Resource Allocation in MS Project



Similar documents
Resource Management with Microsoft Project Professional 2010

Planning and Managing Projects with Microsoft Project Professional 2013

How To Use Ms Powerbook On A Pc Or Mac Or Macbook 2 (Windows)

Creating a New Project

Planning and Scheduling Your Project Using Microsoft Project 2003

Project Management: Intermediate Microsoft Project 2010

Creating a Resource Library

Microsoft Project 2013 Guide to Task and Resource Planning

MICROSOFT PROJECT II

INTRODUCTION TO MICROSOFT PROJECT 2007 CONTENTS

Lesson 6 - Managing Resources in a Project Plan

Computer Training Centre University College Cork

Microsoft Project 2010

Session 6. Microsoft Project. Emanuele Della Valle. Lecturer: Dario Cerizza

Using MS Project in Translation Projects Management

Microsoft Project Server 2010 Project Manager s Guide for Project Web App

8. COMPUTER TOOLS FOR PROJECT MANAGEMENT

1. INTRODUCTION PRODUCT Installation Documentation Website workbench features...2

Introduction to Microsoft Project 2010

Microsoft Access Rollup Procedure for Microsoft Office Click on Blank Database and name it something appropriate.

MSP How to guide session 2 (Resources & Cost)

Construction Planning, Equipment and Methods ENGI 8749 Fall Semester, 2008 Tutorial #2 Resource Leveling using MS Project

Online Appointments (Patients)

A. Look at the Resource Sheet and Gantt Entry View Sheet to see what and where resources are over allocated.

Project Management Quick Reference Guide for MS Project 2010

ELECTRO-MECHANICAL PROJECT MANAGEMENT

Mail Merge Creating Mailing Labels 3/23/2011

How to Change Your Schedule for Holidays

MS Project Tutorial. CS 587 Software Project Management Instructor: Dr. Atef Bader. Prepared by Milton Hurtado

INTERCALL ONLINE Administrator Invoices User Guide

MICROSOFT PROJECT TUTORIAL

Beginning Microsoft Project

INTRODUCTION TO PROJECT MANAGEMENT AND MS PROJECT

Avery Wizard: Using the wizard with Microsoft Word. This is a simple step-by-step guide showing how to use the Avery wizard in word

OVERVIEW. Microsoft Project terms and definitions

Microsoft Project 2007 Level 1: Creating Project Tasks

MICROSOFT PROJECT SOFTWARE FOR THE PROJECT SCHEDULING

1. Go to your programs menu and click on Microsoft Excel.

Microsoft Project 2007 Level 2: Working with Resources and Managing a Project

Hands on Microsoft Project (Part I) From a WBS to a Complete Schedule Emanuele Della Valle, Lecturer: Dario Cerizza

Dayforce HCM Employee Access Employee Guide

SYSTEM ANALYSIS AND COMPUTER PROJECT MANAGEMENT Developing Engine Technology

Project Day Numbering

Tasks can be added manually by typing them into the list Manually adding tasks put the project manager in control and is a good way to start

QUICK START GUIDE RESOURCE MANAGERS. Last Updated: 04/27/2012

INTRODUCTION 5 COLLABORATION RIBBON 5 SELECT THE UPDATING METHOD 6 MAKE YOUR PROJECT COLLABORATIVE 8 PROCESSING RECEIVED TASK UPDATES 9

Microsoft Outlook 2003 Quick How-to Guide

MS Project Tutorial for Senior Design Using Microsoft Project to manage projects

Project 2010 Introduction

1 Start a new project

Excel Pivot Tables. Blue Pecan Computer Training Ltd - Onsite Training Provider :: :: info@bluepecan.co.

MERLIN. The Quick Start Guide to professional project management ProjectWizards GmbH, Melle, Germany. All rights reserved.

Changing the Default Delivery Location

MS Project 2000 Tutorial: Introduction

Optomate Training Compendium Appointment Book Page 2

Implementing Mission Control in Microsoft Outlook 2010

Bradley University College of Liberal Arts and Sciences Department of Computer Sciences and Information Systems

Open Workbench Warrior. Beginner's Guide to Open Workbench

How to Enter and Close Time Sheet For an Hourly Pay Overtime

Submit Employee Time Section

Microsoft Project Activity

All of the IntelliGanttt functions are accessed directly in Microsoft Project from the IntelliGanttt menu on the menu bar.

Microsoft Project 2013

Using Microsoft Project 2000

MICROSOFT OFFICE PROJECT - SYLLABUS

MindView Advanced Training Guide (PC)

1. Introduction. P2O is automatically loaded when you open Ms Project (2010 or 2013). The add-in can be found under the M5 Tools menu. 2.

Microsoft Project From the WBS to a Complete Schedule Emanuele Della Valle, Lecturer: Dario Cerizza

MS Project 2007 Quick Guide

IST 195 Lab 12 Introduction to Microsoft Project

Teacher References archived classes and resources

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by

Laboratory 1 Initiating a Project

This tutorial provides detailed instructions to help you download and configure Internet Explorer 6.0 for use with Web Commerce application.

PaperClip. em4 Cloud Client. Setup Guide

How To Manage A Project With Project Management On M Project Software On A Pc Or Macbook 2.5 (Windows)

Project Creation and Gantt Chart Design Using Microsoft Project. R. Baker. The University of Tampa

Process Document Campus Community: Create Communication Template. Document Generation Date 7/8/2009 Last Changed by Status

Shipment Label Header Guide

User Guide QAD Field Service Scheduler

Microsoft Project 2007 Tutorial Boston University. Boston University, Dept of Administrative Sciences, Project Management Programs (2010)

MS Project Tips and Tricks

Creating Survey Forms from a Word Table

MICROSOFT ACCESS TABLES

New Mexico State University

Using Check Boxes and Radio Buttons

PERCEPTION PERT-PAC Using Microsoft Project 2000

Excel Reports User Guide

Dayforce HCM Manager Timesheet Guide

Configuring Network Load Balancing with Cerberus FTP Server

Lab 1 Introduction to Microsoft Project

a. First Drag Position from Measures to Dimensions b. Drag Position into Rows c. Drag Candidate into Columns

MONAHRQ Installation Permissions Guide. Version 2.0.4

Quick start guide to using Attendant

Project Management: Tracking Progress and Earned Value with MS Project 2003

Fact Sheet No. 3 Topic: Creating Deliverables Applicable to: Microsoft Project Server 2007/Microsoft Office Project 2007 (Professional)

MICROSOFT PROJECT 2013 INTRODUCTION

Mac Outlook Calendar/Scheduler and Tasks

Transcription:

Resource Allocation in MS Project Calendars The project calendar determines the working days and hours available to your project, In addition each resource can have their unique calendars to mark time off. Open MS Project and from the Tools menu select Change Working Time... The following dialogue appears: Fig 1 In this dialogue you can select one of the existing calendars or create your own based in one of the standard calendars. Each resource has its own calendar derived from the project calendar. You can mark non-working days such as holidays, etc. The options allow you to define working days and time: TU03

Defining Resources Fig 2 Before resources can be allocated to tasks, they need to be defined in MS Project. From the View menu select Resource Sheet. Also from the View menu select Table: Entry. The following screen appears: Fig 3 On this screen you can enter the resource name, or a generic name such as analyst, designer, etc. The following parameters are used to define the resource: Type: Work for human resources subject to a rate Material for materials. Material Label: The units for material type Not used for Work type. Initials: The initial of the resource name. Group: Used to filter resources by defined categories. TU03 2

Max. Units: 100% corresponds to a full time resource. More than 100% represents multiple resources, and less than 100% indicates restricted availability, for instance time working in a different project. Std. Rate: The cost of the resource time, or unit cost for materials. Ovt. Rate: Overtime rates for Work type. Cost/Use: Fixed amount for using the resource. Accrue At: The cost can be accrued at the start of the task, prorated through the duration of the task or at the end of the task. Base Calendar: The base calendar used to create a specific resource calendar. Code: Another field used for filtering. Clicking on the resource opens the Resource Information dialogue: Fig 4 In the General tab you can define Workgroup information to be used in conjunction with the web or email workgroup options. You can also define the resource availability. This allows you to define the time that the resource will be available to work in the project. This is useful to make changes to the schedule maintaining the integrity of the resource base available to the project. The Working Time tab allows you to modify the resource specific calendar. The next useful tab is Cost: TU03 3

Fig 5 Here you can define up to five different rates for the same resource, and also make up to 25 rate modifications for each rate. This is useful to deal with rate increases, salary reviews, etc. Another application of this information is to manage rates for non-resident resources. By default the A rate is used. We will see how to select a different table later in the tutorial. Assigning a resource to a task Select Gantt Chart from the View menu. Select Assign Resources... from the Tools menu. The following dialogue appears: Fig 6 Resources are allocated to tasks by simply dragging them over the selected task.. They can me removed by selecting the task, the resource you want to remove and then clicking on the Remove button. By default up to 100% will be allocated, but you can change this for each assignment. The Replace... button is an easy way to substitute one resource for another in a task. TU03 4

The final allocation can be reviewed by selecting More Views... Task Usage from the View menu. The following screen appears: Fig 7 This screens show the resources assigned to each task and the assignment information. On this screen you can change the Assignment information of a resource by clicking on it. The following dialogue appears: Fig 8 Work contour allows you to specify how the time will be distributed over the task duration when scheduling the project. The Cost rate table allows you to specify one of the five different rate tables. The start and finish dates refer specifically to the assignment, and these dates can be different to the task dates. TU03 5

Fig 9 The Tracking tab is used to enter tracking information, such as the actual work performed and an estimate to complete. The assignment information is automatically adjusted to reflect changes in any field. Rob Jeges www.projectware.com.au Microsoft Project (MS Project) is a trademark of the Microsoft Corporation. TU03 6