BUILDING UTILITIES SERVICES

Similar documents
POLICY. Environmental Standards for Facility Operations and Maintenance. Board Received: January 26, 2015 Review Date: February 2019

Build the cloud OpenStack Installation & Configuration Integration with existing tools and processes Cloud Migration

The actions discussed below in this Appendix assume that the firm has already taken three foundation steps:

CCPRF. Request for Proposals. Monitoring Services. November 25, 2009

IEMA Practitioner Volume 14 Supporting Information

Commissioning the Data Center The Integrated Systems Test

COUNTY OF SONOMA AGENDA ITEM SUMMARY REPORT

ISO Management Systems. Guidance on understanding the benefits of an ISO Management System

Stream Group Ltd Claims Services Division Update. Paul Lynch- CEO Stream Claims Services February Stream Group Limited ABN:

WD Associates Major Business Areas and Clients

Internal Audit Charter and operating standards

How To Write Insurance Quotation Software For Gthaer Vericherungen Insurance Prducts

SBA 504 Financing. Long Term Asset Financing Made Possible. Glen Heller, Relationship Manager Nancy Sheridan, Specialty Finance Officer

Basics of Supply Chain Management

How Smart City solutions contribute to increased security

EUROPEAN UNION EUROPEAN SOCIAL FUND GREEK MINISTRY OF LABOUR AND SOCIAL SECURITY GENERAL SECRETARIAT FOR THE MANAGEMENT OF EUROPEAN FUNDS

Priority i 2 : Infrastructure for long distance transport. Livia Pardi, Autostrade per l Italia, IT Raphaël Steenbergen, TNO, NL

COUNTRY REPORT: Sweden

POSITION DESCRIPTION. Classification Higher Education Worker, Level 7. Responsible to. I.T Manager. The Position

Digital Signage Proposal Prepared For:

POLISH STANDARDS ON HEALTH AND SAFETY AS A TOOL FOR IMPLEMENTING REQUIREMENTS OF THE EUROPEAN DIRECTIVES INTO THE PRACTICE OF ENTERPRISES

Overview of the European Smart Cities Dimension

FACILITIES DESIGN & CONSTRUCTION OFFICE OF ENERGY MANAGEMENT UTILITY SERVICES, REPORT ON LONG-RANGE PLAN 2014

OFFICIAL JOB SPECIFICATION. Network Services Analyst. Network Services Team Manager

EPA Green Power Partnership Clean Energy Collaborative Procurement Initiative Metropolitan Washington DC For Local Agencies.

Project Management Professional Development Program

Implementing SQL Manage Quick Guide

FAQs. Therefore, the company submitting the application will be required to confirm that

Avaya Business Continuity Plan Overview

REQUEST FOR PROPOSAL FOR SHAREPOINT LEGISLATIVE MANAGEMENT SERVICES

Technologies Taking Us There

Description of Colocation Centre, Scope of Services

Systems Support - Extended

Interactive Catchment Plan Project Brief. Background to the organisation. How will we achieve this? What is a rivers trust?

AMERITAS INFORMATION TECHNOLOGY DISASTER RECOVERY AND DATA CENTER STRATEGY

BT Applications Assured Infrastructure (AAI) Application Optimisation Service (AOS) Optimising business performance

17 Construction environmental management plan (CEMP)

BSc (Hons) Real Estate Course content

Service Level Agreement (SLA) Hosted Products. Netop Business Solutions A/S

E-Commerce-SWOT Analysis

Impact Partnership Business Plan 2011/12. Impact Partnership Payroll Services. Business Plan 2011/12

STARplex Fitness Centre Manager

FINANCE SCRUTINY SUB-COMMITTEE

Project Startup Report Presented to the IT Committee June 26, 2012

Integrated Automation & Security Solution Improves Safety, Reliability and Efficiency at Freeport LNG

QBT - Making business travel simple

This report provides Members with an update on of the financial performance of the Corporation s managed IS service contract with Agilisys Ltd.

Process Improvement Center of Excellence Service Proposal Recommendation. Operational Oversight Committee Report Submission

Zimbra Professional Services Portfolio, Purchasing Guide & Price List

Customer Support & Software Enhancements Policy

GIS Service Provider. GIS Service Management

Infor EAM Mobility Initiative

Google Adwords Pay Per Click Checklist

THIRD PARTY PROCUREMENT PROCEDURES

Help Desk Level Competencies

Slough CCG. February Developing a Complex Care Case Management Service within Primary Care. Sangeeta Saran Head of Operations, Slough CCG

PENETRATION TEST OF THE INDIAN HEALTH SERVICE S COMPUTER NETWORK

Best «People & Talent» Management Program Ascott Young Talent Program

Independent Development Trust JOB DESCRIPTION

Customer no.: enter customer no. Contract no.: enter contract no.

Introducing Understanding Space Using STK An Integrated Training Course (Online or Onsite) A Training Partnership between TSTI and AGI

Risk Management Policy AGL Energy Limited

Transcription:

BUILDING UTILITIES SERVICES

Primary Energy Cnsumptin & Csts Offices Bucharest Ptential Market size: 2.017.571 m 2 ; Primary energy cnsumptin: 494 305 MWh PCS; Gas cnsumptin: 0.21 0.28 MWh PCS/ m 2 year; Electricity cnsumptin: U Tenants Mnthly Csts Energy 2.5 /m 2 Energy 2.5 /m 2 T be further ptimized 160 230 KWh el/ m 2 year; Yearly Heating cst*: 33 lei/m 2 r 7.5 /m 2 + VAT; Yearly Electricity cst*: FM H S Service Charge 3.5-4.5 /m 2 Prices t a minimum. 100 lei/m 2 r 22.5 /m 2 + VAT; Annual Primary Energy Cst: 30 /m 2 year + VAT r 2.5 / m 2 mnth + VAT RENTS Supply exceeds Demand. Pressure n rent csts by tenants Heating Cst: 0.245 MWh PCS/ m 2, 134,25 Lei/MWh PCS (B4 nncasnic price); * Electricity Cst: 0,2 Mwhel / m 2, 500 Lei/MWhel, 4.42 lei/eur exchange rate.

Electricity Cnsumptin split (BVO case study) Primary Energy Csts: Gas cnsumptin: 565 MWh PCS (2012-2013 heating seasn) = 69 kron + VAT; Electricity cnsumptin: 661 MWhel (Oct 2012 Sept 2013) = 306 kron + VAT. Glbal annual energy cst: 375 kron r 2.45 /m 2 + VAT Subject t ptimizatin Key Figures: 3UG + GF + 7 Flrs; GLA: 2880 m2; In peratin: fr 2 years

Classic FM Services & Lcal Apprach / 4

Classic FM Services & Lcal Apprach FM perspective BUS perspective U H S U E H S Little r n fcus n utilities cnsumptin ptimizatin; Limited pwer in negtiatin discunts fr the purchase f primary energy (gas & electricity); FM cmpanies => limited technical knw hw (due t brad range f services prvided & lw prfitability); N FM prvider is the best in hard & sft services; Crrective maintenance apprach ( intervene nly if it breaks); Shrt term cntracts (1-2 years) => n fcus n medium-lng term ptimizatin actin plan. SLA s / KPI s rarely used in energy/technical management issues Guaranteed savings thrugh the reductin f energy cnsumptin & discunts n primary energy csts (a glbal 10% reductin can be achieved fr mst prjects). Best service prvider fr each service. Sft services => externalized t specialized cmpanies; Lng term partnership enables: Energy Efficiency Actin Plan; Sharing f CAPEX (Client & Prvider f Services). Bnus/malus system linked t KPI s (energy efficiency); Gd technical cmpetences with fcus n energy efficiency; Preventive maintenance apprach => lwer n. f breakdwn incidents; O&M actins => essential part f keeping the LEED/BREEAM certificatin.

Scpe f Building Utilities Services UTILITY PERFORMANCE UTILITY SUPPLY Management f Utilities Usages MULTITECHNICAL UTILITY PERFORMENCE Secured supply f Energy & Water Cntinuus imprvement Secured supply f Energy & Water Scpe O&M fr HVAC equipment and water system O&M fr HVAC equipment and water system O&M HVAC equipment and water system Guaranties Equipment availability at required service level and ur interventin in time. Equipment availability at required service level and ur interventin in time. Equipment availability at required service level and ur interventin in time. Quantity, quality, price and availability. Quantity, quality, price and availability Level f perfrmance and/r Utilities savings Cntract f results Nvember 6, 2014

Scpe f Building Utilities Services 1 Wrks n interir installatins fr Buildings / residential / individual huses / cmpanies 2 Detecting water leaks Apă Servicii 3 4 5 Replacement f water netwrk valves Repairs plumbing wrks n cld / ht water netwrks Unblcking / cleaning hme netwrk cnnectin and sewage 6 Vide inspectin n sewage netwrks 7 Cnsulting / assembly / disassembly / maintenance f waste - water treatment systems

OUR TARGET OFFER TODAY Gas supply With Velia U Electricity supply Water Drinking, prcess & sewage Waste Management U Heat supply Electricity supply Water Drinking, prcess & sewage Waste Management Velia Prpsal Heat cnsumptin < 10 t 15% Electricity cnsumptin < 5 t 8% Water Balance < 5 t 10% Better Waste Management H O&M Services H O&M Services S Sft Services S Sft Services

Velia Slutins Steps f cllabratin (BUS)

References fr BUS in Bucharest Market Barbu Vacarescu Offices (BVO)- Energy Perfrmance Descriptin BVO - Bucharest Mdern ffice building, lcated in Barbu Vacarescu Bld., latest htspt in ffice buildings develpment. The building prvides 3,600 sqm f high quality space distributed n grund, 6 upper flrs and tw basement levels, ut f which 2,000 sqm are dedicated t A class ffice space. Services Energy Perfrmance Cntract and sales f heat/cling - ptinal Standard O & M preventive maintenance Crrective maintenance Velia s slutins Phase 1 Diagnsis 1 year Measure and analyze cnsumptin Establish benchmark cnditins => Reference Perid. Identify ptential savings n the energy prductin and distributin, technical slutins and their cst Preventive & Crrective maintenance services Phase 2 Energy Perfrmance 2 years O&M services with ff-site team, implementatin f Energy Perfrmance Plan, sales f heat & electricity. Velia Energy dispatcher is cnnected t the n-site BMS prviding 24/7 mnitrizatin f HVAC equipment. Client cntinues t keep its n-site peratinal team but this team is directly managed & acts accrding t Velia directives. Bnus/Malus system cnnected t savings generated..

References fr BUS in Bucharest Market Embasy f France - Energy Perfrmance Descriptin Building with a net usable area f 3394 sqm cmprising: - Main building + administrative buildings and residential husing - Main equipment cvered by services: 2 biler De Dietrich 330 x 370 kw; 2 CTA: 2500 m3 / h and 27 000 m3 / h; 49 AC units split and multi-split; Tw sets: 27 and 100 kva; Client Needs Energy csts evaluatin and the technical cnditin f existing equipment; Cnducting wrks in rder t imprve the technical cnditin f buildings (insulatin and interir installatins); A single integrated service prvider. Cntinuity in prviding energy (heat, air cnditining, electricity) and treated air; Preventive and crrective maintenance services fr facilities Precise cntrl f expenses and reductin f energy csts Velia s slutins Cntract duratin: 3 years; Selling heat at cmpetitive price; Preventive and crrective maintenance services; Establishing a baseline (Reference Perid): 1 year; Implementing Energy Efficiency Actin Plan. Bnus / malus system - Savings: year 2-3.

References fr BUS in EU Market Tur du Midi Belgium - Energy Perfrmance Cntext The central administratin f the Natinal Pensin Office (ONP) has fully ccupied the Tur du Midi cmplex in Brussels since 1967. Velia Energy has always been the peratr f the twer - nearly 45 years f cntractual relatins fr multi-technical maintenance. In 2008, the ONP decided t cmmit t a certificatin system fr cntinuus imprvement f its envirnmental impact. As part f this ambitius plicy, Velia Energy has cncluded an innvative Energy and Envirnmental Perfrmance cntract fr a maximum perid f six years, as an addenda t the existing cntract. Key figures Height 150 m (tallest building in Belgium) Antenna height: 165 m Number f flrs: 38 Area: 65,200 m² Cnstructin between 1962 and 1967 (renvated in 1996) Energy cnsumptin in 2009 Fuel il: 650,000 litres Electricity: 136 kwh/m² Custmer challenges Financial challenge: Reduce perating csts Envirnmental challenge: Reduce the carbn ftprint Scietal challenge: Measure the lng-term impact f the activities n the envirnment Velia Energy Slutin Energy guarantee fr fuel il cnsumptin Energy guarantee fr electrical cnsumptin CO2 emissin guarantee Prfit-sharing n energy savings Apprach: Audit / Wrks / Mnitring & ccupants awareness campaign - Energy cnservatin measures planed accrding a radmap shrt term actins: Actins implemented withut investment, intended t reduce energy cnsumptin Advantages fr the custmer: Predictable energy budgets Guaranteed ptimal management f facilities Opprtunity fr ec-energy prpsals Assurance f Velia Energy f its full invlvement in the energy apprach (partnership) Excess CO2 emissins are cmpensated at the Eurpean level thrugh the carbn penalty Results Energy savings generated the first year: Fuel il: 7% Electricity:19% CO 2 emissins avided: 500 tnnes

References fr BUS in Bucharest Market Apă Servicii Henri Canda Internatinal Airprt Operatinal Facts Technical data: 960,000 m³ / year Extracted vlume 46.280 m - water distributin netwrk 30.940 m - Sewerage netwrk 41.750 m Rain water Netwrk Schengen Terminal + SPAU Departures Terminal Expansin Platfrm Operatinal team n site 18 peple Prtland Platfrm - Pepsi Lidl Operatinal Facts Activity - platfrm area - 151 ha 7,000 m - water netwrk - Prtland 6424 m - sewerage netwrk: Prtland - 4670 m, Pepsi - 1008 m, Lidl - 742 m 11.187 m - rainwater netwrk: Prtland - 3818 m, Pepsi - 1826 m, Lidl - 5543 m 188 - Inspectin checking pints n sewage netwrk. 158 - sputs 3 Wastewater pumping statins Wastewater treatment plant Prtland Operatinal team 7 peple

Thank Yu!