administrative Requirements, Cst Principles, and Audit Requirements fr Financial Awards (the Super
0820.02 Workers Disability Compensation Claims Procedures Issued: January 1, 1994 Revised: March 29, 2012
State f Michigan Administrative Guide t State Gvernment 0820.02 Wrkers Disability Cmpensatin Claims Prcedures Issued: January 1, 1994 Revised: March 29, 2012 SUBJECT: APPLICATION: PURPOSE: CONTACT AGENCY:
CDC UNIFIED PROCESS PRACTICES GUIDE
Dcument Purpse The purpse f this dcument is t prvide guidance n the practice f Business Case and t describe the practice verview, requirements, best practices, activities, and key terms related t these
All Harvard University schools, tubs, local units, Affiliate Institutions, Allied Institutions and University-wide Initiatives.
HARVARD UNIVERSITY FINANCIAL POLICY INDEPENDENT CONTRACTOR CLASSIFICATION Plicy Title: Independent Cntractr Respnsible Office: ERP and UFS Effective Date: Octber 4, 2000 Revisin Date: May 12, 2009 Plicy
Satisfactory Academic Progress Policy
Satisfactry Academic Prgress Plicy Lakeview Cllege f Nursing (LCN) awards the Bachelr f Science in Nursing degree upn recmmendatin by the faculty and presentatin t the Bard f Directrs after the student
Electronic and Information Resources Accessibility Compliance Plan
Electrnic and Infrmatin Resurces Accessibility Cmpliance Plan Intrductin The University f Nrth Texas at Dallas (UNTD) is cmmitted t prviding a wrk envirnment that affrds equal access and pprtunity t therwise
FAFSA / DREAM ACT COMPLETION PROGRAM AGREEMENT
FAFSA / DREAM ACT COMPLETION PROGRAM AGREEMENT If using US Pstal Service, please return t: Califrnia Student Aid Cmmissin Prgram Administratin & Services Divisin ATTN: Institutinal Supprt P.O. Bx 419028
ITIL Release Control & Validation (RCV) Certification Program - 5 Days
ITIL Release Cntrl & Validatin (RCV) Certificatin Prgram - 5 Days Prgram Overview ITIL is a set f best practices guidance that has becme a wrldwide-adpted framewrk fr Infrmatin Technlgy Services Management
Bond Authorization Requested
District r Charter Schl Cntact Persn: Address 1: Address 2: City: Zip Cde: Telephne: Email Address: Bnd Authrizatin Requested The maximum bnd authrizatin that may be requested per district r charter schl
ATTACHMENT U THIRD PARTY AUDITOR/CONSULTANT QUALIFICATION GUIDELINE
ATTACHMENT U THIRD PARTY AUDITOR/CONSULTANT QUALIFICATION GUIDELINE 1 INTRODUCTION Third party auditr/cnsultant plays an imprtant rle in decmmissining t ensure that all critical decmmissining activities
COE: Hybrid Course Request for Proposals. The goals of the College of Education Hybrid Course Funding Program are:
COE: Hybrid Curse Request fr Prpsals The gals f the Cllege f Educatin Hybrid Curse Funding Prgram are: T supprt the develpment f effective, high-quality instructin that meets the needs and expectatins
Medical Assistance Site Training Process
Medical Assistance Site Training Prcess 2015-2016 7800 E Orchard Rad, Suite 280 Greenwd Village, CO 80111 Cntents Organizatinal Overview... 2 General Training Apprach... 2 Accessing Training... 3 Training
Software and Hardware Change Management Policy for CDes Computer Labs
Sftware and Hardware Change Management Plicy fr CDes Cmputer Labs Overview The cmputer labs in the Cllege f Design are clsely integrated with the academic needs f faculty and students. Cmputer lab resurces
Vancouver Island University Job Posting System Instruction Manual
Vancuver Island University Jb Psting System Instructin Manual Have questins, cncerns, r need training? Cntact Human Resurces Recruitment Office at [email protected] r lcal 6239 Last updated: February 2013