The Tomato Plant Company Ltd. Method Statement and Risk Assessment Loads requiring lifting
|
|
|
- Alison Shields
- 9 years ago
- Views:
Transcription
1 The Tomato Plant Company Ltd Method Statement and Risk Assessment Loads requiring lifting Generic method statement & risk assessment for the removal of portable accommodation units and/or shipping containers and/or other loads requiring lifting. N.B. This document is to be regarded as a generic assessment only; when available, site specific method statements and risk assessments will take precedence. Method Statement 1. Access and egress a. The work will commence on (date and time to be advised) when our vehicle driver/operator will arrive at site, report to site security and sign the visitor s book (if necessary) and then report to the client s designated site representative. b. In advance of our arrival on site, client s representative will ensure that no activities or obstructions hinder our lorry loader s ability to perform the removal of the load. 2. Site Induction a. Before the commencement of any work, our driver/operator will report to the client s responsible site representative for a full site induction. At this time the driver should be made aware of any rules and/or cautions relating to routes, hazards etc. to be observed whilst on site. b. The lorry loader driver/operator will produce all documents required to undertake a lifting operation: Copy of current method statement/risk assessment. 12 monthly certificate of inspection for lorry loader. 6 monthly certificate of examination for lifting accessories. Relevant CPCS/CSCS/ALLMI/IPAF cards/certificates. c. Nominated responsible person to undertake brief of method statement and risk assessment.
2 2. Site Induction (continued) d. If required driver/operator will request any relevant permits to work. e. All site personnel to wear all appropriate PPE at all times. 3. Lifting activity sequence of events a. Upon acceptance of method statement/risk assessment and issue of permit to lift, our driver/operator will proceed to the work area and set the vehicle up for the lift. b. When the load is an accommodation unit, driver/operator will make sure any loose furniture etc. is laid down on the floor to prevent damage to the unit whilst in transit. Any damage to the load is to be noted, and such note signed by the client s representative before removing the load from site. c. Lorry loader will be positioned in the nominated lifting area adjacent to the load. Should reversing be necessary, a banksman should assist the driver/operator. All unnecessary and/or unauthorised personnel will be cleared from the lift area. d. The driver/operator will set up the vehicle as per the manufacturer s instructions. Suitable supports will be placed under the outriggers where ground conditions dictate. It is the responsibility of the client to establish the presence of any adverse ground conditions and ensure that adequate preparation has been made to mitigate these before the lorry loader s arrival on site. e. The driver/operator will check the lifting gear over visually and then position the HIAB so as to attach o-ring of four chain brothers and inertia reel fall block to the HIAB hook. f. The operator will then connect the inertia reel to his safety harness (to be worn at all times). He will then raise the HIAB and position it over the load. He will then climb onto the load be means of a stabilised ladder and attach lifting hooks at each lifting point. He will then descend the ladder and disconnect the inertia reel. g. A guideline will be attached to the load to assist in controlling any tendency for it to swing.
3 3. Lifting activity sequence of events (continued) h. The HIAB hook will now be raised to take the weight of the load and ensure the lift is centered and stable. The load will then be slewed over the vehicle and lowered onto the vehicle load bed. i. Once the load is in position on the vehicle the operator will connect to the inertia reel, climb onto the load by means of a stabilised ladder and remove the lifting hooks from the lifting points. He will then descend the ladder and disconnect from the inertia reel. j. When the lift is complete the driver/operator will remove the four leg chain brothers and stow the HIAB in its correct position for driving away. k. The driver operator will secure the load as necessary and will be escorted or directed from the site. l. Client site representative is then responsible for clearing all rubbish left, if any, when the load has been removed. 4. Additional Notes Personnel attending site and position: The Tomato Plant Company Ltd Driver/operator Client and or Clients representative General Lifting Information : Maximum Load weight Driver to establish with clients representative before the lifting takes place. Safe Working Load Driver to ensure that the stabilisers and legs can be fully extended regardless of lift, pads are placed under legs. Legs are not to be supported over fresh trenches, manhole covers or over any power cables. Also make sure that the chains are at the correct angle to lift, to prevent unit from swinging when lifted.
4 4. Additional Notes (continued) Use of P.P.E. All personnel must wear the following PPE at all times as a minimum on site: Hard hats, steel toe cap boots, gloves, harness and lanyard whilst at heights (check that all test certificates are in date), high visibility vests or coats. Working at heights rescue plan. In the event that a person working at height and wearing a safety harness should fall and consequently be suspended at height the following rescue plan is to be followed. The following requirements need to be available and accessible before commencing work at height whilst protected by the wearing of a safety harness and lanyard. 1 x Ladder with Stabiliser 1x Person to act as rescuer. Rescue sequence: a) Rescuers to be alerted that their attendance is required. b) During operations, the Inertia Reel connecting the operative (via Safety Harness) to the Hiab/Crane will be above the persons head, therefore there will be no chance of a pendulum effect in the event that operative should slip off the side of the load. c) Consequently there should be no need to lower the Operative to ground by means of the Hiab/Crane based on that an inertia should not let them fall any more than 0.5m. d) One rescuer to place ladder and stabiliser immediately adjacent to suspended person so they can gain a foothold or arm hold on that ladder and perform a self-rescue.
5 4. Additional Notes (continued) Site welfare a) First aid Cover shall be provided by the Client. b) Toilets Tomato Plant personnel and/or sub contractors may require the use of any existing site facilities whilst at site. Pollution and waste. 1. In the event of an oil leak/spill from a lorry loader all lorry loaders will carry a spill kit and a drip tray to catch any residual oil. 2. Any waste generated by our activities will be collected and removed prior to our exiting the site.
6 EXAMPLE RISK ASSESSMENT Risk Calculation: Likelihood of harm x Severity of harm x Control rating Common occurrence = 5 Death = 5 No protection = x 1.00 Frequent occurrence = 4 Major injury = 4 Safe working practice = x 0.75 Occasional occurrence = 3 Notifiable injury = 3 Protection with PPE, SWP, training = x 0.50 Possible occurrence = 2 Minor injury = 2 Complete protection = x 0.25 Improbable occurrence = 1 Trivial injury = 1 Foolproof = x 0.00 Risk rating: 0-5 Satisfactory 6-15 Action necessary Immediate action mandatory N.B. If, following the application of controls, a risk rating greater than 5 exists then refer the assessment to the Health and Safety Manager for review of controls. Further controls should be instigated to reduce the risk rating. Risk Assessment Scope of works Uplift and removal of miscellaneous loads. Site location All sites. Persons exposed Tomato plant employees, client employees, potentially other site workers and the public including young persons.
7 N.B. Important: All Tomato Plant staff attending site must be made aware of any client health and safety risk assessments, regulations and/or emergency procedures that may apply to the site prior to the commencement of work. All operatives involved in the lifting operation are reminded of their responsibilities under Lifting Operations and Lifting Equipment Regulations 1998, BS 7121 Part 1 Safe Use of HIABS and BS 7121 Part 4 (Safe Use of HIABS) Lorry Loaders.
8 HEALTH & SAFETY RISK ASSESSMENT Factors of harm Risk HAZARD Likelihood Severity Multiple Likelihood x Control Residual Control IDENTIFIED of CONTROL MEASURES Severity See Rating Risk Multiple Measures Note 1 Note 1 Columns Note 1 See Note of Columns Implemented by 1&2 = column 3 1 5&6 (name) Lorry loader to have valid 12 monthly (lorry loader) and 6 monthly (lifting Lorry Loader tackle) certification. Lorry loader operator to produce CPCS trained and competent card. Access/Egress Lifting Operations Client to ensure that no vehicles or plant are placed to hinder access/egress of lorry loader at site entrance, site roadways and in the proximity of the lifting position. Driver to seek aid of competent banksman if required. Operator to set-up lorry loader as per manufacturer s instructions. Operator to undertake visual inspection of vehicle and Hiab arm to ensure no obvious signs of a defect prior to any lift. Operator to examine ground surface prior to lifting operation to ensure no obvious signs of soft ground or surface erosion. (Ground conditions are the clients responsibility). Lorry loader stabilisers must be fully extended. Operator to check for proximity hazards. Working at Height Site Personnel Interface Failure of Lorry Loader Slinging of Loads Follow method statement. Ladder to be in good order and inspected prior to use. Ladder to be stabilised or footed. Over reaching to be avoided. Persons to wear a safety harness c/w safety lanyard and shall clip on to inertia reel fall block if access to top of load required. Climbing on load should be avoided if possible. positioning ladder at each lifting point is preferred method. Site personnel not involved in the lifting operation should be controlled so that they do not encroach into the lifting radius. Client to cordon off working area or supervise the operational area for unauthorised encroachment. Lorry loader capacity to be as stated in agreed lift plan. All lorry loader lifts should be undertaken on level and secure ground. Loads to be properly slung, if possible using the integral lifting points on each load. Suitable PPE to be worn Hard Hats, Lace Up Safety Boots, High Vis, Gloves and Safety Eyewear
METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS
METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS CLIENT: Elliott Group CONTACT: Maurice Kennett SITE: Lympstone Church Ring School,
Method Statement. Risk Assessment
Method Statement Risk Assessment Client: Location: Page 1 of 6 Health and Safety Method Statement and Risk Assessment Customer & Address: Site Address: Description of Works: Method Statement: Risk Assessment:
MINIMUM DELIVERY, UNLOADING AND LOADING OF MATERIALS AND PLANT STANDARDS
MINIMUM DELIVERY, UNLOADING AND LOADING OF MATERIALS AND PLANT STANDARDS Scope: These standards shall apply to all delivery drivers not undertaking works other than those works directly involved with the
SG19:10 NASC. A Guide to Formulating a Rescue Plan. NOTE: Scaffolders who need to use a harness should never work alone. 1 of 8 1.
SG19:10 A Guide to Formulating a Rescue Plan 1. INTRODUCTION The legal requirement for rescue is specified in the Work at Height Regulations 2005 and require every employer in selecting work equipment
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION
ELECTRICAL CONTRACTOR RISK ASSESSMENT AND KEY CONTROL MEASURES CONTRACTOR NAME: AEC Automation Ltd. NAME OF CONTRACT: A: SIGNIFICANT RISKS Initial Risk Rating H/M/L Slips, trips and falls. Manual handling.
BSH Exhibition Sample Risk Assessment for exhibitors / contractors
BSH Exhibition Sample Risk Assessment for exhibitors / BSH Conferences Ltd have produced this risk assessment for its exhibitors to use as a template if they have not undertaken risk assessment before.
Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting
Good Practice Guide The Selection of Access Methods to Install and Dismantle Safety Netting FASET is the trade association for the safety net rigging and temporary safety systems industry. This document
WORKING AT HEIGHT GUIDELINES. Version II
WORKING AT HEIGHT GUIDELINES Version II 21 st September 2011 WORKING AT HEIGHT GUIDELINES EXECUTIVE SUMMARY Working at height is where an individual is carrying out work in any place in the course of obtaining
SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
Work at Height. John Frontczak Construction Manager Facilities Engineering. 2011 Chevron Corporation. All rights reserved.
Today Work at Height John Frontczak Construction Manager Facilities Engineering Agenda Definition and Requirements Fall Prevention Scaffolding Safety Fall Protection Fall-Arrest System Rescue Plan Training
Tremline Pty Ltd trading as The Hills Bark Blower
JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of
EMPLOYEE FALL PROTECTION
EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very
Procedural Guidance for Roof Access/Roof Work
University of Central Lancashire Safety, Health & Environment Section Procedural Guidance for Roof Access/Roof Work Document Number: FM/HSE 001 Revision Number: 2 Review Date: August 2005 Reviewed by:
PORT HEDLAND PORT AUTHORITY
PORT HEDLAND PORT AUTHORITY Working at Heights Procedure PR-OHS021 Document Users : All Contractors All Port Users Port Hedland Port Authority Position Responsible For Keeping Document Current : Safety
RISK ASSESSMENT & METHOD STATEMENT Example 2
RISK ASSESSMENT & METHOD STATEMENT Example 2 Customer Another Limited Site Any town House, Any town, A123 4ZX Contact Name(s) Andy Person Customer Order No. Example 2 No. of pages 14 Description of work
FALL PROTECTION PROGRAM
FALL PROTECTION PROGRAM Page 2 of 15 Table of Contents Applicability... 3 Overview... 3 Definitions... 3 Responsibilities... 5 Risk Assessment... 6 Risk Management... 7 Roof Access Procedure 10 Rescue
Revision Date Reviewed By Authorised By. A 31/01/14 R McKeen P FitzPatrick Review Date 31/01/15 Change Details No Change Task
Safe Working Procedure: TAT SWP 014 v1 Lifting and Placing Stanchions and stanchion bases Revision Date Reviewed By Authorised By A 31/01/14 R McKeen P FitzPatrick Review Date 31/01/15 Change Details No
SITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details
Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details
Names and Contact Numbers of Competent Rescuers Assigned to Job (Please print)
Emergency Plan For Rescue from Heights Department of Facilities Management Occupational Health and Safety Shop Performing Work Date Work Order No. Job Location Job Description Height of work platform /
Working at a height of two metres or more while carrying out general work activities or construction works
1. Working at Heights 2. Scope / Description of Job Working at a height of two metres or more while carrying out general work activities or construction works 3. Critical Safety Issues A fall from any
FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING
JOB NO: PROJECT: DATE: SWMS NO: SWMS 001.1 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: December 2015 MINIMUM PERSONAL PROTECTIVE
How To Prevent Accidents At Work
2 Preventing vehicle accidents Construction work is considered to be one of the most hazardous industrial activities in the EU. The rate of injury in the construction industry is higher than in other industries.
SLIPS, TRIPS AND FALLS POLICY
SLIPS, TRIPS AND FALLS POLICY First Issued Issue Version Purpose of issue/description of change Planned Review Date 2 Root cause analysis (RCA), RIDDOR August 2012 and inspection of communal areas referenced
Guidance on Lifting Operations in Construction When Using Excavators
Guidance on Lifting Operations in Construction When Using Excavators Working in Partnership 1. Introduction The use of excavators for lifting operations, particularly on construction sites, has become
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY Dumfries Timber Co. Ltd. is committed to comply with our legal duties in order to provide a safe and healthy working environment
GHD EPCM Standard operating procedure Working at height May 2013 v1
GHD EPCM Standard operating procedure Working at height May 2013 v1 Table of contents 1. Purpose 2. Scope 3. Duty of care 4. Lifesaving rules; An overview 5. Roles and responsibilities 4.1 Operating centre
SECTION 2 HAZARDOUS WORK. CLASSIC STANDARD 2.04 Working at Heights
SECTION 2 HAZARDOUS WORK CLASSIC STANDARD 2.04 Working at Heights 1 Purpose The purpose of this standard is to document Rio Tinto Aluminium Mining & Refining Weipa s requirements to minimise, and where
Route-setting and Maintenance Fall Protection Management
Route-setting and Maintenance Fall Protection Management Note: this plan is based on Alberta workplace regulations as of October, 2010. Not all jurisdictions have similar standards. Canadian Mountain and
WORK AT HEIGHT UNIT 4
WORK AT HEIGHT UNIT 4 WHAT IS WORKING AT HEIGHT? The Working At Height Regulations 2005 define working at height as:- Any work above or below ground level where a fall would result in personal injury.
Working at Height. Procedure
Procedure *All Forth Valley College Health, Safety and Welfare Procedures are covered under the overarching Health, Safety and Welfare Policy. Status: Date of version: Reviewed by: Author/Contact Person;
GET A GRIP TO AVOID INJURIES
GET A GRIP TO AVOID INJURIES What does GET A GRIP Mean? Using 3 Points of Contact Getting in and out of vehicles or heavy equipment When climbing up or down stairs (using the handrail) When using ladders
Programme-Based Engagement (ProBE) for Fall From Heights. Statistics
Programme-Based Engagement (ProBE) for Fall From Heights Statistics For the past ten years, falling from height has been the number one cause of death in workplaces in Singapore. It has accounted for 34%
Work at Height / Falling Objects
Introduction This information sheet gives employers and employees practical advice on work at height and falling objects and how to eliminate or reduce the risk of harm or damage occurring. It will assist
RESCUE PLAN FALL PROTECTION PROGRAM
RESCUE PLAN IMPORTANT: This document is intended to provide guidance only for developing site-specific rescue plans for working at heights. GLOBAL LEADER IN FALL PROTECTION RESCUE PLAN This document is
SITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
SAFE USE OF LIFTING EQUIPMENT
Golden Rule 6 Mechanical Lifting SAFE USE OF LIFTING EQUIPMENT Do not operate any lifting equipment unless It has been approved for use The lift has been assessed by a competent person The load has been
POTENTIAL HEALTH & SAFETY HAZARDS
Number: OH&S 18.27.1 Revision Date: 2014.01.28 Crane Safety Procedures 1. PURPOSE 1.1. These procedures provide the University requirements for the operation and management of overhead travelling cranes
Question and answer brief for the construction industry on the Work at Height Regulations 2005
Question and answer brief for the construction industry on the Work at Height Regulations 2005 Introduction This question and answer brief includes some of the key issues about the new Work at Height Regulations
Level 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
Golden Safety Rules booklet. No one gets hurt, no incidents
Golden Safety Rules booklet No one gets hurt, no incidents The Golden Safety Rules exist to keep you safe There s nothing more important than your safety and that of your workmates. That s why we ve adopted
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
Safety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.
STANDARDS Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.503 1.0 Purpose This document meets the requirements outlined
Generic Risk Assessment: Working on Roofs (FMRA 0006)
Generic Risk Assessment: Working on Roofs (FMRA 0006) Only staff and contractors who are Authorised by Facilities Management are allowed to access roof areas. Those who need access who are not Authorised
1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;
Fire Action Plan FIRE ACTION PLAN SEStran aims to provide and maintain safe & healthy working conditions, equipment and systems of work for all our employees, and to provide such information, training
Working at height. What is the risk? How can you manage it?
Working at height What is the risk? How can you manage it? Shell Chemicals Europe BV June 2011 1 DISCLAIMER This document is made available for information only and on the condition that (i) it may not
CHAPTER 10. FALL PROTECTION PROGRAM
CHAPTER 10. FALL PROTECTION PROGRAM 1000 GENERAL. This chapter establishes policy for developing fall protection programs to protect all Federal Aviation Administration (FAA) personnel working at elevated
There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
Appendix 6145-T1 Forklift Use Practices
Appendix 6145-T1 Operators must perform a preoperational inspection of the forklifts and attachments in accordance with the equipment operating manual. They will immediately report any equipment deficiencies
ERPP (17) FALL PROTECTION RESCUE INFORMATION AND PROCEDURES
ERPP (17) FALL PROTECTION RESCUE INFORMATION AND PROCEDURES FALL PROTECTION RESCUE REQUIREMENTS Always consult the work jurisdictions OHS Regulations/codes when developing fall protection plans, carrying
Health & Safety Policy For Locations Hosting Film Production Companies
Health & Safety Policy For Locations Hosting Film Production Companies Throughout this document, the location will be referred to as The Venue and the film production company as The Contractor. The following
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude
Walking/Work Surfaces Fall Protection Program
Reviewed: 10-2006 Walking/Work Surfaces Fall Protection Program It is the responsibility of all supervisors and/or administrators to implement this safety program. Their responsibility includes yearly,
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
Management of Lifting with Mobile Cranes
Management of Lifting with Mobile Cranes IOSH Eastern Branch 9 th December 2011 Tim Watson CPA Technical Consultant Topics Construction Plant-hire Association LOLER and Planning Lifting Operations Contract
Facilitator s Guide PREVENTING SLIPS TRIPS AND FALLS. Copyright - All Rights Reserved. Telephone (905) 631 6070 Facsimile (905) 631 8183
CANADA USA AUSTRALIA UNITED KINGDOM SINGAPORE Safetycare Inc. Telephone (905) 631 6070 Facsimile (905) 631 8183 Safetycare Inc. Telephone 1800 323 6638 Facsimile (905) 631 8183 Safetycare Australia Pty.
Total s Golden rules
Total s Golden rules Golden rule No. 10: Work at height A century ago Shocking, right? And yet it s still happening today Foreword The Group s activities all involve work at height, at varying frequencies.
WHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
Job Hazard/Safety Analysis For the Office Worker
Job Hazard/Safety Analysis For the Office Worker 1 INTRODUCTION Job Hazard/Safety Analysis for the Office Worker is a partial list of known task performed by the professional office worker. We have placed
Description of the Task/Activity: General door/window fitting/replacement. Start Date/Time: Site Address/ Location: Finish Date/Time:
Method Statement This method statement is to be read in conjunction with the attached risk assessments and the Wembley Windows (SC) Ltd Health and Safety Policy and Procedures Manual. Description of the
Fall Protection Guidelines
OCT 2015 1 of 6 Fall Protection Guidelines 1.0 PURPOSE To establish the requirements and procedures to protect employees and other persons conducting work from hazards associated with falling from one
School of Engineering University of Glasgow
School of Engineering University of Glasgow Electronics Workshops Rankine Building 319A (2 Technicians) 510 (1 Technician) 712A (4 Technicians, 1 Modern Apprentice) James Watt South 619 (2 Technicians)
Risk Assessment for visits by schools and other groups including children.
Perrygrove Railway Risk Assessment for visits by schools and other groups including children. Page 1 Risk Assessment for visits by schools and other groups including children. Introduction Perrygrove Railway
RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager
RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Working at Height above 2trs Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE:
The Royal Environmental Health Institute of Scotland
The Royal Environmental Health Institute of Scotland Introduction to Health and Safety Course Syllabus Minimum teaching time 3 hours The Royal Environmental Health Institute of Scotland is a registered
A Casebook of Fatal Accidents Related to Work-at-Height
A Casebook of Fatal Accidents Related to Work-at-Height Occupational Safety and Health Branch Labour Department Occupational Safety and Health Council This casebook is prepared by the Occupational Safety
Contractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
CATERING CONTRACTORS General Code of Safety Practice
Residential & Business Services Director s Office CATERING CONTRACTORS General Code of Safety Practice CONTENTS 1 Introduction 2 2 Commencement of Work 3 3 Vehicles 3 4 Temperature control 3 5 Food hygiene
This material was produced under grant number SH-17792-08-60-F-48 Occupational Safety and Health Administration, U.S. Department of Labor.
Big Four Construction Hazards: Fall Hazards This material was produced under grant number SH-17792-08-60-F-48 Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily
FALL PROTECTION PROGRAM RESCUE PLAN
GLOBAL LEADER IN FALL PROTECTION Capital Safety 95 Derby Street Silverwater, NSW 2128 Tel: 02 8753 7600 Fax: 02 8753 7603 FALL PROTECTION PROGRAM RESCUE PLAN IMPORTANT: This document is intended to provide
Direct Slips, Trips and Falls Policy
Direct Slips, Trips and Falls Policy Direct Slips, Trips and Falls Policy Version: 2.0 Ratified by: Date ratified: Name and Title of originator/author(s): Steve Duncan Estates & Facilities Manager Name
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
Guide to Fall Protection Regulations
Guide to Fall Protection Regulations Produced by: Workers Compensation Board of PEI PO Box 757 Charlottetown PE C1A 7L7 902-368-5697 or 1-800-237-5049 website: www.wcb.pe.ca Revised June 2013 Guide to
PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to June 9, 2012. It is intended for information and reference purposes only.
David Hicks Consultants Ltd Industrial Roofing & Cladding Consultants
28 Orwell Drive, Aylesbury, Bucks, HP21 9JN Office: 01296 719 775 Mobile: 07980 432 848 Roof Inspection Risk Assessment & Method Statement This document is prepared to cover any type of roof construction
Safe Driver. Information Sheet
Workplace Transport Safety Safe Driver Information Sheet To effectively control workplace transport risks, the vehicle, the driver and the working environment must be appropriately managed. This information
University Arms Hotel, Cambridge
Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN
STONEBRIDGE COMMUNITY FUNDAY
STONEBRIDGE COMMUNITY FUNDAY General Assessment Activity assessed: Planning and Delivery of the Stonebridge Community Funday Location: Name of assessor: A Smith Date of assessment: 21 May 2014 Version
Slip, Trip and Fall Prevention Manual
Slip, Trip and Fall Prevention Manual S B e S. A. F. E. State of Wisconsin Produced in partnership with the Bureau of State Risk Management and the UW System Slip, Trip and Fall injuries continue each
Guidance to Prevent Slips, Trips & Falls
Guidance to Prevent Slips, Trips & Falls Published June 2005 CONTENTS 1. Scope of this guidance 2. New plant/ installations 3. Maintenance 4. Housekeeping 1. Scope of this guidance Slips, trips and falls
Moving and Handling Techniques
Moving and Handling Techniques Introduction Manual handling involves any activity that requires the use of force exerted by a person to lift, lower, push, pull, carry or otherwise move or hold an object.
FIRE RISK ASSESSMENT SW13 0HA
FIRE RISK ASSESSMENT at Carmichael Court Grove Road London SW13 0HA ON BEHALF OF Farrar Property Management Date of assessment: 14/01/2013 Recommended review date: January 2015 CONTENTS 1.0 INTRODUCTION
RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager
RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Gantry Crane Operation Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE:
Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.
SWP (6) FALL PROTECTION PROGRAM The following information on Fall Protection has been based around the BC OHS Regulations, standards, policies and guidelines. Prior to starting work outside of BC, the
Preventing Falls, Slips and Trips
Preventing Falls, Slips and Trips Falls/Slips/Trips (FSTs) You take hundreds of steps every day, but how many of those steps do you take seriously? Please take a few minutes to understand how Falls/Slips/Trips
68 Metal Industry Guidelines for Safe Work
3 68 Metal Industry Guidelines for Safe Work section 3 high-risk 3 activities Metal Industry Guidelines for Safe Work 69 section 3 high risk activities 3.1 working at heights Falls from heights have been
Standard Operating Procedure for Handling an Inanimate Load
Standard Operating Procedure for Handling an Inanimate Load Moving and handling an inanimate load/s is a key part of the working day for most employees. Moving inanimate loads can take place in many different
Pollution Incident Response Management Plan (PIRMP)
Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:
This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.
UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract
Tool Box Talk. Forklift Operations
Tool Box Talk Forklift Operations Treat them with respect 40k for H40, 62k for H70 Mercedes CL, Jaguar Daimler or XKR, Porsche Carrera 4S 40k, same price as H40 treat them the same! 62k, same price as
Fact Sheet: Slips, trips and falls
Fact Sheet: Slips, trips and falls Slips, Trips & Falls Slips, Trips and Falls are one of the highest causes of workplace injuries. They include those, which occur on the same level as a result of uneven
RZ Guardrail System Installation Manual
TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand
Procedure. Working at Heights. 1. Purpose. 2. Scope. 3. Definitions. 4. Planning. 4.1. QUT risk check. 4.2. Work at Height permit
Procedure Working at Heights 1. Purpose The purpose of this procedure is to establish compliance requirements and specify precautions to be taken during the conduct of work at height within QUT to prevent
Sample Fall Rescue Plan for Bridge Work
This document is intended to provide guidance for developing fall rescue plans for bridge contractors. The Occupational Safety and Health Administration s (OSHA) regulation 29 CFR 1926.502(d)(20) states:
Construction Employers Federation. A Best Practice Guide to Preventing Slips, Trips and Falls
Construction Employers Federation A Best Practice Guide to Preventing Slips, Trips and Falls FOREWORD Some of you may be surprised to know that slips and trips are one of the most common causes of serious