Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS



Similar documents
G VYCOR DECK PROTECTOR

Residential Roofing Guide

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

SEAMS SEAMING USING SEAM TAPE

CertainTeed. Self-Adhering Roof Systems for Low Slope Residential Roofs

How to repair your existing low slope flat roof.

Please read the entire document before purchasing and installing any of these products

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

Asphalt Shingle Application Requirements

Although we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

G VYCOR DECK PROTECTOR. For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects.

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Peel & Seal Self-Stick Roofing Solutions

ITEM THERMOPLASTIC MEMBRANE ROOFING

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

CHAPTER 7: Building Systems ROOFING SYSTEMS

Directions For Applying Malarkey Laminate Shingles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

HHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H SECTION STANDING SEAM METAL ROOFING

Shingle Installation Guide

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

GreenGuard Housewrap Installation Guide

Maintenance & repair Solutions

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

WATERPROOFING FOR CONCRETE STRUCTURES

Herringbone Pattern Flooring

ATLAS Roofing Products

Detached accessory structures that contain no conditioned floor area are exempt.

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

SHINGLE APPLICATION GUIDE

Chapter 9: INSTALLING ROOFING

application instructions

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

CREEK Technical Services, LLC

RECOATING AND RENEWING SPF ROOFING SYSTEMS

Colorado State University. Durrell Center Roof Repair

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

MODULAR EPDM ROOFING SYSTEMS

SECTION STANDING SEAM METAL ROOFING

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Technology at its best. Benefits

ROOFING PRODUCTS. INSTALLATION GUIDE FOR RESISTO. Time-tested premium quality products

Carpet Tile Installation Guidelines

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

Installation Manual for STANDING SEAM ROOFING

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

Self-Stick Roofing Solutions

There s a new problem on deck. Corrosion. And now there s a solution. Quick and easy. G VYCOR DECK PROTECTOR. Self-Adhered Flashing

UNIT 4: SHEATHING AND SHINGLING THE ROOF

GENERAL RUBBER LINING PRINCIPLES

VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals Magnolia Ave. Chino, CA 91710

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

INSTALLATION GUIDE. americanwick.com WICK (9425)

Rooflight INSTALLATION INSTRUCTIONS

Laminate Flooring T-Lock Angle-Drop Installation Instructions

Your guide to home maintenance. Flat Roofs

INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels

EPDM. Roofing systems

Sun Windows General Information Sun New Construction Window Installation Instructions

CHAPTER 3 MOISTURE TESTING

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

STANDING SEAM SHEET METAL ROOFING

Epdm Flat Roofing Systems

K2 STONE NATURAL VENEER

CHAPTER 6 ASPHALT ROLL ROOFING

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Distributed by: BEST MATERIALS LLC, Phoenix AZ Ph: , Fx:

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING General Materials Equipment...

PANELIZED HOME INSTALLATION GUIDELINE

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

G VYCOR. Contractor s Guide. Flash it rightṭm WINDOWS, DOORS AND DETAIL AREAS. Self-Adhered Flashing

BLACK JACK ALL WEATHER ROOF COATING

How to Install Hardwood Flooring Over a Sub Floor

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

Window Installation Instructions

SECTION ROOFING TILE

WATERPROOFING OF WET ROOMS

Ver. 2. Guide to. Inspecting Residential Brick Veneer

Fully Adhered System ApplicationHandbook

3 Installation. 3. Installation. EPDM Installation

GigaCrete Specification PlasterMax

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Transcription:

AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings AC TopSeal Colors: Grey, WeatherWood, Black, White, Brown & Tan DESCRIPTION: AC TopSeal rolled roofing is a self-adhered, rubberized asphalt product designed to protect residential low slope roofs. AC TopSeal rolled roofing consists of a proprietary modified asphalt, a tough polyester reinforcing core, and a granular surface to protect against UV rays, weathering and physical damage. AC TopSeal rolled roofing is available in 100 sq. ft. (9.3 sq. m.) rolls, 3 ft. by 33.3 ft. (0.9 m by 10.1 m). Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS A. PRECAUTIONS: Only for use on: Oriented Strand Board (OSB) or plywood roof decks (no planked roofs). AC TopSeal rolled roofing may be used for new construction or re-roofing. Minimum OSB or plywood thickness is 15/32 in. (1.19 cm.). Maximum space between sheathing is 1/4 in. (0.64 cm.). Roof Conditions: The roof deck must be structurally sound, securely nailed, dry, clean, and free of dust, oil, frost and protruding nails. Priming: All roof decks require priming. Please see Section D. Priming for details. Ventilation: The attic or roof space must be adequately ventilated according to local building code requirements. Mastic/Adhesive: All end lap treatments require mastic/adhesive for AC TopSeal rolled roofing. Please see Section E. Mastics/Adhesives for details. Roll Size: When measuring the roof to be covered, consider that approximately 10% of the roll will be consumed for side laps, end laps, and waste. Temperature Restrictions: AC TopSeal rolled roofing is to be installed when ambient and substrate temperatures are 40 F (5 C) and rising, including the 24 hours before installation. Store rolled roofing inside for better adhesion prior to application. At ambient temperatures above 90 F (32.2 C) and rising, AC TopSeal rolled roofing should be stored in a shaded area prior to application. If the rolled roofing is exposed to high temperatures or direct sunlight, the paper release liner may be difficult to remove. Moving the rolls to a shaded location will allow them to cool sufficiently and allow the release liner to be easily removed. Roof Protrusions: All roof protrusions such as soil pipes and vents should be addressed prior to installing rolled roofing over the roof deck. See Figure 9 and Roof Protrusion instructions. Storage: AC TopSeal rolled roofing should be stored in an inside, dry, well-ventilated area. Stand rolls upright. Do not store at 90 F (32.2 C) or warmer for extended periods of time. Store on a hard, flat, level surface. Do not stack more than two (2) pallets high. If there is any sign of pallet damage or water intrusion to pallets or boxes, do not double stack. When working on the roof use all necessary safety precautions and guidelines in accordance with proper roofing trade practices. AC TopSeal rolled roofing should be installed by a professional contractor. AC TopSeal rolled roofing is intended for exterior roof applications only. Do NOT install AC TopSeal rolled roofing over uncured caulking, uncured sealants, or flexible vinyl. If these products are installed over any of these materials, the adhesive will melt and run causing unsightly streaks and drips. It is the installer s responsibility to determine whether all the materials used are compatible with each other. Contact the caulking or sealant manufacturer to ensure the product is compatible with asphalt. Caulking and sealants must be fully cured before covering with AC TopSeal rolled roofing. Do NOT install AC TopSeal rolled roofing over granular surfaced roofing, EPDM, urethane based materials or flexible PVC. B. ROOF PITCH REQUIREMENTS: 1. The minimum slope is 1:12 and the maximum slope is 2:12. 2. Back nailing is required along the selvedge edge every 12 in. (30.5 cm.). See Figure 3B. 3. All roof surfaces must have positive drainage. Page 1 of 5

C. NEW ROOF DIRECT-TO-DECK PREPARATION: The roof deck must be structurally sound, securely nailed, dry, clean, and free of dust, oil and frost. AC TopSeal rolled roofing must be applied directly to a primed plywood or a primed OSB structural deck. D. PRIMING Prime roof deck to enhance the bond of the rolled roofing to the substrate. Ensure all areas are primed prior to installing AC TopSeal rolled roofing. Carefully read the installation instructions provided with the primer before starting work. Follow the manufacturer s published installation recommendations, paying particular attention to environmental conditions, storage requirements, application rates, anticipated dry times and surface conditions at the time of rolled roofing application. While it is typically appropriate for primers to fully dry, some water based primers should dry only until the surface is dry but tacky, at which time the rolled roofing is applied. Only prime the area that the rolled roofing can be applied to that day. If an SBS modified asphalt primer is not available, SealBest DrySeal manufactured by ThorWorks Industries, Inc., can be used as an alternative product with the following changes to the application: 1. SealBest DrySeal should be applied by brush or roller to the entire area to be covered by the rolled roofing. 2. SealBest DrySeal should be applied as a thin coating that completely covers the surface. The 60 mil (1.524 mm.) requirement by ThorWorks Industries is not needed when using SealBest DrySeal as a primer underneath AC TopSeal rolled roofing. 3. SealBest DrySeal should be allowed to dry until it is dry to the touch but does not transfer to your hand. The material will dry black. CAUTION! Prior to drying, primer may wash off in a rain event. Primer will permanently stain finishes if washed into adjacent surfaces. E. MASTICS / ADHESIVES Mastics are used to adhere membrane to membrane applications where there is a granular substrate surface or there is inadequate adhesion between the self-adhered membrane layers. An SBS polymer modified mastic shall be used in all applications. All mastics should comply with ASTM D4586. Apply mastic with a trowel, forming a 1/8 in. (.32 cm.) thick layer. Do NOT over apply mastic. Clean off excess while still wet. Always form the lap into wet mastic. LOW SLOPE INSTALLATION INSTRUCTIONS RE-ROOF APPLICATION PREPARATION: AC TopSeal rolled roofing may be installed over a layer of existing self-adhered ice & water protection membrane as long as the top surface of the ice & water is smooth, dry and has a non-granulated surface. All blisters or wrinkles must be cut, re-nailed and sealed with appropriate mastic. Applications of this type are based on the judgment of the roofer as to the conditions of the old roof system. The manufacturer does not assume responsibility for problems that are due to the conditions of the old roof system. The roof deck must be dry, clean, and free of dust, oil, frost and protruding nails. The surface should be swept thoroughly. The substrate being covered must be primed following the instructions in Section D. Priming. Primed Roof Deck FIGURE 1 ROOF EDGE PREPARATION: The roof edge must be prepared using this method: A. Install metal drip edge to the eaves and rakes. Nail the metal drip edge 8 inches (20.32 cm.) on center. B. Prime the top of the drip edge prior to membrane installation. See Section D. Priming. 1 Drip edge Page 2 of 5

2 3A Back Nail 12ʺ on center. First course First course application FIGURE 2 ROLL APPLICATION INSTRUCTIONS: Nails should be hot dipped galvanized tin caps. Cap nails should have integral metal caps (do not use plastic caps), minimum 1 in. (2.54 cm.) in diameter with rounded heads. Consult manufacturer s literature, local building codes, and project specifications for appropriate nail and fastener types and spacing. Roof only as much area as can be completed in one day. A. Roll AC TopSeal out onto roof and cut into manageable lengths of 12 to 16 ft. (3.66 to 4.88 m.). Allow the AC TopSeal to lay flat for 15 minutes to relax from roll configuration. AC TopSeal must be laying flat at time of installation. FIGURES 3A & 3B FIRST COURSE APPLICATION: A. Align the AC TopSeal parallel with the eaves, with the selvedge at the top of the roll. Edge of AC TopSeal should be flush with drip edge on the eaves and rakes (the bottom and side edges of the roof). If wrinkles or fishmouths appear, re-align the membrane. B. Fold the lower half of the membrane back to expose half of the release liner. Remove lower half of the release liner and press the membrane into place, starting in the middle and working your way out to the ends of the AC TopSeal. See Figure 3A. C. Repeat the same process with the upper half of the membrane. Back nail 12 in. (30.5 cm.) on center through the selvedge area using nails as described before. See Figure 3B. 3B FIGURE 4 END LAPS: Apply adhesive to the 6 overlap area If an additional AC TopSeal segment is needed to complete the run along the eaves, a 6 in. (15.24 cm.) overlap will be needed. Apply adhesive to the entire 6 in. (15.24 cm.) area at the end of the first run where the overlap will occur. See Section E. Mastics / Adhesives. 4 Page 3 of 5

45 angle at the selvedge overlap first roll by 6 FIGURE 5 Cut the corner of the selvedge of the overlapping membrane to a 45 angle. Apply the second section by overlapping the section by 6 in. (15.24 cm.), covering all of the adhesive. 5 FIGURE 6 All end laps should be staggered from course to course and be at least 36 in. (91.44 cm.) apart. Staggered end laps - minimum 36 apart 6 Second course FIGURE 7 7 SECOND COURSE APPLICATION: Apply the second course using the same procedure as the first course. Position the upper course to overlap the selvedge edge of the lower course. The selvedge edge is designed to create a 3 in. (7.62 cm.) overlap. Fold back the lower section of the upper course and remove the protective release paper covering the selvedge tape on the lower course. Remove the release liner of the upper course and adhere to the lower course. Roll with a minimum 40 lb. weighted (flooring or garden) roller to ensure good initial adhesion. End laps FIGURE 8 8 36 apart STAGGER END LAPS: After each course is installed, roll with a minimum 40 lb. weighted (flooring or garden) roller to ensure good initial adhesion. Remember all end laps are to be staggered from course to course and be a minimum of 36 in. (91.44 cm.) apart. Page 4 of 5

PROTRUSION DETAIL FIGURE 9 ROOF PROTRUSIONS SUCH AS SOIL PIPES: 9 Topseal inverted a. If a sleeve or boot is being used to seal the roof protrusion, cut a section of AC TopSeal that will extend a minimum of 6 in. (15.24 cm.) beyond the flange on the sleeve or boot. b. Cut a hole in the center of the AC TopSeal the size of the pipe projection. An exact size can be obtained by placing the center of the AC TopSeal over the pipe and tapping it gently to create the hole pattern. c. Apply a 1/8 in. (.32 cm.) thick coat of an SBS polymer modified mastic around the opening in the roof deck extending it out to the size of the AC TopSeal cut in step a. d. Slide the section of AC TopSeal cut in step a down over the pipe, release liner side up. e. Remove the release liner and nail in 1 in. (2.54 cm.) from each corner. f. Ensure that the top surface (sticky surface) of the inverted top seal is clean and free of dirt, oil, water, or other debris that will affect the adhesion of the cap sheet around the penetration. g. Slide the sleeve or boot over the pipe and nail the sleeve or boot to the roof deck 1 in. (2.54 cm.) in from each corner. Before installing the finish course of AC TopSeal over the pipe sleeve or boot, a 1/8 in. (.32 cm.) thin coat of SBS polymer modified mastic should be applied over the flange on the pipe sleeve. Don t do this step until applying the finish course to avoid tracking roof adhesive over the finished surface. h. Apply a silicone caulking approved for roof application around the pipe protrusion. WARNING! SLIPPERY SURFACE: Use extreme caution when installing AC TopSeal rolled roofing. The surface of AC TopSeal rolled roofing is slippery even when dry. Use of Fall Protection is Highly Recommended. Consult OSHA for Guidelines on Fall Protection (29 CFR 1926,500). FALLING HAZARD: Secure area below work. Unsecured materials may slide on roof. Place on level plane or secure to prevent sliding. Wear a hard hat. WARNING: This product contains a chemical known in the State of California to cause cancer. FOR TECHNICAL INQUIRIES PLEASE CALL 1-800-438-7465. *See actual warranty for complete details, limitations and requirements. Page 5 of 5 61 Pine Road, Brentwood, NH 03833 www.nei-act.com The data contained herein, is considered to be true and accurate and is offered for the user s consideration, investigation and verification. NEI does not warrant the results to be obtained. Effective 5-31-16. Copyright 2016 Northern Elastomeric, Inc. All Rights Reserved.