Description of the Task/Activity: General door/window fitting/replacement. Start Date/Time: Site Address/ Location: Finish Date/Time:



Similar documents
A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION

OUTLINE TENDER STAGE METHOD STATEMENT Removal of Asbestos Cement Roof & demolition of Building At Highbury Roundhouse. Ronald Road. London.

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

Installation Instructions

Health & Safety Policy For Locations Hosting Film Production Companies

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

BILL WHYTE FLOORCOVERINGS LTD UNIT 5 KINGS COURT KING ST LEYLAND LANCS PR269RL. Tel: METHOD STATEMENT

The Tomato Plant Company Ltd. Method Statement and Risk Assessment Loads requiring lifting

Installation Instructions

Unit FFL 1 Respond to requests for fire damage limitation work

ASTFFL2 - SQA Unit Code H54D 04 Assess and estimate work required to limit damage to structures post fire

1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY

Method Statement. Risk Assessment

Employee Health and Safety Induction Training Record

FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Basement Window Installation Guide Hopper and Sliding

CAER Construction and Environmental Resource

Contractor s Safe Working Agreement

Safety Systems Review Facilities Management Guidance and specification Version

Safety and Environmental Information for External Companies Koehler Oberkirch

Safety Training Needs Assessment

CONTRACTOR INDUCTION HANDBOOK

Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules

Working at Height. Procedure

Level 1 Award in Health and Safety in a Construction Environment

Window Installation Instructions

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

SITE CONTRACTOR PROCEDURES

Awning Instructions. Standard Manual 1.5m to 4.5m

School of Engineering University of Glasgow

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

Safety and Environmental Information for External Companies

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

CONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT

Safety and Environmental Information for External Companies

Greenhouse Assembly Instructions

Notes. Material 1. Tools the employee is expected to operate

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.

68 Metal Industry Guidelines for Safe Work

SKAC222 (SQA Unit Code - DD38 04) Carry out basic glazing and carpentry repairs

DIY CABINET REFACING INSTALLATION GUIDE

Tremline Pty Ltd trading as The Hills Bark Blower

Job safety analysis Installing wall frames and roof trusses on-site

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

GHD EPCM Standard operating procedure Working at height May 2013 v1

SLIPS, TRIPS AND FALLS POLICY

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Method Statements. Debenham House, 8 Addison Road, London, W1J 8DJ Debenham House 8 Addison Road Holland Park W14 8DJ.

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

00MK-MA0190-EN00. Mounting System ASSEMBLY INSTRUCTIONS. Universal Light system with locking brackets, for sloped roof

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

WHS Contractor Management Procedure

Machine/Woodworking Shop The Basic Rules

New Employee / Applicant - Information Pack (Includes: Driver Back round Release Form, Skills & Tools Assessment

Procedural Guidance for Roof Access/Roof Work

FRAME DOOR OPENING, DOOR AND SIDE PANEL OUTER

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

WINDOW REPAIR MANUAL & REFERENCE GUIDE

CPPSEC2021A Install security equipment and systems

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

Working at height - Practical Guidance for Schools

SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl

Site Induction Presentation

TEMPORARY EMPLOYEES SAFETY PROCEDURES

Packaged Terminal Air Conditioner Wall Sleeve Installation

BSH Exhibition Sample Risk Assessment for exhibitors / contractors

Active and Passive Sash Replacement

ISSUE 2. Installation Guide

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

RESIDENTIAL ROOF TRUSS INSTALLATION PROCEDURES

S4 - Top Hung Window. Outside view. Inside view. Interior frame. Exterior frame. Glazing Panel

Fire Safety Log Book

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website

Premier & Deluxe 3-Season Room Sliding Glass Door

WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS

WORKING AT HEIGHT GUIDELINES. Version II

Lifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

Guide for Contractors and Project Supervisors

All-Season Sunroom Sliding Glass Door Installation Instructions

Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES

SITE SPECIFIC FALL PROTECTION PLAN

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE O*NET CODE

Example risk assessment for a motor vehicle mechanical repair workshop

Independent Contractor Policy

Chelsea Loft Bed WARNING:

Greater Manchester Fire and Rescue Service

Workshop Self Inspection Checklist WORK01

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

This material was produced under grant number SH F-48 Occupational Safety and Health Administration, U.S. Department of Labor.

UBC Plant Operations Asbestos Work Procedures April 2004

IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL

Temporary Worker Safety Checklist

Safety Inspection Checklist

Transcription:

Method Statement This method statement is to be read in conjunction with the attached risk assessments and the Wembley Windows (SC) Ltd Health and Safety Policy and Procedures Manual. Description of the Task/Activity: Project Name: General door/window fitting/replacement Project Ref: Site Address/ Location: Personnel involved: Name Start Date/Time: Finish Date/Time: Role/Trade Works Supervisor/Senior Window Fitter Window Fitter Labourer Works Supervisor: Key Plant and Tools Required: Key Materials Required: Other Essential Equipment: Specific Identified Residual Hazards: Role: Works Supervisor Tel: Chop saw, jig-saw Spanners, Screwdrivers, Chisels, Stanley knife, Pliers, Hammers, Hand Saws, Files and other small tools Wrecking bar Lump hammer Hammer drill Reciprocating saw Battery powered cordless drill/screwdrivers Work bench Miscellaneous trims and packing UPVc doors and door frames Replacement UPVc windows and associated frames Miscellaneous hinges, brackets, locks and fixings PVA Wood Glue/Adhesive Expanding builders foam Gripfill Podium steps Clamps Fire extinguisher First aid kit Inspection lamp Dust sheets Hop-ups Crawl boards Please refer to the attached risk assessments. The key hazards are: Manual handling Use of power tools Working at height Slips, trips and falls Page 1 of 9

A competent and experienced site supervisor will be appointed to manage and oversee the works, including on-site health and safety. All operatives are to receive information and instruction on the content of this method statement and the attached risk assessments. All operatives are to receive a site safety induction prior to the commencement of works. Specific Staff Training Requirements: All operatives using power tools are to have received suitable and sufficient training in the use of the equipment. Only those considered competent to use such equipment shall be permitted to operate such tools. All operatives are to receive training on safe manual handling techniques and asbestos awareness. All operatives are also to receive training in safe working practices for work at height and are to be advised that the use of step-ladders/ladders shall only be used where there is no other suitable alternative, such as full access scaffold, mobile tower scaffold or MEWP. All work is to be carried out by competent experienced window fitters, as a company we are registered and audited by FENSA to ensure that we maintain their high standards of workmanship. A record of all training shall be maintained and will be available on request. Sequence of 1. Liase with the client prior to the start of works to determine start dates and durations for the works. Advise the client of the hazards associated with the works. 2. Ensure all materials, parts and equipment have been ordered and are available for the start of works. 3. On Commencement of works, prepare the site for work by advising the residents of the property of the scope of works and the restrictions that will be placed upon the working area in terms of where the client and other contractors can and cannot go whilst the works are being undertaken. 4. Carry out a visual inspection of the work area to ensure that the required works are as per the specification and that no additional works or materials are likely to be required. Check to see if any suspect substances, such as asbestos are present. If additional works are required, or any suspicious substances have been identified, contact head office immediately and advise the client. 5. Deliver all parts and materials to site, ensuring that appropriate care is taken when manual handling large, heavy or awkward shaped objects, such as heavy glazed units. 6. Cover all affected areas of flooring, soft furnishings, white goods and other items with dust sheets or other appropriate protective sheets to prevent any damage being caused to them. Page 2 of 9

Sequence of Door Replacement/Installation 7. This should be carried out in strict accordance with the manufacturers recommendations and in the sequence specified by the manufacturer. Before starting work ensure that the correct door and frame sizes have been supplied, together with all the necessary ironmongery, locks and fixings etc. 8. Where applicable any existing door should first be removed by removing the hinges from the door frame. The existing door frame can then be removed from the wall; this will be done by cutting through the frame and levering the frame away from the wall with a wrecking bar. 9. Carefully remove all old fixings and other parts of the door frame assembly from the wall and dispose of safely in the site skip. 10. Prior to the fitting of the new door and door frame, the walls must be checked to ensure that they are sound and secure, and suitable for the fittings to be used. Where sections of the wall are damaged or are not suitable, the area should be made good or alternative fixings used. 11. Clean the area and prepare the recess for the installation of the new door frame. Fit the frame into position, ensuring a tight fit, checks should also be made to ensure the frame is plumb and square. 12. Use packers where necessary to secure and level the frame in position and then drill through the frame into the masonry/stud wall for the frame fixings. A minimum of 3 frame fixings should be used on each element of the door frame. 13. Once the frame fixings have been inserted and securely fixed /tightened, any voids at the back of the frame should be filled with expanding foam to provide added protection against the weather/water ingress and from unwanted noise. 14. The door hinges can then be fitted to the frame and the door hung on the frame and the door furniture added, this will involve simple hand tools and electric screwdrivers etc. 15. The glazed panels can then be carefully lifted into position, grip gloves should be worn at all times when lifting glazed units and for large panels a minimum of 2 persons should be used to lift and secure the panels in place. The use of suction lifters should also be used to provide a safe and secure grip when lifting large and heavy glass panels/units. Page 3 of 9

Sequence of 16. The door should then be tested to ensure that it opens and closes smoothly without rubbing or catching, if necessary the hinges and door should be adjusted to ensure a suitable fit. 17. Once the door has been suitably adjusted, the remaining door locks, handles and other ironmongery can be fitted into the pre-formed recesses and secured into place. 18. The door frame should then be trimmed and sealed both internally and externally and the area cleaned and made good. 19. Remove all rubbish, scrap and waste materials/packaging from the premises and dispose of appropriately. Thoroughly vacuum and clean through the area and all transit routes leaving the property in a clean and tidy state. Window Installation 20. This should be carried out in strict accordance with the manufacturers recommendations and in the sequence specified by the manufacturer. All work will also be carried out in strict accordance with FENSA requirements. 21. Before starting work ensure that the correct window sizes have been supplied, together with the necessary fixtures and fittings. 22. Where applicable the existing windows should first be removed by removing the hinges from the window frame. The existing widow frame can then be removed from the wall; this will be done by cutting through the frame and levering the frame work from the wall with a wrecking bar. 23. The old windows and frames will be removed from site and disposed of via a licensed waste carried for disposal at a licensed waste site. 24. All work will generally be carried out from the inside of the property, however, where work is being carried out on floors other than the ground floor, or where work is carried out on the ground floor and level of the ground outside of the window is more than 1.5m below the sill height AND where the internal sill height is less than 910mm (or 950mm on properties constructed after April 2005) above the internal floor level, then additional measures must be implemented to safeguard against falls through the open window aperture. This is to ensure compliance with the Work at Height Regulations 2005. In such instances where the sill height is below 910mm (or 950mm on new properties) either a temporary hand rail at 950mm must be erected; or those carrying out the works, must wear a full body harness with a lanyard attached to a suitable anchor point. Page 4 of 9

Sequence of 25. Prior to the fitting of the new window and window frame, the walls must be checked to ensure that they are sound and that any old fixings have been removed and disposed of. Where sections of the wall have been damaged or are not suitable, the area should be made good or alternative fixings used. 26. Clean the area and prepare the recess for the installation of the new windows. Fit the new window frame into position, ensuring a tight fit and ensuring that the frame is plumb and square. 27. Use packers where necessary to secure the frame in position and then drill through the frame into the masonry wall for the frame fixings. A minimum of 2 frame fixings should be used on each element of the window frame, though for long windows additional fixings will be required. 28. Once the frame fixings have been inserted and securely fixed /tightened, the back of the frame should be filled with expanding foam to provide added protection against the weather, water ingress and from unwanted noise. 29. Where applicable the individual windows openings can be inserted and fixed to the window frame with the hinges. Generally all windows and frames should be supplied pre-assembled prior to arriving on site. 30. Once the windows and frames have been installed, the glazing units can be inserted. Each unit should be installed and secured into position with the appropriate beading/seals. The glazed panels can then be carefully lifted into position, grip gloves should be worn at all times when lifting glazed units and for large panels a minimum of 2 persons should be used to lift and secure the panels in place. The use of suction lifters should also be used to provide a safe and secure grip when lifting large and heavy glass panels/units. 31. The windows should then be tested to ensure that they open and close smoothly without rubbing or catching, if necessary the hinges should be adjusted to ensure a suitable fit. 32. The window frame should then be trimmed and sealed both internally and externally and the area made good. 33. Upon completion of the works, Wembley Windows (SC) Ltd will remove all rubbish, scrap and waste materials/packaging from the premises and dispose of appropriately. Thoroughly vacuum and clean through the area and all transit routes leaving the property in a clean and tidy state. 34. Care must be taken to ensure that the glass is not broken and that when handling glass and windows, that appropriate gloves are worn. Page 5 of 9

Sequence of 35. Wembley Windows (SC) Ltd have a policy of a Tidy Site is a Safe Site and in this respect all employees are required to remove and dispose of waste as it is generated, leaving a clean and tidy site at all times. All waste is to be segregated where applicable and placed into the appropriate waste containers/skips. At the end of each working day, a check is to be made to ensure that all waste has been removed from the site and placed into the appropriate waste containers/skips and that the site is left in a clean and tidy state. Temporary Supports and Props needed to facilitate the works: At the end of each shift, ensure that all working areas are left tidy, safe and secure and remove or cover anything which may constitute a trip hazard, or result in a danger to other workers/persons. Method of Access and Egress to the work area: Access and egress to the working area will be via the front/rear doors of the premises, access to the first floor will be via the internal staircase. In areas where external access is needed all work will be carried out from full access scaffolds or tower scaffolds, the use of ladders will not be permitted for use as a working platform. Do not store tools or materials on top of working platforms or around holes in the floor when working above ground level. Fall Protection Measures: Exclusion zones shall also be established in the area beneath all such works, to protect others from the risk of falling tools, equipment and materials etc. Access scaffolds are to be used for all external work at height to provide a safe working platform and protection from falls, all scaffolds will be provided with close boarded platforms, toe boards and double handrails in full accordance with the Work at Height Regulations 2005. Hazardous Substances: Very Toxic Harmful/ Irritant Corrosive Dangerous for the environment Oxidising Highly flammable Explosive Applicable: No Yes No No No No No SWL's: Not applicable. Page 6 of 9

Required Personnel Protective Equip.: Safety Boots Hard Hats Safety Gloves Hearing Protection Respiratory Protection Eye Protection Yes Yes Yes Yes Yes Yes When When When When using using At all At all using using selected selected times times power power power power tools tools tools tools Call 999 and advise the appropriate emergency services Isolate any plant, machinery or other equipment. Other: 1. Hi-Viz 2. Coveralls 3. Emergency Procedures: Do NOT move the injured person unless it is absolutely necessary and they are in danger by remaining where they are. Keep the injured person warm and dry. Inform the site manager and head office. Name of On-Site First Aider: First Aid Facilities: First Aid Box Location: A first aid box is available within each of the company s vehicles. Location of Nearest Hospital: All plant, machinery, tools and equipment will be inspected on each occasion before it is used and in accordance with the manufacturers and statutory requirements. If any defects are identified, the equipment shall be taken out of use and replaced. Other Information & Comments: Wembley Windows (SC) Ltd are very aware of the potential health hazards presented by hand arm vibration (HAV) and whole body vibration (WBV), the use of tools such as angle grinders which can be responsible for HAV will therefore be limited to reduce the effects of HAV, a limit of 10 minutes (max.) will be placed on the usage of such tools for each individual. There must then be a break of at least 20 minutes before the tool, or another similar tool is used again. Page 7 of 9

The use of low vibration tools will be utilised where possible, only low vibration models will be purchased and when tools are being hired, consideration is to be given to lower vibration models. Other Information & Comments: As with vibration, low noise tools will be selected where appropriate, consideration has been given to the selection of appropriate tools in this method statement and quieter methods of working are selected where appropriate. All work will be undertaken by qualified competent persons with experience of the type of work described above, and in all cases in full accordance with the company s Health and Safety Policy. Reviewed by: Position: Works Supervisor Date: Page 8 of 9

Method Statement Briefing Record Briefing delivered by: Position: Date: We (the undersigned) have read and understood the attached method statement and will comply with the specified requirements and control measures. If the work activity changes or deviates from that originally envisaged, we will seek further advice and request an amended method statement. Name (Print) Signature Date Page 9 of 9