New Employee / Applicant - Information Pack (Includes: Driver Back round Release Form, Skills & Tools Assessment
|
|
|
- Marvin Cannon
- 10 years ago
- Views:
Transcription
1 New Employee / Applicant - Information Pack (Includes: Driver Back round Release Form, Skills & Tools Assessment Included are the following: Personal information form Driver Back round Check Authorization form (required for any position that the employee would drive a company owned vehicle) Field Employee Skills & Tools Assessment form Please fill them out and with a copy of your resume to [email protected] They can also be faxed to NOTE: Please note Attention Recruiting on your fax cover sheet PIECE MANAGEMENT, INC. Tri-State/NYC Metro: 117 South Second Street New Hyde Park, New York (516) (516) Fax South Jersey/Philadelphia: 8015 Route130 South Delran, New Jersey (609) (609) Fax DC Metro: 3420 Gough Drive Unit #6 Gough Industrial Park Waldorf, MD (301) (301) Fax New England: 230 Ballardvale Street #A Wilmington, Massachusetts (978) (978) Fax
2 Page 1 of 6
3 Page 2 of 6
4 Skills & Tools Assessment This survey is to help us evaluate your skill level with various tasks that you may be performing for PMI. A comprehensive understanding of your experience makes it easier to place you in a position that benefits us both. Please indicate the number of years of experience and rating for all that apply. No knowledge or experience with this skill. Rating Chart Basic knowledge of this skill but little field experience. Good knowledge of this skill with a fair amount of field experience. Better knowledge of this skill than most with vast field experience. Know most aspects of this skill and perform task with minimal support. Know all aspects of this skill and can perform task with no support. Skill Years Experience Rating Comments General framing Wood framing (residential) Steel framing (commercial) Sheetrock Taping and spackling Trim carpentry Cabinet making Cabinet installation/repair Countertop installation Laminate work (cabinetry) Commercial laminate work (FRP, Koroguard, Stainless Steel, etc.) Door installation/repair Page 3 of 6
5 Skill Door hardware installation/repair (Alarm/panic hardware, continuous hinges, etc.) Years Experience Rating Comments Window installation/repair Wood flooring (Wilson, Pergo, etc.) Carpet installation/repair VCT installation Tile work (Residential bath, kitchen) Tile work (Commercial kitchen) Acoustical ceiling installation Roofing (Residential) Roofing (Commercial) Concrete forming Concrete repair Demolition (Jackhammer, saw cut, etc.) Asbestos abatement Trenching (Plumbing and electrical) Painting (Interior, exterior) Wall paper/coverings Blueprint reading Site layout Rough electric (Residential) Page 4 of 6
6 Skill Years Experience Rating Comments Rough electric (Commercial) Electrical fixture installation Plumbing (Residential) Plumbing (Commercial) Do you have a general knowledge of ADA compliance and regulations? Do you have any experience with commercial kitchen maintenance or renovations (Boston Market, Taco Bell, etc.)? Do you have any experience with commercial renovations (Bloomingdale s, Starbucks, Pizzeria Uno, etc.)? Do you have any knowledge of both commercial and residential fire codes? Do you have any experience leading a crew? Yes Do you have all associated tools for skills rated good or better? Are you opposed to night work? Are you opposed to out of state stays? Do you aspire to be in management or an executive position? No Page 5 of 6
7 Essential Tools Equipment Check All That You Have Safety Glasses Angle Grinder Steel Toe Shoes Caulk Gun Respirator (uses replacement filters) Spackle Tools Ear Plugs / Protection Work Lights Gloves (appropreate to the function) Pliers/Vice Grips Knee Pads Nail Set/Punch Screwdrivers Squares Tape Measure Pry Bar/Flat Bar Adjustable Wrenches Utility Knife Levels (assortment) Chalk Line Hammers & Mallets Extension Cords With GFI Plug Laser Level Circular Saw Hand Saws Hammer Drill/Power Drill/Screw Gun(Cordless) Chisels Drill Bit Set Bakers Rolling Cart Hole Saw Kit Wet/Dry Shop Vac Compressor set w/ Nailguns "C" Clamps Saw-Zall Metal Snips / Shears Chop Saw Staple gun Electric Sanders (palm, disk, belt) Ratchet Set Mixing Paddles Heat Gun Tiling Tools (Trowels, nips etc) CONSTRUCTION EQUIPMENT BASIC CARPENTRY TOOLS PLUMBING TOOLS Metal Break Basic Pipe Wrenches Table saw PVC Kit Ladders Soldering kit / Flux & Heat Shield Concrete Mixer Pipe Clamps Level Compactor Plumbing Snake Band Saw Smoke Test equipment Drill Press Line Camera Planer ELECTRICAL TOOLS Panel Lift Wire cutters Stilts Conduit benders Jack Hammer Circuit testers Tile Grid Wire Pull Snap Cutter Electricians Screwdrivers Wet Saw Punch / Knock Out Kit Scaffold Grounded Footwear Generator Electricians Gloves Work Vehicle, Container, Trailer, Other Page 6 of 6
IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL
IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL Check out our Affordable Selection of DIY Pole Barn kit sizes and prices below. We offer a complete DIY pole barn kit plus independent experienced
FACILITY ACCREDITATION CHECKLIST #001 APPRENTICESHIP. Rating Code: Y = Yes * N = No * R = Required * AUDIT AREA: DATE: / / HAND TOOLS Y N R
FACILITY ACCREDITATION CHECKLIST #001 APPRENTICESHIP Designated Trade: Level 1 2 3 4 Institution: Evaluator(s) / / Rating Code: Y = Yes * N = No * R = Required * * Please use a CHECKMARK under the appropriate
FRAME DOOR OPENING, DOOR AND SIDE PANEL OUTER
NUBIRA/LACETTI FRAME DOOR OPENING, DOOR AND SIDE PANEL OUTER 6 1 SECTION 6 FRAME DOOR OPENING, DOOR AND SIDE PANEL OUTER CONTENTS 1. FRAME DOOR OPENING........................................... 6 2 1.1.GENERAL
Brick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version
CEILING SYSTEMS Between us, ideas become reality Installing Suspended Ceilings North America Version 1 Installing Armstrong Suspended Ceilings An Armstrong suspended mineral fiber ceiling is functional,
HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY
HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard
COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)
COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE
BILL OF QUANTITIES Part No.: Part Description
Page 1 of 5 A. REMOVAL OF STRUCTURES 801 Demolition of Existing Structure lot 1 in words in words B. MASONRY WORKS 506(1)a Masonry Units (CHB) sq.m. 58.80 in words in words C. FABRICATED MATERIALS & HARDWARE
Electrical Wiring Technical Bulletin
Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will
ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services
818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services Remove and replace in their
Installing Window and Door Mouldings
Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces
EQUIPMENT LIST. Your. www.1rentaldepot.com Hours Monday Friday 7:00 a.m. 5:00 p.m. Saturday 8:00 a.m. 12:00 noon. Partner in the Planning
www.1rentaldepot.com Hours Monday Friday 7:00 a.m. 5:00 p.m. Saturday 8:00 a.m. 12:00 noon Saint Petersburg 4895 34 th Street North (727) 528-1588 EQUIPMENT LIST Your Partner in the Planning for all Your
Premier & Deluxe 3-Season Room Sliding Glass Door
DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen
ABC-CMEF Craft Training Program CORE Audit Checklist
ABC-CMEF Craft Training Program CORE Audit Checklist Training Unit: Teacher: Auditor: Date: This audit should not be construed as a "safety" audit. The audit team reviewing the facility is charged with
APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE 899.381-010 O*NET CODE 49-9042.00
APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE 899.381-010 O*NET CODE 49-9042.00 This training outline is the current standard for Work Processes and Related Instruction. Changes in technology, regulations,
How to Install GoBoard:
How to Install GoBoard: A Step-by-Step Guide Durable, Ultra-Lightweight, Waterproof Tile Backer Board Introducing GoBoard Every tiling project requires a durable, waterproof surface under the tile, called
Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.
Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal
How To Level A Subfloor
Skill Level: INTERMEDIATE Give these projects a try if you're a confident DIYer with a good working knowledge of a variety of tools. They can take a day or more to complete. If you can build a birdhouse
Building Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product
IMPROVEMENT COST ESTIMATE powered by HomeFixers
IMPROVEMENT COST ESTIMATE powered by HomeFixers 123 Main St, Anytown, USA 12345 2000 SF $ 45,041.06 100.0% $22.52 per sq. ft. Stage 1: Pre-Construction $ 1,461.00 3.2% 1 House Secured $ 106.00 0.2% Lockbox
Installation Directions for RubberForm Recycled Products Spill Berms
Installation Directions for RubberForm Recycled Products Spill Berms 1. Tools Needed: a. Broom, mop, vacuum and cleaning solutions (green floor cleaner) If available, a Power-washer with hose if available
DEMOLITION Photocopy this profile and distribute it as widely as possible!
Musculoskeletal hazards and controls DEMOLITION Photocopy this profile and distribute it as widely as possible! Musculoskeletal disorders (MSDs), such as chronic back pain or shoulder problems, often take
Basement Window Installation Guide Hopper and Sliding
Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant
Bathroom Installation Guide
Bathroom Installation Guide Step-by-step installation of your cabinets We do a lot of groundwork to make it as simple as possible for you to assemble and install your new bathroom furniture yourself. We
HOW TO INSTALL A BEAUTIFUL NEW KITCHEN
HOW TO INSTALL A BEAUTIFUL NEW KITCHEN Easy to follow step-by-step kitchen cabinet installation TOOL AND MATERIAL LIST Hammer Pry bar Screwdriver Phillips Flathead Level Tape measure Pencil Straight edge
Inspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com [email protected]
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
DE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
BILL WHYTE FLOORCOVERINGS LTD UNIT 5 KINGS COURT KING ST LEYLAND LANCS PR269RL. Tel: 01772 432120 METHOD STATEMENT
BILL WHYTE FLOORCOVERINGS LTD UNIT 5 KINGS COURT KING ST LEYLAND LANCS PR269RL Tel: 01772 432120 METHOD STATEMENT Prepared For The Main Activities / Operations Performed By The Employees Of Bill Whyte
Asbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
CONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
Asbestos Management Program
Asbestos Management Program Facilities and Operations Revision #4: February 17, 2012 Page IMPORTANT Asbestos related incidents must be reported IMMEDIATELY to your supervisor Emergency Contacts During
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
The Carriage Homes at Woodland Pond Phase III & IV
The Carriage Homes at Woodland Pond Phase III & IV Phase I & II (completed 2009) Phase III & IV (completed Summer 2012) The Carriage Homes are one of five distinctive condominium communities that comprise
SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010
Best Barns USA Assembly Book Revised November 29, 2010 SAMPLE INSTRUCTIONS the Denver 12'x 12' or 12'x16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775
Audio Visual Equipment Projector Screen 50"x50" Projector, Lcd 2700 Lumens. Automotive Items Socket Set, 3/4" Automotive Tow Dolly, 2
COMPLETE OUTDOOR EQUIPMENT Rental Item List Air Tools and Equipment Air Compressor, Ac1-8gr Gas Air Compressor, Mi - T - M 115 V Air Compressor, A C 1-5 E, 4.1cfm Air Compressor, cfm tow behind Air Hose
Acumen Enterprises, Inc.
Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter
Physical Demands Analysis
Alberta Construction Safety Association Physical Demands Analysis Physical Demands Analysis Residential Electrician Development Partners Occupation VIDEO CLIP Residential Electrician VIDEO CLIP Acknowledgement
Installation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
MGB Chrome Bumper Conversion
MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through
KITCHEN INSTALLATION GUIDE
KITCHEN INSTALLATION GUIDE The step-by-step guide to installing your new kitchen right The materials and tools you ll need This brochure is your guide to preparing and installing your new kitchen. Inside
Chapter 9: INSTALLING ROOFING
9.1 LEAK BARRIER (ICE AND WATER SHIELD) 9.2 SHINGLE UNDERLAYMENT 9.3 INSTALLING GUTTER APRON AND GABLE D-EDGE 9.4 INSTALLING SHINGLES 9.5 RIDGE VENT AND CAP Tools needed by each volunteer: Hammer (16 oz.
OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent
Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Scope for Irvinton Village Unit #512 Overall Scope: Demolition, Renovation, and
AUTOMOTIVE SERVICE TECHNOLOGY BASIC TOOL LIST
AUTOMOTIVE SERVICE TECHNOLOGY BASIC TOOL LIST All automotive students are required to provide their own hand tool set. The following list of tools will serve as a guide for Automotive Service Technology
Repair and Remodeling Estimating Methods. 4th Edition. RSMeans
Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling
Best Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
Tennessee 07/01/14. Contracting Class Codes with Descriptions 50-6-901(8)
Contracting s with s * NCCI Basic Manual: "The Governing ification" at a specific job or location is the classification, other 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY OPERATION-BY CONTRACTOR-&
REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES
REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel
RODENT PROOFING CHECKLIST
RODENT PROOFING CHECKLIST The most important part of a rodent control job is a thorough inspection of the problem areas/building. Since we warranty the control of rodents with our standard pest control
ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL
PARTITIONS REGULAR WALLS 9' HIGH 214 LF TENANT DEMISING WALL 150 LF INTERIOR FURRED WALLS 9' 86 LF OFFICE DEMISING WALL 98 LF DOUBLE FRAME RADIUS WALL 18 LF RADIUS SOFFITS 172 LF SOFFIT 76 LF FINISH NEW
JOB READY ASSESSMENT BLUEPRINT PAINTING AND DECORATING. Test Code: 2060 Version: 01
JOB READY ASSESSMENT BLUEPRINT PAINTING AND DECORATING Test Code: 2060 Version: 01 Specific Competencies and Skills Tested in this Assessment: Wood Finishes Identify thinning products Identify wood finish
BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013
The following guide is a general list of Builders Mutual s appetite for business classes residential and commercial WorkSafe workers compensation and Builders Best general liability (including trade contractors),
Beautiful kitchens and bathrooms to meet your budget! KITCHEN REMODELING BATHROOM REMODELING COUNTERTOPS AND MORE!
Beautiful kitchens and bathrooms to meet your budget! KITCHEN REMODELING BATHROOM REMODELING COUNTERTOPS AND MORE! QUALITY CABINETRY CUSTOM DESIGN PROFESSIONAL INSTALLATION SINCE 1989 WOW! DON T YOU DESERVE
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
MRI RF SHIELDING DESIGN
MRI RF SHIELDING DESIGN Nelco s MRI RF Shielding is specifically designed for the MRI industry. Our engineers have developed a shielded enclosure made entirely of nonmagnetic materials that is unsurpassed
May 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240
May 23, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Demolition Asbestos Survey Report 6150 Farrell Street, Marysville, California 95901
Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B
Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you
Gramercy Place Condo Association, Inc.
Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is
SUMMARY OF WORK FOR GENERAL CONTRACTOR
SUMMARY OF WORK FOR GENERAL CONTRACTOR 1. General scope of work A. The work at 163 Seabrook consists of: 1. Finish the kitchen and 1 st floor hallway area 2. Finish 1 st floor bathroom and laundry area
CONDITION OF QUALITY ITEMS
CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
Module 7. Plumber: Sink Installation
Module 7 Plumber: Sink Installation 138 The picture below shows a sample sink installation station. 139 Module 7 Plumber: Sink Installation Module Overview This module will involve the proper setup and
Installing Window Trim and Door Trim
Installing Window Trim and Door Trim Tools and Supplies You'll Need Screws or Finish Nails use screws or nails that are long enough to go through the Ledger and firmly attach to the wall behind it. If
DUROCK Brand Cement Board. installation guide. Substrate and ceramic tile installation for walls, floors, countertops and wall shields.
DUROCK Brand Cement Board installation guide Substrate and ceramic tile installation for walls, floors, countertops and wall shields. DUROCK Brand Cement Board... Strength beneath the surface A ceramic
QUOTATION FOR EXAMPLE BATHROOM RENOVATION
QUOTATION FOR EXAMPLE BATHROOM RENOVATION Prepared For: PEGASUS Client 99 Washington St Melrose, MA 02176 Quotation valid for 90 from: 12/21/10 PEGASUS Design-To-Build is pleased to have the opportunity
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders
All-Season Sunroom Sliding Glass Door Installation Instructions
ASRESGD-08 All-Season Sunroom Sliding Glass Door Installation Instructions Panel Frame Door Frame Left Side Foam Insulator IE241 H Bar Assembly Door Frame Top Track Panel Frame Door Frame Right Side Stationary
Installation Guide for Andersen Architectural Wood Inswing Entry Doors
Installation Guide for Andersen Architectural Wood Inswing Entry Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are
Your Basement Remodeling Specialist LLC
Your Basement Remodeling Specialist LLC Contents Introduction 3 Remodel Details 4 Basement Bid Scope 5 Financial Arrangements 6 Homeowners Shopping Guide 7 The following is provided with your actual quote:
Installation Instructions
Installation Instructions Built-In Dishwasher If you have questions, call 1-800-4-MY-HOME (1-800-469-4663) or visit our website at: www.sears.com BEFORE YOU BEGIN Read these instructions completely and
Customer Service 800.780.8889 or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips
reflect your style TM Customer Service 800.780.8889 or visit us online at smithnoble.com Wood Shutters Step by Step Installation Troubleshooting Tips Easy Care Instructions STEP 1 Your New Shutter Thank
Autobody/Collision and Repair Technology/Technician CIP 47.0603 Task Grid
1 Secondary Task List 100 ORIENTATION 101 Identify opportunities in the auto body field. 102 Identify basic auto body construction. 103 Identify program rules and policies. 104 Identify government agencies
Lesson Plans for Module 00101-15
Lesson Plans for Module 00101-15 Basic Safety (Construction Site Safety Orientation) Module One (00101-15) explains the importance of safety in the construction and industrial crafts. Trainees will learn
Installation of Rear View Camera in a 1995 Roadtrek 190 Popular
Installation Instructions: 1995 Roadtrek Rear View Camera Page 1 Installation of Rear View Camera in a 1995 Roadtrek 190 Popular Introduction. In the fall of 2010 we investigated rear view cameras for
NATIONAL DIPLOMA IN ARCHITECTURAL TECHNOLOGY
PROGRAMME: COURSE NAME: NATIONAL DIPLOMA IN ARCHITECTURAL TECHNOLOGY SITE MANAGEMENT COURSE CODE: BLD 206 DURATION: 0 3 3 UNITS: 3 UNITS GOAL: GENERAL OBJECTIVES: On completion of this module the trainee
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual
0 P a g e H.264 Color or Day/Night SurroundVideo Installation Manual Inside the box: A. Arecont Vision SurroundVideo camera B. Mounting template C. RJ45 female to female coupler D. Hex key E. Security
Renovation instructions
1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following
Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015
Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access
Cascade Remodeling Inc. PO Box 25687 Portland, OR 97298 Catalyzing Euphoria Phone (503) 297-2055, FAX (503) 297-0579 CCB # 67007
SPECIFICATIONS For Sample Customer SCOPE OF WORK: The contractor will provide labor and/or materials for the work as outlined in the estimate and the following specification. The contractor s estimate
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS
PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
2. This is a close up of a typical area where the rocker is rusted out leaving holes under where the rocker moulding would be..
ROCKER PANELS 55,56,57 CHEVY REPLACEMENT Do not throw away any pieces when you first remove them. There are many supports that are not reproduced and will need to be used again. When disassembling try
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No.
Charles H. Cross III, AIA, NCARB, LEED AP Charles Cross Architecture, PC Renovations for a New 18 Bed Gero-Psych Nursing Unit Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum
INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
Cabinetry Installation
Cabinetry Installation INTALLATION EQUIPMENT #8 x 2 1 2 screws #8 x 2 1 2 washer head screws Variable speed drill, electric or cordless Extension cord Countersink drill bit Drill bits, 3/16 and 1/4 Assorted
