SCGEM Engineering and Construction Services

Size: px
Start display at page:

Download "SCGEM Engineering and Construction Services"

Transcription

1 Generatin and Energy Marketing SCGEM Engineering and Cnstructin Services Cnstructin Quality Assurance Prgram & Quality Cntrl Prcedures

2 Suthern Cmpany Generatin Engineering and Cnstructin Services Cnstructin Services Cnstructin QA Prgram and Quality Cntrl Prcedures Table f Cntents Prcedure Number QC A Prcedure Descriptin Revisin Issue/Revisin Date QC A 01 QA Prgram Overview 4 2/14/05 QC A 02 Oversight and Cntrl f Cntractr QC 0 10/11/04 Prgrams QC B QC B 01 Dcument Cntrl 6 9/4/07 QC B 02 Field Change/Clarificatin Request 4 2/14/05 QC C QC C 01 Qualificatin and Evaluatin f Cntractrs 2 8/9/04 QC C 02 Purchase f Quality Items 2 8/9/04 QC D QC D 01 Receipt, Strage and Handling f Prducts 3 7/18/05 QC E QC E 01 Prduct Identificatin and Traceability 1 10/31/02 QC F QC F 01 Prcess Cntrl 1 12/10/02 QC G QC G 01 Civil Inspectin 2 3/8/05 QC G 02 Electrical Inspectin 2 8/9/04 Frms QC G 03 Mechanical Inspectin 2 8/9/04 Frms QC G 04 Welding Inspectin 2 8/9/04 QC G 05 Fiberglass Manufacture & Installatin 0 8/30/05 Inspectin QC G 06 Cnstructin Services Survey Cntrl 0 12/3/07 QC H QC H 01 Nncnfrmance Reprt 5 10/2/07 QC H 02 Hld Tag 2 8/9/04 QC H 03 Crrective and Preventive Actin 1 12/16/02 QC I QC I 01 Cntrl f Quality Recrds 3 4/17/06 QC I 02 Training 1 12/10/02 QC I 03 Statistical Techniques 1 12/10/02 Uncntrlled Cpy Cnstructin Services QA Manual TOC dc

3 SCG Engineering and Cnstructin Services Cnstructin Services QC Prcedure Number (QC A 01) Quality Assurance Prgram Overview Revisin Descriptin Revised By Reviewed By Apprved By Date A Issued fr Review N/A N/A N/A 2/9/00 0 Issued fr Cnstructin RHR, JR. DMC RWM 2/21/00 1 Revisin t Attachment A RHR, JR. DMC RWM 3/6/00 2 General Revisin including Department Name and Frmat Changes 3 Editrial changes t include department name change 4 General revisin t dcument adherence t the E&CS Basic Quality Plicy, SCG Chapter XII Cntract Guidance Manual and the E&CS Plicy and Prcedure Manual. RHR, JR. DMC JBF 1/31/02 RHR, JR. DMC JCH 9/26/02 RHR, Jr. JBF C.A. Baker 02/14/05

4 SCG E&CS Cnstructin Services QC A 01 Quality Assurance Prgram Overview Purpse The purpse f this prcedure is t utline the cnstructin quality assurance prgram f SCG Engineering and Cnstructin Services (E&CS) Cnstructin Services. This prcedure will give an verview f the prgram, describing verall respnsibilities, areas t be cvered by the prgram and a general list f criteria that will be used t determine when this QA prgram will be invked. Scpe This prcedure sets frth the cnstructin quality prgram requirements that are t be applied t wrk perfrmed by SCG E&CS Cnstructin Services. It is intended that this QA prgram will meet the requirements f the SCG Engineering & Cnstructin Services Basic Quality Plicy (BQP) as it relates t Cnstructin Services. It is als intended that this Prgram, where applicable, will meet the criteria utlined in the SCG Chapter XII Cntract Guidance Manual. This Cnstructin QA Prgram and Quality Cntrl Prcedures Manual is Vlume 5 f the E&CS Plicy and Prcedure Manual. The 5 vlumes in the E&CS Plicy and Prcedure Manual are as fllws: Vlume 1: Crprate Plicies and Prcedures Vlume 2: Site Administratin Plicies and Prcedures Vlume 3: Cnstructin and Cntract Administratin Plicies and Prcedures Vlume 4: Envirnmental, Health and Safety Plicies and Prcedures Vlume 5: Cnstructin QA Prgram and Quality Cntrl Prcedures ISO 9001 has been used as a reference and guideline, but this prgram is nt designed t meet the requirements f ISO A list f prcedures included in this QA prgram is shwn as Attachment A t this prcedure. Respnsibility The decisin t implement this QA prgram fr a particular cnstructin jb will be made at the sle discretin f the management f SCG E&CS Cnstructin Services. The decisin t implement this prgram (r any part f this prgram) fr a particular jb will be based n, but will nt be limited t, the fllwing criteria: QC-A-01rev4.dc 02/14/05 1

5 SCG E&CS Cnstructin Services Size and cst f the prject Effect f the prject n the verall gals f the Suthern Cmpany Critical nature f the jb (quality/safety) The implementatin f this QA prgram will be initiated by a letter t file frm the apprpriate management f SCG E&CS Cnstructin Services. This letter will utline the areas f the prgram apprpriate fr the particular jb. Refer t Attachment D fr a sample letter. The decisin t Stp Wrk resides with the management f SCG Engineering and Cnstructin Services and is n way affected by the decisin t implement r nt implement this QA Prgram. Cnstructin Site Organizatinal Structure Each cnstructin site shall have at least ne E&CS Cnstructin Services QC representative r individual identified as the QA/QC cntact. Depending n the cnstructin site, this QA/QC functin may be expanded t include additinal persnnel as dictated by the size f the prject and/r scpe f wrk activities. The rganizatinal structure fr the prject shall be aligned in such a manner as t allw the n site QC representative the necessary autnmy t perfrm the QA/QC functin in an unbiased manner. In additin, the nsite E&CS Cnstructin Services QC representative will wrk with the Crprate QC Crdinatr t cnduct peridic assessments f the verall QA/QC implementatin fr the prject. Prgram Implementatin Implementatin f the Cnstructin Services QA/QC Prgram n a particular jb site will generally fllwing the six steps listed n Attachment B and utlined belw. Step 1: Review the Cnstructin QA/QC Implementatin Checklist (Attachment C) This checklist shuld be used as a discussin guide by Cnstructin Site Management, the Crprate QC Crdinatr and the Prject Manager t insure that all aspects f the Prgram are being cnsidered. Step 2: Generate Plan t Implement Letter (Attachment D) and send t Cnstructin Services Lgistics Manager This letter shuld be used t dcument the intent t implement the Prgram and any anticipated deviatins frm full implementatin. Cpies f the letter shuld be sent t the Reginal QC-A-01rev4.dc 02/14/05 2

6 SCG E&CS Cnstructin Services Cnstructin Manager, the Prject Manager, the Crprate QC Crdinatr and nsite Dcument Cntrl. Step 3: Discuss specific prject implementatin plans Cnstructin Site Management with assistance frm the Crprate QC Crdinatr shuld discuss specific implementatin plans fr the particular cnstructin prject. Step 4: Develp and implement specific cmpnents f the Prgram Cnstructin Site Management shuld develp site specific plans based n discussins in step 3 abve and assign respnsibilities fr implementatin. Step 5: Cnduct verview meetings with all Cnstructin Services site emplyees At sme pint in the six step prcess, the Crprate QC Crdinatr will generally cnduct an verview meeting n the generic QA/QC Prgram. If the majrity f the nsite Cnstructin Services persnnel are nt familiar with the QA/QC Prgram, this verview culd ccur earlier in the six step prcess. Hwever, hlding the verview meeting at this stage allws Cnstructin Site Management t interject specific requirements and respnsibilities fr the particular cnstructin site. Attendance in this verview meeting will be dcumented in the individual s training recrds in SHIPS. Step 6: Cnduct peridic reviews with apprpriate feedback and fllwup t Cnstructin Site Management. The Crprate QC Crdinatr with assistance frm the n site QC representative will cnduct peridic assessments f the nsite Prgram implementatin. Tls fr these assessments will be the implementatin checklist (attachment C) and prcess bservatins based n specific cmpnents f the QA/QC Prgram. Results f the assessments will be shared with site Cnstructin Management and will be used as the basis fr future assessments. Quality Assessments Varius reviews and assessments will be carried ut t verify that Cnstructin Services prjects are fllwing the requirements f the Cnstructin Services QA/QC Prgram. These reviews and/r assessments will cnsist f, but nt be limited t, the fllwing: Assessments cnducted by the E&CS Manager QA in accrdance with the E&CS Basic Quality Plicy Assessments assciated with Sarbanes Oxley required cntrls Assessments assciated with administrative prcedure 3H Site Assessment and Peer Review QC-A-01rev4.dc 02/14/05 3

7 SCG E&CS Cnstructin Services Peridic assessments perfrmed by the Cnstructin Services QC Crdinatr as utlined in Step 6 f the Implementatin Prcess abve. On site assessments cnducted by Cnstructin Site Management Apprvals and Revisins Prcedures issued fr review and cmment will be identified with an alpha revisin designatin. Prcedures apprved fr use will be issued with a numerical revisin designatin, beginning with 0. All prcedures apprved fr use will be dated and cntain the initials and/r signature f the fllwing: Persn wh prepared r revised the prcedure Cnstructin Lgistics Manager r designee Vice President Cnstructin Services r designee A brief descriptin f the reasn fr a revisin will be given n the cver sheet alng with apprpriate apprvals. Material within a prcedure that has been revised r added will be indicated with bld type and a bar ( ). Distributin f the Manual As utlined in administrative prcedure 1A Plicy and Prcedure Manual Overview, there will nt be a cntrlled distributin f this Manual. The web cpy f the Manual will always be up-t-date and will cntain the latest revisin f all prcedures. The web versin f this Manual can be accessed frm the Cnstructin Services hme page. Refer t Attachment E fr the steps in accessing the Cnstructin Services hme page and the QA Manual. Ntificatin f newly apprved r revised prcedures will be via an distributin list. It will be the respnsibility f the Users f this Manual t access and/r print the apprved r revised prcedures frm the web. Dcument Cntrl Fr dcument cntrl and recrd keeping purpses, the riginal signed prcedures shall be maintained in a ntebk by the Cnstructin Lgistics Manager r designee. This designee will generally be the Crprate QC Crdinatr. As prcedures are revised, the vided prcedures shall be marked VOID n the cver page, remved frm the Current ntebk and placed in a secnd QC-A-01rev4.dc 02/14/05 4

8 SCG E&CS Cnstructin Services Vided ntebk. By definitin, the Current ntebk shall cntain nly the riginal signed cpies f the current revisin f all prcedures. The Vided ntebk shall cntain all revisins f the vided riginal prcedures. QC-A-01rev4.dc 02/14/05 5

9 SCG E&CS Cnstructin Services SCG Engineering and Cnstructin Services Cnstructin QA Prgram and Quality Cntrl Prcedures Table f Cntents Prcedure Number QC A QC - A - 01 QC A - 02 QC B QC - B - 01 QC - B- 02 QC C QC - C - 01 QC - C - 02 QC D QC - D - 01 QC E QC - E - 01 QC F QC - F - 01 QC G QC - G - 01 QC - G - 02 QC - G - 03 QC - G - 04 QC G - 05 QC H QC - H - 01 QC - H - 02 QC - H - 03 QC I QC - I - 01 QC - I - 02 QC - I - 03 Prcedure Descriptin QA Prgram Overview Oversight and Cntrl f Cntractr QC Prgrams Dcument Cntrl Field Change/Clarificatin Request Qualificatin and Evaluatin f Cntractrs Purchase f Quality Items Receipt, Strage and Handling f Prducts Prduct Identificatin and Traceability Prcess Cntrl Civil Inspectin Electrical Inspectin Mechanical Inspectin Welding Inspectin Fiberglass Manufacture & Installatin Inspectin Nncnfrmance Reprt Hld Tag Crrective and Preventive Actin Cntrl f Quality Recrds Training Statistical Techniques Attachment A QC-A-01rev4.dc 02/14/05 6

10 SCG E&CS Cnstructin Services The Six Steps t E&CS Cnstructin Services QA/QC Prgram Implementatin 1) Review the Cnstructin QA/QC Implementatin Checklist. 2) Generate Plan t Implement Letter and send t Cnstructin Services Lgistics Manager. 3) Discuss specific prject implementatin plans. 4) Develp and implement specific cmpnents f the Prgram. 5) Cnduct verview meetings with all Cnstructin Services site emplyees. 6) Cnduct peridic reviews with apprpriate feedback and fllwup. Attachment B QC-A-01rev4.dc 02/14/05 7

11 SCG E&CS Cnstructin Services SCG ENGINEERING AND CONSTRUCTION SERVICES CONSTRUCTION QA/QC PROGRAM IMPLEMENTATION CHECKLIST Prject: Date f Review: Activity Yes N N/A 1) Is the Cnstructin Management team familiar with the cntents f the E&CS Basic Quality Plicy (BQP), the Cnstructin QA Prgram and Quality Cntrl Prcedures and the lcatin f these dcuments n the intranet? 2) Have there been discussins t determine the applicable prtins f the Cnstructin QA Prgram fr this particular prject? 3) Has a letter been written t the Cnstructin Services Lgistics Manager utlining the prtins f the Cnstructin QA Prgram t be used n this prject? Reference: QC-A-01 QA Prgram Overview Cmments/Actin Items: 4) Has there been a review f the cntractr s QA/QC Prgram t insure that the Prgram will meet the scpe and requirements f the cnstructin prject.? Is the cntractr prepared t implement the QA/QC Prgram as utlined in the QA/QC Manual? Reference: QC-A-02 Cmments/Actins Items: 5) Is there a dcument cntrl prcess in place fr this prject? Reference: QC-B-01 Cmments/Actin Items: Attachment C Page 1 f 4 QC-A-01rev4.dc 02/14/05 8

12 SCG E&CS Cnstructin Services Activity Yes N N/A 6) Is there a prcess in place fr dcumenting design changes, field changes and clarificatins and nncnfrmances? Reference: QC-B-01; QC-B-02; QC-H-01 Cmments/Actin Items: 7) Is there a prcess in place t evaluate ptential cntractrs and t evaluate cntractrs currently perfrming wrk n this prject? Reference: QC-C-01 Cmments/Actin Items: 8) Is there a prcess in place t prperly perfrm receipt, strage and handling f cnstructin prducts? Reference: QC-D-01 Cmments/Actin Items: 9) Is there a prcess in place t evaluate and discuss significant events t insure critical milestnes, inspectin hld pints and acceptance criteria are met? Reference: QC-F-01 Cmments/Actin Items: Attachment C Page 2 f 4 QC-A-01rev4.dc 02/14/05 9

13 SCG E&CS Cnstructin Services Activity Yes N N/A 10) Is there an inspectin and testing prgram in place that allws the unbiased reprting f inspectin and test results t SCG Cnstructin Management? 11) Are the inspectrs and technicians qualified and/r certified as required by standards and specificatins? 12) Has sufficient survey cntrl been established t insure initial and nging verificatin f prper lcatins, plumbness, etc.? Reference: QC-G-01, QC-G-02; QC-G-03; QC-G-04; QC-I-03 Cmments/Actin Items: 13) Has a Hld Tag r equivalent prcess been implemented t islate nncnfrming items r items with incmplete inspectins frm cnstructin use? Reference: QC-H-02 Cmments/Actin Items: 14) Is a prcess in place that will help minimize the reccurrence f actual r ptential nncnfrmances and allw fr the utilizatin f lessns learned? Reference: QC-H-03 Cmments/Actin Items: Attachment C Page 3 f 4 QC-A-01rev4.dc 02/14/05 10

14 SCG E&CS Cnstructin Services Activity Yes N N/A 15) Is there a prcess in place t allw fr the cntrl f quality recrds including cntrlled access during cnstructin and prper strage at the cmpletin f the prject? Reference: QC-I-01 Cmments/Actin Items: 16) Is there a prcess in place that ensures emplyees have the technical capabilities and skills sets necessary t perfrm the required quality tasks and t manage a quality prject? Reference: QC-I-02 Cmments/Actin Items: 17) Is there a prcess in place t ensure that specific requirements f prducts and materials that are critical t the quality f cnstructin are cnveyed, dcumented, reviewed and apprved thrughut the purchasing prcess? Reference: QC-C-02; QC-E-01 Cmments/Cmments/Actin Items: Meeting Attendees: Final Cmments: Implementatin Review Cnducted By: Attachment C Page 4 f 4 QC-A-01rev4.dc 02/14/05 11

15 SCG E&CS Cnstructin Services Date Jby Frame SCG E&CS Cnstructin Services Cnstructin Lgistics Manager RE: Plant (Type f Prject) SCG Engineering and Cnstructin Services Cnstructin QA Prgram and QC Prcedures Jby: In accrdance with the guidelines stated in the Quality Assurance Prgram Overview prcedure (QC A 01), we will implement the SCG E&CS Cnstructin Services Cnstructin QA Prgram and QC Prcedures Manual fr the Plant Prject. We will meet the intent f the verall QA Prgram and will invke apprpriate prcedures as relevant t the scpe f wrk fr this prject. Sincerely, (Name) Cnstructin Site Manager cc: Prject Manager Reginal Cnstructin Manager Crprate QC Crdinatr On site Dcument Cntrl Attachment D QC-A-01rev4.dc 02/14/05 12

16 SCG E&CS Cnstructin Services Yu can access the Cnstructin Services Plicy and Prcedure Manual Vlume 5 Cnstructin QA Manual and QC Prcedures via the fllwing steps: Start at the Suthern Tday hmepage Click n Business Units and Departments at the tp f the page Click n Suthern Cmpany Generatin Click n Departments n the left Click n Engineering and Cnstructin Services n the right Click n Cnstructin Services n the left Click n Cnstructin Services Plicy and Prcedure Manual n the left Click n Vlume 5 at the bttm f the page Attachment E QC-A-01rev4.dc 02/14/05 13

17 SCGEM Engineering and Cnstructin Services Cnstructin Services QC Prcedure Number (QC A 02) Oversight and Cntrl f Cntractr QC Prgrams Revisin Descriptin Revised By Reviewed By Apprved By Date A Issued fr Review R. Reynlds N/A N/A 8/18/04 0 Issued fr Cnstructin R. Reynlds J. Frame A. Baker 10/11/04

18 SCGEM E&CS Cnstructin Services QC A - 02 Oversight and Cntrl f Cntractr QC Prgrams Purpse The purpse f this prcedure is t utline the guidelines fr prviding versight and cntrl f a cntractr s quality cntrl prgram n SCGEM E&CS Cnstructin Services cnstructin prjects. Scpe This prcedure is t be used by SCGEM E&CS Cnstructin Services t manage and evaluate a cntractr s quality cntrl prgram. The Cnstructin Services QA/QC Prgram will be used as a benchmark t gauge the cmpleteness f the cntractr s prgram. The cntractr s prgram, as a minimum, shuld cntain cmpnents that mirrr the Cnstructin Services QA Prgram. This prcedure is an integral part f the SCGEM E&CS Cnstructin Services cnstructin Quality Assurance Prgram and is intended fr use n SCGEM Engineering and Cnstructin Services cnstructin prjects. Respnsibility It will be the respnsibility f SCGEM Engineering and Cnstructin Services persnnel and/r their designee t implement and cntrl the use f this prcedure. It will be the respnsibility f the cntractrs perfrming wrk n E&CS cnstructin sites t implement their quality cntrl prgram as utlined in their quality cntrl manual. Cnstructin Prjects with Prime Cntractrs As part f the initial bid package, ptential cntractrs are instructed t prepare their bids t include an n site QC prgram that cntains, as a minimum, cmpnents that mirrr the Cnstructin Services QA Prgram. Upn award f a cntract, the cntractr will be expected t implement their QC prgram as utlined in their QC manual. Generally, it is expected that QC inspectin in the field will be perfrmed by the Cntractr supplemented, as needed, with 3 rd party testing persnnel hired by the Cntractr. On site E&CS Cnstructin Services persnnel will perfrm peridic QA surveillance f the Cntractr s prgram and the Cntractr s cmpleted wrk. This QA surveillance shuld include all aspects f the Cntractr s prgram as utlined in the Cntractr s qca02rev0.dc 10/11/04 1

19 SCGEM E&CS Cnstructin Services QC Manual. As a general rule, Cnstructin Services persnnel shuld perfrm QA surveillance/inspectin n a minimum f 10% f the wrk accepted as cmplete by the Cntractr s QC grup. The percentage and frequency f these inspectins shuld be increased, as necessary, based n such factrs as: scpe and criticality f the wrk cntractr s previus perfrmance site specific and/r industry standards r requirements If the results f the QA surveillance indicate issues with the cntractr s perfrmance, the cntractr shall be immediately ntified and steps shall be taken t identify and crrect the cause f the prblems. There shall be an increase in QA surveillance by Cnstructin Services until such time as the results f the surveillance indicate a sustainable imprvement in the cntractr s perfrmance. Whenever pssible, the number f inspectins required shuld be calculated based n a defined number f pssible inspectins, fr example: number f blted cnnectins number f welds number f terminatins number f structural members received and accepted number f hanger supprts In additin the Crprate QC Crdinatr will wrk with the nsite E&CS Cnstructin Services QC representative t cnduct peridic assessments f the verall QA/QC implementatin fr the prject. Qualificatins f QC Persnnel It will be the respnsibility f the cntractr t emply qualified inspectin persnnel in sufficient numbers t prperly staff the jb. The qualificatins f these individuals shall be submitted t Cnstructin Services fr review. In additin, as the need arises, the cntractr will be respnsible fr hiring a qualified 3 rd party testing agency t supplement QC staffing requirements. The qualificatins f this agency alng with the qualificatins f inspectrs/technicians assigned t the cnstructin prject shall be submitted t Cnstructin Services fr review. Cntractr s QC Organizatin The cntractr s n site rganizatin shall be structured in such a manner as t allw the QC persnnel the necessary autnmy t perfrm inspectins and tests in an unbiased manner. qca02rev0.dc 10/11/04 2

20 SCGEM E&CS Cnstructin Services Inspectin and Testing Plan The cntractr shall submit t Cnstructin Services an inspectin and testing plan related t the scpe f wrk being perfrmed. This plan shall include, as a minimum, such items as: type and frequency f testing r inspectins prpsed ruting f cmpleted and/r in prcess inspectin dcumentatin t verify cntractr QC acceptance timely ruting and distributin f 3 rd party inspectin and test reprts hld pints fr in prcess peratins t allw time fr Cnstructin Services inspectin, review r peridic QA surveillance timely submittal f cmpleted inspectins t allw time fr Cnstructin Services inspectin, review r peridic QA surveillance cpies f prpsed frms, checklists and reprts* types and methds f transmittals respnsible parties *Cnstructin Services frms, checklists and reprts may be used in lieu f cntractr s dcuments if mutually agreeable Labr Brker Cnstructin Prjects In a labr brker arrangement, the E&CS Cnstructin Services QA Prgram and QC Prcedures will be the gverning dcuments fr all nn ASME wrk perfrmed n the prject. All ASME cde wrk perfrmed n the prject shall be in accrdance with the labr brker s ASME Quality Cntrl Manual. The labr brker s ASME Quality Cntrl Manual shall meet the requirements f the ASME Biler and Pressure Vessel Cde, Sectins I, B31.1, and VIII, Divisin 1, the Natinal Bard Inspectin Cde and Jurisdictinal requirements and shall be the gverning dcument in all Cde related wrk n the prject. A site specific verview prcedure shuld be written that: encmpasses the relevant prtins f the labr brker s QA/QC prgram via addendums links the site specific QA Prgram t the verall Crprate E&CS Cnstructin Services QA Prgram defines the scpe and parameters f the site specific QA Prgram as nted abve defines site specific rles and respnsibilities utlines the review, apprval and cntrlled distributin prcess fr the site specific QA Manual qca02rev0.dc 10/11/04 3

21 SCGEM E&CS Cnstructin Services Generally speaking, this site specific prcedure shuld be mdeled after quality cntrl prcedure QC-A-01. T maintain cntinuity with the Crprate QA Prgram, this site specific verview prcedure shuld be entitled: QC-A-00: Site Specific QA/QC Prgram Overview. Distributin and cntrl f this site specific QA Prgram Manual shall be cntrlled by n site Cnstructin Services Management by the methd mst apprpriate fr the prject (i.e. web site, S drive, hard cpy). In rder t instill Quality as part f the jb, it is anticipated that initial QC inspectin will be perfrmed by the crafts perfrming the wrk. Verificatin f QC inspectin and QA versight will be perfrmed by E&CS Cnstructin Services management persnnel. Each cnstructin site shall have at least ne E&CS Cnstructin Services QC representative. Depending n the cnstructin site, this QA/QC functin may be expanded t include additinal persnnel as dictated by the divisin f wrk activities amng the craft and Cnstructin Services persnnel. The rganizatinal structure fr the prject shall be aligned in such a manner as t allw the n site QC representative the necessary autnmy t perfrm the QA/QC functin in an unbiased manner. In additin, the Crprate QC Crdinatr will wrk with the nsite E&CS Cnstructin Services QC representative t cnduct peridic assessments f the verall QA/QC implementatin fr the prject. Dcument Cntrl All cntractr and 3 rd party cmpleted inspectin and testing reprts shall be submitted t Cnstructin Services in a timely and cntrlled manner. These dcuments shall be assembled int apprpriate turnver packages as utlined in administrative prcedure 3G Prcessing Startup Packages. At the cmpletin f the cnstructin prject, this dcumentatin shall be prcessed in accrdance with prcedure QC I 01: Cntrl f Quality Recrds. qca02rev0.dc 10/11/04 4

22 Suthern Cmpany Generatin Engineering and Cnstructin Services Cnstructin Services Cnstructin Services Quality Prcedures Prcedure QC B 01 Cnstructin Services Dcument Cntrl Rev. 6 Rev. 5 Date 9/4/07 8/16/06 Revised By R.H. Reynlds, Jr. R.H. Reynlds Jr Reviewed By Cnstructin T.L. Magnus T.L. Magnus Apprved By Cnstructin K.D. Russell D.L. McKinney Uncntrlled Cpy

23 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Cntents 1.0 PURPOSE AND SCOPE Purpse Scpe DEFINTIONS AND REFERENCES Definitins References RESPONSIBiLITY Cnstructin Services Recipients f Cntrlled Dcuments Cnstructin Services Cnstructin Site Manager Cnstructin Services Site Quality Lead Dcument Services Cnstructin Services Dcument Cntrl Reginal Crprate Quality Crdinatr PROCEDURE Distributin f Engineering Drawings Design Change Ntices (DCN) Advance Print Printing f Drawings frm Dcumentum CD Cpies f Drawings Miscellaneus Dcument Transmittal Tracking System Assessment f Dcument Cntrl KEY CONTACTS QUALITY RECORDS ATTACHMENTS...10 Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 2 f 17 Rev. 6

24 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/ PURPOSE AND SCOPE 1.1 Purpse This prcedure dcuments the prper distributin f cntrlled dcuments issued t and distributed n Engineering and Cnstructin Services (E&CS) cnstructin sites. This prcedure is an integral part f the E&CS Cnstructin Services cnstructin Quality Assurance prgram. This prcedure dcuments the prcesses in place n cnstructin prjects using hard-cpy transmittals and cpies f drawings distributed by E&CS Dcument Services. This prcedure als dcuments the electrnic transmittal ntificatin prcess, the printing f drawings directly frm Dcumentum, and the use f PIMS fr dcument cntrl. 1.2 Scpe This prcedure affects all E&CS Cnstructin Services persnnel and cntractrs wh wrk fr them. Fr this prcedure, cntrlled dcuments shall include, but are nt limited t, the fllwing: Engineering and Cnstructin Services drawings and ther cntrlled dcuments issued by E&CS Dcument Services via Dcumentum. Dcuments received frm the cntractrs perfrming wrk n E&CS cnstructin sites. Dcuments distributed by Cnstructin Services nsite persnnel t the cntractrs perfrming wrk n E&CS cnstructin sites. Design Change Ntices (DCN), Cnstructin Miscellaneus Transmittal Frms (CMTF), and ther dcuments utilizing the Prject Infrmatin Management System (PIMS). Advance prints the Design rganizatin transmits t r makes available t Cnstructin Services. Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 3 f 17 Rev. 6

25 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/ DEFINTIONS AND REFERENCES 2.1 Definitins advance print A drawing transmitted by Design instead f Dcument Cntrl. Examples include an in-prcess drawing r an fficial drawing being transmitted early. Cnstructin Miscellaneus Transmittal Frm (CMTF) A PIMS-generated frm used by Cnstructin Services and cntractrs t transmit cntract deliverables and ther miscellaneus dcuments. Design Change Ntice (DCN) A PIMS-generated frm Design uses t transmit advance engineering design infrmatin t Cnstructin Services prir t a frmal drawing revisin. Dcumentum A dcument management system supprted by E&CS Dcument Services. Dcumentum is the repsitry fr fficial quality recrds. Prject Infrmatin Management System (PIMS) A Web-based dcument and data management system used by E&CS t manage dcumentatin generated during the life cycle f a cnstructin prject t include engineering design, prcurement, and cnstructin. Transmittal Tracking Database A Micrsft Access database used fr the generatin and tracking f site dcument transmittals. 2.2 References E&CS Basic Quality Prgram Design Prcedure D2-03, Dmestic Drawing Prcess Design Prcedure D2-09, Vendr Dcument Prcessing Design Prcedure D3-02, Preparatin and Distributin f Design Change Ntices Cnstructin Services Prcedure QC-H-01, Nncnfrmance Reprt Cnstructin Services Prcedure QC-I-01, Cntrl f Quality Recrds Prcedure DS 3-1, Dcument Transmittal PIMS Guideline 3-A, Design Change Ntice PIMS Guideline 2-H, Cnstructin Miscellaneus Transmittal Frm (under develpment) Transmittal Tracking Access Database Instructin Manual Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 4 f 17 Rev. 6

26 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/ RESPONSIBILITY 3.1 Cnstructin Services Cnstructin Services shall maintain this Cnstructin Services prcedure. Prir t the transmittal f any dcuments, Cnstructin Services shall ntify Dcument Services f the fllwing: The number f dcuments needed. The cntact emplyees at the jb site. In the case f drawings, the number f each size needed. 3.2 Recipients f Cntrlled Dcuments Recipients f cntrlled dcuments shall be respnsible fr: Updating cntrlled dcuments when issued. Destrying r marking vided dcuments when new drawing revisins are issued. 3.3 Cnstructin Services Cnstructin Site Manager The Cnstructin Services cnstructin site manager r designee shall be respnsible fr implementing and ensuring adherence t the scpe and requirements f this prcedure. 3.4 Cnstructin Services Site Quality Lead The Cnstructin Services site quality lead r designee shall be respnsible fr ensuring quality preplanning, mnitring, and administratin f this prcedure. 3.5 Dcument Services Ntifies the nsite Cnstructin Services Dcument Cntrl cntact persn f dcument availability via . Generates transmitted letters fr hard-cpy transmittals and frwards them t nsite Cnstructin Services Dcument Cntrl cntact persn. Uncntrlled Cpy 3.6 Cnstructin Services Dcument Cntrl Receives frm Dcument Services f dcument availability. Reviews transmitted hardcpy fr accuracy and cmpleteness. QC-B-01, Cnstructin Services Dcument Cntrl 5 f 17 Rev. 6

27 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Ntifies Dcument Services f any discrepancies between the hard-cpy transmittal and the actual dcuments. 3.7 Reginal Crprate Quality Crdinatr Peridically reviews the dcument cntrl prcess at cnstructin sites t evaluate implementatin and adherence t this prcedure. Respnds t inquiries regarding the cntent and implementatin f this prcedure. 4.0 PROCEDURE 4.1 Distributin f Engineering Drawings Engineering drawings are distributed as indicated belw. The distributin f engineering drawings is crdinated thrugh several sets f prcedures (see 2.2, References). The fllwing is a general verview f the drawing distributin prcess. See attachment A, Dcument Cntrl Flwchart, fr an verview representatin. (The numbers n the flwchart crrespnd t the numbers listed belw.) 1) Cnstructin Services shall prvide Dcument Services with the fllwing: The number f drawings needed. The size f drawings needed. The apprpriate cntacts at the cnstructin site. 2) When Design is ready t transmit drawings t Cnstructin Services, the apprpriate Design discipline lead engineer electrnically frwards the drawings t Dcument Services fr prcessing. Dcument Services: Lads the drawings int Dcumentum. Makes the required number f hardcpies. Ntifies the nsite Cnstructin Services Dcument Cntrl cntact persn via f the drawing availability. (Refer t attachment B fr instructins n hw t access Dcumentum and attachment D fr a sample f the ntificatin.) Uncntrlled Cpy Dcument Services generates a transmittal letter when transmitting hardcpies (similar t attachment C) and frwards the drawings t the apprpriate nsite Cnstructin Services Dcument Cntrl cntact persn. QC-B-01, Cnstructin Services Dcument Cntrl 6 f 17 Rev. 6

28 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 3) The nsite Cnstructin Services Dcument Cntrl cntact persn shall review the transmitted hardcpies fr accuracy and cmpleteness and ntify Dcument Services f any discrepancies. The nsite Cnstructin Services Dcument Cntrl cntact persn remves frm the transmittal package the apprpriate number f dcuments needed by the field ffice, then date stamps and files the transmittal letter. The remaining dcuments are distributed t the varius cntractrs based n a predetermined distributin list. The nsite Dcument Cntrl cntact persn imprts the drawings infrmatin int the nsite Transmittal Tracking Database using the transmittal number (refer t attachment F). 4) Using the transmittal tracking database, the nsite Dcument Cntrl cntact persn shall prepare a transmittal letter fr each cntractr, similar t attachment E. If the drawing status is any status ther than Issued fr Cnstructin, the nsite Dcument Cntrl cntact persn shall indicate the status f the drawing in the cmments sectin f the transmittal letter. Fr example, if the drawing status is Advanced Print, Vid, r Infrmatin Only, the nsite Dcument Cntrl cntact persn adds this infrmatin t the transmittal letter. Cnstructin Services shall be respnsible fr ensuring a representative f each cntractr signs the transmittal letter acknwledging the receipt f the dcuments. The nsite Cnstructin Services Dcument Cntrl cntact persn shall file a cpy f each signed transmittal letter. T aid in cntrlling transmittals, an nsite transmittal sequence number may be used. The nsite Cnstructin Services Dcument Cntrl cntact persn shall assign these sequence numbers. 5) As indicated abve, the transmittal tracking database allws the creatin f a transmittal letter, similar t attachment E, directly frm the database. This database pulls transmittal infrmatin frm Dcumentum. It als creates a recrd f all drawings received and transmitted t the cntractr including the date it was transmitted, the date it was signed by the cntractr, and the nsite transmittal number. Attachment F is a general verview f this database. The Transmittal Tracking Access Database Instructin Manual is a cmplete user s guide and instructin manual. 6) With the exceptin f ne cpy maintained by the nsite Cnstructin Services Dcument Cntrl cntact persn, hlders f the cntrlled cpy shall destry all previus revisins f drawings at the time a new revisin is issued. If it is necessary t keep cpies f prir revisins, the hlder f the cntrlled cpy shall stamp the drawing Vid Fr Infrmatin Only. Uncntrlled Cpy NOTE If previus revisins f drawings and the transmittal histry assciated with thse drawings are maintained in Dcumentum and the nsite Transmittal Tracking system, nsite Cnstructin Services Management may deem it unnecessary t maintain a cpy f all vided drawings. At the cmpletin f the cnstructin prject, dispsitin f all QC-B-01, Cnstructin Services Dcument Cntrl 7 f 17 Rev. 6

29 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 cntrlled dcuments shall be in accrdance with QC-I-01, Cntrl f Quality Recrds. 4.2 Design Change Ntices (DCN) Design maintains cntrl f prcedure D3-02, Preparatin and Distributin f Design Change Ntices. D3-02 prvides instructins fr using Design Change Ntices (DCN) and establishes the DCN as the frmal mechanism fr early transmittal f advance engineering design infrmatin t a cnstructin grup prir t frmal drawing revisin. Unless nted therwise n the DCN, infrmatin n the DCN shall be treated as released-fr-cnstructin infrmatin. The nsite Cnstructin Services Dcument Cntrl shall acknwledge receipt f the DCN frm Design and shall frmally transmit the DCN t all affected parties. DCNs are ruted and tracked via the Prject Management Infrmatin System (PIMS). PIMS Guideline 3A, Design Change Ntice, details the prper cmpletin f a DCN. Cnstructin Services shall mnitr the DCN status, and when wrk is cmplete, shall clse the DCN in PIMS. All existing drawings and dcuments affected by a DCN shall be stamped with the DCN number r shall have a cpy f the DCN attached. (See Design D3-02 and/r PIMS guideline 3A fr a Design Change Ntice Prcess flwchart and a cpy f the DCN frm.) 4.3 Advance Print The use f advance prints shuld be minimized n the cnstructin site fr actual cnstructin activities. In situatins when advance prints are required t meet cnstructin schedules, the advance print dcument transmittal and/r retrieval prcess shall be dcumented and cntrlled. NOTE This prcess may vary frm prject t prject. Uncntrlled Cpy The Cnstructin Services Dcument Cntrl cntact persn shall stamp an advance print as ADVANCE PRINT. The nsite Dcument Cntrl cntact persn and all recipients f the advance print shall replace an advance print with the fficial issued-frcnstructin drawing as sn as Dcument Services transmits it via Dcumentum. The Dcument Cntrl cntact persn and all recipients f the advance print shall stamp the replaced advance print VOID. If needed, ne cpy may be retained fr recrd purpses. QC-B-01, Cnstructin Services Dcument Cntrl 8 f 17 Rev. 6

30 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/ Printing f Drawings frm Dcumentum T expedite the delivery f drawings t the cnstructin site, many prjects use the E- mail ntificatin prcess discussed in 4.1, Distributin f Drawings, and print all drawings nsite. E&CS persnnel can cnduct simple drawing searches and print single drawings thrugh the Dcumentum Web site. (Refer t attachment B fr instructins n accessing the Dcumentum Web site.) Hwever, t print the massive vlume f drawings needed fr the jbsite, the nsite Dcument Cntrl staff will need t install the Dcumentum Desktp Client. (The Dcumentum Web site prvides instructins fr lading the Dcumentum Desktp Client.) Drawings printed frm Dcumentum intended fr use by the cntractr shall be transmitted thrugh the nsite Cnstructin Services dcument cntrl. 4.5 CD Cpies f Drawings If allwed by the cntract, in lieu f hard-cpy drawings, prjects may pt t create a cpy f Dcumentum drawing images n a CD and send the CD t the cntractr. The CD enables the cntractr t print as many cpies f the drawings as needed. A transmittal letter generated frm the transmittal tracking database accmpanies the CD sent t the cntractr as it wuld hard-cpy drawings. NOTE Fr sme prjects, Dcument Services is able t create the CD and send it t the nsite Cnstructin Services Dcument Cntrl cntact persn, saving the time and cst f creating the CDs nsite. 4.6 Miscellaneus Dcument Transmittal Tracking System Each cnstructin site shall establish a miscellaneus dcument transmittal tracking prcess t recrd the ruting f imprtant dcuments and crrespndence generated during the curse f a cnstructin prject. The transmittal tracking database has the capability f tracking miscellaneus transmittals. (This prcess is explained in detail in the Transmittal Tracking Access Database Instructin Manual.) Uncntrlled Cpy NOTE The scpe and magnitude f the cnstructin prject influences the type f miscellaneus transmittal tracking system t be used. Tw imprtant aspects f the tracking prcess include: Having dcumentatin verifying cntractrs and ther affected parties received and signed fr all dcuments sent t them by Cnstructin Services. QC-B-01, Cnstructin Services Dcument Cntrl 9 f 17 Rev. 6

31 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Ensuring Cnstructin Services is aware f dcuments sent t them by cntractrs and is able t review and respnd t them in a timely manner Cnstructin Miscellaneus Transmittal Frm The Cnstructin Miscellaneus Transmittal Frm (CMTF) is being develped in PIMS. The CMTF will rute and cntrl miscellaneus dcuments transmitted between the cntractr and Cnstructin Services. This frm, nce implemented, will allw either Cnstructin Services r the cntractr t transmit dcuments via the CMTF. The prper cmpletin f a CMTF will be detailed in PIMS Guideline 2-H, Cnstructin Miscellaneus Transmittal Frm. On sites where the cntractr has access t PIMS, the CMTF will becme the primary methd used t transmit miscellaneus dcuments between Cnstructin Services and the cntractr. 4.7 Assessment f Dcument Cntrl Peridically, the nsite Cnstructin Services Dcument Cntrl cntact persn shall: Review the cntrlled dcuments he r she and the cntractrs maintain t ensure nly current dcuments are in use. Cntrl all drawings used fr cnstructin, ensuring the latest revisin. (See prcedure QC-A-02, Oversight and Cntrl f Cntractr QC Prgrams, fr a guide t establish the review criteria.) Dcument any discrepancies fund in the cntractrs dcuments and ntify the cntractr fr immediate remediatin. Recurring prblems may require that a nncnfrmance reprt be issued (see prcedure QC-H-01, Nncnfrmance Reprt). Additinal reviews f dcument cntrl may be cnducted by the Cnstructin Services site quality lead and the Reginal Crprate Quality Crdinatr. 5.0 KEY CONTACTS Uncntrlled Cpy Fr questins regarding the cntent and implementatin f this prcedure, cntact the apprpriate Reginal Crprate Quality Crdinatr. 6.0 QUALITY RECORDS The dcument transmittal frms discussed in this prcedure are cnsidered quality recrds and shall be stred and managed in accrdance with Quality Prcedure QC-I- 01. These dcuments shall exist as hard-cpy transmittals stred in Cnstructin QC-B-01, Cnstructin Services Dcument Cntrl 10 f 17 Rev. 6

32 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Services Dcument Cntrl and as electrnic cpies within the PIMS system. Transmittal data is stred and tracked in the transmittal tracking systems. 7.0 ATTACHMENTS Attachment A Dcument Cntrl Flwchart Attachment B Dcument Services/Dcumentum Web site Attachment C Sample Dcument Services Drawing Transmittal Letter Attachment D Sample Dcument Services Ntificatin Attachment E Sample Cnstructin Services Dcument Transmittal Letter Attachment F Transmittal Tracking Database Input Screen Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 11 f 17 Rev. 6

33 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Attachment A Dcument Cntrl Flwchart QC - B - 01 Dcument Cntrl E&CS Cnstructin determines the number and size f dcuments needed and the apprpriate n site cntacts. Dcument Cntrl Flw Chart Cntractr signs n site transmittal letter and returns t Cnstructin Services Dcument Cntrl. Vided dcuments are destryed r stamped "Vid - Fr Infrmatin Only". On site Cnstructin Services Dcument Cntrl maintains ne cpy f vided dcuments unless n site Cnstructin Management feels that suitable histrical recrds are maintained elsewhere. 6 E&CS Dcument Services maintains the master list f apprved drawings in the Dcumentum database. Dcuments are distributed t the varius cntractrs via an n site transmittal letter. On site Dcument Cntrl t use transmittal tracking database 4 & 5 fr tracking transmitted drawings. 4 & 5 Design Engineering transmits drawings electrnically t E&CS Dcument Services in Birmingham. E&CS Dcument Services sends an electrnic ntificatin that drawings are ready fr imprt, makes hard cpies and transmits cpies via a transmittal letter t the Cnstructin Services n site Dcument Cntrl. Cnstructin Services n site Dcument Cntrl reviews hard cpy transmittals fr accuracy and cmpleteness. Cpies are remved fr Cnstructin Services use and the transmittal is date stamped and filed. On site Dcument Cntrl will imprt all drawings infrmatin via the transmittal number int the transmittal tracking database. Uncntrlled Cpy 3 QC-B-01, Cnstructin Services Dcument Cntrl 12 f 17 Rev. 6

34 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Attachment B Dcument Services/Dcumentum Web Site Hw t access the Web site: Start at: > Suthern Tday Hme Page (n Suthern Cmpany intranet) > Click n Business Units and Departments > Click n Suthern Cmpany Generatin > Click n Departments > Click n Engineering and Cnstructin Services > Click n Dcumentum Click n Dcumentum Drawing Simple Search feature OR Click n Desktp Client (DTC) Dcumentum Interface Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 13 f 17 Rev. 6

35 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Attachment C Sample Dcument Services Drawing Transmittal Letter Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 14 f 17 Rev. 6

36 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Attachment D Sample Dcument Services Ntificatin Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 15 f 17 Rev. 6

37 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Attachment E Sample Cnstructin Services Dcument Transmittal Letter Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 16 f 17 Rev. 6

38 E&CS Cnstructin Services Date Issued: 01/06/00 Cnstructin Quality Prcedures Date Revised: 09/04/07 Attachment F Transmittal Tracking Database Input Screen Overview The Transmittal Tracking Access Database is passwrd prtected and is unique t each cnstructin site. This database can be used t develp an nsite tracking system capturing the transmittal f all drawings t the cntractrs n the jb and the date received (signed) by the cntractrs representatives. The system will als generate a unique transmittal letter fr each transmittal t each cntractr. The screen belw is the main input screen. This system imprts drawing infrmatin directly frm the Dcumentum system maintained by E&CS Dcument Services. This system can als be used t track miscellaneus transmittals. Refer t the Transmittal Tracking Access Database Instructin Manual fr specific infrmatin. Uncntrlled Cpy QC-B-01, Cnstructin Services Dcument Cntrl 17 f 17 Rev. 6

39 SCG Engineering and Cnstructin Services Cnstructin Services QC Prcedure Number (QC B 02) Field Change/Clarificatin Request Revisin Descriptin Revised By Reviewed By Apprved By Date A Issued fr Review N/A N/A N/A 11/8/99 0 Issued fr Cnstructin RHR, Jr. DMC RWM 11/17/99 1 General Revisin, Including Renumbering t Fit QA Prgram Frmat 2 General Revisin, Including Department Name Change 3 Department name change; additin f FCR prcess flwchart; update attachments 4 Incrpratin f Best Practices by Administrative QC Review Cmmittee: E. Berner, C. Casey, T. Duncan and S. Lumsden RHR, Jr. DMC RWM 3/6/00 RHR, JR. WCL JBF 1/31/02 RHR, Jr. WDP JCH 10/14/02 RHR, Jr. JBF C.A. Baker 02/14/05

40 SCG E&CS Cnstructin Services QC B 02 Field Change/Clarificatin Request Purpse The purpse f this prcedure is t dcument the prper prcessing f a field change and/r clarificatin (FCR) request. A sample FCR frm is attached alng with a cpy f the electrnic versin fund in the suthernprjects.cm database. Whenever pssible, the suthernprjects.cm prcess shall be used fr prcessing FCR s. Scpe This request frm shall be used fr dcumenting changes and clarificatins requested by SCG Engineering and Cnstructin Services (E&CS) cnstructin persnnel. T expedite the prcessing f these requests, it is recmmended that the suthernprjects.cm prcess be used. This frm may als be used t dcument cnversatins that help clarify specificatins and/r drawings and t expedite the review f drawings that have nt been prcessed thrugh the nrmal dcument cntrl prcess (i.e. btleg drawings). This prcedure is an integral part f the SCG E&CS Cnstructin Services cnstructin Quality Assurance Prgram. Respnsibility This request frm and subsequent prcedure will be the respnsibility f SCG E&CS Cnstructin Services. The request will be initiated by field persnnel with the status f the request being mnitred by SCG E&CS thrugh the use f a status lg (refer t Attachment A) and/r the use f the suthernprjects.cm database. Cmpletin f the Request Frm The fllwing items pertain t particular sectins f the sample Field Change/Clarificatin Requests (FCRs) fund at the end f this prcedure. Please refer t Attachment B and Attachment C as yu review this sectin f the prcedure. Attachment B addresses the use f a hard cpy frm and the use f a manual r spreadsheet type lg sheet. Attachment C addresses the use f suthernprjects.cm fr the distributin and tracking f the frm. Attachment D is a flwchart f the FCR prcess. QCB02 REV 4 02/14/05 1

41 SCG E&CS Cnstructin Services Attachment B 1) SCG E&CS will be respnsible fr maintaining the status lg fr all FCRs. FCR numbers shall be assigned in sequential rder. 2) The date the initial request is filled ut. 3) The reslutin due date. This shuld be a realistic due date based n the needs f the jb. As sn as pssible shuld nt be used as the standard. 4) Enter the name f the Plant and the Prject in these bxes. 5) The requested change and/r clarificatin shuld be described in this sectin f the reprt. 6) Drawings and/r specificatins affected r referenced in the change request shuld be listed in this sectin. 7) The requestr f the change/clarificatin shuld be listed here. Since the intent is t maximize the use f electrnic prcessing, this des nt have t be a signature. It is nt required that the requestr be a SCG emplyee. Fr example, emplyees f a third party engineering, testing and/r survey cmpany wrking fr SCG may request that a FCR be initiated. Hwever representatives f the general cntractr r any f their subcntractrs may nt initiate a FCR. Questins raised by cntactrs shuld be addressed n a Request fr Infrmatin (RFI) frm. The cntractr shuld cmplete the RFI frm and submit the frm t Cnstructin Services. If Engineering input is required, Cnstructin Services may cmplete a FCR and frward the cntractr s questin t Engineering. On smaller prjects, the RFI may be frwarded frm Cnstructin Services t Engineering. 8) The name f the respnsible engineer shuld be entered in this bx. Sme examples f items that may require Engineering Apprval include but are nt limited t: any changes t design criteria; questins regarding discrepancies between design dcuments and/r drawings and clarificatin f issues that arise in the field. 9) Cmments related t a suggested reslutin shuld be entered here befre frwarding the FCR t Engineering. 10) The FCR must be apprved by a SCG emplyee. That persn shuld be indicated in this area f the request frm. An riginal signature is recmmended. Hwever, if a signature is nt required, the Apprver must review and apprve the FCR. The Apprver s name shall nt be typed in by the QCB02 REV 4 02/14/05 2

Change Management Process For [Project Name]

Change Management Process For [Project Name] Management Prcess Fr [Prject Name] i 1 Intrductin The is fllwed during the Executin phase f the Prject Management Life Cycle, nce the prject has been frmally defined and planned. 1.1 What is a Management

More information

UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES

UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES REFERENCES AND RELATED POLICIES A. UC PPSM 2 -Definitin f Terms B. UC PPSM 12 -Nndiscriminatin in Emplyment C. UC PPSM 14 -Affirmative

More information

How To Write An Ehsms Training, Awareness And Competency Procedure

How To Write An Ehsms Training, Awareness And Competency Procedure Envirnmental, Health & Safety Management System (EHSMS) Dcument Number: 00122 Issue Date: 05/07/2014 Training, Awareness and Cmpetency Prcedure Revisin Number: 7 Prepared By: Stalcup, Bryce Apprved By:

More information

Plan Transfer Procedures for Utility Submissions 11 24 2015 OVERVIEW

Plan Transfer Procedures for Utility Submissions 11 24 2015 OVERVIEW Plan Transfer Prcedures fr Utility Submissins OVERVIEW Abbreviatins The fllwing will be used thrughut this dcument: CADD MicrStatin r GDOT Bentley Navigatr PPG Plans Preparatin Guide DUO District Utilities

More information

BLUE RIDGE COMMUNITY AND TECHNICAL COLLEGE BOARD OF GOVERNORS

BLUE RIDGE COMMUNITY AND TECHNICAL COLLEGE BOARD OF GOVERNORS BLUE RIDGE COMMUNITY AND TECHNICAL COLLEGE BOARD OF GOVERNORS SERIES: 1 General Rules RULE: 17.1 Recrd Retentin Scpe: The purpse f this rule is t establish the systematic review, retentin and destructin

More information

Systems Support - Extended

Systems Support - Extended 1 General Overview This is a Service Level Agreement ( SLA ) between and the Enterprise Windws Services t dcument: The technlgy services the Enterprise Windws Services prvides t the custmer. The targets

More information

Connecticut State Department of Education 2014-15 School Health Services Information Survey

Connecticut State Department of Education 2014-15 School Health Services Information Survey Cnnecticut State Department f Educatin 2014-15 Schl Health Services Infrmatin Survey General Directins fr Cmpletin by Schl Nurse Crdinatr/Supervisr This Schl Health Services Infrmatin Survey was designed

More information

NHVAS Mass Management Spot Check Checklist

NHVAS Mass Management Spot Check Checklist Legal Entity Name f NHVAS Operatr: DTMR Representative: Lcatin: NHVAS Mass Management Spt Check Checklist Spt Check Date: Spt Check Number: DMS Number: 540/ The fllwing surces f evidence have been identified

More information

THIRD PARTY PROCUREMENT PROCEDURES

THIRD PARTY PROCUREMENT PROCEDURES ADDENDUM #1 THIRD PARTY PROCUREMENT PROCEDURES NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS TRANSPORTATION DEPARTMENT JUNE 2011 OVERVIEW These prcedures establish standards and guidelines fr the Nrth Central

More information

Heythrop College Disciplinary Procedure for Support Staff

Heythrop College Disciplinary Procedure for Support Staff Heythrp Cllege Disciplinary Prcedure fr Supprt Staff Intrductin 1. This prcedural dcument des nt apply t thse academic-related staff wh are mentined in the Cllege s Ordinance, namely the Librarian and

More information

Request for Resume (RFR) CATS II Master Contract. All Master Contract Provisions Apply

Request for Resume (RFR) CATS II Master Contract. All Master Contract Provisions Apply Sectin 1 General Infrmatin RFR Number: (Reference BPO Number) Functinal Area (Enter One Only) F50B3400026 7 Infrmatin System Security Labr Categry A single supprt resurce may be engaged fr a perid nt t

More information

17 Construction environmental management plan (CEMP)

17 Construction environmental management plan (CEMP) 17 Cnstructin envirnmental management plan (CEMP) Bur Happld Cntents 17 Cnstructin Envirnmental Management Plan (CEMP) 17-1 17.1 Intrductin 17-1 17.2 Intrductin t EMS 17-1 17.2.1 Plicy 17-2 17.2.2 Planning

More information

Audit Committee Charter

Audit Committee Charter Audit Cmmittee Charter Membership The Audit Cmmittee (the "Cmmittee") f the Bard f Directrs (the "Bard") f Philip Mrris Internatinal Inc. (the "Cmpany") shall cnsist f at least three directrs all f whm

More information

GUIDANCE FOR BUSINESS ASSOCIATES

GUIDANCE FOR BUSINESS ASSOCIATES GUIDANCE FOR BUSINESS ASSOCIATES This Guidance fr Business Assciates dcument is intended t verview UPMCs expectatins, as well as t prvide additinal resurces and infrmatin, t UPMC s HIPAA business assciates.

More information

TITLE: Supplier Contracting Guidelines Process: FIN_PS_PSG_050 Replaces: Manual Sections 6.4, 7.1, 7.5, 7.6, 7.11 Effective Date: 10/1/2014 Contents

TITLE: Supplier Contracting Guidelines Process: FIN_PS_PSG_050 Replaces: Manual Sections 6.4, 7.1, 7.5, 7.6, 7.11 Effective Date: 10/1/2014 Contents TITLE: Supplier Cntracting Guidelines Prcess: FIN_PS_PSG_050 Replaces: Manual Sectins 6.4, 7.1, 7.5, 7.6, 7.11 Cntents 1 Abut university supplier cntracting... 2 2 When is a cntract required?... 2 3 Wh

More information

Chris Chiron, Interim Senior Director, Employee & Management Relations Jessica Moore, Senior Director, Classification & Compensation

Chris Chiron, Interim Senior Director, Employee & Management Relations Jessica Moore, Senior Director, Classification & Compensation TO: FROM: HR Officers & Human Resurces Representatives Chris Chirn, Interim Senir Directr, Emplyee & Management Relatins Jessica Mre, Senir Directr, Classificatin & Cmpensatin DATE: May 26, 2015 RE: Annual

More information

A.M. BEST RATING SERVICES, INC. RATING DIVISION INTERNAL POLICY AND PROCEDURE. Subject: Dissemination Number: CRPC Policy 5

A.M. BEST RATING SERVICES, INC. RATING DIVISION INTERNAL POLICY AND PROCEDURE. Subject: Dissemination Number: CRPC Policy 5 A.M. BEST RATING SERVICES, INC. RATING DIVISION INTERNAL POLICY AND PROCEDURE Subject: Disseminatin Number: CRPC Plicy 5 Effective Date: Nvember 29, 2006 Revisin Date: January 04, 2016 Purpse: The purpse

More information

NEW YORK STATE DEPARTMENT OF HEALTH BUREAU OF DENTAL HEALTH SCHOOL-BASED HEALTH CENTER DENTAL PROGRAM PERFORMANCE EFFECTIVENESS REVIEW TOOL (PERT)

NEW YORK STATE DEPARTMENT OF HEALTH BUREAU OF DENTAL HEALTH SCHOOL-BASED HEALTH CENTER DENTAL PROGRAM PERFORMANCE EFFECTIVENESS REVIEW TOOL (PERT) NEW YORK STATE DEPARTMENT OF HEALTH BUREAU OF DENTAL HEALTH SCHOOL-BASED HEALTH CENTER DENTAL PROGRAM PERFORMANCE EFFECTIVENESS REVIEW TOOL (PERT) March 1, 2007 TABLE OF CONTENTS SECTION I: INTRODUCTION

More information

Data Warehouse Scope Recommendations

Data Warehouse Scope Recommendations Rensselaer Data Warehuse Prject http://www.rpi.edu/datawarehuse Financial Analysis Scpe and Data Audits This dcument describes the scpe f the Financial Analysis data mart scheduled fr delivery in July

More information

Building Code Administration Program

Building Code Administration Program Building Cde Administratin Prgram Plicies and Prcedures Manual USF FACILITIES PLANNING & CONSTRUCTION CONTENTS BUILDING CODE ADMINISTRATION PROGRAM..2-2 A. Plicy..2-2 B. Purpse..2-2 C. Authrity.2-2 D.

More information

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF UPLAND SOFTWARE, INC.

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF UPLAND SOFTWARE, INC. CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF UPLAND SOFTWARE, INC. PURPOSE The purpse f the Cmpensatin Cmmittee f the Bard f Directrs (the Bard ) f Upland Sftware, Inc. (the Cmpany

More information

edoc Lite Recruitment Guidelines

edoc Lite Recruitment Guidelines edc Lite Recruitment Guidelines Intrductin OneStart & the Academic Psitin Search Channel edc Lite Ruting and Wrkgrups Ruting Actin List Ruting Cntrls Wrkgrups Dcument Search edc Lite Dcuments Vacancy Ntice

More information

ADMINISTRATION AND FINANCE POLICIES AND PROCEDURES TABLE OF CONTENTS

ADMINISTRATION AND FINANCE POLICIES AND PROCEDURES TABLE OF CONTENTS CONTROL Revisin Date: 1/21/03 TABLE OF CONTENTS 10.01 OVERVIEW OF ACCOUNTING FOR INVESTMENT IN PLANT... 2 10.01.1 CURRENT POLICY... 2 10.02 INVENTORY MAINTENANCE AND CONTROL... 3 10.02.1 PROCEDURES FOR

More information

Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013

Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013 Versin: Mdified By: Date: Apprved By: Date: 1.0 Michael Hawkins Octber 29, 2013 Dan Bwden Nvember 2013 Rule 4-004J Payment Card Industry (PCI) Patch Management (prpsed) 01.1 Purpse The purpse f the Patch

More information

FAFSA / DREAM ACT COMPLETION PROGRAM AGREEMENT

FAFSA / DREAM ACT COMPLETION PROGRAM AGREEMENT FAFSA / DREAM ACT COMPLETION PROGRAM AGREEMENT If using US Pstal Service, please return t: Califrnia Student Aid Cmmissin Prgram Administratin & Services Divisin ATTN: Institutinal Supprt P.O. Bx 419028

More information

A96 CALA Policy on the use of Computers in Accredited Laboratories Revision 1.5 August 4, 2015

A96 CALA Policy on the use of Computers in Accredited Laboratories Revision 1.5 August 4, 2015 A96 CALA Plicy n the use f Cmputers in Accredited Labratries Revisin 1.5 August 4, 2015 A96 CALA Plicy n the use f Cmputers in Accredited Labratries TABLE OF CONTENTS TABLE OF CONTENTS... 1 CALA POLICY

More information

9 ITS Standards Specification Catalog and Testing Framework

9 ITS Standards Specification Catalog and Testing Framework New Yrk State ITS Standards Specificatin Develpment Guide 9 ITS Standards Specificatin Catalg and Testing Framewrk This chapter cvers cncepts related t develpment f an ITS Standards Specificatin Catalg

More information

Wire Transfer Request

Wire Transfer Request Wire Transfer Request Requirements and Instructins OFFICE OF DISBURSEMENTS Categry: Dcument Name: Payment Prcessing Wire Transfer Request - Requirements and Instructins Respnsible Department: Office f

More information

Internal Audit Charter and operating standards

Internal Audit Charter and operating standards Internal Audit Charter and perating standards 2 1 verview This dcument sets ut the basis fr internal audit: (i) the Internal Audit charter, which establishes the framewrk fr Internal Audit; and (ii) hw

More information

Customer Support & Software Enhancements Policy

Customer Support & Software Enhancements Policy Custmer Supprt & Sftware Enhancements Plicy Welcme t Manhattan Assciates Custmer Supprt Organizatin (CSO). Staying current n Custmer Supprt & Sftware Enhancements and n a supprted versin f the licensed

More information

Quality Assurance/Control Procedures

Quality Assurance/Control Procedures 2015 Prgrammatic Categrical Exclusin {PCE} Agreement Oregn Department f Transprtatin Federal Highway Administratin, Oregn Divisin Quality Assurance/Cntrl Prcedures Intrductin The Prgrammatic Agreement

More information

Online Learning Portal best practices guide

Online Learning Portal best practices guide Online Learning Prtal Best Practices Guide best practices guide This dcument prvides Micrsft Sftware Assurance Benefit Administratrs with best practices fr implementing e-learning thrugh the Micrsft Online

More information

April 29, 2013 INTRODUCTION ORGANIZATIONAL OVERVIEW PROJECT OVERVIEW

April 29, 2013 INTRODUCTION ORGANIZATIONAL OVERVIEW PROJECT OVERVIEW April 29, 2013 INTRODUCTION The Mid-Atlantic Reginal Air Management Assciatin, Inc (MARAMA) is seeking t engage a cntractr t assist in updating f MARAMA s current website sftware and mve the website t

More information

CMS Eligibility Requirements Checklist for MSSP ACO Participation

CMS Eligibility Requirements Checklist for MSSP ACO Participation ATTACHMENT 1 CMS Eligibility Requirements Checklist fr MSSP ACO Participatin 1. General Eligibility Requirements ACO participants wrk tgether t manage and crdinate care fr Medicare fee-fr-service beneficiaries.

More information

Information Services Hosting Arrangements

Information Services Hosting Arrangements Infrmatin Services Hsting Arrangements Purpse The purpse f this service is t prvide secure, supprted, and reasnably accessible cmputing envirnments fr departments at DePaul that are in need f server-based

More information

Purpose Statement. Objectives

Purpose Statement. Objectives Apprved by Academic Affairs Cuncil, June 24, 2014 Faculty Handbk Part VI: Other Plicies and Prcedures Sectin R. Intellectual Prperty Classified Emplyee Handbk Part VI: Other Plicies and Prcedures Sectin

More information

Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd

Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd Audit Cmmittee Charter St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd Versin 2.0, 22 February 2016 Apprver Bard f Directrs St Andrew

More information

Maryland General Service (MGS) Area 29 Treatment Facilities Committee (TFC) TFC Instructions

Maryland General Service (MGS) Area 29 Treatment Facilities Committee (TFC) TFC Instructions Maryland General Service (MGS) Area 29 Treatment Facilities Cmmittee (TFC) TFC Instructins Lve And Service Facility Presentatin t Patients We are frm Alchlics Annymus (AA), fr AA, and ur service is fr

More information

GUIDELINE INFORMATION MANAGEMENT (IM) PROGRAM PLAN

GUIDELINE INFORMATION MANAGEMENT (IM) PROGRAM PLAN Gvernment f Newfundland and Labradr Office f the Chief Infrmatin Officer Infrmatin Management Branch GUIDELINE INFORMATION MANAGEMENT (IM) PROGRAM PLAN Guideline (Definitin): OCIO Guidelines derive frm

More information

Enrollee Health Assessment Program Implementation Guide and Best Practices

Enrollee Health Assessment Program Implementation Guide and Best Practices Enrllee Health Assessment Prgram Implementatin Guide and Best Practices March 2015 033129 (03-2015) This guide will help yu answer these questins: What is the Enrllee Health Assessment (EHA) prgram and

More information

THE CITY UNIVERSITY OF NEW YORK IDENTITY THEFT PREVENTION PROGRAM

THE CITY UNIVERSITY OF NEW YORK IDENTITY THEFT PREVENTION PROGRAM THE CITY UNIVERSITY OF NEW YORK IDENTITY THEFT PREVENTION PROGRAM 1. Prgram Adptin The City University f New Yrk (the "University") develped this Identity Theft Preventin Prgram (the "Prgram") pursuant

More information

Nuance Healthcare Services Project Delivery Methodology

Nuance Healthcare Services Project Delivery Methodology NUANCE PROFESSIONAL SERVICES Nuance Healthcare Services 2008 Nuance Cmmunicatins, Inc. All rights reserved. Nuance Healthcare Services 1 INTRODUCTION This dcument describes the prject management methdlgy

More information

BRILL s Editorial Manager (EM) Manual for Authors Table of Contents

BRILL s Editorial Manager (EM) Manual for Authors Table of Contents BRILL s Editrial Manager (EM) Manual fr Authrs Table f Cntents Intrductin... 2 1. Getting Started: Creating an Accunt... 2 2. Lgging int EM... 3 3. Changing Yur Access Cdes and Cntact Infrmatin... 3 3.1

More information

VCU Payment Card Policy

VCU Payment Card Policy VCU Payment Card Plicy Plicy Type: Administrative Respnsible Office: Treasury Services Initial Plicy Apprved: 12/05/2013 Current Revisin Apprved: 12/05/2013 Plicy Statement and Purpse The purpse f this

More information

Volume THURSTON COUNTY CLERK S OFFICE. e-file SECURE FTP Site (January 2011) User Guide

Volume THURSTON COUNTY CLERK S OFFICE. e-file SECURE FTP Site (January 2011) User Guide Vlume 1 THURSTON COUNTY CLERK S OFFICE e-file SECURE FTP Site (January 2011) User Guide Table f Cntents C H A P T E R 1 FTP e-filing SERVICE 1 Dcument Requirements 1 Scanners 2 File naming cnventin 2 e-file

More information

1) Update the AccuBuild Program to the latest version Version 9.3.0.3 or later.

1) Update the AccuBuild Program to the latest version Version 9.3.0.3 or later. Certified Payrll XML Exprt As f June 4 th, 2015, The Califrnia Department f Industrial Relatins (DIR) is requiring that all certified payrll reprts be submitted nline using the ecpr system. The ecpr System

More information

Johnston Public Schools Special Education Procedural Manual. IEP Overview

Johnston Public Schools Special Education Procedural Manual. IEP Overview Jhnstn Public Schls Special Educatin Prcedural Manual IEP Overview Definitin The Individualized Educatin Prgram (IEP) is a written plan fr the apprpriate educatin f students with disabilities. It is a

More information

Issuing of qualifications and statement of attainment Policy and Procedures Version: 5.0 Last Modified: 12 February 2015

Issuing of qualifications and statement of attainment Policy and Procedures Version: 5.0 Last Modified: 12 February 2015 Issuing f qualificatins and statement f attainment Plicy and Prcedures Versin: 5.0 Last Mdified: 12 February 2015 Purpse Duke Cllege issues AQF certificatin dcumentatin nly t a learner whm it has assessed

More information

Peratr Accreditatin and Services in Queensland

Peratr Accreditatin and Services in Queensland Infrmatin Bulletin PT 204/09.15 Operatr Accreditatin fr Limusine Services What is peratr accreditatin? The Transprt Operatins (Passenger Transprt) Act 1994 requires peratrs f public passenger services

More information

COUNTY OF SACRAMENTO PLANNING AND ENVIRONMENTAL REVIEW

COUNTY OF SACRAMENTO PLANNING AND ENVIRONMENTAL REVIEW COUNTY OF SACRAMENTO PLANNING AND ENVIRONMENTAL REVIEW REQUEST FOR PROPOSAL fr ON-CALL CULTURAL RESOURCE SERVICES Release Date: Tuesday, March 10, 2015 Submittal Deadline: Mnday, April 13, 2015 by 5:00

More information

How to put together a Workforce Development Fund (WDF) claim 2015/16

How to put together a Workforce Development Fund (WDF) claim 2015/16 Index Page 2 Hw t put tgether a Wrkfrce Develpment Fund (WDF) claim 2015/16 Intrductin What eligibility criteria d my establishment/s need t meet? Natinal Minimum Data Set fr Scial Care (NMDS-SC) and WDF

More information

General Records Authority 33. Accredited Training

General Records Authority 33. Accredited Training General Recrds Authrity 33 2012/00579704 Accredited Training February 2013 This is an accurate reprductin f the authrised recrds authrity cntent, created fr accessibility purpses CONTENTS INTRODUCTION

More information

Third Party Originator Application

Third Party Originator Application Third Party Originatr Applicatin Applicant Infrmatin Third Party Name: Primary Address: City: State: Zip Cde: Primary Cntact: Telephne Number: Email Address: Fax Number: Website Address: Branch Lcatins

More information

The actions discussed below in this Appendix assume that the firm has already taken three foundation steps:

The actions discussed below in this Appendix assume that the firm has already taken three foundation steps: MAKING YOUR MARK 6.1 Gd Practice This sectin presents an example f gd practice fr firms executing plans t enter the resurces sectr supply chain fr the first time, r fr thse firms already in the supply

More information

DATE APPROVED March 2011. Version Date Comments / Changes 1.0 March 2011 Initial policy released

DATE APPROVED March 2011. Version Date Comments / Changes 1.0 March 2011 Initial policy released Page 1 f 11 APPROVED (S) REVISED / REVIEWED SUMMARY Versin Date Cmments / Changes 1.0 Initial plicy released 1. PURPOSE OF THIS POLICY T define the purpses fr which Crprate Purchase Cards are t be used

More information

REQUEST FOR PROPOSAL FOR SHAREPOINT LEGISLATIVE MANAGEMENT SERVICES

REQUEST FOR PROPOSAL FOR SHAREPOINT LEGISLATIVE MANAGEMENT SERVICES REQUEST FOR PROPOSAL FOR SHAREPOINT LEGISLATIVE MANAGEMENT SERVICES The Wyming Legislature is at a pivtal pint in the management f its infrmatin and we are lking fr an accmplished firm with SharePint technlgy

More information

REQUEST FOR PROPOSAL SECURITY SERVICES

REQUEST FOR PROPOSAL SECURITY SERVICES REQUEST FOR PROPOSAL SECURITY SERVICES Sectin I INTRODUCTION [Cmpany] is seeking prpsals frm qualified Cntractrs t prvide unifrmed security service fr [Cmpany] facilities at [Lcatin(s)]. This dcument is

More information

Merchant Processes and Procedures

Merchant Processes and Procedures Merchant Prcesses and Prcedures Table f Cntents EXHIBIT C 1. MERCHANT INTRODUCTION TO T-CHEK 3 1.1 Wh is T-Chek Systems? 3 1.2 Hw t Cntact T-Chek Systems 3 1.3 Hw t Recgnize T-Chek Frms f Payment 3 1.3.1

More information

ATTACHMENT U THIRD PARTY AUDITOR/CONSULTANT QUALIFICATION GUIDELINE

ATTACHMENT U THIRD PARTY AUDITOR/CONSULTANT QUALIFICATION GUIDELINE ATTACHMENT U THIRD PARTY AUDITOR/CONSULTANT QUALIFICATION GUIDELINE 1 INTRODUCTION Third party auditr/cnsultant plays an imprtant rle in decmmissining t ensure that all critical decmmissining activities

More information

10.0 Electronic Data Interchange (EDI) Requirements

10.0 Electronic Data Interchange (EDI) Requirements 10.0 Electrnic Data Interchange (EDI) Requirements 10.1 General Infrmatin The Cmpany requires all vendrs t exchange business dcuments via EDI. These dcuments include; purchase rders (850 PO), purchase

More information

PENETRATION TEST OF THE INDIAN HEALTH SERVICE S COMPUTER NETWORK

PENETRATION TEST OF THE INDIAN HEALTH SERVICE S COMPUTER NETWORK Department f Health and Human Services OFFICE OF INSPECTOR GENERAL PENETRATION TEST OF THE INDIAN HEALTH SERVICE S COMPUTER NETWORK Inquiries abut this reprt may be addressed t the Office f Public Affairs

More information

CS 360 Software Development Spring 2008 Tuesdays and Thursdays 3:30 p.m. 4:45 p.m.

CS 360 Software Development Spring 2008 Tuesdays and Thursdays 3:30 p.m. 4:45 p.m. CS 360 Sftware Develpment Spring 2008 Tuesdays and Thursdays 3:30 p.m. 4:45 p.m. Instructr: Ingrid Russell Office: Dana 343 email: irussell@hartfrd.edu http://uhaweb.hartfrd.edu/irussell Curse Descriptin:

More information

Document Management/Archiving Records general guidelines for the UBC Department of Medicine

Document Management/Archiving Records general guidelines for the UBC Department of Medicine Dcument Management/Archiving Recrds general guidelines fr the UBC Department f Medicine ADMINISTRATIVE/FINACIAL FILES: Email/Crrespndence - An extremely difficult recrd type t schedule, sme email is clearly

More information

Sources of Federal Government and Employee Information

Sources of Federal Government and Employee Information Inf Surce Surces f Federal Gvernment and Emplyee Infrmatin Ridley Terminals Inc. TABLE OF CONTENTS General Infrmatin Intrductin t Inf Surce Backgrund Respnsibilities Institutinal Functins, Prgram and Activities

More information

Loss Share Data Specifications Change Management Plan

Loss Share Data Specifications Change Management Plan Lss Share Data Specificatins Change Management Plan Last Updated: 2/27/2013 Table f Cntents I. Purpse... 3 II. Change Management Apprach... 3 III. Categries f Revisins... 4 IV. Help and Supprt... 6 Lss

More information

Issuing of qualifications and statement of attainment Policy and Procedures Version: 3.0 Last Modified: 1 March 2015

Issuing of qualifications and statement of attainment Policy and Procedures Version: 3.0 Last Modified: 1 March 2015 Issuing f qualificatins and statement f attainment Plicy and Prcedures Versin: 3.0 Last Mdified: 1 March 2015 Purpse ANC issues AQF certificatin dcumentatin nly t a learner whm it has assessed as meeting

More information

NYU Langone Medical Center NYU Hospitals Center NYU School of Medicine

NYU Langone Medical Center NYU Hospitals Center NYU School of Medicine Title: Identity Theft Prgram Effective Date: July 2009 NYU Langne Medical Center NYU Hspitals Center NYU Schl f Medicine POLICY It is the plicy f the NYU Langne Medical Center t educate and train staff

More information

ACCREDITATION. Policy 60150: Substantive Change

ACCREDITATION. Policy 60150: Substantive Change ACCREDITATION Plicy 60150: Substantive Change 1. Purpse 2. Plicy The purpse f this plicy is t assist the Cllege with maintaining cmpliance with Cmprehensive Standard 3.12.1 f the Principles f Accreditatin

More information

Software Quality Assurance Plan

Software Quality Assurance Plan Sftware Quality Assurance Plan fr AnthrpdEST pipeline System Versin 1.0 Submitted in partial fulfillment f the requirements f the degree f Master f Sftware Engineering Prepared by Luis Fernand Carranc

More information

Electronic and Information Resources Accessibility Compliance Plan

Electronic and Information Resources Accessibility Compliance Plan Electrnic and Infrmatin Resurces Accessibility Cmpliance Plan Intrductin The University f Nrth Texas at Dallas (UNTD) is cmmitted t prviding a wrk envirnment that affrds equal access and pprtunity t therwise

More information

ISO Management Systems. Guidance on understanding the benefits of an ISO Management System

ISO Management Systems. Guidance on understanding the benefits of an ISO Management System ISO Management Systems Guidance n understanding the benefits f an ISO Management System Welcme & Intrductins 4031 University Drive, 206, Fairfax, VA 22030 3 Grant Square, 243, Hinsdale, IL 60521 www.radiancmpliance.cm

More information

UNIVERSITY INCIDENT PLANNING COMMITTEE TERMS OF REFERENCE

UNIVERSITY INCIDENT PLANNING COMMITTEE TERMS OF REFERENCE 1. TITLE OF COMMITTEE UNIVERSITY INCIDENT PLANNING COMMITTEE University Incident Planning Cmmittee (IPC) 2. ESTABLISHMENT TERMS OF REFERENCE The University Incident Planning Cmmittee is established in

More information

Army DCIPS Employee Self-Report of Accomplishments Overview Revised July 2012

Army DCIPS Employee Self-Report of Accomplishments Overview Revised July 2012 Army DCIPS Emplyee Self-Reprt f Accmplishments Overview Revised July 2012 Table f Cntents Self-Reprt f Accmplishments Overview... 3 Understanding the Emplyee Self-Reprt f Accmplishments... 3 Thinking Abut

More information

TITLE: RECORDS AND INFORMATION MANAGEMENT POLICY

TITLE: RECORDS AND INFORMATION MANAGEMENT POLICY TITLE: RECORDS AND INFORMATION MANAGEMENT POLICY REFERENCE NUMBER: 14/103368 RESPONSIBLE DEPARTMENT: Crprate Services APPLICABLE LEGISLATION: State Recrds Act 1997 Lcal Gvernment Act 1999 Crpratins Act

More information

San Diego One-Stop Career Center Network PY 2011/2012 Revised June 2011

San Diego One-Stop Career Center Network PY 2011/2012 Revised June 2011 San Dieg One-Stp Career Center Netwrk PY 2011/2012 Revised June 2011 ADULT AND DISLOCATED WORKER PERFORMANCE POLICY 1. WIA requires a cmprehensive accuntability system t determine the effectiveness f services

More information

COLLATERAL VERIFICATION REVIEWS FREQUENTLY ASKED QUESTIONS

COLLATERAL VERIFICATION REVIEWS FREQUENTLY ASKED QUESTIONS NEW OR UPDATED ITEMS FOR 2016 Pwers f Attrney (Flrida & Gergia) The Bank is annuncing a new cllateral eligibility requirement fr lans clsed under pwer f attrney and secured by real estate lcated in the

More information

expertise hp services valupack consulting description security review service for Linux

expertise hp services valupack consulting description security review service for Linux expertise hp services valupack cnsulting descriptin security review service fr Linux Cpyright services prvided, infrmatin is prtected under cpyright by Hewlett-Packard Cmpany Unpublished Wrk -- ALL RIGHTS

More information

CHANGE MANAGEMENT STANDARD

CHANGE MANAGEMENT STANDARD The electrnic versin is current, r when printed and stamped with the green cntrlled dcument stamp. All ther cpies are uncntrlled. DOCUMENT INFORMATION Descriptin Dcument Owner This standard utlines the

More information

We will record and prepare documents based off the information presented

We will record and prepare documents based off the information presented Dear Client: We appreciate the pprtunity f wrking with yu regarding yur Payrll needs. T ensure a cmplete understanding between us, we are setting frth the pertinent infrmatin abut the services that we

More information

CORPORATE CREDIT CARD POLICY

CORPORATE CREDIT CARD POLICY TITLE: POLICY OWNERS: DATE INSTITUTED: May 1, 2008 CURRENT VERSION: Ver. 1.6 REVISION DATE: July 1, 2015 Crprate Credit Card Plicy Melissa Cluse, Vice President & Cntrller Cindy Klein, Accunts Payable

More information

This document provides instructions on how to complete the Cheque Requisition Form.

This document provides instructions on how to complete the Cheque Requisition Form. Office f the Cmptrller Accunts Payable Divisin f Finance and Administratin Standard Operating Prcedure Cheque Requisitin Effective Date: July 19, 2010 Descriptin: This dcument prvides instructins n hw

More information

CDC UNIFIED PROCESS PRACTICES GUIDE

CDC UNIFIED PROCESS PRACTICES GUIDE Dcument Purpse The purpse f this dcument is t prvide guidance n the practice f Risk Management and t describe the practice verview, requirements, best practices, activities, and key terms related t these

More information

SECTION J QUALITY ASSURANCE AND IMPROVEMENT PROGRAM

SECTION J QUALITY ASSURANCE AND IMPROVEMENT PROGRAM Audit Manual Sectin J SECTION J QUALITY ASSURANCE AND IMPROVEMENT PROGRAM Ref. Plicy and Practice Requirements IIA Standards and Other references J 1 Plicy: The Head f Internal Audit shall develp and maintain

More information

Chapter 7 Business Continuity and Risk Management

Chapter 7 Business Continuity and Risk Management Chapter 7 Business Cntinuity and Risk Management Sectin 01 Business Cntinuity Management 070101 Initiating the Business Cntinuity Plan (BCP) Purpse: T establish the apprpriate level f business cntinuity

More information

Multi-Year Accessibility Policy and Plan for NSF Canada and NSF International Strategic Registrations Canada Company, 2014-2021

Multi-Year Accessibility Policy and Plan for NSF Canada and NSF International Strategic Registrations Canada Company, 2014-2021 Multi-Year Accessibility Plicy and Plan fr NSF Canada and NSF Internatinal Strategic Registratins Canada Cmpany, 2014-2021 This 2014-21 accessibility plan utlines the plicies and actins that NSF Canada

More information

WORKPLACE INJURY/ILLNESS/INCIDENT INVESTIGATION & REPORTING POLICY (BC VERSION)

WORKPLACE INJURY/ILLNESS/INCIDENT INVESTIGATION & REPORTING POLICY (BC VERSION) WORKPLACE INJURY/ILLNESS/INCIDENT INVESTIGATION & REPORTING POLICY (BC VERSION) Intrductin: Hw t Use This Tl As d all ther jurisdictins, BC requires emplyers t investigate and reprt specific kinds f wrkplace

More information

Business Plan Overview

Business Plan Overview Business Plan Overview Organizatin and Cntent Summary A business plan is a descriptin f yur business, including yur prduct yur market, yur peple and yur financing needs. Yu shuld cnsider that a well prepared

More information

University of Texas at Dallas Policy for Accepting Credit Card and Electronic Payments

University of Texas at Dallas Policy for Accepting Credit Card and Electronic Payments University f Texas at Dallas Plicy fr Accepting Credit Card and Electrnic Payments Cntents: Purpse Applicability Plicy Statement Respnsibilities f a Merchant Department Prcess t Becme a Merchant Department

More information

Transportation Allowance Program

Transportation Allowance Program Transprtatin Allwance Prgram Respnsibilities, Prcedures and Guidelines I. INTRODUCTION This manual describes respnsibilities, prcedures and guidelines (including vehicle specificatins and reimbursable

More information

Service Request Form

Service Request Form New Prfessinal Services Order Frm Editable PDF Service Request Frm If yu have any questins while filling ut this frm, please cntact yur CDM, email Prfessinal Services at PS@swipeclck.cm, r call 888-223-3250

More information

AHI. Foreign Pre-Approval Inspections (PAIs) Points to Consider

AHI. Foreign Pre-Approval Inspections (PAIs) Points to Consider AHI Freign Pre-Apprval Inspectins (PAIs) Pints t Cnsider The fllwing suggestins are intended t prvide spnsr guidance fr timeliness and predictability f freign PAIs. The FDA Center fr Veterinary Medicine

More information

Agency Fund (Non-Student Org X-Fund) Guidelines Last Revision: 12/7/2009

Agency Fund (Non-Student Org X-Fund) Guidelines Last Revision: 12/7/2009 Agency Fund (Nn-Student Org X-Fund) Guidelines Last Revisin: 12/7/2009 Definitin f Agency Fund: An Agency Fund cnsists f funds held by Eastern Michigan University as custdian r fiscal agent fr thers, such

More information

TrustED Briefing Series:

TrustED Briefing Series: TrustED Briefing Series: Since 2001, TrustCC has prvided IT audits and security assessments t hundreds f financial institutins thrugh ut the United States. Our TrustED Briefing Series are white papers

More information

Compliance Checklist for Storm Water Requirements at Construction Sites

Compliance Checklist for Storm Water Requirements at Construction Sites Cmpliance Checklist fr Strm Water Requirements at Cnstructin Sites This cmpliance checklist summarizes Strm Water Management requirements fr Cnstructin prjects which invlve demlitin, clearing, grading

More information

All Harvard University schools, tubs, local units, Affiliate Institutions, Allied Institutions and University-wide Initiatives.

All Harvard University schools, tubs, local units, Affiliate Institutions, Allied Institutions and University-wide Initiatives. HARVARD UNIVERSITY FINANCIAL POLICY INDEPENDENT CONTRACTOR CLASSIFICATION Plicy Title: Independent Cntractr Respnsible Office: ERP and UFS Effective Date: Octber 4, 2000 Revisin Date: May 12, 2009 Plicy

More information

CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT

CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT Plicy Number: 2.20 1. Authrity Lcal Gvernment Act 2009 Lcal Gvernment Regulatin 2012 AS/NZS ISO 31000-2009 Risk Management Principles

More information

Electronic Data Interchange (EDI) Requirements

Electronic Data Interchange (EDI) Requirements Electrnic Data Interchange (EDI) Requirements 1.0 Overview 1.1 EDI Definitin 1.2 General Infrmatin 1.3 Third Party Prviders 1.4 EDI Purchase Order (850) 1.5 EDI PO Change Request (860) 1.6 Advance Shipment

More information

Request for Proposal (RFP) RFP HQ2015-01 Training Session and Leadership Program Development Consulting Services

Request for Proposal (RFP) RFP HQ2015-01 Training Session and Leadership Program Development Consulting Services technserve.rg Date: January 5, 2014 Request fr Prpsal (RFP) RFP HQ2015-01 Training Sessin and Leadership Prgram Develpment Cnsulting Services Subject: Request fr Prpsal TechnServe Inc. (TNS) invites yu

More information

Key Steps for Organizations in Responding to Privacy Breaches

Key Steps for Organizations in Responding to Privacy Breaches Key Steps fr Organizatins in Respnding t Privacy Breaches Purpse The purpse f this dcument is t prvide guidance t private sectr rganizatins, bth small and large, when a privacy breach ccurs. Organizatins

More information